NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams...

21
NHS Highland Stuart Caldwell

Transcript of NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams...

Page 1: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

NHS HighlandStuart Caldwell

Page 2: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Our Kaizen Programme

• 6 week programme in June 2008• 3 Work streams

– New patient referral– Re-referral– Depot

• MDT teams - everyone involved ~17 staff

Page 3: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

What we did…

Value mapped processes to identify• Bottlenecks, duplication and constraints• Waste – non-value work• Information flow & understanding• KPI’s

Page 4: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -
Page 5: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Tools we used

• Process flow analysis• Value stream mapping• 5 S• 8 Wastes• Mistake Proofing (Poka Yoke)• PDSA• Root Cause analysis

– 5 Why– Fishbone

Page 6: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Soon and Routine Scheduling not Working

Plate Numbers issued by Admin Team

Excess Inventory (chairs) the Depot

Quality of information on Referral Forms poor

Assessment of chairs not conducted timely

Sub optimal use of database

Cushions not controlled correctly

Depot condition very poor, 5S, Layout etc.

Status against 8 major concerns identified by the Team

New date priority system running

Plate Numbers issued by Depot

Inventory (chairs) reduced by 43%

New referral form to be implemented

Assessment of chairs conducted on arrival

Current actions will only address 20% of inaccuracy

Process now in operation

New layout and processes to maintain implemented

Page 7: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Workshop Conditions before and after 5S

Page 8: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Stores Changes and Control.

Before

After

Page 9: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Stores Changes and Control.

Well organised

stores area (easy to

control and find parts.

Page 10: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Reclaimed Materials

Examples of parts that used to be

scrapped off.

Page 11: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

New Area for Reclaimed Materials

Old area (poor utilisation of space)

New area (better utilisation of space)

Page 12: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

New Process for Reclaimed Materials

Page 13: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Results Summary

• Improved Service Performance

•Scheduling system eliminates the need for individuals to make prioritising decisions.

• Scheduling system will provide the team with accurate data which will keep patients informed.

•Time savings for Admin team gives extra capacity and reduces pressure on team.

• Calculated process lead time reduction (from activities implemented) is 8 working days.

• K.P.I.s will allow the department to understand current condition and prioritise future activities and improvements.

• Stock reduction of 40% saves wasted resource and gives cost saving.

• Removal of hired storage container returns a cost saving.

• Structure and procedures in the depot will generate productivity savings.

• Control of reclaimed parts will save money and increase accuracy of database .

Page 14: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Legacy•Improved Service Performance

•Cost reduction

•Training in basic lean tools will help team continue with improvement activities•K.P.Is enable:-- Problems to be located, understood and rectified quicklyProblems to be located, understood and rectified quickly Visualisation of all the Key Performance Indicators in one location Management are able to prioritise & plan resources to optimum effect, thereby reducing waste & reducing costs With effective controls, a large number of management issues can be handled simultaneously

•Meeting structure will provide: Clarity for senior management team (policy deployment, new initiatives etc) Direction to teams within the Wheelchair Service. A process for continual improvement A ‘vehicle’ for good communication. Process for all employees to escalate concerns and constraints.•Improved teamwork

•Improved Morale

Page 15: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Other Major Improvement Opportunities

Top 2 concerns that must be addressed

Page 16: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Future Activities? / Areas of Concern

Page 17: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Strengths

•Structure to processes (defining, definitions, rules)• Thinking about process from end to end•Open and straight forward talking• Passion in employees•Autonomy given to the correct departments and people• Support for top management team• 6 week timing (time to assess and gather data.• Introduction into the new tools and techniques• New process will make the decisions and prioritise

Weaknesses

•Time / Availability of Team•Pressure on individuals•Initial Attitude (people with baggage)•Backlog of work created at depot•Service understanding of programme

SWOT Analysis of Programme

Page 18: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Opportunities

•Timing good to help redefine the business case•Right person doing the right job•Expands and develops peoples roles•Setting targets for the future•Robust governance and performance management•Tools will help service development•Applies lean methodology in a structured approach

Threats

•Agenda to Change (demarcation, and working round ideal solution.• Project management•If people short cut the processes•Backlog of work masking the improvements initially•Succession Planning (Lack of)

SWOT Analysis of Programme

Page 19: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Learning Points

•Better Availability Planning

•Better Understanding of the Process & Expectations

•Baggage Drop

•Cross-Functional Teams Work

•The 6 Weeks worked for the wheelchair service

•Tools & Techniques are Transferable

Page 20: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Staff Comments

• Opportunity to be heard

• Good for morale• An opportunity to

change things• Been a

good/positive experience

• Been suggesting all this for years

• Interfered with workload – built up a backlog

• Still need a new build with more space & better working environment

Page 21: NHS Highland Stuart Caldwell. Our Kaizen Programme 6 week programme in June 2008 3 Work streams –New patient referral –Re-referral –Depot MDT teams -

Ongoing Work

• Database processes and usage • Competence development and job role

expansion • Inventory and reclaimed parts • Referral information accuracy • Developing standard operating