General Revision- IV CSR - 2005 Page 1 / 778 Rate Analysis Summary ( Construction) District (02) Attock CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE 101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36 102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.14 102.44 0.88 27.12 135.58 102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.07 258.13 1.97 68.79 343.96 102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 60.28 1,032.53 7.89 275.18 1,375.88 103 STRIPPING CM 1.74 59.42 - 15.29 76.45 104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48 106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.75 86.79 - 22.39 111.93 106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 85.73 193.76 46.20 81.42 407.11 EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.29 214.84 - 56.78 283.91 EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.04 167.12 - 43.79 218.95 106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.25 78.63 - 20.22 101.10 106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 85.73 193.76 46.20 81.42 407.11 EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.63 199.88 - 53.38 266.89 EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.19 167.24 - 43.36 216.79 107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.70 89.04 0.31 23.51 117.56 107 b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL CM 44.17 165.86 53.31 65.84 329.18 107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.73 258.51 30.80 91.26 456.30 STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 64.62 193.04 - 64.42 322.08 STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.95 160.37 - 49.83 249.15 107 d GRANULAR BACK FILL CM 24.19 83.07 267.85 93.78 468.89 107 e COMMON BACK FILL CM 18.71 37.31 4.13 15.04 75.19 108 a FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL CM 4.74 106.71 4.13 28.90 144.48 108 bi FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL CM 14.13 302.97 48.81 91.48 457.39 FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL CM 10.60 268.11 1.96 70.17 350.84 FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL CM 9.42 238.60 - 62.01 310.03 108 c FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL CM 5.52 112.14 6.81 31.12 155.59 108 d FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.27 46.31 4.13 13.68 68.39 108 e CM 10.18 73.87 2.45 21.63 108.13 109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.95 16.84 1.18 4.74 23.71 109 bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL SM 0.68 10.31 0.63 2.91 14.53 110 IMPROVED SUB-GRADE CM 6.93 75.50 55.21 34.41 172.05 114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.58 9.38 0.64 2.65 13.25 114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.87 9.92 0.74 2.88 14.41 201 GRANULAR SUB-BASE CM 5.57 106.91 344.35 114.21 571.04 National Highway Authority Islamabad Quantity Surveying & Estimation Specialist, NHA 106 bii 106 biii 106 dii 106 diii 107 cii 107 ciii 108 bii 108 biii FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

Transcript of Nha Csr Punjab - 2005

Page 1: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 1 / 244

Rate Analysis Summary ( Construction)District (02) Attock

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.14 102.44 0.88 27.12 135.58

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.07 258.13 1.97 68.79 343.96

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 60.28 1,032.53 7.89 275.18 1,375.88

103 STRIPPING CM 1.74 59.42 - 15.29 76.45

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.75 86.79 - 22.39 111.93

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 85.73 193.76 46.20 81.42 407.11

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.29 214.84 - 56.78 283.91

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.04 167.12 - 43.79 218.95

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.25 78.63 - 20.22 101.10

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 85.73 193.76 46.20 81.42 407.11

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.63 199.88 - 53.38 266.89

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.19 167.24 - 43.36 216.79

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.70 89.04 0.31 23.51 117.56

107 b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL CM 44.17 165.86 53.31 65.84 329.18

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.73 258.51 30.80 91.26 456.30

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 64.62 193.04 - 64.42 322.08

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.95 160.37 - 49.83 249.15

107 d GRANULAR BACK FILL CM 24.19 83.07 267.85 93.78 468.89

107 e COMMON BACK FILL CM 18.71 37.31 4.13 15.04 75.19

108 a FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL CM 4.74 106.71 4.13 28.90 144.48

108 bi CM 14.13 302.97 48.81 91.48 457.39

108 bii CM 10.60 268.11 1.96 70.17 350.84

108 biii CM 9.42 238.60 - 62.01 310.03

108 c FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL CM 5.52 112.14 6.81 31.12 155.59

108 d CM 4.27 46.31 4.13 13.68 68.39

108 e CM 10.18 73.87 2.45 21.63 108.13

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.95 16.84 1.18 4.74 23.71

109 bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL SM 0.68 10.31 0.63 2.91 14.53

110 IMPROVED SUB-GRADE CM 6.93 75.50 55.21 34.41 172.05

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

Page 2: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 2 / 244

Rate Analysis Summary ( Construction)District (02) Attock

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.58 9.38 0.64 2.65 13.25

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.87 9.92 0.74 2.88 14.41

201 GRANULAR SUB-BASE CM 5.57 106.91 344.35 114.21 571.04

202 AGGREGATE BASE CM 6.37 132.11 483.45 155.48 777.41

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 53.64 916.98 3,240.29 1,052.73 5,263.64

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 55.36 916.98 3,479.95 1,113.07 5,565.36

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 59.20 957.74 3,234.86 1,062.95 5,314.75

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 59.20 954.75 3,561.74 1,143.92 5,719.61

204 b CEMENT STABILIZED BASE CM 19.84 272.73 525.74 204.58 1,022.89

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 164.86 568.44 21,715.80 5,612.28 28,061.38

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 164.86 568.44 22,602.83 5,834.03 29,170.16

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 72.01 55.65 512.14 159.95 799.75

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 107.09 1,408.67 2,944.26 1,115.01 5,575.03

206 b WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B CM 79.99 66.68 402.70 137.34 686.71

207 a DEEP PATCHING (0-15 cm) SM 1.18 30.14 1.02 8.09 40.43

207 b DEEP PATCHING (16-30 cm) SM 1.18 26.47 1.02 7.17 35.84

208 REINSTATEMENT OF ROAD SURFACE SM 1.25 37.00 0.45 9.68 48.38

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.34 70.82 0.55 18.18 90.89

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.72 5.65 28.24

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.72 5.65 28.24

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.58 2.48 12.38

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.04 2.34 11.70

304 a SINGLE SURFACE TREATMENT SM 0.52 4.16 42.16 11.71 58.55

304 b DOUBLE SURFACE TREATMENT SM 0.76 8.06 80.10 22.23 111.15

304 c TRIPLE SURFACE TREATMENT SM 1.27 11.08 95.28 26.91 134.54

304 d SEAL COAT SM 0.48 2.33 23.92 6.68 33.41

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 49.81 906.07 3,809.46 1,191.34 5,956.68

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 49.81 876.73 4,107.20 1,258.44 6,292.18

307 a DENSE GRADED HOT BIT-MAC CM 122.51 171.48 2,969.24 815.81 4,079.04

307 b OPEN GRADED HOT BIT-MAC CM 122.51 171.48 2,896.73 797.68 3,988.40

Page 3: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 3 / 244

Rate Analysis Summary ( Construction)District (02) Attock

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 20.68 456.95 904.60 345.56 1,727.79

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 146.95 465.97 23,791.50 6,101.11 30,505.53

309 a COLD MILLING, 0 - 30 mm SM 0.65 16.87 7.54 6.27 31.33

309 b COLD MILLING, 0 - 50 mm SM 1.08 28.11 12.57 10.44 52.20

309 c COLD MILLING, 0 - 70 mm SM 1.63 42.16 18.85 15.66 78.30

401 ai CONCRETE CLASS "A3" (Underground) CM 362.21 643.62 2,969.71 993.89 4,969.43

401 aii CONCRETE CLASS "A3" (On ground) CM 362.21 643.62 3,178.61 1,046.11 5,230.55

401 aiii CONCRETE CLASS "A3" (Elevated) CM 362.21 643.62 3,387.51 1,098.34 5,491.68

401 b CONCRETE CLASS "B" CM 472.49 407.09 2,230.60 777.55 3,887.73

401 ci CONCRETE CLASS "C" (Underground) CM 362.12 258.76 2,643.36 816.06 4,080.30

401 cii CONCRETE CLASS "C" (On ground) CM 362.12 258.76 2,732.45 838.33 4,191.66

401 ciii CONCRETE CLASS "C" (Elevated) CM 362.12 258.76 2,910.64 882.88 4,414.40

401 d CONCRETE CLASS "D1" CM 563.63 810.64 3,841.15 1,303.86 6,519.28

401 e CONCRETE CLASS "Y" CM 794.90 258.76 3,257.66 1,077.83 5,389.15

401 f LEAN CONCRETE CM 319.81 252.12 1,777.95 587.47 2,937.35

401 gi PRECAST CONCRETE CLASS "A" CM 1,246.16 468.57 3,751.06 1,366.45 6,832.24

401 gii PRECAST CONCRETE CLASS "B" CM 1,246.16 468.57 3,389.25 1,276.00 6,379.98

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,081.48 - 42,572.95 10,913.61 54,568.04

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,081.48 - 44,672.95 11,438.61 57,193.04

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 892.74 2,335.68 37,856.95 10,271.34 51,356.71

405 a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT TON 1,974.00 6,882.66 80,757.49 22,403.54 112,017.69

405 b LAUNCHING OF GIRDER TON 46.72 403.69 - 112.60 563.01

406 a PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL SM 81.58 - 189.66 67.81 339.05

406 b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL SM 81.58 - 198.37 69.99 349.94

406 c STEEL EXPANSION JOINTS KG 6.70 11.61 61.72 20.01 100.04

406 d WATER STOPS 6" SIZE M 66.94 - 310.31 94.31 471.56

406 e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS) ccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 28.83 - 1,412.55 360.35 1,801.73

406 g STEEL OR METAL BEARING DEVICES KG 14.73 30.66 81.99 31.85 159.23

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL M 251.05 847.08 561.98 415.03 2,075.14

407 d2 M 376.57 1,270.62 842.97 622.54 3,112.70 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

Page 4: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 4 / 244

Rate Analysis Summary ( Construction)District (02) Attock

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL M 376.57 1,270.62 647.61 573.70 2,868.50

407 d4 M 627.62 2,117.70 804.35 887.42 4,437.09

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL M 537.96 1,815.17 748.37 775.38 3,876.88

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL M 941.43 3,176.55 1,051.84 1,292.46 6,462.28

407 h PILE LOAD TEST UP TO 120 TON EACH 16,232.16 19,990.40 70,987.00 26,802.39 134,011.95

407 i PILE LOAD TEST UP TO 240 TON EACH 33,045.12 19,990.40 141,974.00 48,752.38 243,761.90

407 j PILE LOAD TEST UP TO 360 TON EACH 49,316.16 19,990.40 212,961.00 70,566.89 352,834.45

407 k CONFIRMATORY BORING (NX SIZE) M 151.42 826.61 5.16 245.80 1,228.99

410 BRICK WORK CM 235.76 142.50 1,963.25 585.38 2,926.89

411 a STONE MASONRY RANDOM DRY CM 248.36 56.01 424.51 182.22 911.10

411 b STONE MASONRY RANDOM WITH MORTAR CM 297.54 84.89 1,145.94 382.09 1,910.46

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 343.40 56.01 473.02 218.11 1,090.54

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 389.26 84.89 1,199.98 418.53 2,092.66

411 g ROLL POINTING SM 50.07 5.78 45.67 25.38 126.90

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 519.30 134.30 1,128.60 445.55 2,227.75

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 170.66 230.36 365.55 191.64 958.21

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 167.11 297.19 470.73 233.76 1,168.79

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 160.15 514.83 580.63 313.90 1,569.51

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 169.46 639.81 870.68 419.99 2,099.94

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 195.15 704.13 1,175.72 518.75 2,593.75

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 240.60 868.93 1,772.27 720.45 3,602.25

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 311.36 961.94 2,217.62 872.73 4,363.65

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 367.96 1,168.07 3,095.80 1,157.96 5,789.79

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 434.54 1,362.74 4,693.40 1,622.67 8,113.35

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 170.66 263.77 386.81 205.31 1,026.55

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 167.11 297.19 503.53 241.96 1,209.79

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 156.21 514.83 606.87 319.48 1,597.39

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 169.46 639.81 930.39 434.92 2,174.58

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 195.15 704.13 1,641.80 635.27 3,176.35

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 240.60 868.93 2,234.75 836.07 4,180.35

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 311.36 961.94 2,847.38 1,030.17 5,150.85

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

Page 5: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 5 / 244

Rate Analysis Summary ( Construction)District (02) Attock

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 367.96 1,168.07 3,721.77 1,314.45 6,572.25

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 434.54 1,362.74 5,125.49 1,730.69 8,653.46

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 65.84 68.08 258.36 98.07 490.35

502 b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT CM 532.58 309.47 2,282.82 781.22 3,906.09

507 a STEEL WIRE MESH FOR GABIONS KG 3.76 - 75.81 19.89 99.46

507 b ROCK FILL IN GABIONS CM 72.79 - 315.00 96.95 484.74

508 a BRICK PAVING (SINGLE COURSE) SM 80.09 15.80 152.26 62.04 310.19

508 b BRICK PAVING (DOUBLE COURSE) SM 143.45 15.80 302.19 115.36 576.80

509 a RIP RAP CLASS "A" CM 343.83 - 353.14 174.24 871.21

509 b RIP RAP CLASS "B" CM 332.76 - 350.31 170.77 853.84

509 c RIP RAP CLASS "C" CM 334.82 - 353.14 171.99 859.95

509 d GROUTED RIP RAP CLASS "A" CM 387.43 35.09 1,278.95 425.37 2,126.84

509 e GROUTED RIP RAP CLASS "B" CM 373.66 28.07 1,180.34 395.52 1,977.59

509 f GROUTED RIP RAP CLASS "C" CM 369.43 23.39 1,199.31 398.03 1,990.16

509 g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT) CM 572.55 181.56 2,647.63 850.44 4,252.18

509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.46 115.89 268.10 105.11 525.56

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 79.18 194.57 - 68.44 342.19

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 108.35 35.01 57.39 50.19 250.94

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 138.69 44.81 73.45 64.24 321.19

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 175.38 91.01 230.58 124.24 621.21

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 219.22 113.77 288.23 155.31 776.53

603 BRICK EDGING M 6.38 - 24.00 7.60 37.98

605 a CONCRETE BEAM GUARDRAIL M 55.41 14.67 415.46 121.39 606.93

605 c CONCRETE POST FOR GUARDRAIL M 68.04 13.10 410.38 122.88 614.40

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 172.63 128.42 4,667.99 1,242.26 6,211.30

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 50.14 192.63 6,828.04 1,767.70 8,838.51

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 172.63 272.87 8,432.27 2,219.44 11,097.21

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 584.87 304.65 15,508.53 4,099.51 20,497.56

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 116.97 60.93 7,006.18 1,796.02 8,980.10

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.65 318.37 1,591.86

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,544.47 447.08 2,235.39

Page 6: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 6 / 244

Rate Analysis Summary ( Construction)District (02) Attock

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH M 1.85 2.85 15.38 5.02 25.10

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH M 0.62 1.27 30.30 8.05 40.24

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH M 1.85 2.85 20.53 6.31 31.54

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH M 0.62 1.27 40.41 10.58 52.88

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS EACH 50.24 - 148.64 49.72 248.60

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS EACH 50.24 - 381.84 108.02 540.10

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH M 2.31 3.56 21.40 6.82 34.09

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH M 2.31 4.75 51.71 14.69 73.46

608 i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH M 2.31 3.56 28.53 8.60 43.00

608 i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH M 2.31 4.75 68.95 19.00 95.01

608 j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS EACH 50.24 - 206.60 64.21 321.05

608 j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS EACH 50.24 - 652.07 175.58 877.89

608 n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP EACH 41.73 - 99.09 35.21 176.03

608 n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP EACH 41.73 - 254.95 74.17 370.85

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 41.73 - 137.73 44.87 224.33

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 41.73 - 435.37 119.28 596.38

609 c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE) EACH 6.50 46.68 167.54 55.18 275.90

609 d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE) EACH 6.50 46.68 202.54 63.93 319.65

610 b RIGHT OF WAY MARKER EACH 78.36 60.88 204.01 85.81 429.06

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 461.81 476.40 1,363.38 575.40 2,876.99

610 d TEN KILOMETRE POST EACH 895.27 952.79 2,977.77 1,206.46 6,032.29

Page 7: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 7 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.46 6.96 - 1.86 9.28

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.53 102.44 0.88 26.96 134.81

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.19 258.13 1.97 68.32 341.61

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 52.74 1,032.53 7.89 273.29 1,366.45

103 STRIPPING CM 1.53 59.42 - 15.24 76.19

104 COMPACTION OF NATURAL GROUND SM 0.22 5.92 0.62 1.69 8.45

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.54 86.79 - 22.33 111.66

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 76.72 193.76 46.20 79.17 395.85

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.87 214.84 - 56.43 282.14

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.13 167.12 - 43.56 217.81

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.08 78.63 - 20.18 100.89

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 76.72 193.76 46.20 79.17 395.85

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.22 199.88 - 53.03 265.13

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.47 167.24 - 43.18 215.89

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.26 89.04 0.31 23.40 117.01

107 bCM 38.79 165.86 53.31 64.49 322.45

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 67.88 258.51 30.80 89.30 446.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 57.80 193.04 - 62.71 313.55

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 34.91 160.37 - 48.82 244.10

107 d GRANULAR BACK FILL CM 21.41 83.07 324.04 107.13 535.65

107 e COMMON BACK FILL CM 16.26 37.31 4.13 14.43 72.13

108 aCM 4.24 106.71 4.13 28.77 143.85

108 biCM 12.52 302.97 48.81 91.08 455.38

108 biiCM 9.39 268.11 1.96 69.87 349.33

108 biiiCM 8.35 238.60 - 61.74 308.69

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

Page 8: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 8 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 cCM 4.90 112.14 6.81 30.96 154.81

108 dCM 3.79 46.31 4.13 13.56 67.79

108 eCM 8.99 73.87 2.45 21.33 106.64

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.85 16.84 1.18 4.72 23.59

109 biSM 0.61 10.31 0.63 2.89 14.44

110 IMPROVED SUB-GRADE CM 6.16 75.50 50.19 32.96 164.81

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.52 9.38 0.64 2.64 13.18

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.77 9.92 0.74 2.86 14.29

201 GRANULAR SUB-BASE CM 4.96 106.91 542.45 163.58 817.90

202 AGGREGATE BASE CM 5.75 132.11 681.92 204.95 1,024.73

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.01 916.98 3,549.31 1,128.33 5,641.63

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.60 916.98 3,774.92 1,185.13 5,925.63

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 51.94 957.74 3,543.83 1,138.38 5,691.89

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 51.94 954.75 3,856.68 1,215.84 6,079.21

204 b CEMENT STABILIZED BASE CM 17.80 272.73 831.27 280.45 1,402.25

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 147.22 568.44 22,378.80 5,773.62 28,868.08

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 147.22 568.44 23,297.33 6,003.25 30,016.24

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.18 55.65 722.37 210.05 1,050.25

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 94.60 1,408.67 3,237.94 1,185.30 5,926.51

206 bCM 69.04 66.68 619.49 188.80 944.01

207 a DEEP PATCHING (0-15 cm) SM 1.05 30.14 1.02 8.05 40.26

207 b DEEP PATCHING (16-30 cm) SM 1.05 26.47 1.02 7.14 35.68

208 REINSTATEMENT OF ROAD SURFACE SM 1.12 37.00 0.45 9.64 48.21

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.21 70.82 0.55 18.15 90.73

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63 18.14

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.39 5.81 29.05

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 9: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 9 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.39 5.81 29.05

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.84 2.54 12.69

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.32 2.41 12.04

304 a SINGLE SURFACE TREATMENT SM 0.47 4.16 44.93 12.39 61.95

304 b DOUBLE SURFACE TREATMENT SM 0.69 8.06 86.58 23.83 119.16

304 c TRIPLE SURFACE TREATMENT SM 1.15 11.08 103.87 29.03 145.13

304 d SEAL COAT SM 0.44 2.33 25.23 7.00 35.00

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 43.90 906.07 4,121.43 1,267.85 6,339.25

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 43.90 876.73 4,439.92 1,340.14 6,700.69

307 a DENSE GRADED HOT BIT-MAC CM 107.62 171.48 3,257.26 884.09 4,420.45

307 b OPEN GRADED HOT BIT-MAC CM 107.62 171.48 3,172.12 862.81 4,314.03

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.24 456.95 958.35 358.39 1,791.93

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 130.59 465.97 24,454.50 6,262.77 31,313.83

309 a COLD MILLING, 0 - 30 mm SM 0.59 16.87 7.54 6.25 31.25

309 b COLD MILLING, 0 - 50 mm SM 0.98 28.11 12.57 10.42 52.08

309 c COLD MILLING, 0 - 70 mm SM 1.47 42.16 18.85 15.62 78.10

401 ai CONCRETE CLASS "A3" (Underground) CM 316.28 643.62 3,294.01 1,063.48 5,317.39

401 aii CONCRETE CLASS "A3" (On ground) CM 316.28 643.62 3,502.91 1,115.70 5,578.51

401 aiii CONCRETE CLASS "A3" (Elevated) CM 316.28 643.62 3,920.71 1,220.15 6,100.76

401 b CONCRETE CLASS "B" CM 414.70 407.09 2,533.86 838.91 4,194.56

401 ci CONCRETE CLASS "C" (Underground) CM 313.89 258.76 2,992.91 891.39 4,456.95

401 cii CONCRETE CLASS "C" (On ground) CM 313.89 258.76 3,082.01 913.67 4,568.33

401 ciii CONCRETE CLASS "C" (Elevated) CM 313.89 258.76 3,260.20 958.21 4,791.06

401 d CONCRETE CLASS "D1" CM 488.52 810.64 4,152.65 1,362.95 6,814.76

401 e CONCRETE CLASS "Y" CM 685.24 258.76 3,571.93 1,128.98 5,644.91

401 f LEAN CONCRETE CM 276.78 252.12 2,074.09 650.75 3,253.74

Page 10: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 10 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,075.73 468.57 4,104.40 1,412.18 7,060.88

401 gii PRECAST CONCRETE CLASS "B" CM 1,075.73 468.57 3,709.80 1,313.53 6,567.63

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 941.33 - 42,777.07 10,929.60 54,648.00

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 941.33 - 44,877.07 11,454.60 57,273.00

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 793.65 2,335.68 37,251.97 10,095.33 50,476.63

405 aTON 1,895.98 6,882.66 80,761.84 22,385.12 111,925.60

405 b LAUNCHING OF GIRDER TON 45.10 403.69 - 112.20 560.99

406 aSM 70.63 - 188.18 64.70 323.51

406 b SM 70.63 - 197.44 67.02 335.09

406 c STEEL EXPANSION JOINTS KG 5.95 11.61 60.89 19.61 98.06

406 d WATER STOPS 6" SIZE M 57.89 - 309.01 91.73 458.63

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 25.03 - 1,412.70 359.43 1,797.16

406 g STEEL OR METAL BEARING DEVICES KG 13.30 30.66 81.24 31.30 156.50

407 d1M 243.12 847.08 626.75 429.24 2,146.19

407 d2M 364.68 1,270.62 940.12 643.86 3,219.28

407 d3M 364.68 1,270.62 710.39 586.42 2,932.11

407 d4M 607.81 2,117.70 863.14 897.16 4,485.81

407 d5M 520.98 1,815.17 808.59 786.19 3,930.93

407 d6M 911.71 3,176.55 1,114.25 1,300.63 6,503.14

407 h PILE LOAD TEST UP TO 120 TON EACH 14,037.18 19,990.40 69,433.80 25,865.35 129,326.73

407 i PILE LOAD TEST UP TO 240 TON EACH 28,492.38 19,990.40 138,867.60 46,837.60 234,187.98

407 j PILE LOAD TEST UP TO 360 TON EACH 42,383.58 19,990.40 208,301.40 67,668.85 338,344.23

407 k CONFIRMATORY BORING (NX SIZE) M 139.40 826.61 5.16 242.79 1,213.96

410 BRICK WORK CM 202.88 142.50 2,094.87 610.06 3,050.31

411 a STONE MASONRY RANDOM DRY CM 213.88 56.01 563.58 208.37 1,041.84

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 11: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 11 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 256.04 84.89 1,385.28 431.55 2,157.76

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 295.34 56.01 622.61 243.49 1,217.45

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 334.64 84.89 1,427.03 461.64 2,308.20

411 g ROLL POINTING SM 42.96 5.78 47.44 24.05 120.23

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 446.10 134.30 1,355.65 484.01 2,420.06

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 147.52 230.36 368.89 186.69 933.46

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 144.23 297.19 474.73 229.04 1,145.19

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 138.90 514.83 585.24 309.74 1,548.71

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 146.73 639.81 876.10 415.66 2,078.30

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 169.44 704.13 1,181.14 513.68 2,568.39

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 209.39 868.93 1,780.16 714.62 3,573.10

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 270.97 961.94 2,225.59 864.63 4,323.13

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 320.35 1,168.07 3,105.47 1,148.47 5,742.36

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 378.25 1,362.74 4,704.68 1,611.42 8,057.09

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 147.52 263.77 392.90 201.05 1,005.24

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 144.23 297.19 507.53 237.24 1,186.19

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 135.53 514.83 611.48 315.46 1,577.30

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 146.73 639.81 934.58 430.28 2,151.40

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 169.44 704.13 1,647.95 630.38 3,151.90

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 209.39 868.93 2,242.64 830.24 4,151.20

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 270.97 961.94 2,855.35 1,022.07 5,110.33

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 320.35 1,168.07 3,731.43 1,304.96 6,524.81

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 378.25 1,362.74 5,136.77 1,719.44 8,597.20

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 57.44 68.08 237.18 90.68 453.38

502 bCM 465.47 309.47 2,587.19 840.53 4,202.66

507 a STEEL WIRE MESH FOR GABIONS KG 3.30 - 77.80 20.28 101.38

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 12: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 12 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.05 - 493.62 139.17 695.84

508 a BRICK PAVING (SINGLE COURSE) SM 69.00 15.80 157.02 60.46 302.28

508 b BRICK PAVING (DOUBLE COURSE) SM 123.30 15.80 311.90 112.75 563.75

509 a RIP RAP CLASS "A" CM 296.09 - 492.20 197.07 985.36

509 b RIP RAP CLASS "B" CM 286.31 - 488.26 193.64 968.21

509 c RIP RAP CLASS "C" CM 287.90 - 492.20 195.03 975.13

509 d GROUTED RIP RAP CLASS "A" CM 326.65 35.09 1,544.32 476.52 2,382.58

509 e GROUTED RIP RAP CLASS "B" CM 314.79 28.07 1,431.36 443.56 2,217.78

509 f GROUTED RIP RAP CLASS "C" CM 310.93 23.39 1,458.66 448.25 2,241.23

509 gCM 494.23 181.56 2,947.03 905.71 4,528.53

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.63 115.89 323.84 117.84 589.20

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 73.16 194.57 - 66.93 334.66

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 93.50 35.01 79.98 52.12 260.61

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 119.68 44.81 102.38 66.72 333.59

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 151.12 91.01 266.76 127.22 636.11

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 188.90 113.77 333.45 159.03 795.15

603 BRICK EDGING M 5.51 - 24.96 7.62 38.09

605 a CONCRETE BEAM GUARDRAIL M 47.70 14.67 429.22 122.90 614.49

605 c CONCRETE POST FOR GUARDRAIL M 58.57 13.10 427.07 124.69 623.43

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 149.65 128.42 4,691.95 1,242.51 6,212.53

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 42.98 192.63 6,882.88 1,779.62 8,898.11

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 149.65 272.87 8,526.26 2,237.20 11,185.98

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 503.78 304.65 15,647.23 4,113.92 20,569.58

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 100.76 60.93 7,031.17 1,798.22 8,991.08

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.82 318.17 1,590.83

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,543.23 446.77 2,233.84

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 13: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 13 / 244

Rate Analysis Summary ( Construction)District (04) Bahawalnagar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.58 2.85 15.39 4.96 24.78

608 b2M 0.53 1.27 30.39 8.05 40.24

608 c1M 1.58 2.85 20.54 6.24 31.21

608 c2M 0.53 1.27 40.53 10.58 52.91

608 d1EACH 42.99 - 148.74 47.93 239.66

608 d2EACH 42.99 - 382.97 106.49 532.45

608 h1M 1.98 3.56 21.41 6.74 33.69

608 h2M 1.98 4.75 51.71 14.61 73.05

608 i1M 1.98 3.56 28.54 8.52 42.60

608 i2M 1.98 4.75 68.95 18.92 94.60

608 j1EACH 42.99 - 206.70 62.42 312.11

608 j2EACH 42.99 - 652.07 173.77 868.83

608 n1 EACH 35.70 - 99.16 33.72 168.58

608 n2 EACH 35.70 - 255.70 72.85 364.25

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 35.70 - 137.80 43.38 216.88

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 35.70 - 435.37 117.77 588.84

609 cEACH 5.57 46.68 167.70 54.99 274.94

609 dEACH 5.57 46.68 202.70 63.74 318.69

610 b RIGHT OF WAY MARKER EACH 67.50 60.88 217.88 86.57 432.83

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 397.83 476.40 1,474.68 587.23 2,936.14

610 d TEN KILOMETRE POST EACH 771.35 952.79 3,206.07 1,232.55 6,162.76

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 14: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 14 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.54 6.96 - 1.88 9.38

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.31 102.44 0.88 27.16 135.79

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.45 258.13 1.97 68.89 344.44

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 61.79 1,032.53 7.89 275.55 1,377.76

103 STRIPPING CM 1.78 59.42 - 15.30 76.50

104 COMPACTION OF NATURAL GROUND SM 0.25 5.92 0.62 1.70 8.49

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.01 86.79 - 22.45 112.25

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 90.03 193.76 46.20 82.50 412.49

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.68 214.84 - 56.88 284.40

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.30 167.12 - 43.86 219.28

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.46 78.63 - 20.27 101.36

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 90.03 193.76 46.20 82.50 412.49

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 14.35 199.88 - 53.56 267.79

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.38 167.24 - 43.41 217.03

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.97 89.04 0.31 23.58 117.90

107 bCM 43.77 165.86 53.31 65.74 328.68

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 79.73 258.51 30.80 92.26 461.30

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 67.86 193.04 - 65.23 326.13

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 41.00 160.37 - 50.34 251.71

107 d GRANULAR BACK FILL CM 25.15 83.07 359.89 117.03 585.14

107 e COMMON BACK FILL CM 19.02 37.31 4.13 15.12 75.58

108 aCM 4.95 106.71 4.13 28.95 144.74

108 biCM 14.63 302.97 48.81 91.60 458.01

108 biiCM 10.97 268.11 1.96 70.26 351.30

108 biiiCM 9.75 238.60 - 62.09 310.44

108 cCM 5.72 112.14 6.81 31.17 155.84

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 15: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 15 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.42 46.31 4.13 13.72 68.58

108 eCM 10.48 73.87 2.45 21.70 108.50

109 a SUB GRADE PREPARATION IN EARTH CUT SM 1.00 16.84 1.18 4.76 23.78

109 biSM 0.71 10.31 0.63 2.91 14.56

110 IMPROVED SUB-GRADE CM 7.21 75.50 52.04 33.69 168.44

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.60 9.38 0.64 2.66 13.28

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.89 9.92 0.74 2.89 14.44

201 GRANULAR SUB-BASE CM 5.80 106.91 527.08 159.95 799.74

202 AGGREGATE BASE CM 6.79 132.11 639.97 194.72 973.59

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 55.01 916.98 3,510.09 1,120.52 5,602.60

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 56.89 916.98 3,736.73 1,177.65 5,888.25

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 60.71 957.74 3,504.75 1,130.80 5,654.00

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 60.71 954.75 3,818.86 1,208.58 6,042.90

204 b CEMENT STABILIZED BASE CM 20.97 272.73 782.52 269.06 1,345.28

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 171.65 568.44 22,480.80 5,805.22 29,026.11

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 171.65 568.44 21,660.72 5,600.20 28,001.01

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 72.55 55.65 677.92 201.53 1,007.65

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 110.67 1,408.67 3,188.73 1,177.02 5,885.09

206 bCM 80.62 66.68 581.59 182.22 911.11

207 a DEEP PATCHING (0-15 cm) SM 1.22 30.14 1.02 8.10 40.48

207 b DEEP PATCHING (16-30 cm) SM 1.22 26.47 1.02 7.18 35.89

208 REINSTATEMENT OF ROAD SURFACE SM 1.32 37.00 0.45 9.69 48.46

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.40 70.82 0.55 18.19 90.96

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.28 14.16 0.11 3.64 18.19

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.21 0.67 22.49 5.84 29.21

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 16: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 16 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.21 0.67 22.49 5.84 29.21

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.99 2.58 12.90

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.66 2.25 11.24

304 a SINGLE SURFACE TREATMENT SM 0.55 4.16 43.61 12.08 60.40

304 b DOUBLE SURFACE TREATMENT SM 0.81 8.06 82.92 22.95 114.74

304 c TRIPLE SURFACE TREATMENT SM 1.35 11.08 99.22 27.91 139.56

304 d SEAL COAT SM 0.51 2.33 25.10 6.99 34.93

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 51.41 906.07 4,087.30 1,261.20 6,305.98

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 51.41 876.73 4,405.35 1,333.37 6,666.86

307 a DENSE GRADED HOT BIT-MAC CM 126.18 171.48 3,229.28 881.74 4,408.68

307 b OPEN GRADED HOT BIT-MAC CM 126.18 171.48 3,139.20 859.22 4,296.08

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.41 456.95 927.29 351.41 1,757.06

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 151.94 465.97 24,454.50 6,268.10 31,340.51

309 a COLD MILLING, 0 - 30 mm SM 0.69 16.87 7.54 6.28 31.38

309 b COLD MILLING, 0 - 50 mm SM 1.15 28.11 12.57 10.46 52.29

309 c COLD MILLING, 0 - 70 mm SM 1.73 42.16 18.85 15.69 78.43

401 ai CONCRETE CLASS "A3" (Underground) CM 346.96 643.62 3,268.87 1,064.86 5,324.31

401 aii CONCRETE CLASS "A3" (On ground) CM 346.96 643.62 3,477.78 1,117.09 5,585.45

401 aiii CONCRETE CLASS "A3" (Elevated) CM 346.96 643.62 3,895.58 1,221.54 6,107.70

401 b CONCRETE CLASS "B" CM 468.80 407.09 2,498.37 843.57 4,217.83

401 ci CONCRETE CLASS "C" (Underground) CM 345.51 258.76 2,956.53 890.20 4,451.00

401 cii CONCRETE CLASS "C" (On ground) CM 345.51 258.76 3,045.62 912.47 4,562.36

401 ciii CONCRETE CLASS "C" (Elevated) CM 345.51 258.76 3,223.82 957.02 4,785.11

401 d CONCRETE CLASS "D1" CM 526.75 810.64 4,136.61 1,368.50 6,842.50

401 e CONCRETE CLASS "Y" CM 736.24 258.76 3,553.13 1,137.03 5,685.16

401 f LEAN CONCRETE CM 314.93 252.12 2,035.50 650.64 3,253.19

Page 17: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 17 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,186.97 468.57 4,076.05 1,432.90 7,164.49

401 gii PRECAST CONCRETE CLASS "B" CM 1,186.97 468.57 3,671.43 1,331.74 6,658.71

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,017.25 - 42,784.42 10,950.42 54,752.09

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,017.25 - 44,884.42 11,475.42 57,377.09

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 834.90 2,335.68 38,008.48 10,294.77 51,473.83

405 aTON 2,059.03 6,882.66 80,761.88 22,425.89 112,129.46

405 b LAUNCHING OF GIRDER TON 48.51 403.69 - 113.05 565.25

406 aSM 77.94 - 182.63 65.14 325.71

406 b SM 77.94 - 199.77 69.43 347.14

406 c STEEL EXPANSION JOINTS KG 6.23 11.61 61.89 19.93 99.66

406 d WATER STOPS 6" SIZE M 63.44 - 307.69 92.78 463.91

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.20 - 1,412.93 360.03 1,800.16

406 g STEEL OR METAL BEARING DEVICES KG 14.51 30.66 82.16 31.83 159.16

407 d1M 258.33 847.08 562.83 417.06 2,085.30

407 d2M 387.49 1,270.62 844.25 625.59 3,127.95

407 d3M 387.49 1,270.62 648.89 576.75 2,883.75

407 d4M 645.82 2,117.70 806.48 892.50 4,462.50

407 d5M 553.56 1,815.17 750.19 779.73 3,898.65

407 d6M 968.73 3,176.55 1,055.03 1,300.08 6,500.39

407 h PILE LOAD TEST UP TO 120 TON EACH 16,407.96 19,990.40 74,094.28 27,623.16 138,115.80

407 i PILE LOAD TEST UP TO 240 TON EACH 33,108.84 19,990.40 148,188.56 50,321.95 251,609.75

407 j PILE LOAD TEST UP TO 360 TON EACH 49,491.96 19,990.40 222,282.84 72,941.30 364,706.50

407 k CONFIRMATORY BORING (NX SIZE) M 153.76 826.61 5.16 246.38 1,231.91

410 BRICK WORK CM 219.88 142.50 2,090.79 613.29 3,066.46

411 a STONE MASONRY RANDOM DRY CM 234.15 56.01 647.13 234.32 1,171.61

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 18: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 18 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 281.23 84.89 1,463.04 457.29 2,286.45

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 322.88 56.01 713.44 273.08 1,365.41

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 364.53 84.89 1,514.41 490.96 2,454.79

411 g ROLL POINTING SM 45.93 5.78 47.39 24.78 123.88

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 488.26 134.30 1,443.04 516.40 2,582.00

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 170.10 230.36 368.79 192.31 961.56

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 166.20 297.19 474.60 234.50 1,172.49

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 159.95 514.83 585.08 314.97 1,574.83

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 169.28 639.81 875.92 421.25 2,106.26

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 195.94 704.13 1,180.96 520.26 2,601.29

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 241.84 868.93 1,779.92 722.67 3,613.36

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 312.97 961.94 2,225.40 875.08 4,375.39

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 371.41 1,168.07 3,105.24 1,161.18 5,805.90

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 436.81 1,362.74 4,704.41 1,625.99 8,129.95

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 170.10 263.77 392.47 206.59 1,032.93

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 166.20 297.19 507.40 242.70 1,213.49

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 156.01 514.83 611.32 320.54 1,602.70

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 169.28 639.81 934.43 435.88 2,179.40

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 195.94 704.13 1,647.80 636.97 3,184.84

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 241.84 868.93 2,242.40 838.29 4,191.46

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 312.97 961.94 2,855.16 1,032.52 5,162.59

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 371.41 1,168.07 3,731.20 1,317.67 6,588.35

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 436.81 1,362.74 5,136.50 1,734.01 8,670.06

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 67.11 68.08 300.73 108.98 544.90

502 bCM 520.83 309.47 2,552.15 845.61 4,228.06

507 a STEEL WIRE MESH FOR GABIONS KG 3.68 - 77.80 20.37 101.85

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 19: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 19 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 73.58 - 455.00 132.15 660.73

508 a BRICK PAVING (SINGLE COURSE) SM 76.29 15.80 159.67 62.94 314.70

508 b BRICK PAVING (DOUBLE COURSE) SM 135.44 15.80 316.66 116.98 584.88

509 a RIP RAP CLASS "A" CM 324.52 - 575.75 225.07 1,125.34

509 b RIP RAP CLASS "B" CM 313.94 - 571.14 221.27 1,106.35

509 c RIP RAP CLASS "C" CM 314.93 - 575.75 222.67 1,113.35

509 d GROUTED RIP RAP CLASS "A" CM 388.49 35.09 1,589.61 503.30 2,516.49

509 e GROUTED RIP RAP CLASS "B" CM 373.00 28.07 1,480.00 470.27 2,351.34

509 f GROUTED RIP RAP CLASS "C" CM 368.21 23.39 1,505.43 474.26 2,371.29

509 gCM 551.27 181.56 2,918.40 912.81 4,564.04

509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.87 115.89 359.90 128.17 640.83

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 80.60 194.57 - 68.79 343.96

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 103.70 35.01 93.56 58.07 290.34

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 132.73 44.81 119.76 74.33 371.63

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 166.05 91.01 278.33 133.85 669.24

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 207.56 113.77 347.91 167.31 836.55

603 BRICK EDGING M 6.21 - 24.96 7.79 38.96

605 a CONCRETE BEAM GUARDRAIL M 53.75 14.67 428.27 124.17 620.86

605 c CONCRETE POST FOR GUARDRAIL M 66.00 13.10 425.92 126.26 631.28

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 169.21 128.42 4,693.50 1,247.78 6,238.91

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 47.59 192.63 6,882.70 1,780.73 8,903.65

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 169.21 272.87 8,526.24 2,242.08 11,210.40

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 575.53 304.65 15,651.51 4,132.92 20,664.61

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 115.11 60.93 7,037.20 1,803.31 9,016.55

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,030.37 318.55 1,592.76

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,545.56 447.35 2,236.75

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 20: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 20 / 244

Rate Analysis Summary ( Construction)District (05) Bahawalpur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 2.15 2.85 15.40 5.10 25.50

608 b2M 0.72 1.27 30.48 8.12 40.59

608 c1M 2.15 2.85 20.56 6.39 31.95

608 c2M 0.72 1.27 40.65 10.66 53.30

608 d1EACH 48.05 - 148.85 49.23 246.13

608 d2EACH 48.05 - 384.09 108.04 540.18

608 h1M 2.69 3.56 21.42 6.92 34.59

608 h2M 2.69 4.75 51.71 14.79 73.94

608 i1M 2.69 3.56 28.56 8.70 43.51

608 i2M 2.69 4.75 68.95 19.10 95.49

608 j1EACH 48.05 - 206.81 63.72 318.58

608 j2EACH 48.05 - 652.07 175.03 875.15

608 n1 EACH 40.80 - 99.23 35.01 175.04

608 n2 EACH 40.80 - 256.45 74.31 371.56

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 40.80 - 137.87 44.67 223.34

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 40.80 - 435.37 119.04 595.21

609 cEACH 6.12 46.68 167.71 55.13 275.64

609 dEACH 6.12 46.68 202.71 63.88 319.39

610 b RIGHT OF WAY MARKER EACH 77.40 60.88 216.86 88.79 443.93

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 441.05 476.40 1,464.27 595.43 2,977.15

610 d TEN KILOMETRE POST EACH 857.96 952.79 3,189.40 1,250.04 6,250.19

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 21: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 21 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.40 6.96 - 1.84 9.20

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.05 102.44 0.88 26.84 134.21

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 11.64 258.13 1.97 67.94 339.68

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 46.55 1,032.53 7.89 271.74 1,358.71

103 STRIPPING CM 1.42 59.42 - 15.21 76.05

104 COMPACTION OF NATURAL GROUND SM 0.20 5.92 0.62 1.69 8.43

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.52 86.79 - 22.33 111.64

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 73.94 193.76 46.20 78.48 392.38

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.39 214.84 - 56.31 281.54

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.89 167.12 - 43.50 217.51

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.06 78.63 - 20.17 100.86

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 73.94 193.76 46.20 78.48 392.38

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.78 199.88 - 52.92 264.58

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.26 167.24 - 43.13 215.63

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.22 89.04 0.31 23.39 116.96

107 bCM 37.82 165.86 53.31 64.25 321.24

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 65.45 258.51 30.80 88.69 443.45

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 55.62 193.04 - 62.17 310.83

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 33.66 160.37 - 48.51 242.54

107 d GRANULAR BACK FILL CM 19.54 83.07 295.68 99.57 497.86

107 e COMMON BACK FILL CM 14.13 37.31 4.13 13.89 69.46

108 aCM 4.11 106.71 4.13 28.74 143.69

108 biCM 11.86 302.97 48.81 90.91 454.55

108 biiCM 8.89 268.11 1.96 69.74 348.70

108 biiiCM 7.90 238.60 - 61.63 308.13

108 cCM 4.67 112.14 6.81 30.91 154.53

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 22: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 22 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.67 46.31 4.13 13.53 67.64

108 eCM 8.43 73.87 2.45 21.19 105.94

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.82 16.84 1.18 4.71 23.55

109 biSM 0.58 10.31 0.63 2.88 14.40

110 IMPROVED SUB-GRADE CM 5.80 75.50 53.37 33.67 168.34

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.49 9.38 0.64 2.63 13.14

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.73 9.92 0.74 2.85 14.24

201 GRANULAR SUB-BASE CM 4.75 106.91 446.26 139.48 697.40

202 AGGREGATE BASE CM 5.52 132.11 597.97 183.90 919.50

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 41.94 916.98 3,386.78 1,086.43 5,432.13

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 43.54 916.98 3,639.78 1,150.08 5,750.38

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 46.79 957.74 3,381.40 1,096.48 5,482.41

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 46.79 954.75 3,721.55 1,180.77 5,903.86

204 b CEMENT STABILIZED BASE CM 16.79 272.73 643.08 233.15 1,165.75

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 141.47 568.44 22,072.80 5,695.68 28,478.39

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 141.47 568.44 22,973.55 5,920.87 29,604.33

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 53.77 55.65 677.93 196.84 984.19

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 86.64 1,408.67 3,137.67 1,158.25 5,791.23

206 bCM 59.43 66.68 549.53 168.91 844.55

207 a DEEP PATCHING (0-15 cm) SM 1.01 30.14 1.02 8.04 40.21

207 b DEEP PATCHING (16-30 cm) SM 1.01 26.47 1.02 7.13 35.63

208 REINSTATEMENT OF ROAD SURFACE SM 1.07 37.00 0.45 9.63 48.15

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.21 70.82 0.55 18.15 90.73

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63 18.14

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.08 5.73 28.65

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 23: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 23 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.08 5.73 28.65

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.72 2.51 12.54

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.19 2.38 11.88

304 a SINGLE SURFACE TREATMENT SM 0.45 4.16 43.79 12.10 60.50

304 b DOUBLE SURFACE TREATMENT SM 0.66 8.06 84.35 23.27 116.34

304 c TRIPLE SURFACE TREATMENT SM 1.11 11.08 100.90 28.27 141.36

304 d SEAL COAT SM 0.42 2.33 24.37 6.78 33.90

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 39.76 906.07 3,964.56 1,227.60 6,137.99

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 39.76 876.73 4,266.21 1,295.68 6,478.38

307 a DENSE GRADED HOT BIT-MAC CM 95.86 171.48 3,091.63 839.74 4,198.71

307 b OPEN GRADED HOT BIT-MAC CM 95.86 171.48 3,047.82 828.79 4,143.95

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 16.41 456.95 943.08 354.11 1,770.55

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 124.83 465.97 24,148.50 6,184.83 30,924.13

309 a COLD MILLING, 0 - 30 mm SM 0.55 16.87 7.54 6.24 31.20

309 b COLD MILLING, 0 - 50 mm SM 0.92 28.11 12.57 10.40 52.00

309 c COLD MILLING, 0 - 70 mm SM 1.38 42.16 18.85 15.60 77.99

401 ai CONCRETE CLASS "A3" (Underground) CM 314.96 643.62 2,993.38 987.99 4,939.95

401 aii CONCRETE CLASS "A3" (On ground) CM 314.96 643.62 3,202.28 1,040.22 5,201.08

401 aiii CONCRETE CLASS "A3" (Elevated) CM 314.96 643.62 3,620.08 1,144.67 5,723.33

401 b CONCRETE CLASS "B" CM 399.15 407.09 2,294.91 775.29 3,876.44

401 ci CONCRETE CLASS "C" (Underground) CM 306.35 258.76 2,716.44 820.39 4,101.94

401 cii CONCRETE CLASS "C" (On ground) CM 306.35 258.76 2,805.54 842.66 4,213.31

401 ciii CONCRETE CLASS "C" (Elevated) CM 306.35 258.76 2,983.73 887.21 4,436.05

401 d CONCRETE CLASS "D1" CM 491.68 810.64 3,885.29 1,296.90 6,484.51

401 e CONCRETE CLASS "Y" CM 686.75 258.76 3,270.77 1,054.07 5,270.35

401 f LEAN CONCRETE CM 253.37 252.12 1,836.45 585.49 2,927.43

Page 24: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 24 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,033.27 468.57 3,770.57 1,318.10 6,590.51

401 gii PRECAST CONCRETE CLASS "B" CM 1,033.27 468.57 3,467.37 1,242.30 6,211.51

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 952.05 - 42,573.21 10,881.32 54,406.58

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 952.05 - 44,673.21 11,406.32 57,031.58

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 793.12 2,335.68 37,884.40 10,253.30 51,266.50

405 aTON 1,905.43 6,882.66 80,756.19 22,386.07 111,930.35

405 b LAUNCHING OF GIRDER TON 45.29 403.69 - 112.25 561.23

406 aSM 68.79 - 183.41 63.05 315.25

406 b SM 68.79 - 199.02 66.95 334.76

406 c STEEL EXPANSION JOINTS KG 5.83 11.61 61.76 19.80 99.00

406 d WATER STOPS 6" SIZE M 56.27 - 308.50 91.19 455.96

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 25.29 - 1,412.96 359.56 1,797.81

406 g STEEL OR METAL BEARING DEVICES KG 12.43 30.66 82.03 31.28 156.40

407 d1M 243.10 847.08 556.51 411.67 2,058.36

407 d2M 364.65 1,270.62 834.77 617.51 3,087.55

407 d3M 364.65 1,270.62 639.41 568.67 2,843.35

407 d4M 607.76 2,117.70 790.68 879.04 4,395.18

407 d5M 520.93 1,815.17 736.66 768.19 3,840.95

407 d6M 911.64 3,176.55 1,031.34 1,279.88 6,399.41

407 h PILE LOAD TEST UP TO 120 TON EACH 12,118.38 19,990.40 69,433.80 25,385.65 126,928.23

407 i PILE LOAD TEST UP TO 240 TON EACH 24,172.38 19,990.40 138,867.60 45,757.60 228,787.98

407 j PILE LOAD TEST UP TO 360 TON EACH 35,928.78 19,990.40 208,301.40 66,055.15 330,275.73

407 k CONFIRMATORY BORING (NX SIZE) M 130.93 826.61 5.16 240.68 1,203.38

410 BRICK WORK CM 199.10 142.50 2,015.55 589.29 2,946.44

411 a STONE MASONRY RANDOM DRY CM 208.11 56.01 508.88 193.25 966.25

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 25: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 25 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 246.81 84.89 1,169.28 375.25 1,876.23

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 286.41 56.01 564.13 226.64 1,133.19

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 326.01 84.89 1,247.13 414.51 2,072.54

411 g ROLL POINTING SM 42.78 5.78 44.72 23.32 116.60

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 429.51 134.30 1,175.75 434.89 2,174.45

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 130.67 230.36 363.81 181.21 906.05

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 127.38 297.19 468.63 223.30 1,116.50

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 125.66 514.83 578.14 304.66 1,523.29

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 131.41 639.81 867.79 409.75 2,048.76

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 151.94 704.13 1,172.83 507.23 2,536.13

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 189.32 868.93 1,768.15 706.60 3,533.00

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 245.01 961.94 2,213.61 855.14 4,275.70

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 287.86 1,168.07 3,090.92 1,136.71 5,683.56

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 342.37 1,362.74 4,687.71 1,598.21 7,991.03

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 130.67 263.77 382.86 194.33 971.63

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 127.38 297.19 501.43 231.50 1,157.50

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 122.82 514.83 604.38 310.51 1,552.54

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 131.41 639.81 928.13 424.84 2,124.19

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 151.94 704.13 1,638.70 623.69 3,118.46

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 189.32 868.93 2,230.63 822.22 4,111.10

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 245.01 961.94 2,843.37 1,012.58 5,062.90

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 287.86 1,168.07 3,716.89 1,293.21 6,466.03

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 342.37 1,362.74 5,119.80 1,706.23 8,531.14

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 50.90 68.08 237.18 89.04 445.20

502 bCM 451.21 309.47 2,348.02 777.18 3,885.88

507 a STEEL WIRE MESH FOR GABIONS KG 3.21 - 75.81 19.76 98.78

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 26: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 26 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 54.92 - 396.67 112.90 564.49

508 a BRICK PAVING (SINGLE COURSE) SM 65.61 15.80 162.67 61.02 305.10

508 b BRICK PAVING (DOUBLE COURSE) SM 117.81 15.80 323.20 114.20 571.01

509 a RIP RAP CLASS "A" CM 285.37 - 437.50 180.72 903.59

509 b RIP RAP CLASS "B" CM 275.09 - 434.00 177.27 886.36

509 c RIP RAP CLASS "C" CM 277.24 - 437.50 178.69 893.43

509 d GROUTED RIP RAP CLASS "A" CM 309.36 35.09 1,370.56 428.75 2,143.76

509 e GROUTED RIP RAP CLASS "B" CM 298.79 28.07 1,270.51 399.34 1,996.71

509 f GROUTED RIP RAP CLASS "C" CM 294.89 23.39 1,290.37 402.16 2,010.81

509 gCM 465.15 181.56 2,718.75 841.37 4,206.83

509 h FILTER LAYER OF GRANULAR MATERIAL CM 27.87 115.89 295.63 109.85 549.24

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 68.36 194.57 - 65.73 328.66

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 89.12 35.01 71.09 48.81 244.03

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 114.07 44.81 91.00 62.47 312.35

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 145.75 91.01 233.89 117.66 588.31

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 182.19 113.77 292.36 147.08 735.40

603 BRICK EDGING M 5.15 - 25.92 7.77 38.84

605 a CONCRETE BEAM GUARDRAIL M 43.56 14.67 416.28 118.63 593.14

605 c CONCRETE POST FOR GUARDRAIL M 53.48 13.10 411.32 119.48 597.38

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 140.73 128.42 4,688.85 1,239.50 6,197.50

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 41.04 192.63 6,844.31 1,769.50 8,847.48

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 140.73 272.87 8,458.32 2,217.98 11,089.90

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 452.30 304.65 15,547.97 4,076.23 20,381.15

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 90.46 60.93 7,014.50 1,791.47 8,957.36

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.78 318.41 1,592.03

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,544.66 447.13 2,235.63

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 27: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 27 / 244

Rate Analysis Summary ( Construction)District (07) Bhakkar

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.48 2.85 15.40 4.93 24.66

608 b2M 0.49 1.27 30.44 8.05 40.25

608 c1M 1.48 2.85 20.55 6.22 31.10

608 c2M 0.49 1.27 40.60 10.59 52.95

608 d1EACH 45.48 - 148.81 48.57 242.86

608 d2EACH 45.48 - 383.63 107.28 536.39

608 h1M 1.85 3.56 21.42 6.71 33.54

608 h2M 1.85 4.75 51.71 14.58 72.89

608 i1M 1.85 3.56 28.55 8.49 42.45

608 i2M 1.85 4.75 68.95 18.89 94.44

608 j1EACH 45.48 - 206.77 63.06 315.31

608 j2EACH 45.48 - 652.07 174.39 871.94

608 n1 EACH 37.38 - 99.20 34.15 170.73

608 n2 EACH 37.38 - 256.14 73.38 366.90

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 37.38 - 137.84 43.81 219.03

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 37.38 - 435.37 118.19 590.94

609 cEACH 5.50 46.68 167.50 54.92 274.60

609 dEACH 5.50 46.68 202.50 63.67 318.35

610 b RIGHT OF WAY MARKER EACH 59.73 60.88 204.75 81.34 406.70

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 376.25 476.40 1,363.90 554.14 2,770.69

610 d TEN KILOMETRE POST EACH 725.50 952.79 2,989.86 1,167.04 5,835.19

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 28: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 28 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.38 102.44 0.88 27.18 135.88

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.59 258.13 1.97 68.92 344.61

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.38 1,032.53 7.89 275.70 1,378.50

103 STRIPPING CM 1.83 59.42 - 15.31 76.56

104 COMPACTION OF NATURAL GROUND SM 0.26 5.92 0.62 1.70 8.50

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.12 86.79 - 22.48 112.39

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 93.46 193.76 46.20 83.36 416.78

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.18 214.84 - 57.01 285.03

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.66 167.12 - 43.95 219.73

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.55 78.63 - 20.30 101.48

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 93.46 193.76 46.20 83.36 416.78

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 14.89 199.88 - 53.69 268.46

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.65 167.24 - 43.47 217.36

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 5.19 89.04 0.31 23.64 118.18

107 bCM 46.69 165.86 53.31 66.47 332.33

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 82.74 258.51 30.80 93.01 465.06

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 70.42 193.04 - 65.87 329.33

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 42.55 160.37 - 50.73 253.65

107 d GRANULAR BACK FILL CM 25.62 83.07 312.07 105.19 525.95

107 e COMMON BACK FILL CM 19.14 37.31 4.13 15.15 75.73

108 aCM 5.15 106.71 4.13 29.00 144.99

108 biCM 15.12 302.97 48.81 91.73 458.63

108 biiCM 11.34 268.11 1.96 70.35 351.76

108 biiiCM 10.08 238.60 - 62.17 310.85

108 cCM 5.93 112.14 6.81 31.22 156.10

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 29: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 29 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.60 46.31 4.13 13.76 68.80

108 eCM 10.80 73.87 2.45 21.78 108.90

109 a SUB GRADE PREPARATION IN EARTH CUT SM 1.03 16.84 1.18 4.76 23.81

109 biSM 0.73 10.31 0.63 2.92 14.59

110 IMPROVED SUB-GRADE CM 7.42 75.50 54.33 34.31 171.56

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.62 9.38 0.64 2.66 13.30

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.93 9.92 0.74 2.90 14.49

201 GRANULAR SUB-BASE CM 6.00 106.91 360.12 118.26 591.29

202 AGGREGATE BASE CM 7.00 132.11 556.42 173.88 869.41

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 55.72 916.98 3,310.22 1,070.73 5,353.65

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 57.68 916.98 3,549.90 1,131.14 5,655.70

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 61.69 957.74 3,304.88 1,081.08 5,405.39

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 61.69 954.75 3,631.41 1,161.96 5,809.81

204 b CEMENT STABILIZED BASE CM 21.55 272.73 601.82 224.03 1,120.13

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 177.75 568.44 21,715.80 5,615.50 28,077.49

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 177.75 568.44 22,604.35 5,837.64 29,188.18

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 73.02 55.65 589.43 179.53 897.63

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 112.91 1,408.67 3,027.95 1,137.38 5,686.91

206 bCM 81.03 66.68 464.44 153.04 765.19

207 a DEEP PATCHING (0-15 cm) SM 1.27 30.14 1.02 8.11 40.54

207 b DEEP PATCHING (16-30 cm) SM 1.27 26.47 1.02 7.19 35.95

208 REINSTATEMENT OF ROAD SURFACE SM 1.36 37.00 0.45 9.70 48.51

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.47 70.82 0.55 18.21 91.05

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.29 14.16 0.11 3.64 18.20

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 21.72 5.65 28.26

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 30: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 30 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.21 0.67 21.72 5.65 28.25

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.58 2.48 12.39

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.04 2.34 11.71

304 a SINGLE SURFACE TREATMENT SM 0.57 4.16 42.62 11.84 59.19

304 b DOUBLE SURFACE TREATMENT SM 0.83 8.06 81.47 22.59 112.95

304 c TRIPLE SURFACE TREATMENT SM 1.40 11.08 97.20 27.42 137.10

304 d SEAL COAT SM 0.53 2.33 24.04 6.73 33.63

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 52.27 906.07 3,878.81 1,209.29 6,046.44

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 52.27 876.73 4,178.49 1,276.87 6,384.36

307 a DENSE GRADED HOT BIT-MAC CM 127.64 171.48 3,027.92 831.76 4,158.80

307 b OPEN GRADED HOT BIT-MAC CM 127.64 171.48 2,962.41 815.38 4,076.91

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.70 456.95 918.63 349.32 1,746.60

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 157.27 465.97 23,791.50 6,103.69 30,518.43

309 a COLD MILLING, 0 - 30 mm SM 0.71 16.87 7.54 6.28 31.40

309 b COLD MILLING, 0 - 50 mm SM 1.18 28.11 12.57 10.47 52.33

309 c COLD MILLING, 0 - 70 mm SM 1.77 42.16 18.85 15.70 78.48

401 ai CONCRETE CLASS "A3" (Underground) CM 381.11 643.62 3,003.76 1,007.12 5,035.61

401 aii CONCRETE CLASS "A3" (On ground) CM 381.11 643.62 3,212.66 1,059.35 5,296.74

401 aiii CONCRETE CLASS "A3" (Elevated) CM 381.11 643.62 3,630.46 1,163.80 5,818.99

401 b CONCRETE CLASS "B" CM 498.57 407.09 2,277.26 795.73 3,978.65

401 c1 CONCRETE CLASS "C" (Underground) CM 376.50 258.76 2,696.25 832.88 4,164.39

401 c2 CONCRETE CLASS "C" (On ground) CM 376.50 258.76 2,785.35 855.15 4,275.76

401 c3 CONCRETE CLASS "C" (Elevated) CM 376.50 258.76 2,963.54 899.70 4,498.50

401 d CONCRETE CLASS "D1" CM 588.37 810.64 3,874.09 1,318.28 6,591.38

401 e CONCRETE CLASS "Y" CM 823.77 258.76 3,285.59 1,092.03 5,460.15

401 f LEAN CONCRETE CM 328.35 252.12 1,824.64 601.28 3,006.39

Page 31: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 31 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,285.88 468.57 3,787.35 1,385.45 6,927.25

401 gii PRECAST CONCRETE CLASS "B" CM 1,285.88 468.57 3,441.97 1,299.11 6,495.53

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,136.68 - 42,572.27 10,927.24 54,636.19

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,136.68 - 44,672.27 11,452.24 57,261.19

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 935.30 2,335.68 37,787.24 10,264.56 51,322.78

405 aTON 2,111.40 6,882.66 80,757.23 22,437.82 112,189.11

405 b LAUNCHING OF GIRDER TON 49.59 403.69 - 113.32 566.60

406 aSM 84.91 - 182.86 66.94 334.71

406 b SM 84.91 - 197.71 70.66 353.28

406 c STEEL EXPANSION JOINTS KG 6.93 11.61 61.66 20.05 100.25

406 d WATER STOPS 6" SIZE M 69.28 - 310.18 94.87 474.33

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 30.34 - 1,412.35 360.67 1,803.36

406 g STEEL OR METAL BEARING DEVICES KG 15.41 30.66 81.94 32.00 160.01

407 d1M 264.05 847.08 559.56 417.67 2,088.36

407 d2M 396.07 1,270.62 839.35 626.51 3,132.55

407 d3M 396.07 1,270.62 643.99 577.67 2,888.35

407 d4M 660.12 2,117.70 798.31 894.03 4,470.16

407 d5M 565.82 1,815.17 743.19 781.05 3,905.23

407 d6M 990.18 3,176.55 1,042.78 1,302.38 6,511.89

407 h PILE LOAD TEST UP TO 120 TON EACH 16,511.40 19,990.40 72,541.08 27,260.72 136,303.60

407 i PILE LOAD TEST UP TO 240 TON EACH 33,093.00 19,990.40 145,082.16 49,541.39 247,706.95

407 j PILE LOAD TEST UP TO 360 TON EACH 49,545.00 19,990.40 217,623.24 71,789.66 358,948.30

407 k CONFIRMATORY BORING (NX SIZE) M 155.55 826.61 5.16 246.83 1,234.15

410 BRICK WORK CM 242.77 142.50 2,054.77 610.01 3,050.05

411 a STONE MASONRY RANDOM DRY CM 255.63 56.01 342.09 163.43 817.16

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 32: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 32 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 305.44 84.89 1,052.92 360.81 1,804.06

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 352.63 56.01 384.00 198.16 990.80

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 399.81 84.89 1,103.02 396.93 1,984.65

411 g ROLL POINTING SM 51.49 5.78 45.49 25.69 128.45

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 531.77 134.30 1,031.64 424.43 2,122.14

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 173.85 230.36 365.22 192.36 961.79

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 169.80 297.19 470.33 234.33 1,171.65

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 164.73 514.83 580.16 314.93 1,574.65

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 173.59 639.81 870.14 420.89 2,104.43

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 200.65 704.13 1,175.18 519.99 2,599.95

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 248.54 868.93 1,771.49 722.24 3,611.20

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 321.64 961.94 2,216.85 875.11 4,375.54

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 379.95 1,168.07 3,094.86 1,160.72 5,803.60

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 449.10 1,362.74 4,692.30 1,626.04 8,130.18

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 173.85 263.77 386.15 205.94 1,029.71

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 169.80 297.19 503.13 242.53 1,212.65

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 160.79 514.83 606.40 320.51 1,602.53

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 173.59 639.81 929.97 435.84 2,179.21

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 200.65 704.13 1,641.20 636.50 3,182.48

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 248.54 868.93 2,233.97 837.86 4,189.30

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 321.64 961.94 2,846.61 1,032.55 5,162.74

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 379.95 1,168.07 3,720.82 1,317.21 6,586.05

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 449.10 1,362.74 5,124.39 1,734.06 8,670.29

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 67.91 68.08 279.55 103.89 519.43

502 bCM 559.40 309.47 2,329.48 799.59 3,997.94

507 a STEEL WIRE MESH FOR GABIONS KG 3.96 - 75.81 19.94 99.71

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 33: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 33 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 74.16 - 379.17 113.33 566.66

508 a BRICK PAVING (SINGLE COURSE) SM 82.16 15.80 164.44 65.60 328.00

508 b BRICK PAVING (DOUBLE COURSE) SM 146.82 15.80 326.38 122.25 611.25

509 a RIP RAP CLASS "A" CM 353.31 - 270.71 156.01 780.03

509 b RIP RAP CLASS "B" CM 341.37 - 268.55 152.48 762.40

509 c RIP RAP CLASS "C" CM 343.31 - 270.71 153.51 767.53

509 d GROUTED RIP RAP CLASS "A" CM 382.60 35.09 1,236.40 413.52 2,067.61

509 e GROUTED RIP RAP CLASS "B" CM 368.73 28.07 1,134.33 382.78 1,913.91

509 f GROUTED RIP RAP CLASS "C" CM 363.99 23.39 1,153.40 385.20 1,925.98

509 gCM 588.19 181.56 2,691.88 865.41 4,327.04

509 h FILTER LAYER OF GRANULAR MATERIAL CM 37.30 115.89 312.21 116.35 581.75

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 81.16 194.57 - 68.93 344.66

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 111.44 35.01 43.99 47.61 238.05

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 142.64 44.81 56.31 60.94 304.70

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 180.39 91.01 217.97 122.34 611.71

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 225.49 113.77 272.46 152.93 764.65

603 BRICK EDGING M 6.56 - 25.92 8.12 40.60

605 a CONCRETE BEAM GUARDRAIL M 56.41 14.67 416.78 121.97 609.83

605 c CONCRETE POST FOR GUARDRAIL M 69.26 13.10 411.97 123.58 617.91

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 179.03 128.42 4,674.76 1,245.55 6,227.76

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 51.12 192.63 6,836.02 1,769.94 8,849.71

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 179.03 272.87 8,444.99 2,224.22 11,121.11

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 595.41 304.65 15,526.69 4,106.69 20,533.44

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 119.08 60.93 7,008.69 1,797.18 8,985.88

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.31 318.29 1,591.44

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,543.97 446.95 2,234.76

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 34: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 34 / 244

Rate Analysis Summary ( Construction)District (09) Chakwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.87 2.85 15.40 5.03 25.15

608 b2M 0.62 1.27 30.42 8.08 40.39

608 c1M 1.87 2.85 20.55 6.32 31.59

608 c2M 0.62 1.27 40.58 10.62 53.09

608 d1EACH 52.05 - 148.78 50.21 251.04

608 d2EACH 52.05 - 383.36 108.85 544.26

608 h1M 2.34 3.56 21.41 6.83 34.14

608 h2M 2.34 4.75 51.71 14.70 73.50

608 i1M 2.34 3.56 28.55 8.61 43.06

608 i2M 2.34 4.75 68.95 19.01 95.05

608 j1EACH 52.05 - 206.74 64.70 323.49

608 j2EACH 52.05 - 652.07 176.03 880.15

608 n1 EACH 43.14 - 99.19 35.58 177.91

608 n2 EACH 43.14 - 255.96 74.78 373.88

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 43.14 - 137.83 45.24 226.21

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 43.14 - 435.37 119.63 598.14

609 cEACH 6.66 46.68 167.53 55.22 276.09

609 dEACH 6.66 46.68 202.53 63.97 319.84

610 b RIGHT OF WAY MARKER EACH 79.43 60.88 205.38 86.42 432.11

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 473.27 476.40 1,374.21 580.97 2,904.85

610 d TEN KILOMETRE POST EACH 916.83 952.79 3,000.32 1,217.49 6,087.43

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 35: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 35 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.48 6.96 - 1.86 9.30

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.75 102.44 0.88 27.02 135.09

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.69 258.13 1.97 68.45 342.24

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 54.77 1,032.53 7.89 273.80 1,368.99

103 STRIPPING CM 1.69 59.42 - 15.28 76.39

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.84 86.79 - 22.41 112.04

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 81.75 193.76 46.20 80.43 402.14

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.36 214.84 - 56.55 282.75

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.50 167.12 - 43.66 218.28

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.32 78.63 - 20.24 101.19

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 81.75 193.76 46.20 80.43 402.14

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.96 199.88 - 53.21 266.05

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.75 167.24 - 43.25 216.24

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.78 89.04 0.31 23.53 117.66

107 bCM 42.89 165.86 53.31 65.52 327.58

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 72.02 258.51 30.80 90.33 451.66

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 60.92 193.04 - 63.49 317.45

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 37.04 160.37 - 49.35 246.76

107 d GRANULAR BACK FILL CM 22.30 83.07 230.93 84.08 420.38

107 e COMMON BACK FILL CM 16.80 37.31 4.13 14.56 72.80

108 aCM 4.51 106.71 4.13 28.84 144.19

108 biCM 13.28 302.97 48.81 91.27 456.33

108 biiCM 9.96 268.11 1.96 70.01 350.04

108 biiiCM 8.85 238.60 - 61.86 309.31

108 cCM 5.17 112.14 6.81 31.03 155.15

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 36: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 36 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.09 46.31 4.13 13.63 68.16

108 eCM 9.57 73.87 2.45 21.47 107.36

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.91 16.84 1.18 4.73 23.66

109 biSM 0.67 10.31 0.63 2.90 14.51

110 IMPROVED SUB-GRADE CM 6.49 75.50 54.33 34.08 170.40

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.57 9.38 0.64 2.65 13.24

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.84 9.92 0.74 2.88 14.38

201 GRANULAR SUB-BASE CM 5.22 106.91 364.50 119.16 595.79

202 AGGREGATE BASE CM 5.87 132.11 514.65 163.16 815.79

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.35 916.98 3,299.61 1,065.99 5,329.93

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.84 916.98 3,542.88 1,127.18 5,635.88

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 52.63 957.74 3,294.13 1,076.13 5,380.63

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 52.63 954.75 3,625.13 1,158.13 5,790.64

204 b CEMENT STABILIZED BASE CM 18.10 272.73 558.25 212.27 1,061.35

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 162.23 568.44 22,072.80 5,700.87 28,504.34

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 162.23 568.44 22,118.01 5,712.17 28,560.85

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.43 55.65 545.18 166.07 830.33

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 96.32 1,408.67 3,003.97 1,127.24 5,636.20

206 bCM 69.76 66.68 450.31 146.69 733.44

207 a DEEP PATCHING (0-15 cm) SM 1.16 30.14 1.02 8.08 40.40

207 b DEEP PATCHING (16-30 cm) SM 1.16 26.47 1.02 7.16 35.81

208 REINSTATEMENT OF ROAD SURFACE SM 1.17 37.00 0.45 9.66 48.28

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.46 70.82 0.55 18.21 91.04

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.29 14.16 0.11 3.64 18.20

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 22.08 5.74 28.68

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 37: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 37 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 22.08 5.74 28.68

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.82 2.54 12.68

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 8.85 2.29 11.46

304 a SINGLE SURFACE TREATMENT SM 0.50 4.16 41.83 11.62 58.11

304 b DOUBLE SURFACE TREATMENT SM 0.72 8.06 78.82 21.90 109.50

304 c TRIPLE SURFACE TREATMENT SM 1.22 11.08 93.74 26.51 132.55

304 d SEAL COAT SM 0.46 2.33 24.97 6.94 34.70

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 44.17 906.07 3,876.60 1,206.71 6,033.55

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 44.17 876.73 4,179.32 1,275.06 6,375.28

307 a DENSE GRADED HOT BIT-MAC CM 107.59 171.48 3,034.76 828.46 4,142.29

307 b OPEN GRADED HOT BIT-MAC CM 107.59 171.48 2,963.76 810.71 4,053.54

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.09 456.95 893.60 342.16 1,710.80

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 146.74 465.97 24,148.50 6,190.30 30,951.51

309 a COLD MILLING, 0 - 30 mm SM 0.61 16.87 7.54 6.26 31.28

309 b COLD MILLING, 0 - 50 mm SM 1.01 28.11 12.57 10.42 52.11

309 c COLD MILLING, 0 - 70 mm SM 1.52 42.16 18.85 15.63 78.16

401 ai CONCRETE CLASS "A3" (Underground) CM 351.53 643.62 2,932.38 981.88 4,909.41

401 aii CONCRETE CLASS "A3" (On ground) CM 351.53 643.62 3,141.28 1,034.11 5,170.54

401 aiii CONCRETE CLASS "A3" (Elevated) CM 351.53 643.62 3,559.08 1,138.56 5,692.79

401 b CONCRETE CLASS "B" CM 449.42 407.09 2,180.39 759.23 3,796.13

401 ci CONCRETE CLASS "C" (Underground) CM 348.72 258.76 2,608.91 804.10 4,020.49

401 cii CONCRETE CLASS "C" (On ground) CM 348.72 258.76 2,698.00 826.37 4,131.85

401 ciii CONCRETE CLASS "C" (Elevated) CM 348.72 258.76 2,876.20 870.92 4,354.60

401 d CONCRETE CLASS "D1" CM 554.52 810.64 3,827.00 1,298.04 6,490.20

401 e CONCRETE CLASS "Y" CM 783.45 258.76 3,231.29 1,068.38 5,341.88

401 f LEAN CONCRETE CM 296.12 252.12 1,720.42 567.17 2,835.83

Page 38: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 38 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,186.72 468.57 3,707.41 1,340.68 6,703.38

401 gii PRECAST CONCRETE CLASS "B" CM 1,186.72 468.57 3,342.62 1,249.48 6,247.39

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,076.66 - 42,564.62 10,910.32 54,551.60

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,076.66 - 44,664.62 11,435.32 57,176.60

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 864.52 2,335.68 36,998.81 10,049.75 50,248.76

405 aTON 1,711.02 6,882.66 80,752.11 22,336.45 111,682.24

405 b LAUNCHING OF GIRDER TON 40.27 403.69 - 110.99 554.95

406 aSM 77.66 - 188.69 66.59 332.94

406 b SM 77.66 - 197.40 68.77 343.83

406 c STEEL EXPANSION JOINTS KG 6.45 11.61 60.61 19.67 98.34

406 d WATER STOPS 6" SIZE M 65.18 - 307.68 93.22 466.08

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 28.20 - 1,413.30 360.38 1,801.88

406 g STEEL OR METAL BEARING DEVICES KG 13.44 30.66 81.03 31.28 156.41

407 d1M 221.84 847.08 730.55 449.87 2,249.34

407 d2M 332.75 1,270.62 1,095.82 674.80 3,373.99

407 d3M 332.75 1,270.62 831.71 608.77 3,043.85

407 d4M 554.59 2,117.70 1,019.52 922.95 4,614.76

407 d5M 475.36 1,815.17 952.44 810.74 4,053.71

407 d6M 831.88 3,176.55 1,323.03 1,332.87 6,664.33

407 h PILE LOAD TEST UP TO 120 TON EACH 14,176.92 19,990.40 64,772.44 24,734.94 123,674.70

407 i PILE LOAD TEST UP TO 240 TON EACH 28,451.64 19,990.40 129,544.88 44,496.73 222,483.65

407 j PILE LOAD TEST UP TO 360 TON EACH 42,523.32 19,990.40 194,317.32 64,207.76 321,038.80

407 k CONFIRMATORY BORING (NX SIZE) M 130.66 826.61 5.16 240.61 1,203.04

410 BRICK WORK CM 230.02 142.50 1,956.45 582.24 2,911.21

411 a STONE MASONRY RANDOM DRY CM 242.12 56.01 321.63 154.94 774.70

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 39: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 39 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 287.31 84.89 970.31 335.63 1,678.14

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 332.68 56.01 361.90 187.65 938.24

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 378.06 84.89 1,036.55 374.88 1,874.38

411 g ROLL POINTING SM 49.16 5.78 44.55 24.87 124.36

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 498.62 134.30 965.18 399.53 1,997.63

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 154.73 230.36 363.48 187.14 935.71

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 150.83 297.19 484.64 233.17 1,165.83

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 146.90 514.83 577.67 309.85 1,549.25

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 154.00 639.81 867.25 415.27 2,076.33

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 176.08 704.13 1,172.29 513.13 2,565.63

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 216.89 868.93 1,767.38 713.30 3,566.50

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 280.69 961.94 2,212.86 863.87 4,319.36

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 329.98 1,168.07 3,090.02 1,147.02 5,735.09

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 392.01 1,362.74 4,686.66 1,610.35 8,051.76

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 154.73 263.77 382.09 200.15 1,000.74

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 150.83 297.19 501.04 237.27 1,186.33

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 143.52 514.83 603.91 315.57 1,577.83

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 154.00 639.81 927.70 430.38 2,151.89

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 176.08 704.13 1,638.12 629.58 3,147.91

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 216.89 868.93 2,229.86 828.92 4,144.60

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 280.69 961.94 2,842.62 1,021.31 5,106.56

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 329.98 1,168.07 3,715.99 1,303.51 6,517.55

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 392.01 1,362.74 5,118.74 1,718.37 8,591.86

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 60.63 68.08 173.61 75.58 377.90

502 bCM 510.08 309.47 2,233.72 763.32 3,816.59

507 a STEEL WIRE MESH FOR GABIONS KG 3.63 - 76.80 20.11 100.54

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 40: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 40 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 65.43 - 379.17 111.15 555.75

508 a BRICK PAVING (SINGLE COURSE) SM 75.87 15.80 154.37 61.51 307.55

508 b BRICK PAVING (DOUBLE COURSE) SM 136.25 15.80 307.13 114.80 573.98

509 a RIP RAP CLASS "A" CM 329.67 - 250.25 144.98 724.90

509 b RIP RAP CLASS "B" CM 318.04 - 248.25 141.57 707.86

509 c RIP RAP CLASS "C" CM 320.41 - 250.25 142.67 713.33

509 d GROUTED RIP RAP CLASS "A" CM 374.54 35.09 1,171.38 395.25 1,976.26

509 e GROUTED RIP RAP CLASS "B" CM 361.73 28.07 1,074.08 365.97 1,829.85

509 f GROUTED RIP RAP CLASS "C" CM 357.46 23.39 1,091.95 368.20 1,841.00

509 gCM 535.81 181.56 2,612.78 832.54 4,162.69

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.48 115.89 230.82 94.80 473.99

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 70.59 194.57 - 66.29 331.45

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 104.03 35.01 40.67 44.93 224.64

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 133.16 44.81 52.05 57.51 287.53

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 169.46 91.01 200.16 115.16 575.79

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 211.83 113.77 250.21 143.95 719.76

603 BRICK EDGING M 6.05 - 24.96 7.75 38.76

605 a CONCRETE BEAM GUARDRAIL M 51.02 14.67 414.22 119.98 599.89

605 c CONCRETE POST FOR GUARDRAIL M 62.64 13.10 408.84 121.15 605.73

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 159.94 128.42 4,678.24 1,241.65 6,208.25

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 48.30 192.63 6,825.30 1,766.56 8,832.79

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 159.94 272.87 8,427.23 2,215.01 11,075.05

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 525.29 304.65 15,502.88 4,083.21 20,416.03

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 105.06 60.93 7,007.33 1,793.33 8,966.65

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,030.33 318.54 1,592.71

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,545.50 447.34 2,236.68

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 41: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 41 / 244

Rate Analysis Summary ( Construction)District (11) Dera Ghazi Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.82 2.85 15.40 5.02 25.09

608 b2M 0.61 1.27 30.48 8.09 40.45

608 c1M 1.82 2.85 20.56 6.31 31.54

608 c2M 0.61 1.27 40.65 10.63 53.16

608 d1EACH 52.08 - 148.85 50.23 251.16

608 d2EACH 52.08 - 384.09 109.04 545.21

608 h1M 2.27 3.56 21.42 6.81 34.06

608 h2M 2.27 4.75 51.71 14.68 73.41

608 i1M 2.27 3.56 28.56 8.60 42.99

608 i2M 2.27 4.75 68.95 18.99 94.96

608 j1EACH 52.08 - 206.81 64.72 323.61

608 j2EACH 52.08 - 652.07 176.04 880.19

608 n1 EACH 42.96 - 99.23 35.55 177.74

608 n2 EACH 42.96 - 256.45 74.85 374.26

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 42.96 - 137.87 45.21 226.04

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 42.96 - 435.37 119.58 597.91

609 cEACH 6.52 46.68 167.49 55.17 275.86

609 dEACH 6.52 46.68 202.49 63.92 319.61

610 b RIGHT OF WAY MARKER EACH 70.52 60.88 202.59 83.50 417.49

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 438.36 476.40 1,344.96 564.93 2,824.65

610 d TEN KILOMETRE POST EACH 846.34 952.79 2,954.54 1,188.42 5,942.09

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 42: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 42 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.52 6.96 - 1.87 9.35

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.02 102.44 0.88 27.09 135.43

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 14.79 258.13 1.97 68.72 343.61

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 59.14 1,032.53 7.89 274.89 1,374.45

103 STRIPPING CM 1.70 59.42 - 15.28 76.40

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.57 86.79 - 22.34 111.70

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 81.72 193.76 46.20 80.42 402.10

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.87 214.84 - 56.68 283.39

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.78 167.12 - 43.73 218.63

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.10 78.63 - 20.18 100.91

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 81.72 193.76 46.20 80.42 402.10

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.97 199.88 - 53.21 266.06

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.98 167.24 - 43.31 216.53

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.51 89.04 0.31 23.47 117.33

107 bCM 44.04 165.86 53.31 65.80 329.01

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 72.04 258.51 30.80 90.34 451.69

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 61.55 193.04 - 63.65 318.24

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 37.05 160.37 - 49.36 246.78

107 d GRANULAR BACK FILL CM 23.40 83.07 314.57 105.26 526.30

107 e COMMON BACK FILL CM 18.46 37.31 4.13 14.98 74.88

108 aCM 4.57 106.71 4.13 28.85 144.26

108 biCM 13.69 302.97 48.81 91.37 456.84

108 biiCM 10.27 268.11 1.96 70.09 350.43

108 biiiCM 9.13 238.60 - 61.93 309.66

108 cCM 5.35 112.14 6.81 31.08 155.38

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 43: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 43 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.13 46.31 4.13 13.64 68.21

108 eCM 9.94 73.87 2.45 21.57 107.83

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.92 16.84 1.18 4.74 23.68

109 biSM 0.66 10.31 0.63 2.90 14.50

110 IMPROVED SUB-GRADE CM 6.71 75.50 54.33 34.14 170.68

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.57 9.38 0.64 2.65 13.24

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.85 9.92 0.74 2.88 14.39

201 GRANULAR SUB-BASE CM 5.38 106.91 437.31 137.40 687.00

202 AGGREGATE BASE CM 6.02 132.11 545.98 171.03 855.14

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 52.64 916.98 3,350.72 1,080.09 5,400.43

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 54.23 916.98 3,584.96 1,139.04 5,695.21

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 58.10 957.74 3,345.47 1,090.33 5,451.64

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 58.10 954.75 3,667.01 1,169.97 5,849.83

204 b CEMENT STABILIZED BASE CM 18.91 272.73 628.89 230.13 1,150.66

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 160.24 568.44 21,970.80 5,674.87 28,374.35

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 160.24 568.44 22,880.46 5,902.29 29,511.43

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 71.50 55.65 578.38 176.38 881.91

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 104.52 1,408.67 3,041.38 1,138.64 5,693.21

206 bCM 79.37 66.68 486.48 158.13 790.66

207 a DEEP PATCHING (0-15 cm) SM 1.15 30.14 1.02 8.08 40.39

207 b DEEP PATCHING (16-30 cm) SM 1.15 26.47 1.02 7.16 35.80

208 REINSTATEMENT OF ROAD SURFACE SM 1.18 37.00 0.45 9.66 48.29

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.31 70.82 0.55 18.17 90.85

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.26 14.16 0.11 3.63 18.16

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.98 5.71 28.55

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 44: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 44 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.98 5.71 28.55

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.68 2.50 12.50

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.15 2.37 11.84

304 a SINGLE SURFACE TREATMENT SM 0.50 4.16 43.14 11.95 59.75

304 b DOUBLE SURFACE TREATMENT SM 0.73 8.06 82.34 22.78 113.91

304 c TRIPLE SURFACE TREATMENT SM 1.22 11.08 98.22 27.63 138.15

304 d SEAL COAT SM 0.46 2.33 24.40 6.80 33.99

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 48.64 906.07 3,925.91 1,220.16 6,100.78

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 48.64 876.73 4,232.47 1,289.46 6,447.30

307 a DENSE GRADED HOT BIT-MAC CM 119.77 171.48 3,079.73 842.75 4,213.73

307 b OPEN GRADED HOT BIT-MAC CM 119.77 171.48 2,998.33 822.40 4,111.98

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 20.14 456.95 922.62 349.93 1,749.64

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 143.60 465.97 24,046.50 6,164.02 30,820.09

309 a COLD MILLING, 0 - 30 mm SM 0.62 16.87 7.54 6.26 31.29

309 b COLD MILLING, 0 - 50 mm SM 1.04 28.11 12.57 10.43 52.15

309 c COLD MILLING, 0 - 70 mm SM 1.56 42.16 18.85 15.64 78.21

401 ai CONCRETE CLASS "A3" (Underground) CM 365.71 643.62 3,046.90 1,014.06 5,070.29

401 aii CONCRETE CLASS "A3" (On ground) CM 365.71 643.62 3,255.80 1,066.28 5,331.41

401 aiii CONCRETE CLASS "A3" (Elevated) CM 365.71 643.62 3,673.60 1,170.73 5,853.66

401 b CONCRETE CLASS "B" CM 468.95 407.09 2,299.33 793.84 3,969.21

401 ci CONCRETE CLASS "C" (Underground) CM 366.68 258.76 2,727.30 838.19 4,190.93

401 cii CONCRETE CLASS "C" (On ground) CM 366.68 258.76 2,816.40 860.46 4,302.30

401 ciii CONCRETE CLASS "C" (Elevated) CM 366.68 258.76 2,994.59 905.01 4,525.04

401 d CONCRETE CLASS "D1" CM 575.73 810.64 3,910.14 1,324.13 6,620.64

401 e CONCRETE CLASS "Y" CM 815.87 258.76 3,332.93 1,101.89 5,509.45

401 f LEAN CONCRETE CM 320.06 252.12 1,846.96 604.79 3,023.93

Page 45: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 45 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,262.43 468.57 3,836.54 1,391.89 6,959.43

401 gii PRECAST CONCRETE CLASS "B" CM 1,262.43 468.57 3,462.82 1,298.46 6,492.28

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,099.89 - 42,568.73 10,917.16 54,585.78

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,099.89 - 44,668.73 11,442.16 57,210.78

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 897.71 2,335.68 37,423.00 10,164.10 50,820.49

405 aTON 1,895.98 6,882.66 80,749.88 22,382.13 111,910.65

405 b LAUNCHING OF GIRDER TON 45.10 403.69 - 112.20 560.99

406 aSM 82.20 - 186.14 67.09 335.43

406 b SM 82.20 - 191.18 68.35 341.73

406 c STEEL EXPANSION JOINTS KG 6.74 11.61 61.28 19.91 99.54

406 d WATER STOPS 6" SIZE M 68.05 - 308.85 94.23 471.13

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 29.12 - 1,411.57 360.17 1,800.86

406 g STEEL OR METAL BEARING DEVICES KG 14.30 30.66 81.57 31.63 158.16

407 d1M 243.87 847.08 560.11 412.77 2,063.83

407 d2M 365.80 1,270.62 840.17 619.15 3,095.74

407 d3M 365.80 1,270.62 644.81 570.31 2,851.54

407 d4M 609.67 2,117.70 799.68 881.76 4,408.81

407 d5M 522.57 1,815.17 744.37 770.53 3,852.64

407 d6M 914.50 3,176.55 1,044.84 1,283.97 6,419.86

407 h PILE LOAD TEST UP TO 120 TON EACH 16,045.98 19,990.40 72,541.06 27,144.36 135,721.80

407 i PILE LOAD TEST UP TO 240 TON EACH 32,956.38 19,990.40 145,082.12 49,507.23 247,536.13

407 j PILE LOAD TEST UP TO 360 TON EACH 49,079.58 19,990.40 217,623.18 71,673.29 358,366.45

407 k CONFIRMATORY BORING (NX SIZE) M 148.70 826.61 5.16 245.12 1,225.59

410 BRICK WORK CM 241.56 142.50 2,124.55 627.15 3,135.76

411 a STONE MASONRY RANDOM DRY CM 253.78 56.01 420.11 182.48 912.38

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 46: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 46 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 303.74 84.89 1,155.67 386.08 1,930.38

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 351.22 56.01 467.66 218.72 1,093.61

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 398.70 84.89 1,205.21 422.20 2,111.00

411 g ROLL POINTING SM 51.63 5.78 45.90 25.83 129.14

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 531.10 134.30 1,133.84 449.81 2,249.05

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 170.24 230.36 366.00 191.65 958.25

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 166.95 297.19 471.26 233.85 1,169.25

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 159.17 514.83 581.25 313.81 1,569.06

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 168.54 639.81 871.40 419.94 2,099.69

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 193.50 704.13 1,176.44 518.52 2,592.59

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 238.12 868.93 1,773.32 720.09 3,600.46

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 308.16 961.94 2,218.66 872.19 4,360.95

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 363.48 1,168.07 3,097.06 1,157.15 5,785.76

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 430.00 1,362.74 4,694.87 1,621.90 8,109.51

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 170.24 263.77 387.69 205.43 1,027.13

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 166.95 297.19 504.06 242.05 1,210.25

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 155.24 514.83 607.49 319.39 1,596.95

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 168.54 639.81 930.95 434.83 2,174.13

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 193.50 704.13 1,642.60 635.06 3,175.29

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 238.12 868.93 2,235.80 835.71 4,178.56

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 308.16 961.94 2,848.42 1,029.63 5,148.15

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 363.48 1,168.07 3,723.03 1,313.65 6,568.23

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 430.00 1,362.74 5,126.96 1,729.93 8,649.63

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 64.90 68.08 279.55 103.13 515.66

502 bCM 532.52 309.47 2,351.55 798.39 3,991.93

507 a STEEL WIRE MESH FOR GABIONS KG 3.75 - 75.81 19.89 99.45

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 47: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 47 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 72.17 - 379.17 112.84 564.18

508 a BRICK PAVING (SINGLE COURSE) SM 81.40 15.80 170.09 66.82 334.11

508 b BRICK PAVING (DOUBLE COURSE) SM 146.36 15.80 337.68 124.96 624.80

509 a RIP RAP CLASS "A" CM 350.64 - 348.74 174.85 874.23

509 b RIP RAP CLASS "B" CM 339.47 - 345.95 171.36 856.78

509 c RIP RAP CLASS "C" CM 342.03 - 348.74 172.69 863.46

509 d GROUTED RIP RAP CLASS "A" CM 398.43 35.09 1,342.22 443.94 2,219.68

509 e GROUTED RIP RAP CLASS "B" CM 384.89 28.07 1,236.58 412.39 2,061.93

509 f GROUTED RIP RAP CLASS "C" CM 380.82 23.39 1,258.58 415.70 2,078.49

509 gCM 578.70 181.56 2,712.72 868.25 4,341.23

509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.16 115.89 314.70 116.69 583.44

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 78.12 194.57 - 68.17 340.86

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 109.96 35.01 56.67 50.41 252.05

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 140.75 44.81 72.54 64.53 322.63

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 178.73 91.01 233.51 125.81 629.06

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 223.41 113.77 291.89 157.27 786.34

603 BRICK EDGING M 6.42 - 26.88 8.33 41.63

605 a CONCRETE BEAM GUARDRAIL M 55.92 14.67 418.59 122.30 611.48

605 c CONCRETE POST FOR GUARDRAIL M 68.66 13.10 414.20 123.99 619.95

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 172.17 128.42 4,669.40 1,242.50 6,212.49

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 51.35 192.63 6,833.54 1,769.38 8,846.90

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 172.17 272.87 8,441.90 2,221.74 11,108.68

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 585.41 304.65 15,517.19 4,101.81 20,509.06

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 117.08 60.93 7,000.97 1,794.75 8,973.73

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.56 317.85 1,589.25

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.34 446.30 2,231.48

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 48: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 48 / 244

Rate Analysis Summary ( Construction)District (16) Faisalabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.88 2.85 15.38 5.03 25.14

608 b2M 0.63 1.27 30.32 8.06 40.28

608 c1M 1.88 2.85 20.53 6.32 31.58

608 c2M 0.63 1.27 40.44 10.59 52.93

608 d1EACH 53.18 - 148.65 50.46 252.29

608 d2EACH 53.18 - 382.04 108.81 544.03

608 h1M 2.35 3.56 21.40 6.83 34.14

608 h2M 2.35 4.75 51.71 14.70 73.51

608 i1M 2.35 3.56 28.53 8.61 43.05

608 i2M 2.35 4.75 68.95 19.01 95.06

608 j1EACH 53.18 - 206.61 64.95 324.74

608 j2EACH 53.18 - 652.07 176.31 881.56

608 n1 EACH 44.07 - 99.10 35.79 178.96

608 n2 EACH 44.07 - 255.08 74.79 373.94

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 44.07 - 137.74 45.45 227.26

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 44.07 - 435.37 119.86 599.30

609 cEACH 6.70 46.68 188.58 60.49 302.45

609 dEACH 6.70 46.68 224.58 69.49 347.45

610 b RIGHT OF WAY MARKER EACH 78.53 60.88 207.34 86.69 433.44

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 468.90 476.40 1,390.79 584.02 2,920.11

610 d TEN KILOMETRE POST EACH 907.79 952.79 3,032.24 1,223.21 6,116.03

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 49: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 49 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.47 6.96 - 1.86 9.29

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.65 102.44 0.88 26.99 134.96

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.46 258.13 1.97 68.39 341.95

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 53.82 1,032.53 7.89 273.56 1,367.80

103 STRIPPING CM 1.61 59.42 - 15.26 76.29

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.73 86.79 - 22.38 111.90

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 81.57 193.76 46.20 80.38 401.91

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.58 214.84 - 56.61 283.03

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.66 167.12 - 43.70 218.48

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.23 78.63 - 20.22 101.08

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 81.57 193.76 46.20 80.38 401.91

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.98 199.88 - 53.22 266.08

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.86 167.24 - 43.28 216.38

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.64 89.04 0.31 23.50 117.49

107 bCM 42.76 165.86 53.31 65.48 327.41

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 72.11 258.51 30.80 90.36 451.78

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 61.35 193.04 - 63.60 317.99

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 37.08 160.37 - 49.36 246.81

107 d GRANULAR BACK FILL CM 22.14 83.07 329.22 108.61 543.04

107 e COMMON BACK FILL CM 16.48 37.31 4.13 14.48 72.40

108 aCM 4.56 106.71 4.13 28.85 144.25

108 biCM 13.28 302.97 48.81 91.27 456.33

108 biiCM 9.96 268.11 1.96 70.01 350.04

108 biiiCM 8.85 238.60 - 61.86 309.31

108 cCM 5.22 112.14 6.81 31.04 155.21

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 50: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 50 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.08 46.31 4.13 13.63 68.15

108 eCM 9.52 73.87 2.45 21.46 107.30

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.91 16.84 1.18 4.73 23.66

109 biSM 0.65 10.31 0.63 2.90 14.49

110 IMPROVED SUB-GRADE CM 6.51 75.50 52.80 33.70 168.51

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.55 9.38 0.64 2.64 13.21

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.83 9.92 0.74 2.87 14.36

201 GRANULAR SUB-BASE CM 5.29 106.91 416.81 132.25 661.26

202 AGGREGATE BASE CM 6.07 132.11 608.64 186.71 933.53

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 48.32 916.98 3,421.83 1,096.78 5,483.91

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 50.04 916.98 3,645.96 1,153.25 5,766.23

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 53.74 957.74 3,416.51 1,107.00 5,534.99

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 53.74 954.75 3,727.26 1,183.94 5,919.69

204 b CEMENT STABILIZED BASE CM 18.65 272.73 734.94 256.58 1,282.90

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 158.20 568.44 21,817.80 5,636.11 28,180.55

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 158.20 568.44 22,723.31 5,862.49 29,312.44

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.11 55.65 644.74 190.88 954.38

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 98.63 1,408.67 3,111.91 1,154.80 5,774.01

206 bCM 69.82 66.68 576.19 178.17 890.86

207 a DEEP PATCHING (0-15 cm) SM 1.13 30.14 1.02 8.07 40.36

207 b DEEP PATCHING (16-30 cm) SM 1.13 26.47 1.02 7.16 35.78

208 REINSTATEMENT OF ROAD SURFACE SM 1.18 37.00 0.45 9.66 48.29

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.34 70.82 0.55 18.18 90.89

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 51: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 51 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.62 2.49 12.43

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.09 2.35 11.76

304 a SINGLE SURFACE TREATMENT SM 0.50 4.16 43.29 11.99 59.94

304 b DOUBLE SURFACE TREATMENT SM 0.73 8.06 82.98 22.94 114.71

304 c TRIPLE SURFACE TREATMENT SM 1.23 11.08 99.30 27.90 139.51

304 d SEAL COAT SM 0.46 2.33 24.49 6.82 34.10

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 45.44 906.07 3,985.93 1,234.36 6,171.80

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 45.44 876.73 4,294.89 1,304.27 6,521.33

307 a DENSE GRADED HOT BIT-MAC CM 110.24 171.48 3,276.79 889.63 4,448.14

307 b OPEN GRADED HOT BIT-MAC CM 110.24 171.48 3,191.69 868.35 4,341.76

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.76 456.95 931.06 351.69 1,758.46

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 140.29 465.97 23,893.50 6,124.94 30,624.70

309 a COLD MILLING, 0 - 30 mm SM 0.61 16.87 7.54 6.26 31.28

309 b COLD MILLING, 0 - 50 mm SM 1.02 28.11 12.57 10.43 52.13

309 c COLD MILLING, 0 - 70 mm SM 1.54 42.16 18.85 15.64 78.19

401 ai CONCRETE CLASS "A3" (Underground) CM 355.69 643.62 3,069.56 1,017.22 5,086.09

401 aii CONCRETE CLASS "A3" (On ground) CM 355.69 643.62 3,278.46 1,069.44 5,347.21

401 aiii CONCRETE CLASS "A3" (Elevated) CM 355.69 643.62 3,696.26 1,173.89 5,869.46

401 b CONCRETE CLASS "B" CM 451.80 407.09 2,306.62 791.38 3,956.89

401 ci CONCRETE CLASS "C" (Underground) CM 349.63 258.76 2,754.14 840.63 4,203.16

401 cii CONCRETE CLASS "C" (On ground) CM 349.63 258.76 2,843.23 862.91 4,314.53

401 ciii CONCRETE CLASS "C" (Elevated) CM 349.63 258.76 3,021.43 907.46 4,537.28

401 d CONCRETE CLASS "D1" CM 557.86 810.64 3,929.63 1,324.53 6,622.66

401 e CONCRETE CLASS "Y" CM 783.77 258.76 3,359.00 1,100.38 5,501.91

401 f LEAN CONCRETE CM 293.16 252.12 1,854.29 599.89 2,999.46

Page 52: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 52 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,185.81 468.57 3,862.75 1,379.28 6,896.41

401 gii PRECAST CONCRETE CLASS "B" CM 1,185.81 468.57 3,475.29 1,282.42 6,412.09

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,077.00 - 42,564.93 10,910.48 54,552.41

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,077.00 - 44,664.93 11,435.48 57,177.41

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 879.26 2,335.68 37,031.47 10,061.60 50,308.01

405 aTON 1,963.83 6,882.66 80,751.44 22,399.48 111,997.41

405 b LAUNCHING OF GIRDER TON 46.52 403.69 - 112.55 562.76

406 aSM 78.30 - 184.82 65.78 328.90

406 b SM 78.30 - 193.53 67.96 339.79

406 c STEEL EXPANSION JOINTS KG 6.47 11.61 60.72 19.70 98.50

406 d WATER STOPS 6" SIZE M 64.47 - 309.34 93.45 467.26

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 28.48 - 1,411.19 359.92 1,799.59

406 g STEEL OR METAL BEARING DEVICES KG 13.63 30.66 81.08 31.34 156.71

407 d1M 249.55 847.08 553.83 412.62 2,063.08

407 d2M 374.32 1,270.62 830.75 618.92 3,094.61

407 d3M 374.32 1,270.62 635.39 570.08 2,850.41

407 d4M 623.87 2,117.70 783.98 881.39 4,406.94

407 d5M 534.74 1,815.17 730.91 770.21 3,851.03

407 d6M 935.80 3,176.55 1,021.28 1,283.41 6,417.04

407 h PILE LOAD TEST UP TO 120 TON EACH 14,181.84 19,990.40 69,433.80 25,901.51 129,507.55

407 i PILE LOAD TEST UP TO 240 TON EACH 28,537.92 19,990.40 138,867.60 46,848.98 234,244.90

407 j PILE LOAD TEST UP TO 360 TON EACH 42,528.24 19,990.40 208,301.40 67,705.01 338,525.05

407 k CONFIRMATORY BORING (NX SIZE) M 141.47 826.61 5.16 243.31 1,216.55

410 BRICK WORK CM 228.58 142.50 2,046.30 604.35 3,021.73

411 a STONE MASONRY RANDOM DRY CM 239.18 56.01 447.19 185.60 927.98

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 53: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 53 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 284.37 84.89 1,147.43 379.17 1,895.86

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 329.75 56.01 497.50 220.82 1,104.08

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 375.12 84.89 1,208.58 417.15 2,085.74

411 g ROLL POINTING SM 49.08 5.78 45.31 25.04 125.21

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 495.69 134.30 1,137.20 441.80 2,208.99

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 152.58 230.36 364.89 186.96 934.79

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 149.04 297.19 469.93 229.04 1,145.20

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 145.30 514.83 579.70 309.96 1,549.79

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 152.54 639.81 869.60 415.49 2,077.44

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 175.95 704.13 1,174.64 513.68 2,568.40

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 218.35 868.93 1,770.71 714.50 3,572.49

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 282.57 961.94 2,216.07 865.15 4,325.73

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 332.27 1,168.07 3,093.91 1,148.56 5,742.81

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 394.68 1,362.74 4,691.20 1,612.16 8,060.78

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 152.58 263.77 385.49 200.46 1,002.30

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 149.04 297.19 502.73 237.24 1,186.20

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 141.92 514.83 605.94 315.67 1,578.36

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 152.54 639.81 929.55 430.48 2,152.38

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 175.95 704.13 1,640.60 630.17 3,150.85

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 218.35 868.93 2,233.19 830.12 4,150.59

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 282.57 961.94 2,845.83 1,022.59 5,112.93

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 332.27 1,168.07 3,719.87 1,305.05 6,525.26

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 394.68 1,362.74 5,123.28 1,720.18 8,600.88

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 58.96 68.08 237.18 91.06 455.28

502 bCM 511.94 309.47 2,358.84 795.06 3,975.31

507 a STEEL WIRE MESH FOR GABIONS KG 3.63 - 75.81 19.86 99.30

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 54: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 54 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.23 - 420.00 121.06 605.29

508 a BRICK PAVING (SINGLE COURSE) SM 75.73 15.80 162.67 63.55 317.75

508 b BRICK PAVING (DOUBLE COURSE) SM 136.11 15.80 323.20 118.78 593.89

509 a RIP RAP CLASS "A" CM 328.60 - 375.81 176.10 880.51

509 b RIP RAP CLASS "B" CM 317.18 - 372.81 172.50 862.49

509 c RIP RAP CLASS "C" CM 319.70 - 375.81 173.88 869.39

509 d GROUTED RIP RAP CLASS "A" CM 382.73 35.09 1,362.44 445.07 2,225.33

509 e GROUTED RIP RAP CLASS "B" CM 369.64 28.07 1,257.31 413.76 2,068.78

509 f GROUTED RIP RAP CLASS "C" CM 365.42 23.39 1,278.91 416.93 2,084.65

509 gCM 536.72 181.56 2,719.76 859.51 4,297.55

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.48 115.89 328.98 119.34 596.69

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 74.18 194.57 - 67.19 335.94

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 102.67 35.01 61.07 49.69 248.44

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 131.42 44.81 78.17 63.60 318.00

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 167.72 91.01 230.06 122.20 610.99

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 209.65 113.77 287.58 152.75 763.75

603 BRICK EDGING M 5.94 - 25.92 7.97 39.83

605 a CONCRETE BEAM GUARDRAIL M 50.73 14.67 419.73 121.28 606.41

605 c CONCRETE POST FOR GUARDRAIL M 62.29 13.10 415.57 122.74 613.70

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 160.96 128.42 4,674.99 1,241.09 6,205.46

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 47.54 192.63 6,834.48 1,768.66 8,843.31

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 160.96 272.87 8,442.48 2,219.08 11,095.39

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 526.82 304.65 15,517.01 4,087.12 20,435.60

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 105.36 60.93 6,999.66 1,791.49 8,957.44

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.18 317.76 1,588.78

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,540.77 446.15 2,230.76

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 55: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 55 / 244

Rate Analysis Summary ( Construction)District (17) Gujranwala

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.78 2.85 15.38 5.00 25.01

608 b2M 0.59 1.27 30.30 8.04 40.20

608 c1M 1.78 2.85 20.53 6.29 31.45

608 c2M 0.59 1.27 40.41 10.57 52.84

608 d1EACH 52.03 - 148.63 50.17 250.83

608 d2EACH 52.03 - 381.78 108.45 542.26

608 h1M 2.22 3.56 21.40 6.80 33.98

608 h2M 2.22 4.75 51.71 14.67 73.35

608 i1M 2.22 3.56 28.52 8.58 42.88

608 i2M 2.22 4.75 68.95 18.98 94.90

608 j1EACH 52.03 - 206.59 64.66 323.28

608 j2EACH 52.03 - 652.07 176.03 880.13

608 n1 EACH 42.92 - 99.09 35.50 177.51

608 n2 EACH 42.92 - 254.90 74.46 372.28

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 42.92 - 137.73 45.16 225.81

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 42.92 - 435.37 119.57 597.86

609 cEACH 6.33 46.68 167.52 55.13 275.66

609 dEACH 6.33 46.68 202.52 63.88 319.41

610 b RIGHT OF WAY MARKER EACH 69.98 60.88 208.50 84.84 424.20

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 434.77 476.40 1,399.18 577.59 2,887.94

610 d TEN KILOMETRE POST EACH 839.16 952.79 3,051.12 1,210.77 6,053.84

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 56: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 56 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.48 6.96 - 1.86 9.30

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.77 102.44 0.88 27.02 135.11

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.73 258.13 1.97 68.46 342.29

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 54.90 1,032.53 7.89 273.83 1,369.15

103 STRIPPING CM 1.64 59.42 - 15.27 76.33

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.91 86.79 - 22.43 112.13

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 84.91 193.76 46.20 81.22 406.09

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.89 214.84 - 56.68 283.41

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.85 167.12 - 43.74 218.71

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.38 78.63 - 20.25 101.26

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 84.91 193.76 46.20 81.22 406.09

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.54 199.88 - 53.36 266.78

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.01 167.24 - 43.31 216.56

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.81 89.04 0.31 23.54 117.70

107 bCM 42.68 165.86 53.31 65.46 327.31

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.22 258.51 30.80 91.13 455.66

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 63.90 193.04 - 64.24 321.18

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.68 160.37 - 49.76 248.81

107 d GRANULAR BACK FILL CM 22.86 83.07 306.30 103.06 515.29

107 e COMMON BACK FILL CM 16.71 37.31 4.13 14.54 72.69

108 aCM 4.70 106.71 4.13 28.89 144.43

108 biCM 13.64 302.97 48.81 91.36 456.78

108 biiCM 10.23 268.11 1.96 70.08 350.38

108 biiiCM 9.09 238.60 - 61.92 309.61

108 cCM 5.37 112.14 6.81 31.08 155.40

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 57: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 57 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.19 46.31 4.13 13.66 68.29

108 eCM 9.72 73.87 2.45 21.51 107.55

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.94 16.84 1.18 4.74 23.70

109 biSM 0.67 10.31 0.63 2.90 14.51

110 IMPROVED SUB-GRADE CM 6.70 75.50 47.26 32.37 161.83

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.56 9.38 0.64 2.65 13.23

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.84 9.92 0.74 2.88 14.38

201 GRANULAR SUB-BASE CM 5.45 106.91 448.24 140.15 700.75

202 AGGREGATE BASE CM 6.39 132.11 598.19 184.17 920.86

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 49.26 916.98 3,409.69 1,093.98 5,469.91

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 51.10 916.98 3,636.00 1,151.02 5,755.10

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 54.75 957.74 3,404.30 1,104.20 5,520.99

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 54.75 954.75 3,717.40 1,181.73 5,908.63

204 b CEMENT STABILIZED BASE CM 19.51 272.73 716.10 252.09 1,260.43

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 162.43 568.44 21,868.80 5,649.92 28,249.59

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 162.43 568.44 22,774.46 5,876.33 29,381.66

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.47 55.65 633.68 188.20 941.00

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 101.04 1,408.67 3,101.61 1,152.83 5,764.15

206 bCM 70.28 66.68 539.74 169.18 845.88

207 a DEEP PATCHING (0-15 cm) SM 1.15 30.14 1.02 8.08 40.39

207 b DEEP PATCHING (16-30 cm) SM 1.15 26.47 1.02 7.16 35.80

208 REINSTATEMENT OF ROAD SURFACE SM 1.23 37.00 0.45 9.67 48.35

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.37 70.82 0.55 18.19 90.93

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.88 5.69 28.44

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 58: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 58 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.88 5.69 28.43

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.64 2.49 12.45

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.11 2.36 11.79

304 a SINGLE SURFACE TREATMENT SM 0.52 4.16 43.31 12.00 59.99

304 b DOUBLE SURFACE TREATMENT SM 0.76 8.06 82.97 22.95 114.74

304 c TRIPLE SURFACE TREATMENT SM 1.28 11.08 99.23 27.90 139.49

304 d SEAL COAT SM 0.49 2.33 24.50 6.83 34.15

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 46.55 906.07 3,974.70 1,231.83 6,159.15

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 46.55 876.73 4,283.05 1,301.58 6,507.91

307 a DENSE GRADED HOT BIT-MAC CM 112.86 171.48 3,265.63 887.49 4,437.46

307 b OPEN GRADED HOT BIT-MAC CM 112.86 171.48 3,182.30 866.66 4,333.30

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 19.29 456.95 930.25 351.62 1,758.11

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 143.24 465.97 23,944.50 6,138.43 30,692.14

309 a COLD MILLING, 0 - 30 mm SM 0.64 16.87 7.54 6.26 31.31

309 b COLD MILLING, 0 - 50 mm SM 1.07 28.11 12.57 10.44 52.19

309 c COLD MILLING, 0 - 70 mm SM 1.61 42.16 18.85 15.66 78.28

401 ai CONCRETE CLASS "A3" (Underground) CM 349.99 643.62 3,098.93 1,023.14 5,115.68

401 aii CONCRETE CLASS "A3" (On ground) CM 349.99 643.62 3,307.83 1,075.36 5,376.80

401 aiii CONCRETE CLASS "A3" (Elevated) CM 349.99 643.62 3,725.63 1,179.81 5,899.05

401 b CONCRETE CLASS "B" CM 452.93 407.09 2,339.44 799.87 3,999.33

401 ci CONCRETE CLASS "C" (Underground) CM 342.65 258.76 2,783.29 846.18 4,230.88

401 cii CONCRETE CLASS "C" (On ground) CM 342.65 258.76 2,872.39 868.45 4,342.25

401 ciii CONCRETE CLASS "C" (Elevated) CM 342.65 258.76 3,050.58 913.00 4,564.99

401 d CONCRETE CLASS "D1" CM 541.62 810.64 3,960.28 1,328.14 6,640.68

401 e CONCRETE CLASS "Y" CM 756.36 258.76 3,386.21 1,100.33 5,501.66

401 f LEAN CONCRETE CM 291.55 252.12 1,885.63 607.33 3,036.63

Page 59: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 59 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,160.97 468.57 3,893.82 1,380.84 6,904.20

401 gii PRECAST CONCRETE CLASS "B" CM 1,160.97 468.57 3,507.45 1,284.25 6,421.24

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,050.76 - 42,568.47 10,904.81 54,524.04

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,050.76 - 44,668.47 11,429.81 57,149.04

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 861.14 2,335.68 37,396.01 10,148.21 50,741.04

405 aTON 2,031.81 6,882.66 84,745.53 23,415.00 117,075.00

405 b LAUNCHING OF GIRDER TON 47.94 403.69 - 112.91 564.54

406 aSM 76.97 - 185.36 65.58 327.91

406 b SM 76.97 - 194.08 67.76 338.81

406 c STEEL EXPANSION JOINTS KG 6.32 11.61 61.26 19.80 98.99

406 d WATER STOPS 6" SIZE M 62.95 - 309.51 93.12 465.58

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.88 - 1,411.38 359.82 1,799.08

406 g STEEL OR METAL BEARING DEVICES KG 13.80 30.66 81.56 31.51 157.53

407 d1M 255.70 847.08 548.23 412.75 2,063.76

407 d2M 383.56 1,270.62 822.35 619.13 3,095.66

407 d3M 383.56 1,270.62 626.99 570.29 2,851.46

407 d4M 639.26 2,117.70 769.98 881.74 4,408.68

407 d5M 547.94 1,815.17 718.91 770.51 3,852.53

407 d6M 958.89 3,176.55 1,000.28 1,283.93 6,419.65

407 h PILE LOAD TEST UP TO 120 TON EACH 14,326.74 19,990.40 72,541.08 26,714.56 133,572.78

407 i PILE LOAD TEST UP TO 240 TON EACH 28,583.46 19,990.40 145,082.16 48,414.01 242,070.03

407 j PILE LOAD TEST UP TO 360 TON EACH 42,673.14 19,990.40 217,623.24 70,071.70 350,358.48

407 k CONFIRMATORY BORING (NX SIZE) M 143.54 826.61 5.16 243.83 1,219.14

410 BRICK WORK CM 221.09 142.50 2,121.13 621.18 3,105.90

411 a STONE MASONRY RANDOM DRY CM 232.10 56.01 422.34 177.61 888.06

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 60: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 60 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 276.28 84.89 1,153.27 378.61 1,893.05

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 319.63 56.01 470.67 211.58 1,057.89

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 362.98 84.89 1,205.21 413.27 2,066.35

411 g ROLL POINTING SM 47.11 5.78 45.84 24.68 123.41

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 422.16 134.30 1,098.44 413.73 2,068.63

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 152.58 230.36 365.89 187.21 936.04

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 148.78 297.19 471.13 229.28 1,146.38

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 145.62 514.83 581.09 310.39 1,551.93

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 152.83 639.81 871.22 415.97 2,079.83

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 176.94 704.13 1,176.26 514.33 2,571.66

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 219.95 868.93 1,773.07 715.49 3,577.44

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 284.64 961.94 2,218.44 866.26 4,331.28

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 335.51 1,168.07 3,096.79 1,150.09 5,750.46

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 397.62 1,362.74 4,694.56 1,613.73 8,068.65

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 152.58 263.77 387.37 200.93 1,004.65

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 148.78 297.19 503.93 237.48 1,187.38

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 142.24 514.83 607.33 316.10 1,580.50

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 152.83 639.81 930.81 430.86 2,154.31

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 176.94 704.13 1,642.43 630.88 3,154.38

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 219.95 868.93 2,235.55 831.11 4,155.54

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 284.64 961.94 2,848.20 1,023.70 5,118.48

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 335.51 1,168.07 3,722.76 1,306.59 6,532.93

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 397.62 1,362.74 5,126.65 1,721.75 8,608.76

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 59.80 68.08 279.55 101.86 509.29

502 bCM 508.95 309.47 2,391.88 802.58 4,012.88

507 a STEEL WIRE MESH FOR GABIONS KG 3.62 - 76.80 20.11 100.53

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 61: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 61 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.74 - 408.33 118.27 591.34

508 a BRICK PAVING (SINGLE COURSE) SM 73.96 15.80 170.09 64.96 324.81

508 b BRICK PAVING (DOUBLE COURSE) SM 132.31 15.80 337.68 121.45 607.24

509 a RIP RAP CLASS "A" CM 319.63 - 350.96 167.65 838.24

509 b RIP RAP CLASS "B" CM 308.38 - 348.15 164.13 820.66

509 c RIP RAP CLASS "C" CM 310.34 - 350.96 165.33 826.63

509 d GROUTED RIP RAP CLASS "A" CM 342.94 28.07 1,193.49 391.13 1,955.63

509 e GROUTED RIP RAP CLASS "B" CM 342.94 28.07 1,193.49 391.13 1,955.63

509 f GROUTED RIP RAP CLASS "C" CM 338.44 23.39 1,212.95 393.70 1,968.48

509 gCM 527.49 181.56 2,753.22 865.57 4,327.84

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.71 115.89 306.47 113.77 568.84

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 75.19 194.57 - 67.44 337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 100.46 35.01 57.03 48.13 240.63

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 128.59 44.81 73.00 61.60 308.00

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 163.27 91.01 232.98 121.82 609.08

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 204.08 113.77 291.23 152.27 761.35

603 BRICK EDGING M 5.87 - 26.88 8.19 40.94

605 a CONCRETE BEAM GUARDRAIL M 50.00 14.67 420.77 121.36 606.80

605 c CONCRETE POST FOR GUARDRAIL M 61.39 13.10 416.85 122.84 614.18

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 160.13 128.42 4,675.58 1,241.03 6,205.16

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 46.02 192.63 6,841.34 1,770.00 8,849.99

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 160.13 272.87 8,454.83 2,221.96 11,109.79

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 523.55 304.65 15,536.23 4,091.11 20,455.54

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 104.71 60.93 7,004.35 1,792.50 8,962.49

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.43 317.82 1,589.09

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.15 446.25 2,231.24

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 62: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 62 / 244

Rate Analysis Summary ( Construction)District (18) Gujrat

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.77 2.85 15.38 5.00 25.00

608 b2M 0.59 1.27 30.30 8.04 40.20

608 c1M 1.77 2.85 20.53 6.29 31.44

608 c2M 0.59 1.27 40.41 10.57 52.84

608 d1EACH 49.67 - 148.65 49.58 247.90

608 d2EACH 49.67 - 381.78 107.86 539.31

608 h1M 2.21 3.56 21.40 6.79 33.96

608 h2M 2.21 4.75 51.71 14.67 73.34

608 i1M 2.21 3.56 28.53 8.58 42.88

608 i2M 2.21 4.75 68.95 18.98 94.89

608 j1EACH 49.67 - 206.61 64.07 320.35

608 j2EACH 49.67 - 652.07 175.44 877.18

608 n1 EACH 41.16 - 99.10 35.07 175.33

608 n2 EACH 41.16 - 254.90 74.02 370.08

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 41.16 - 137.74 44.73 223.63

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 41.16 - 435.37 119.13 595.66

609 cEACH 6.08 46.68 167.56 55.08 275.40

609 dEACH 6.08 46.68 202.56 63.83 319.15

610 b RIGHT OF WAY MARKER EACH 69.61 60.88 209.63 85.03 425.15

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 425.15 476.40 1,408.28 577.46 2,887.29

610 d TEN KILOMETRE POST EACH 821.95 952.79 3,069.66 1,211.10 6,055.50

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 63: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 63 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.48 6.96 - 1.86 9.30

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.77 102.44 0.88 27.02 135.11

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.73 258.13 1.97 68.46 342.29

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 54.90 1,032.53 7.89 273.83 1,369.15

103 STRIPPING CM 1.62 59.42 - 15.26 76.30

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.91 86.79 - 22.43 112.13

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 85.01 193.76 46.20 81.24 406.21

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.85 214.84 - 56.67 283.36

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.79 167.12 - 43.73 218.64

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.38 78.63 - 20.25 101.26

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 85.01 193.76 46.20 81.24 406.21

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.57 199.88 - 53.36 266.81

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.98 167.24 - 43.31 216.53

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.75 89.04 0.31 23.53 117.63

107 bCM 41.33 165.86 53.31 65.13 325.63

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.38 258.51 30.80 91.17 455.86

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 64.05 193.04 - 64.27 321.36

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.77 160.37 - 49.79 248.93

107 d GRANULAR BACK FILL CM 22.91 83.07 300.49 101.62 508.09

107 e COMMON BACK FILL CM 16.71 37.31 4.13 14.54 72.69

108 aCM 4.66 106.71 4.13 28.88 144.38

108 biCM 13.57 302.97 48.81 91.34 456.69

108 biiCM 10.18 268.11 1.96 70.06 350.31

108 biiiCM 9.05 238.60 - 61.91 309.56

108 cCM 5.33 112.14 6.81 31.07 155.35

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 64: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 64 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.15 46.31 4.13 13.65 68.24

108 eCM 9.63 73.87 2.45 21.49 107.44

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.93 16.84 1.18 4.74 23.69

109 biSM 0.66 10.31 0.63 2.90 14.50

110 IMPROVED SUB-GRADE CM 6.67 75.50 47.95 32.53 162.65

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.55 9.38 0.64 2.64 13.21

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.83 9.92 0.74 2.87 14.36

201 GRANULAR SUB-BASE CM 5.42 106.91 429.67 135.50 677.50

202 AGGREGATE BASE CM 6.42 132.11 556.42 173.74 868.69

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 49.14 916.98 3,380.59 1,086.68 5,433.39

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 50.98 916.98 3,601.88 1,142.46 5,712.30

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 54.49 957.74 3,375.19 1,096.86 5,484.28

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 54.49 954.75 3,683.35 1,173.15 5,865.74

204 b CEMENT STABILIZED BASE CM 19.58 272.73 693.83 246.54 1,232.68

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 160.18 568.44 21,817.80 5,636.61 28,183.03

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 160.18 568.44 22,721.62 5,862.56 29,312.80

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.32 55.65 589.42 177.10 885.49

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 100.50 1,408.67 3,054.93 1,141.03 5,705.13

206 bCM 70.23 66.68 477.14 153.51 767.56

207 a DEEP PATCHING (0-15 cm) SM 1.14 30.14 1.02 8.08 40.38

207 b DEEP PATCHING (16-30 cm) SM 1.14 26.47 1.02 7.16 35.79

208 REINSTATEMENT OF ROAD SURFACE SM 1.24 37.00 0.45 9.67 48.36

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.33 70.82 0.55 18.18 90.88

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.82 5.67 28.36

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 65: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 65 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.62 2.49 12.43

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.09 2.35 11.76

304 a SINGLE SURFACE TREATMENT SM 0.52 4.16 42.99 11.92 59.59

304 b DOUBLE SURFACE TREATMENT SM 0.76 8.06 82.03 22.71 113.56

304 c TRIPLE SURFACE TREATMENT SM 1.27 11.08 97.96 27.58 137.89

304 d SEAL COAT SM 0.49 2.33 24.45 6.82 34.09

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 46.40 906.07 3,943.80 1,224.07 6,120.34

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 46.40 876.73 4,252.46 1,293.90 6,469.49

307 a DENSE GRADED HOT BIT-MAC CM 112.86 171.48 3,243.92 882.07 4,410.33

307 b OPEN GRADED HOT BIT-MAC CM 112.86 171.48 3,149.83 858.54 4,292.71

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 19.29 456.95 921.03 349.32 1,746.59

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 140.98 465.97 23,893.50 6,125.11 30,625.56

309 a COLD MILLING, 0 - 30 mm SM 0.64 16.87 7.54 6.26 31.31

309 b COLD MILLING, 0 - 50 mm SM 1.07 28.11 12.57 10.44 52.19

309 c COLD MILLING, 0 - 70 mm SM 1.61 42.16 18.85 15.66 78.28

401 ai CONCRETE CLASS "A3" (Underground) CM 335.19 643.62 3,092.94 1,017.94 5,089.69

401 aii CONCRETE CLASS "A3" (On ground) CM 335.19 643.62 3,301.84 1,070.16 5,350.81

401 aiii CONCRETE CLASS "A3" (Elevated) CM 335.19 643.62 3,719.64 1,174.61 5,873.06

401 b CONCRETE CLASS "B" CM 441.46 407.09 2,316.72 791.32 3,956.59

401 ci CONCRETE CLASS "C" (Underground) CM 328.65 258.76 2,761.42 837.21 4,186.04

401 cii CONCRETE CLASS "C" (On ground) CM 328.65 258.76 2,850.52 859.48 4,297.41

401 ciii CONCRETE CLASS "C" (Elevated) CM 328.65 258.76 3,028.71 904.03 4,520.15

401 d CONCRETE CLASS "D1" CM 513.30 810.64 3,948.42 1,318.09 6,590.45

401 e CONCRETE CLASS "Y" CM 714.57 258.76 3,384.89 1,089.56 5,447.78

401 f LEAN CONCRETE CM 285.81 252.12 1,864.37 600.58 3,002.88

Page 66: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 66 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,117.53 468.57 3,889.42 1,368.88 6,844.40

401 gii PRECAST CONCRETE CLASS "B" CM 1,117.53 468.57 3,481.08 1,266.80 6,333.98

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 996.68 - 42,565.00 10,890.42 54,452.10

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 996.68 - 44,665.00 11,415.42 57,077.10

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 837.24 2,335.68 37,038.29 10,052.80 50,264.01

405 aTON 2,042.79 6,882.66 80,753.29 22,419.69 112,098.43

405 b LAUNCHING OF GIRDER TON 48.16 403.69 - 112.96 564.81

406 aSM 74.23 - 185.35 64.90 324.48

406 b SM 74.23 - 194.06 67.07 335.36

406 c STEEL EXPANSION JOINTS KG 6.20 11.61 60.71 19.63 98.15

406 d WATER STOPS 6" SIZE M 60.25 - 309.52 92.44 462.21

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.65 - 1,411.63 359.57 1,797.85

406 g STEEL OR METAL BEARING DEVICES KG 14.06 30.66 81.07 31.45 157.24

407 d1M 256.79 847.08 558.00 415.47 2,077.34

407 d2M 385.19 1,270.62 837.00 623.20 3,116.01

407 d3M 385.19 1,270.62 641.64 574.36 2,871.81

407 d4M 641.98 2,117.70 794.39 888.52 4,442.59

407 d5M 550.27 1,815.17 739.84 776.32 3,881.60

407 d6M 962.97 3,176.55 1,036.90 1,294.11 6,470.53

407 h PILE LOAD TEST UP TO 120 TON EACH 14,356.02 19,990.40 70,987.00 26,333.36 131,666.78

407 i PILE LOAD TEST UP TO 240 TON EACH 28,583.46 19,990.40 141,974.00 47,636.97 238,184.83

407 j PILE LOAD TEST UP TO 360 TON EACH 42,702.42 19,990.40 212,961.00 68,913.46 344,567.28

407 k CONFIRMATORY BORING (NX SIZE) M 144.15 826.61 5.16 243.98 1,219.90

410 BRICK WORK CM 210.01 142.50 2,080.20 608.18 3,040.89

411 a STONE MASONRY RANDOM DRY CM 221.28 56.01 430.06 176.84 884.19

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 67: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 67 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 264.11 84.89 1,172.68 380.42 1,902.10

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 304.76 56.01 479.01 209.95 1,049.73

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 345.40 84.89 1,221.86 413.04 2,065.19

411 g ROLL POINTING SM 44.41 5.78 46.02 24.05 120.26

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 458.88 134.30 1,150.49 435.92 2,179.59

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 150.89 230.36 366.22 186.87 934.34

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 147.09 297.19 471.52 228.95 1,144.75

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 143.83 514.83 581.55 310.05 1,550.26

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 151.21 639.81 871.76 415.70 2,078.48

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 175.32 704.13 1,176.80 514.06 2,570.31

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 217.83 868.93 1,773.84 715.15 3,575.75

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 281.89 961.94 2,219.18 865.75 4,328.76

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 333.14 1,168.07 3,097.69 1,149.73 5,748.63

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 393.72 1,362.74 4,695.61 1,613.02 8,065.09

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 150.89 263.77 388.13 200.70 1,003.49

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 147.09 297.19 504.32 237.15 1,185.75

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 140.46 514.83 607.79 315.77 1,578.85

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 151.21 639.81 931.23 430.56 2,152.81

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 175.32 704.13 1,643.00 630.61 3,153.06

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 217.83 868.93 2,236.32 830.77 4,153.85

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 281.89 961.94 2,848.94 1,023.19 5,115.96

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 333.14 1,168.07 3,723.66 1,306.22 6,531.09

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 393.72 1,362.74 5,127.70 1,721.04 8,605.20

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 59.58 68.08 258.36 96.51 482.53

502 bCM 492.97 309.47 2,368.95 792.85 3,964.24

507 a STEEL WIRE MESH FOR GABIONS KG 3.50 - 75.81 19.83 99.14

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 68: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 68 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.51 - 414.17 119.67 598.35

508 a BRICK PAVING (SINGLE COURSE) SM 71.12 15.80 163.56 62.62 313.10

508 b BRICK PAVING (DOUBLE COURSE) SM 126.77 15.80 324.79 116.84 584.20

509 a RIP RAP CLASS "A" CM 305.77 - 358.69 166.12 830.58

509 b RIP RAP CLASS "B" CM 295.13 - 355.82 162.74 813.69

509 c RIP RAP CLASS "C" CM 296.59 - 358.69 163.82 819.10

509 d GROUTED RIP RAP CLASS "A" CM 321.96 35.09 1,346.61 425.92 2,129.58

509 e GROUTED RIP RAP CLASS "B" CM 309.95 28.07 1,241.47 394.87 1,974.36

509 f GROUTED RIP RAP CLASS "C" CM 305.54 23.39 1,263.09 398.01 1,990.03

509 gCM 510.48 181.56 2,729.17 855.30 4,276.51

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.51 115.89 300.56 112.24 561.20

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 75.19 194.57 - 67.44 337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 96.66 35.01 58.29 47.49 237.45

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 123.72 44.81 74.61 60.79 303.93

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 156.24 91.01 234.80 120.51 602.56

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 195.30 113.77 293.50 150.64 753.21

603 BRICK EDGING M 5.70 - 25.92 7.91 39.53

605 a CONCRETE BEAM GUARDRAIL M 48.74 14.67 420.62 121.01 605.04

605 c CONCRETE POST FOR GUARDRAIL M 59.85 13.10 416.69 122.41 612.05

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 156.73 128.42 4,670.21 1,238.84 6,194.20

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 43.99 192.63 6,836.28 1,768.23 8,841.13

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 156.73 272.87 8,446.59 2,219.05 11,095.24

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 515.74 304.65 15,487.94 4,077.08 20,385.41

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 103.15 60.93 6,994.75 1,789.71 8,948.54

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.45 317.82 1,589.11

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.18 446.26 2,231.28

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 69: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 69 / 244

Rate Analysis Summary ( Construction)District (200A) Hafizabad

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.63 2.85 15.38 4.97 24.83

608 b2M 0.54 1.27 30.31 8.03 40.15

608 c1M 1.63 2.85 20.53 6.25 31.26

608 c2M 0.54 1.27 40.43 10.56 52.80

608 d1EACH 45.14 - 148.65 48.45 242.24

608 d2EACH 45.14 - 381.97 106.78 533.89

608 h1M 2.04 3.56 21.40 6.75 33.75

608 h2M 2.04 4.75 51.71 14.63 73.13

608 i1M 2.04 3.56 28.53 8.53 42.66

608 i2M 2.04 4.75 68.95 18.94 94.68

608 j1EACH 45.14 - 206.61 62.94 314.69

608 j2EACH 45.14 - 652.07 174.30 871.51

608 n1 EACH 37.44 - 99.10 34.14 170.68

608 n2 EACH 37.44 - 255.03 73.12 365.59

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 37.44 - 137.74 43.80 218.98

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 37.44 - 435.37 118.20 591.01

609 cEACH 5.74 46.68 167.57 55.00 274.99

609 dEACH 5.74 46.68 202.57 63.75 318.74

610 b RIGHT OF WAY MARKER EACH 68.65 60.88 209.50 84.76 423.79

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 409.60 476.40 1,408.49 573.62 2,868.11

610 d TEN KILOMETRE POST EACH 793.56 952.79 3,067.60 1,203.49 6,017.44

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 70: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 70 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.46 6.96 - 1.86 9.28

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.51 102.44 0.88 26.96 134.79

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.15 258.13 1.97 68.31 341.56

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 52.59 1,032.53 7.89 273.25 1,366.26

103 STRIPPING CM 1.54 59.42 - 15.24 76.20

104 COMPACTION OF NATURAL GROUND SM 0.22 5.92 0.62 1.69 8.45

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.54 86.79 - 22.33 111.66

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 76.94 193.76 46.20 79.23 396.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.93 214.84 - 56.44 282.21

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.20 167.12 - 43.58 217.90

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.07 78.63 - 20.18 100.88

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 76.94 193.76 46.20 79.23 396.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.25 199.88 - 53.03 265.16

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.51 167.24 - 43.19 215.94

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.29 89.04 0.31 23.41 117.05

107 bCM 39.89 165.86 53.31 64.77 323.83

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 68.04 258.51 30.80 89.34 446.69

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 57.95 193.04 - 62.75 313.74

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 34.99 160.37 - 48.84 244.20

107 d GRANULAR BACK FILL CM 21.41 83.07 289.48 98.49 492.45

107 e COMMON BACK FILL CM 16.26 37.31 4.13 14.43 72.13

108 aCM 4.26 106.71 4.13 28.78 143.88

108 biCM 12.58 302.97 48.81 91.09 455.45

108 biiCM 9.44 268.11 1.96 69.88 349.39

108 biiiCM 8.39 238.60 - 61.75 308.74

108 cCM 4.93 112.14 6.81 30.97 154.85

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 71: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 71 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.82 46.31 4.13 13.57 67.83

108 eCM 9.04 73.87 2.45 21.34 106.70

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.86 16.84 1.18 4.72 23.60

109 biSM 0.61 10.31 0.63 2.89 14.44

110 IMPROVED SUB-GRADE CM 6.16 75.50 52.06 33.43 167.15

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.52 9.38 0.64 2.64 13.18

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.78 9.92 0.74 2.86 14.30

201 GRANULAR SUB-BASE CM 4.99 106.91 459.23 142.78 713.91

202 AGGREGATE BASE CM 5.71 132.11 556.42 173.56 867.80

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 46.99 916.98 3,354.69 1,079.67 5,398.33

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.59 916.98 3,599.00 1,141.14 5,705.71

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 52.06 957.74 3,349.54 1,089.84 5,449.18

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 52.06 954.75 3,681.54 1,172.09 5,860.44

204 b CEMENT STABILIZED BASE CM 17.68 272.73 601.82 223.06 1,115.29

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 149.47 568.44 22,174.80 5,723.18 28,615.89

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 149.47 568.44 23,086.55 5,951.12 29,755.58

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.27 55.65 589.45 176.84 884.21

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 94.69 1,408.67 3,058.73 1,140.52 5,702.61

206 bCM 69.09 66.68 509.35 161.28 806.40

207 a DEEP PATCHING (0-15 cm) SM 1.06 30.14 1.02 8.06 40.28

207 b DEEP PATCHING (16-30 cm) SM 1.06 26.47 1.02 7.14 35.69

208 REINSTATEMENT OF ROAD SURFACE SM 1.11 37.00 0.45 9.64 48.20

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.23 70.82 0.55 18.15 90.75

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.25 14.16 0.11 3.63 18.15

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.18 5.76 28.79

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 72: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 72 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.18 5.76 28.79

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.76 2.52 12.59

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.23 2.39 11.93

304 a SINGLE SURFACE TREATMENT SM 0.47 4.16 43.56 12.05 60.24

304 b DOUBLE SURFACE TREATMENT SM 0.69 8.06 83.26 23.00 115.01

304 c TRIPLE SURFACE TREATMENT SM 1.15 11.08 99.30 27.88 139.41

304 d SEAL COAT SM 0.44 2.33 24.49 6.82 34.08

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 43.89 906.07 3,940.29 1,222.56 6,112.81

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 43.89 876.73 4,246.95 1,291.89 6,459.46

307 a DENSE GRADED HOT BIT-MAC CM 106.87 171.48 3,229.13 876.87 4,384.35

307 b OPEN GRADED HOT BIT-MAC CM 106.87 171.48 3,157.98 859.08 4,295.41

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 17.98 456.95 929.43 351.09 1,755.45

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 132.83 465.97 24,250.50 6,212.33 31,061.63

309 a COLD MILLING, 0 - 30 mm SM 0.58 16.87 7.54 6.25 31.24

309 b COLD MILLING, 0 - 50 mm SM 0.97 28.11 12.57 10.41 52.06

309 c COLD MILLING, 0 - 70 mm SM 1.46 42.16 18.85 15.62 78.09

401 ai CONCRETE CLASS "A3" (Underground) CM 326.74 643.62 3,048.05 1,004.60 5,023.01

401 aii CONCRETE CLASS "A3" (On ground) CM 326.74 643.62 3,256.95 1,056.83 5,284.14

401 aiii CONCRETE CLASS "A3" (Elevated) CM 326.74 643.62 3,674.75 1,161.28 5,806.39

401 b CONCRETE CLASS "B" CM 422.50 407.09 2,325.68 788.82 3,944.09

401 ci CONCRETE CLASS "C" (Underground) CM 323.94 258.76 2,741.94 831.16 4,155.80

401 cii CONCRETE CLASS "C" (On ground) CM 323.94 258.76 2,831.04 853.44 4,267.18

401 ciii CONCRETE CLASS "C" (Elevated) CM 323.94 258.76 3,009.23 897.98 4,489.91

401 d CONCRETE CLASS "D1" CM 509.33 810.64 3,914.16 1,308.53 6,542.66

401 e CONCRETE CLASS "Y" CM 718.83 258.76 3,325.92 1,075.88 5,379.39

401 f LEAN CONCRETE CM 280.58 252.12 1,873.20 601.48 3,007.38

Page 73: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 73 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,110.64 468.57 3,835.58 1,353.70 6,768.49

401 gii PRECAST CONCRETE CLASS "B" CM 1,110.64 468.57 3,490.20 1,267.35 6,336.76

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 980.21 - 42,564.98 10,886.30 54,431.49

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 980.21 - 44,664.98 11,411.30 57,056.49

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 813.97 2,335.68 37,036.41 10,046.52 50,232.58

405 aTON 1,895.98 6,882.66 80,746.45 22,381.27 111,906.36

405 b LAUNCHING OF GIRDER TON 45.10 403.69 - 112.20 560.99

406 aSM 72.79 - 187.63 65.11 325.53

406 b SM 72.79 - 196.34 67.28 336.41

406 c STEEL EXPANSION JOINTS KG 6.10 11.61 60.61 19.58 97.90

406 d WATER STOPS 6" SIZE M 59.09 - 308.57 91.92 459.58

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.38 - 1,412.25 359.66 1,798.29

406 g STEEL OR METAL BEARING DEVICES KG 13.30 30.66 80.95 31.23 156.14

407 d1M 242.87 847.08 555.96 411.48 2,057.39

407 d2M 364.31 1,270.62 833.95 617.22 3,086.10

407 d3M 364.31 1,270.62 638.59 568.38 2,841.90

407 d4M 607.18 2,117.70 789.31 878.55 4,392.74

407 d5M 520.44 1,815.17 735.48 767.77 3,838.86

407 d6M 910.77 3,176.55 1,029.28 1,279.15 6,395.75

407 h PILE LOAD TEST UP TO 120 TON EACH 13,360.38 19,990.40 67,879.72 25,307.63 126,538.13

407 i PILE LOAD TEST UP TO 240 TON EACH 28,492.38 19,990.40 135,759.44 46,060.56 230,302.78

407 j PILE LOAD TEST UP TO 360 TON EACH 42,383.58 19,990.40 203,639.16 66,503.29 332,516.43

407 k CONFIRMATORY BORING (NX SIZE) M 139.40 826.61 5.16 242.79 1,213.96

410 BRICK WORK CM 213.78 142.50 2,085.84 610.53 3,052.65

411 a STONE MASONRY RANDOM DRY CM 223.92 56.01 417.09 174.26 871.28

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 74: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 74 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 267.42 84.89 1,166.76 379.77 1,898.84

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 309.42 56.01 465.00 207.61 1,038.04

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 351.42 84.89 1,213.15 412.37 2,061.83

411 g ROLL POINTING SM 45.66 5.78 46.14 24.40 121.98

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 466.92 134.30 1,141.77 435.75 2,178.74

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 149.02 230.36 366.44 186.46 932.28

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 145.73 297.19 471.79 228.68 1,143.39

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 140.55 514.83 581.86 309.31 1,546.55

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 148.23 639.81 872.12 415.04 2,075.20

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 170.94 704.13 1,177.16 513.06 2,565.29

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 211.49 868.93 1,774.36 713.70 3,568.48

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 273.70 961.94 2,219.70 863.84 4,319.18

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 322.71 1,168.07 3,098.32 1,147.28 5,736.38

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 382.43 1,362.74 4,696.35 1,610.38 8,051.90

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 149.02 263.77 388.57 200.34 1,001.70

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 145.73 297.19 504.59 236.88 1,184.39

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 137.36 514.83 608.10 315.07 1,575.36

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 148.23 639.81 931.51 429.89 2,149.44

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 170.94 704.13 1,643.40 629.62 3,148.09

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 211.49 868.93 2,236.84 829.32 4,146.58

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 273.70 961.94 2,849.46 1,021.28 5,106.38

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 322.71 1,168.07 3,724.29 1,303.77 6,518.84

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 382.43 1,362.74 5,128.43 1,718.40 8,592.00

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 57.54 68.08 215.99 85.40 427.01

502 bCM 475.26 309.47 2,377.90 790.66 3,953.29

507 a STEEL WIRE MESH FOR GABIONS KG 3.41 - 75.81 19.81 99.03

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 75: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 75 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.15 - 379.17 110.58 552.90

508 a BRICK PAVING (SINGLE COURSE) SM 71.75 15.80 161.79 62.34 311.68

508 b BRICK PAVING (DOUBLE COURSE) SM 128.75 15.80 321.61 116.54 582.70

509 a RIP RAP CLASS "A" CM 309.72 - 345.71 163.86 819.29

509 b RIP RAP CLASS "B" CM 299.37 - 342.95 160.58 802.90

509 c RIP RAP CLASS "C" CM 301.48 - 345.71 161.80 808.99

509 d GROUTED RIP RAP CLASS "A" CM 326.38 35.09 1,337.23 424.68 2,123.38

509 e GROUTED RIP RAP CLASS "B" CM 315.10 28.07 1,231.83 393.75 1,968.75

509 f GROUTED RIP RAP CLASS "C" CM 311.18 23.39 1,253.58 397.04 1,985.19

509 gCM 506.86 181.56 2,737.62 856.51 4,282.55

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.72 115.89 289.33 109.24 546.18

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 73.16 194.57 - 66.93 334.66

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 97.06 35.01 56.18 47.06 235.31

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 124.23 44.81 71.91 60.24 301.19

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 157.83 91.01 233.13 120.49 602.46

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 197.29 113.77 291.42 150.62 753.10

603 BRICK EDGING M 5.66 - 25.92 7.90 39.48

605 a CONCRETE BEAM GUARDRAIL M 48.80 14.67 418.41 120.47 602.35

605 c CONCRETE POST FOR GUARDRAIL M 59.92 13.10 413.97 121.75 608.74

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 153.44 128.42 4,672.52 1,238.60 6,192.98

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 44.25 192.63 6,841.06 1,769.49 8,847.43

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 153.44 272.87 8,454.46 2,220.19 11,100.96

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 512.17 304.65 15,538.34 4,088.79 20,443.95

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 102.43 60.93 7,007.96 1,792.83 8,964.15

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.39 318.06 1,590.29

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,542.59 446.61 2,233.04

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 76: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 76 / 244

Rate Analysis Summary ( Construction)District (22) Jhang

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.56 2.85 15.39 4.95 24.75

608 b2M 0.52 1.27 30.37 8.04 40.20

608 c1M 1.56 2.85 20.54 6.24 31.19

608 c2M 0.52 1.27 40.51 10.58 52.88

608 d1EACH 42.16 - 148.72 47.72 238.60

608 d2EACH 46.16 - 382.77 107.23 536.16

608 h1M 1.95 3.56 21.41 6.73 33.65

608 h2M 1.95 4.75 51.71 14.60 73.01

608 i1M 1.95 3.56 28.54 8.51 42.56

608 i2M 1.95 4.75 68.95 18.91 94.56

608 j1EACH 46.16 - 206.68 63.21 316.05

608 j2EACH 46.16 - 652.07 174.56 872.79

608 n1 EACH 38.06 - 99.15 34.30 171.51

608 n2 EACH 38.06 - 255.56 73.41 367.03

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.06 - 137.79 43.96 219.81

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.06 - 435.37 118.36 591.79

609 cEACH 5.77 46.68 167.58 55.01 275.04

609 dEACH 5.77 46.68 202.58 63.76 318.79

610 b RIGHT OF WAY MARKER EACH 68.20 60.88 207.15 84.06 420.29

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 412.95 476.40 1,389.70 569.76 2,848.81

610 d TEN KILOMETRE POST EACH 798.91 952.79 3,029.27 1,195.24 5,976.21

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 77: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 77 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.48 6.96 - 1.86 9.30

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.77 102.44 0.88 27.02 135.11

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.73 258.13 1.97 68.46 342.29

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 54.90 1,032.53 7.89 273.83 1,369.15

103 STRIPPING CM 1.64 59.42 - 15.27 76.33

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.91 86.79 - 22.43 112.13

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 85.33 193.76 46.20 81.32 406.61

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.93 214.84 - 56.69 283.46

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.87 167.12 - 43.75 218.74

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.38 78.63 - 20.25 101.26

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 85.33 193.76 46.20 81.32 406.61

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.61 199.88 - 53.37 266.86

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.03 167.24 - 43.32 216.59

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.79 89.04 0.31 23.54 117.68

107 bCM 42.18 165.86 53.31 65.34 326.69

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.62 258.51 30.80 91.23 456.16

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 64.26 193.04 - 64.33 321.63

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.89 160.37 - 49.82 249.08

107 d GRANULAR BACK FILL CM 22.91 83.07 297.15 100.78 503.91

107 e COMMON BACK FILL CM 16.71 37.31 4.13 14.54 72.69

108 aCM 4.70 106.71 4.13 28.89 144.43

108 biCM 13.65 302.97 48.81 91.36 456.79

108 biiCM 10.24 268.11 1.96 70.08 350.39

108 biiiCM 9.10 238.60 - 61.93 309.63

108 cCM 5.36 112.14 6.81 31.08 155.39

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 78: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 78 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.19 46.31 4.13 13.66 68.29

108 eCM 9.70 73.87 2.45 21.51 107.53

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.94 16.84 1.18 4.74 23.70

109 biSM 0.67 10.31 0.63 2.90 14.51

110 IMPROVED SUB-GRADE CM 6.70 75.50 54.33 34.13 170.66

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.56 9.38 0.64 2.65 13.23

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.84 9.92 0.74 2.88 14.38

201 GRANULAR SUB-BASE CM 5.45 106.91 391.76 126.03 630.15

202 AGGREGATE BASE CM 6.42 132.11 556.42 173.74 868.69

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 49.22 916.98 3,360.78 1,081.75 5,408.73

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 51.05 916.98 3,588.53 1,139.14 5,695.70

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 54.65 957.74 3,355.43 1,091.96 5,459.78

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 54.65 954.75 3,670.10 1,169.88 5,849.38

204 b CEMENT STABILIZED BASE CM 19.58 272.73 663.22 238.88 1,194.41

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 161.59 568.44 21,817.80 5,636.96 28,184.79

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 161.59 568.44 22,717.33 5,861.84 29,309.20

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.43 55.65 589.45 177.13 885.66

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 100.84 1,408.67 3,048.24 1,139.44 5,697.19

206 bCM 70.29 66.68 478.56 153.88 769.41

207 a DEEP PATCHING (0-15 cm) SM 1.15 30.14 1.02 8.08 40.39

207 b DEEP PATCHING (16-30 cm) SM 1.15 26.47 1.02 7.16 35.80

208 REINSTATEMENT OF ROAD SURFACE SM 1.24 37.00 0.45 9.67 48.36

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.35 70.82 0.55 18.18 90.90

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.82 5.67 28.36

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 79: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 79 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.62 2.49 12.43

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.09 2.35 11.76

304 a SINGLE SURFACE TREATMENT SM 0.52 4.16 42.93 11.90 59.51

304 b DOUBLE SURFACE TREATMENT SM 0.76 8.06 81.98 22.70 113.50

304 c TRIPLE SURFACE TREATMENT SM 1.28 11.08 97.87 27.56 137.79

304 d SEAL COAT SM 0.49 2.33 24.35 6.79 33.96

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 46.49 906.07 3,927.35 1,219.98 6,099.89

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 46.49 876.73 4,233.62 1,289.21 6,446.05

307 a DENSE GRADED HOT BIT-MAC CM 112.86 171.48 3,223.85 877.05 4,385.24

307 b OPEN GRADED HOT BIT-MAC CM 112.86 171.48 3,138.68 855.76 4,278.78

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 19.29 456.95 921.03 349.32 1,746.59

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 142.39 465.97 23,893.50 6,125.47 30,627.33

309 a COLD MILLING, 0 - 30 mm SM 0.64 16.87 7.54 6.26 31.31

309 b COLD MILLING, 0 - 50 mm SM 1.07 28.11 12.57 10.44 52.19

309 c COLD MILLING, 0 - 70 mm SM 1.61 42.16 18.85 15.66 78.28

401 ai CONCRETE CLASS "A3" (Underground) CM 344.68 643.62 2,994.29 995.65 4,978.24

401 aii CONCRETE CLASS "A3" (On ground) CM 344.68 643.62 3,203.19 1,047.87 5,239.36

401 aiii CONCRETE CLASS "A3" (Elevated) CM 344.68 643.62 3,621.00 1,152.33 5,761.63

401 b CONCRETE CLASS "B" CM 448.96 407.09 2,228.55 771.15 3,855.75

401 c1 CONCRETE CLASS "C" (Underground) CM 337.56 258.76 2,668.88 816.30 4,081.50

401 c2 CONCRETE CLASS "C" (On ground) CM 337.56 258.76 2,757.97 838.57 4,192.86

401 c3 CONCRETE CLASS "C" (Elevated) CM 337.56 258.76 2,936.17 883.12 4,415.61

401 d CONCRETE CLASS "D1" CM 531.23 810.64 3,861.18 1,300.76 6,503.81

401 e CONCRETE CLASS "Y" CM 740.82 258.76 3,289.32 1,072.23 5,361.13

401 f LEAN CONCRETE CM 289.56 252.12 1,776.10 579.45 2,897.23

Page 80: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 80 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,145.67 468.57 3,780.44 1,348.67 6,743.35

401 gii PRECAST CONCRETE CLASS "B" CM 1,145.67 468.57 3,393.05 1,251.82 6,259.11

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,030.44 - 42,565.13 10,898.89 54,494.46

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,030.44 - 44,665.13 11,423.89 57,119.46

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 857.50 2,335.68 37,052.17 10,061.34 50,306.69

405 aTON 2,042.79 6,882.66 80,755.13 22,420.15 112,100.73

405 b LAUNCHING OF GIRDER TON 48.16 403.69 - 112.96 564.81

406 aSM 76.11 - 186.70 65.70 328.51

406 b SM 76.11 - 195.42 67.88 339.41

406 c STEEL EXPANSION JOINTS KG 6.33 11.61 60.64 19.65 98.23

406 d WATER STOPS 6" SIZE M 61.94 - 309.78 92.93 464.65

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.50 - 1,411.74 359.81 1,799.05

406 g STEEL OR METAL BEARING DEVICES KG 14.06 30.66 81.03 31.44 157.19

407 d1M 256.79 847.08 554.23 414.53 2,072.63

407 d2M 385.19 1,270.62 831.35 621.79 3,108.95

407 d3M 385.19 1,270.62 635.99 572.95 2,864.75

407 d4M 641.98 2,117.70 784.98 886.17 4,430.83

407 d5M 550.27 1,815.17 731.76 774.30 3,871.50

407 d6M 962.97 3,176.55 1,022.78 1,290.58 6,452.88

407 h PILE LOAD TEST UP TO 120 TON EACH 14,356.02 19,990.40 72,541.08 26,721.88 133,609.38

407 i PILE LOAD TEST UP TO 240 TON EACH 28,583.46 19,990.40 145,082.16 48,414.01 242,070.03

407 j PILE LOAD TEST UP TO 360 TON EACH 42,702.42 19,990.40 217,623.24 70,079.02 350,395.08

407 k CONFIRMATORY BORING (NX SIZE) M 144.15 826.61 5.16 243.98 1,219.90

410 BRICK WORK CM 216.93 142.50 2,023.70 595.78 2,978.91

411 a STONE MASONRY RANDOM DRY CM 228.04 56.01 378.61 165.67 828.33

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 81: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 81 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 271.70 84.89 1,050.61 351.80 1,759.00

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 314.04 56.01 500.45 217.63 1,088.13

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 356.38 84.89 1,190.34 407.90 2,039.51

411 g ROLL POINTING SM 46.10 5.78 44.84 24.18 120.90

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 472.38 134.30 1,118.96 431.41 2,157.05

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 151.95 230.36 364.01 186.58 932.90

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 148.15 297.19 468.87 228.55 1,142.76

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 145.10 514.83 578.47 309.60 1,548.00

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 152.36 639.81 868.15 415.08 2,075.40

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 176.47 704.13 1,173.19 513.45 2,567.24

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 219.36 868.93 1,768.62 714.23 3,571.14

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 283.88 961.94 2,213.99 864.95 4,324.76

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 334.95 1,168.07 3,091.39 1,148.60 5,743.01

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 396.54 1,362.74 4,688.25 1,611.88 8,059.41

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 151.95 263.77 383.72 199.86 999.30

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 148.15 297.19 501.67 236.75 1,183.76

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 141.72 514.83 604.71 315.32 1,576.58

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 152.36 639.81 928.42 430.15 2,150.74

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 176.47 704.13 1,638.99 629.90 3,149.49

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 219.36 868.93 2,231.10 829.85 4,149.24

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 283.88 961.94 2,843.75 1,022.39 5,111.96

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 334.95 1,168.07 3,717.35 1,305.09 6,525.46

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 396.54 1,362.74 5,120.34 1,719.91 8,599.53

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 59.72 68.08 279.55 101.84 509.19

502 bCM 503.28 309.47 2,280.78 773.38 3,866.91

507 a STEEL WIRE MESH FOR GABIONS KG 3.58 - 75.81 19.85 99.24

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 82: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 82 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.65 - 350.00 103.66 518.31

508 a BRICK PAVING (SINGLE COURSE) SM 72.89 15.80 164.44 63.28 316.41

508 b BRICK PAVING (DOUBLE COURSE) SM 130.23 15.80 326.38 118.10 590.51

509 a RIP RAP CLASS "A" CM 314.42 - 307.24 155.42 777.08

509 b RIP RAP CLASS "B" CM 303.40 - 304.78 152.05 760.23

509 c RIP RAP CLASS "C" CM 305.17 - 307.24 153.10 765.51

509 d GROUTED RIP RAP CLASS "A" CM 349.20 35.09 1,236.55 405.21 2,026.05

509 e GROUTED RIP RAP CLASS "B" CM 336.47 28.07 1,137.94 375.62 1,878.10

509 f GROUTED RIP RAP CLASS "C" CM 332.03 23.39 1,156.52 377.99 1,889.93

509 gCM 521.27 181.56 2,645.90 837.18 4,185.91

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.64 115.89 297.37 111.48 557.38

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 75.19 194.57 - 67.44 337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 99.03 35.01 49.93 45.99 229.96

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 126.76 44.81 63.91 58.87 294.35

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 160.63 91.01 217.64 117.32 586.60

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 200.78 113.77 272.06 146.65 733.26

603 BRICK EDGING M 5.81 - 25.92 7.93 39.66

605 a CONCRETE BEAM GUARDRAIL M 49.53 14.67 416.81 120.25 601.26

605 c CONCRETE POST FOR GUARDRAIL M 60.81 13.10 412.00 121.48 607.39

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 159.26 128.42 4,671.85 1,239.88 6,199.41

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 45.26 192.63 6,823.60 1,765.37 8,826.86

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 159.26 272.87 8,423.82 2,213.99 11,069.94

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 521.23 304.65 15,491.62 4,079.38 20,396.88

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 104.25 60.93 6,997.71 1,790.72 8,953.61

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.12 317.99 1,589.95

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,542.18 446.51 2,232.53

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 83: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 83 / 244

Rate Analysis Summary ( Construction)District (23) Jhelum

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.72 2.85 15.39 4.99 24.95

608 b2M 0.57 1.27 30.35 8.05 40.24

608 c1M 1.72 2.85 20.53 6.28 31.38

608 c2M 0.57 1.27 40.48 10.58 52.90

608 d1EACH 47.92 - 148.70 49.16 245.78

608 d2EACH 47.92 - 382.50 107.61 538.03

608 h1M 2.15 3.56 21.40 6.78 33.89

608 h2M 2.15 4.75 51.71 14.65 73.26

608 i1M 2.15 3.56 28.54 8.56 42.81

608 i2M 2.15 4.75 68.95 18.96 94.81

608 j1EACH 47.92 - 206.66 63.65 318.23

608 j2EACH 47.92 - 652.07 175.00 874.99

608 n1 EACH 39.71 - 99.13 34.71 173.55

608 n2 EACH 39.71 - 255.39 73.78 368.88

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 39.71 - 137.77 44.37 221.85

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 39.71 - 435.37 118.77 593.85

609 cEACH 5.95 46.68 167.48 55.03 275.14

609 dEACH 5.95 46.68 202.48 63.78 318.89

610 b RIGHT OF WAY MARKER EACH 69.25 60.88 205.38 83.88 419.39

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 419.31 476.40 1,373.07 567.20 2,835.98

610 d TEN KILOMETRE POST EACH 811.28 952.79 3,000.21 1,191.07 5,955.35

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 84: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 84 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.46 6.96 - 1.86 9.28

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.53 102.44 0.88 26.96 134.81

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.19 258.13 1.97 68.32 341.61

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 52.74 1,032.53 7.89 273.29 1,366.45

103 STRIPPING CM 1.55 59.42 - 15.24 76.21

104 COMPACTION OF NATURAL GROUND SM 0.22 5.92 0.62 1.69 8.45

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.54 86.79 - 22.33 111.66

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 77.22 193.76 46.20 79.30 396.48

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.00 214.84 - 56.46 282.30

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.24 167.12 - 43.59 217.95

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.08 78.63 - 20.18 100.89

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 77.22 193.76 46.20 79.30 396.48

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.29 199.88 - 53.04 265.21

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.55 167.24 - 43.20 215.99

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.32 89.04 0.31 23.42 117.09

107 bCM 40.14 165.86 53.31 64.83 324.14

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 68.25 258.51 30.80 89.39 446.95

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 58.14 193.04 - 62.80 313.98

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 35.10 160.37 - 48.87 244.34

107 d GRANULAR BACK FILL CM 21.41 83.07 341.93 111.60 558.01

107 e COMMON BACK FILL CM 16.26 37.31 4.13 14.43 72.13

108 aCM 4.30 106.71 4.13 28.79 143.93

108 biCM 12.66 302.97 48.81 91.11 455.55

108 biiCM 9.49 268.11 1.96 69.89 349.45

108 biiiCM 8.44 238.60 - 61.76 308.80

108 cCM 4.96 112.14 6.81 30.98 154.89

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 85: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 85 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.85 46.31 4.13 13.57 67.86

108 eCM 9.10 73.87 2.45 21.36 106.78

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.86 16.84 1.18 4.72 23.60

109 biSM 0.61 10.31 0.63 2.89 14.44

110 IMPROVED SUB-GRADE CM 6.21 75.50 54.33 34.01 170.05

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.52 9.38 0.64 2.64 13.18

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.78 9.92 0.74 2.86 14.30

201 GRANULAR SUB-BASE CM 5.02 106.91 458.85 142.70 713.48

202 AGGREGATE BASE CM 5.75 132.11 639.97 194.46 972.29

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.13 916.98 3,463.35 1,106.87 5,534.33

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.73 916.98 3,695.92 1,165.41 5,827.04

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 52.21 957.74 3,457.88 1,116.96 5,584.79

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 52.21 954.75 3,777.62 1,196.15 5,980.73

204 b CEMENT STABILIZED BASE CM 17.80 272.73 744.69 258.81 1,294.03

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 149.47 568.44 22,174.80 5,723.18 28,615.89

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 149.47 568.44 23,095.91 5,953.46 29,767.28

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.37 55.65 677.92 198.99 994.93

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 95.14 1,408.67 3,166.76 1,167.64 5,838.21

206 bCM 69.15 66.68 571.68 176.88 884.39

207 a DEEP PATCHING (0-15 cm) SM 1.07 30.14 1.02 8.06 40.29

207 b DEEP PATCHING (16-30 cm) SM 1.07 26.47 1.02 7.14 35.70

208 REINSTATEMENT OF ROAD SURFACE SM 1.12 37.00 0.45 9.64 48.21

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.24 70.82 0.55 18.15 90.76

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.25 14.16 0.11 3.63 18.15

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.18 5.76 28.79

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 86: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 86 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.18 5.76 28.79

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.76 2.52 12.59

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.24 2.39 11.94

304 a SINGLE SURFACE TREATMENT SM 0.47 4.16 44.18 12.20 61.01

304 b DOUBLE SURFACE TREATMENT SM 0.69 8.06 84.93 23.42 117.10

304 c TRIPLE SURFACE TREATMENT SM 1.16 11.08 101.69 28.48 142.41

304 d SEAL COAT SM 0.44 2.33 24.81 6.90 34.48

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 44.05 906.07 4,034.68 1,246.20 6,231.00

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 44.05 876.73 4,346.04 1,316.71 6,583.53

307 a DENSE GRADED HOT BIT-MAC CM 107.62 171.48 3,315.97 898.77 4,493.84

307 b OPEN GRADED HOT BIT-MAC CM 107.62 171.48 3,240.81 879.98 4,399.89

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.24 456.95 945.48 355.17 1,775.84

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 132.83 465.97 24,250.50 6,212.33 31,061.63

309 a COLD MILLING, 0 - 30 mm SM 0.59 16.87 7.54 6.25 31.25

309 b COLD MILLING, 0 - 50 mm SM 0.98 28.11 12.57 10.42 52.08

309 c COLD MILLING, 0 - 70 mm SM 1.47 42.16 18.85 15.62 78.10

401 ai CONCRETE CLASS "A3" (Underground) CM 331.44 643.62 3,197.37 1,043.11 5,215.54

401 aii CONCRETE CLASS "A3" (On ground) CM 331.44 643.62 3,406.27 1,095.33 5,476.66

401 aiii CONCRETE CLASS "A3" (Elevated) CM 331.44 643.62 3,824.07 1,199.78 5,998.91

401 b CONCRETE CLASS "B" CM 426.68 407.09 2,453.43 821.80 4,109.00

401 ci CONCRETE CLASS "C" (Underground) CM 328.12 258.76 2,896.94 870.96 4,354.78

401 cii CONCRETE CLASS "C" (On ground) CM 328.12 258.76 2,986.03 893.23 4,466.14

401 ciii CONCRETE CLASS "C" (Elevated) CM 328.12 258.76 3,164.22 937.78 4,688.88

401 d CONCRETE CLASS "D1" CM 517.17 810.64 4,062.95 1,347.69 6,738.45

401 e CONCRETE CLASS "Y" CM 727.18 258.76 3,476.19 1,115.53 5,577.66

401 f LEAN CONCRETE CM 282.77 252.12 1,995.35 632.56 3,162.80

Page 87: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 87 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,120.67 468.57 3,998.08 1,396.83 6,984.15

401 gii PRECAST CONCRETE CLASS "B" CM 1,120.67 468.57 3,625.35 1,303.65 6,518.24

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 995.25 - 42,670.66 10,916.48 54,582.39

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 995.25 - 44,770.66 11,441.48 57,207.39

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 814.00 2,335.68 37,106.25 10,063.98 50,319.91

405 aTON 1,895.98 6,882.66 80,763.03 22,385.42 111,927.09

405 b LAUNCHING OF GIRDER TON 45.10 403.69 - 112.20 560.99

406 aSM 73.63 - 184.86 64.62 323.11

406 b SM 73.63 - 193.57 66.80 334.00

406 c STEEL EXPANSION JOINTS KG 6.04 11.61 60.84 19.62 98.11

406 d WATER STOPS 6" SIZE M 60.59 - 309.30 92.47 462.36

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.38 - 1,411.44 359.46 1,797.28

406 g STEEL OR METAL BEARING DEVICES KG 13.00 30.66 81.19 31.21 156.06

407 d1M 242.62 847.08 490.06 394.94 1,974.70

407 d2M 363.93 1,270.62 735.10 592.41 2,962.06

407 d3M 363.93 1,270.62 574.11 552.17 2,760.83

407 d4M 606.56 2,117.70 727.68 862.99 4,314.93

407 d5M 519.91 1,815.17 672.84 751.98 3,759.90

407 d6M 909.84 3,176.55 962.62 1,262.25 6,311.26

407 h PILE LOAD TEST UP TO 120 TON EACH 14,037.18 19,990.40 72,541.06 26,642.16 133,210.80

407 i PILE LOAD TEST UP TO 240 TON EACH 28,492.38 19,990.40 145,082.12 48,391.23 241,956.13

407 j PILE LOAD TEST UP TO 360 TON EACH 42,383.58 19,990.40 217,623.18 69,999.29 349,996.45

407 k CONFIRMATORY BORING (NX SIZE) M 139.40 826.61 5.16 242.79 1,213.96

410 BRICK WORK CM 213.93 142.50 2,167.24 630.92 3,154.59

411 a STONE MASONRY RANDOM DRY CM 224.67 56.01 503.60 196.07 980.35

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 88: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 88 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 268.17 84.89 1,291.12 411.05 2,055.23

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 310.17 56.01 558.43 231.15 1,155.76

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 352.17 84.89 1,336.77 443.46 2,217.29

411 g ROLL POINTING SM 45.66 5.78 46.85 24.57 122.86

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 467.67 134.30 1,265.39 466.84 2,334.20

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 149.21 230.36 367.78 186.84 934.19

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 145.92 297.19 473.40 229.13 1,145.64

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 140.93 514.83 583.70 309.87 1,549.33

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 148.57 639.81 874.29 415.67 2,078.34

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 171.28 704.13 1,179.33 513.69 2,568.43

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 211.84 868.93 1,777.54 714.58 3,572.89

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 274.14 961.94 2,222.96 864.76 4,323.80

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 323.24 1,168.07 3,102.27 1,148.40 5,741.98

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 382.74 1,362.74 4,700.96 1,611.61 8,058.05

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 149.21 263.77 390.80 200.95 1,004.73

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 145.92 297.19 506.20 237.33 1,186.64

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 137.55 514.83 609.94 315.58 1,577.90

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 148.57 639.81 933.18 430.39 2,151.95

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 171.28 704.13 1,645.92 630.33 3,151.66

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 211.84 868.93 2,240.02 830.20 4,150.99

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 274.14 961.94 2,852.72 1,022.20 5,111.00

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 323.24 1,168.07 3,728.24 1,304.89 6,524.44

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 382.74 1,362.74 5,133.04 1,719.63 8,598.15

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 57.66 68.08 279.55 101.32 506.61

502 bCM 481.94 309.47 2,506.54 824.49 4,122.44

507 a STEEL WIRE MESH FOR GABIONS KG 3.41 - 77.80 20.30 101.51

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 89: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 89 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.28 - 431.67 123.74 618.69

508 a BRICK PAVING (SINGLE COURSE) SM 71.83 15.80 170.09 64.43 322.15

508 b BRICK PAVING (DOUBLE COURSE) SM 128.83 15.80 337.68 120.58 602.89

509 a RIP RAP CLASS "A" CM 309.91 - 432.23 185.54 927.68

509 b RIP RAP CLASS "B" CM 299.52 - 428.77 182.07 910.36

509 c RIP RAP CLASS "C" CM 301.60 - 432.23 183.46 917.29

509 d GROUTED RIP RAP CLASS "A" CM 343.21 35.09 1,438.44 454.19 2,270.93

509 e GROUTED RIP RAP CLASS "B" CM 331.27 28.07 1,330.80 422.54 2,112.68

509 f GROUTED RIP RAP CLASS "C" CM 327.36 23.39 1,354.25 426.25 2,131.25

509 gCM 511.45 181.56 2,868.48 890.37 4,451.86

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.84 115.89 341.91 122.41 612.05

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 73.16 194.57 - 66.93 334.66

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 97.29 35.01 70.24 50.64 253.18

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 124.53 44.81 89.90 64.81 324.05

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 158.13 91.01 254.13 125.82 629.09

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 197.67 113.77 317.67 157.28 786.39

603 BRICK EDGING M 5.68 - 26.88 8.14 40.70

605 a CONCRETE BEAM GUARDRAIL M 48.95 14.67 424.88 122.13 610.63

605 c CONCRETE POST FOR GUARDRAIL M 60.11 13.10 421.82 123.76 618.79

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 153.69 128.42 4,682.11 1,241.06 6,205.28

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 45.00 192.63 6,861.63 1,774.82 8,874.08

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 153.69 272.87 8,490.65 2,229.30 11,146.51

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 512.54 304.65 15,588.81 4,101.50 20,507.50

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 102.51 60.93 7,013.47 1,794.23 8,971.14

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.02 317.72 1,588.58

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,540.53 446.09 2,230.46

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 90: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 90 / 244

Rate Analysis Summary ( Construction)District (28) Kasur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.62 2.85 15.38 4.96 24.81

608 b2M 0.54 1.27 30.29 8.03 40.13

608 c1M 1.62 2.85 20.52 6.25 31.24

608 c2M 0.54 1.27 40.39 10.55 52.75

608 d1EACH 46.62 - 148.62 48.81 244.05

608 d2EACH 46.62 - 381.64 107.07 535.33

608 h1M 2.02 3.56 21.40 6.75 33.73

608 h2M 2.02 4.75 51.71 14.62 73.10

608 i1M 2.02 3.56 28.53 8.53 42.64

608 i2M 2.02 4.75 68.95 18.93 94.65

608 j1EACH 46.62 - 206.58 63.30 316.50

608 j2EACH 46.62 - 652.07 174.67 873.36

608 n1 EACH 38.52 - 99.08 34.40 172.00

608 n2 EACH 38.52 - 254.81 73.33 366.66

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.52 - 137.72 44.06 220.30

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.52 - 435.37 118.47 592.36

609 cEACH 5.91 46.68 167.65 55.06 275.30

609 dEACH 5.91 46.68 202.65 63.81 319.05

610 b RIGHT OF WAY MARKER EACH 68.45 60.88 213.63 85.74 428.70

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 413.33 476.40 1,439.92 582.41 2,912.06

610 d TEN KILOMETRE POST EACH 799.66 952.79 3,135.85 1,222.08 6,110.38

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 91: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 91 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.30 102.44 0.88 27.16 135.78

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.51 258.13 1.97 68.90 344.51

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.05 1,032.53 7.89 275.62 1,378.09

103 STRIPPING CM 1.81 59.42 - 15.31 76.54

104 COMPACTION OF NATURAL GROUND SM 0.25 5.92 0.62 1.70 8.49

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.80 86.79 - 22.40 111.99

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 87.34 193.76 46.20 81.83 409.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.73 214.84 - 56.89 284.46

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.31 167.12 - 43.86 219.29

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.29 78.63 - 20.23 101.15

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 87.34 193.76 46.20 81.83 409.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.85 199.88 - 53.43 267.16

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.43 167.24 - 43.42 217.09

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.92 89.04 0.31 23.57 117.84

107 bCM 46.25 165.86 53.31 66.36 331.78

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 76.92 258.51 30.80 91.56 457.79

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 65.68 193.04 - 64.68 323.40

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 39.56 160.37 - 49.98 249.91

107 d GRANULAR BACK FILL CM 24.47 83.07 293.22 100.19 500.95

107 e COMMON BACK FILL CM 19.07 37.31 4.13 15.13 75.64

108 aCM 4.94 106.71 4.13 28.95 144.73

108 biCM 14.63 302.97 48.81 91.60 458.01

108 biiCM 10.97 268.11 1.96 70.26 351.30

108 biiiCM 9.75 238.60 - 62.09 310.44

108 cCM 5.74 112.14 6.81 31.17 155.86

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 92: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 92 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.46 46.31 4.13 13.73 68.63

108 eCM 10.61 73.87 2.45 21.73 108.66

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.99 16.84 1.18 4.75 23.76

109 biSM 0.71 10.31 0.63 2.91 14.56

110 IMPROVED SUB-GRADE CM 7.28 75.50 49.40 33.05 165.23

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.61 9.38 0.64 2.66 13.29

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.92 9.92 0.74 2.90 14.48

201 GRANULAR SUB-BASE CM 5.77 106.91 477.57 147.56 737.81

202 AGGREGATE BASE CM 6.59 132.11 629.52 192.06 960.28

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 55.24 916.98 3,500.43 1,118.16 5,590.81

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 56.95 916.98 3,726.28 1,175.05 5,875.26

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 60.91 957.74 3,495.02 1,128.42 5,642.09

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 60.91 954.75 3,808.39 1,206.01 6,030.06

204 b CEMENT STABILIZED BASE CM 20.50 272.73 773.78 266.75 1,333.76

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 167.04 568.44 22,378.80 5,778.57 28,892.85

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 167.04 568.44 23,295.73 6,007.80 30,039.01

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 74.01 55.65 665.20 198.72 993.58

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 110.88 1,408.67 3,177.28 1,174.21 5,871.04

206 bCM 81.92 66.68 572.84 180.36 901.80

207 a DEEP PATCHING (0-15 cm) SM 1.24 30.14 1.02 8.10 40.50

207 b DEEP PATCHING (16-30 cm) SM 1.24 26.47 1.02 7.18 35.91

208 REINSTATEMENT OF ROAD SURFACE SM 1.30 37.00 0.45 9.69 48.44

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.41 70.82 0.55 18.20 90.98

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.28 14.16 0.11 3.64 18.19

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.21 0.67 22.39 5.82 29.09

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 93: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 93 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 22.39 5.82 29.08

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.84 2.54 12.70

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.32 2.41 12.05

304 a SINGLE SURFACE TREATMENT SM 0.53 4.16 44.60 12.32 61.61

304 b DOUBLE SURFACE TREATMENT SM 0.78 8.06 85.60 23.61 118.05

304 c TRIPLE SURFACE TREATMENT SM 1.30 11.08 102.48 28.72 143.58

304 d SEAL COAT SM 0.48 2.33 25.13 6.99 34.93

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 51.35 906.07 4,075.83 1,258.31 6,291.56

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 51.35 876.73 4,393.20 1,330.32 6,651.60

307 a DENSE GRADED HOT BIT-MAC CM 128.09 171.48 3,363.68 915.81 4,579.06

307 b OPEN GRADED HOT BIT-MAC CM 128.09 171.48 3,272.60 893.04 4,465.21

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 22.26 456.95 948.27 356.87 1,784.35

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 149.13 465.97 24,454.50 6,267.40 31,337.00

309 a COLD MILLING, 0 - 30 mm SM 0.67 16.87 7.54 6.27 31.35

309 b COLD MILLING, 0 - 50 mm SM 1.12 28.11 12.57 10.45 52.25

309 c COLD MILLING, 0 - 70 mm SM 1.69 42.16 18.85 15.68 78.38

401 ai CONCRETE CLASS "A3" (Underground) CM 392.63 643.62 3,214.56 1,062.70 5,313.51

401 aii CONCRETE CLASS "A3" (On ground) CM 392.63 643.62 3,423.46 1,114.93 5,574.64

401 aiii CONCRETE CLASS "A3" (Elevated) CM 392.63 643.62 3,841.26 1,219.38 6,096.89

401 b CONCRETE CLASS "B" CM 501.04 407.09 2,445.02 838.29 4,191.44

401 ci CONCRETE CLASS "C" (Underground) CM 390.72 258.76 2,899.75 887.31 4,436.54

401 cii CONCRETE CLASS "C" (On ground) CM 390.72 258.76 2,988.85 909.58 4,547.91

401 ciii CONCRETE CLASS "C" (Elevated) CM 390.72 258.76 3,167.04 954.13 4,770.65

401 d CONCRETE CLASS "D1" CM 615.44 810.64 4,075.38 1,375.37 6,876.83

401 e CONCRETE CLASS "Y" CM 856.70 258.76 3,499.77 1,153.81 5,769.04

401 f LEAN CONCRETE CM 337.24 252.12 1,986.65 644.00 3,220.01

Page 94: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 94 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,323.95 468.57 4,018.93 1,452.86 7,264.31

401 gii PRECAST CONCRETE CLASS "B" CM 1,323.95 468.57 3,616.43 1,352.24 6,761.19

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,180.20 - 42,565.60 10,936.45 54,682.25

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,180.20 - 44,665.60 11,461.45 57,307.25

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 965.98 2,335.68 37,099.90 10,100.39 50,501.95

405 aTON 1,963.83 6,882.66 80,754.35 22,400.21 112,001.05

405 b LAUNCHING OF GIRDER TON 46.52 403.69 - 112.55 562.76

406 aSM 87.26 - 189.38 69.16 345.80

406 b SM 87.26 - 198.09 71.34 356.69

406 c STEEL EXPANSION JOINTS KG 7.09 11.61 60.62 19.83 99.15

406 d WATER STOPS 6" SIZE M 75.83 - 308.23 96.02 480.08

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 29.42 - 1,412.90 360.58 1,802.90

406 g STEEL OR METAL BEARING DEVICES KG 14.80 30.66 81.02 31.62 158.10

407 d1M 251.61 847.08 558.00 414.17 2,070.86

407 d2M 377.42 1,270.62 837.00 621.26 3,106.30

407 d3M 377.42 1,270.62 641.64 572.42 2,862.10

407 d4M 629.03 2,117.70 794.39 885.28 4,426.40

407 d5M 539.17 1,815.17 739.84 773.55 3,867.73

407 d6M 943.55 3,176.55 1,036.90 1,289.25 6,446.25

407 h PILE LOAD TEST UP TO 120 TON EACH 19,761.84 19,990.40 67,884.12 26,909.09 134,545.45

407 i PILE LOAD TEST UP TO 240 TON EACH 33,779.52 19,990.40 135,768.24 47,384.54 236,922.70

407 j PILE LOAD TEST UP TO 360 TON EACH 50,390.64 19,990.40 203,652.36 68,508.35 342,541.75

407 k CONFIRMATORY BORING (NX SIZE) M 152.39 826.61 5.16 246.04 1,230.20

410 BRICK WORK CM 243.03 142.50 2,067.29 613.21 3,066.03

411 a STONE MASONRY RANDOM DRY CM 258.70 56.01 478.66 198.34 991.71

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 95: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 95 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 309.19 84.89 1,266.25 415.08 2,075.41

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 356.44 56.01 531.50 235.99 1,179.94

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 403.68 84.89 1,309.88 449.61 2,248.06

411 g ROLL POINTING SM 51.54 5.78 46.85 26.04 130.21

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 537.25 134.30 1,238.50 477.51 2,387.56

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 175.32 230.36 367.78 193.37 966.83

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 171.78 297.19 473.40 235.59 1,177.96

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 165.09 514.83 583.70 315.91 1,579.53

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 174.51 639.81 874.30 422.16 2,110.78

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 200.56 704.13 1,179.34 521.01 2,605.04

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 246.69 868.93 1,777.54 723.29 3,616.45

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 319.25 961.94 2,222.96 876.04 4,380.19

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 377.18 1,168.07 3,102.28 1,161.88 5,809.41

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 444.06 1,362.74 4,700.96 1,626.94 8,134.70

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 175.32 263.77 390.80 207.47 1,037.36

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 171.78 297.19 506.20 243.79 1,218.96

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 160.16 514.83 609.94 321.23 1,606.16

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 174.51 639.81 933.18 436.88 2,184.38

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 200.56 704.13 1,645.92 637.65 3,188.26

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 246.69 868.93 2,240.02 838.91 4,194.55

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 319.25 961.94 2,852.72 1,033.48 5,167.39

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 377.18 1,168.07 3,728.24 1,318.37 6,591.86

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 444.06 1,362.74 5,133.05 1,734.96 8,674.81

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 67.67 68.08 216.05 87.95 439.75

502 bCM 575.26 309.47 2,498.13 845.72 4,228.58

507 a STEEL WIRE MESH FOR GABIONS KG 3.83 - 75.81 19.91 99.55

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 96: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 96 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 74.89 - 408.33 120.81 604.03

508 a BRICK PAVING (SINGLE COURSE) SM 82.54 15.80 156.14 63.62 318.10

508 b BRICK PAVING (DOUBLE COURSE) SM 147.70 15.80 310.31 118.45 592.26

509 a RIP RAP CLASS "A" CM 353.94 - 407.29 190.31 951.54

509 b RIP RAP CLASS "B" CM 342.45 - 404.03 186.62 933.10

509 c RIP RAP CLASS "C" CM 344.56 - 407.29 187.96 939.81

509 d GROUTED RIP RAP CLASS "A" CM 434.15 35.09 1,399.23 467.12 2,335.59

509 e GROUTED RIP RAP CLASS "B" CM 418.35 28.07 1,293.25 434.92 2,174.59

509 f GROUTED RIP RAP CLASS "C" CM 418.35 28.07 1,293.25 434.92 2,174.59

509 gCM 608.41 181.56 2,860.17 912.54 4,562.68

509 h FILTER LAYER OF GRANULAR MATERIAL CM 37.75 115.89 293.05 111.67 558.36

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 80.00 194.57 - 68.64 343.21

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 112.25 35.01 66.18 53.36 266.80

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 143.68 44.81 84.72 68.30 341.51

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 181.47 91.01 248.49 130.24 651.21

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 226.84 113.77 310.61 162.81 814.03

603 BRICK EDGING M 6.62 - 24.96 7.90 39.48

605 a CONCRETE BEAM GUARDRAIL M 57.53 14.67 425.26 124.37 621.83

605 c CONCRETE POST FOR GUARDRAIL M 70.63 13.10 422.35 126.52 632.60

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 177.00 128.42 4,686.14 1,247.89 6,239.45

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 55.14 192.63 6,867.37 1,778.79 8,893.93

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 177.00 272.87 8,499.60 2,237.37 11,186.84

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 599.34 304.65 15,608.14 4,128.03 20,640.16

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 119.87 60.93 7,024.44 1,801.31 9,006.55

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.15 318.25 1,591.24

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,543.72 446.89 2,234.45

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 97: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 97 / 244

Rate Analysis Summary ( Construction)District (30) Khanewal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 2.25 2.85 15.33 5.11 25.54

608 b2M 0.75 1.27 30.41 8.11 40.54

608 c1M 2.25 2.85 20.46 6.39 31.95

608 c2M 0.75 1.27 40.56 10.65 53.23

608 d1EACH 55.33 - 148.14 50.87 254.34

608 d2EACH 55.33 - 383.23 109.64 548.20

608 h1M 2.82 3.56 21.41 6.95 34.74

608 h2M 2.82 4.75 51.71 14.82 74.10

608 i1M 2.82 3.56 28.55 8.73 43.66

608 i2M 2.82 4.75 68.95 19.13 95.65

608 j1EACH 55.33 - 206.73 65.52 327.58

608 j2EACH 55.33 - 652.07 176.85 884.25

608 n1 EACH 46.60 - 98.76 36.34 181.70

608 n2 EACH 46.60 - 255.87 75.62 378.09

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 46.60 - 137.82 46.11 230.53

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 46.60 - 435.37 120.49 602.46

609 cEACH 7.36 46.68 167.65 55.42 277.11

609 dEACH 7.36 46.68 202.65 64.17 320.86

610 b RIGHT OF WAY MARKER EACH 81.39 60.88 214.43 89.18 445.88

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 475.57 476.40 1,445.78 599.44 2,997.19

610 d TEN KILOMETRE POST EACH 921.80 952.79 3,147.97 1,255.64 6,278.20

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 98: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 98 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.40 6.96 - 1.84 9.20

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 3.93 102.44 0.88 26.81 134.06

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 11.37 258.13 1.97 67.87 339.34

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 45.47 1,032.53 7.89 271.47 1,357.36

103 STRIPPING CM 1.36 59.42 - 15.20 75.98

104 COMPACTION OF NATURAL GROUND SM 0.19 5.92 0.62 1.68 8.41

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.34 86.79 - 22.28 111.41

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 69.80 193.76 46.20 77.44 387.20

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 9.88 214.84 - 56.18 280.90

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.53 167.12 - 43.41 217.06

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.91 78.63 - 20.14 100.68

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 69.80 193.76 46.20 77.44 387.20

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.11 199.88 - 52.75 263.74

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 4.99 167.24 - 43.06 215.29

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 3.94 89.04 0.31 23.32 116.61

107 bCM 37.55 165.86 53.31 64.18 320.90

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 61.75 258.51 30.80 87.77 438.83

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 52.53 193.04 - 61.39 306.96

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 31.76 160.37 - 48.03 240.16

107 d GRANULAR BACK FILL CM 18.81 83.07 309.33 102.80 514.01

107 e COMMON BACK FILL CM 13.90 37.31 4.13 13.84 69.18

108 aCM 3.88 106.71 4.13 28.68 143.40

108 biCM 11.29 302.97 48.81 90.77 453.84

108 biiCM 8.47 268.11 1.96 69.64 348.18

108 biiiCM 7.53 238.60 - 61.53 307.66

108 cCM 4.44 112.14 6.81 30.85 154.24

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 99: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 99 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.47 46.31 4.13 13.48 67.39

108 eCM 8.06 73.87 2.45 21.10 105.48

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.77 16.84 1.18 4.70 23.49

109 biSM 0.55 10.31 0.63 2.87 14.36

110 IMPROVED SUB-GRADE CM 5.53 75.50 54.33 33.84 169.20

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.46 9.38 0.64 2.62 13.10

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.70 9.92 0.74 2.84 14.20

201 GRANULAR SUB-BASE CM 4.50 106.91 361.33 118.19 590.93

202 AGGREGATE BASE CM 5.20 132.11 545.98 170.82 854.11

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 40.82 916.98 3,358.91 1,079.18 5,395.89

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 42.29 916.98 3,581.69 1,135.24 5,676.20

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 45.38 957.74 3,353.77 1,089.22 5,446.11

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 45.38 954.75 3,663.31 1,165.86 5,829.30

204 b CEMENT STABILIZED BASE CM 15.93 272.73 669.62 239.57 1,197.85

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 133.88 568.44 21,715.80 5,604.53 28,022.65

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 133.88 568.44 22,610.28 5,828.15 29,140.75

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 53.12 55.65 576.94 171.43 857.14

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 83.42 1,408.67 3,033.26 1,131.34 5,656.69

206 bCM 58.80 66.68 495.77 155.31 776.56

207 a DEEP PATCHING (0-15 cm) SM 0.96 30.14 1.02 8.03 40.15

207 b DEEP PATCHING (16-30 cm) SM 0.96 26.47 1.02 7.11 35.56

208 REINSTATEMENT OF ROAD SURFACE SM 1.01 37.00 0.45 9.62 48.08

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.13 70.82 0.55 18.13 90.63

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.23 14.16 0.11 3.63 18.13

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.16 0.67 21.72 5.64 28.19

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 100: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 100 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.16 0.67 21.72 5.64 28.19

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.58 2.47 12.36

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.04 2.34 11.69

304 a SINGLE SURFACE TREATMENT SM 0.42 4.16 42.69 11.82 59.09

304 b DOUBLE SURFACE TREATMENT SM 0.62 8.06 81.41 22.52 112.61

304 c TRIPLE SURFACE TREATMENT SM 1.04 11.08 97.18 27.33 136.63

304 d SEAL COAT SM 0.39 2.33 24.29 6.75 33.76

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 38.43 906.07 3,926.19 1,217.67 6,088.36

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 38.43 876.73 4,233.42 1,287.15 6,435.73

307 a DENSE GRADED HOT BIT-MAC CM 93.23 171.48 3,228.07 873.20 4,365.98

307 b OPEN GRADED HOT BIT-MAC CM 93.23 171.48 3,134.31 849.76 4,248.78

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 15.89 456.95 916.62 347.37 1,736.83

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 118.53 465.97 23,791.50 6,094.00 30,470.00

309 a COLD MILLING, 0 - 30 mm SM 0.52 16.87 7.54 6.23 31.16

309 b COLD MILLING, 0 - 50 mm SM 0.87 28.11 12.57 10.39 51.94

309 c COLD MILLING, 0 - 70 mm SM 1.31 42.16 18.85 15.58 77.90

401 ai CONCRETE CLASS "A3" (Underground) CM 323.96 643.62 3,021.89 997.37 4,986.84

401 aii CONCRETE CLASS "A3" (On ground) CM 323.96 643.62 3,230.79 1,049.59 5,247.96

401 aiii CONCRETE CLASS "A3" (Elevated) CM 323.96 643.62 3,648.59 1,154.04 5,770.21

401 b CONCRETE CLASS "B" CM 399.54 407.09 2,246.30 763.23 3,816.16

401 ci CONCRETE CLASS "C" (Underground) CM 317.08 258.76 2,689.44 816.32 4,081.60

401 cii CONCRETE CLASS "C" (On ground) CM 317.08 258.76 2,778.53 838.59 4,192.96

401 ciii CONCRETE CLASS "C" (Elevated) CM 317.08 258.76 2,956.72 883.14 4,415.70

401 d CONCRETE CLASS "D1" CM 516.11 810.64 3,884.51 1,302.82 6,514.08

401 e CONCRETE CLASS "Y" CM 726.54 258.76 3,318.24 1,075.89 5,379.43

401 f LEAN CONCRETE CM 255.74 252.12 1,793.83 575.42 2,877.11

Page 101: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 101 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,074.27 468.57 3,811.53 1,338.59 6,692.96

401 gii PRECAST CONCRETE CLASS "B" CM 1,074.27 468.57 3,409.90 1,238.19 6,190.93

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 883.89 - 42,565.18 10,862.27 54,311.34

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 883.89 - 44,665.18 11,387.27 56,936.34

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 747.87 2,335.68 37,056.57 10,035.03 50,175.15

405 aTON 1,836.73 6,882.66 80,750.39 22,367.45 111,837.23

405 b LAUNCHING OF GIRDER TON 43.86 403.69 - 111.89 559.44

406 aSM 71.19 - 186.87 64.52 322.58

406 b SM 71.19 - 195.58 66.69 333.46

406 c STEEL EXPANSION JOINTS KG 5.56 11.61 60.64 19.45 97.26

406 d WATER STOPS 6" SIZE M 58.76 - 309.26 92.01 460.03

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.36 - 1,411.73 359.52 1,797.61

406 g STEEL OR METAL BEARING DEVICES KG 12.09 30.66 81.03 30.95 154.73

407 d1M 236.62 847.08 624.25 426.99 2,134.94

407 d2M 354.92 1,270.62 936.37 640.48 3,202.39

407 d3M 354.92 1,270.62 706.64 583.05 2,915.23

407 d4M 591.54 2,117.70 856.89 891.53 4,457.66

407 d5M 507.03 1,815.17 803.23 781.36 3,906.79

407 d6M 887.31 3,176.55 1,104.87 1,292.18 6,460.91

407 h PILE LOAD TEST UP TO 120 TON EACH 11,971.56 19,990.40 69,433.80 25,348.94 126,744.70

407 i PILE LOAD TEST UP TO 240 TON EACH 24,126.84 19,990.40 138,867.60 45,746.21 228,731.05

407 j PILE LOAD TEST UP TO 360 TON EACH 35,781.96 19,990.40 208,301.40 66,018.44 330,092.20

407 k CONFIRMATORY BORING (NX SIZE) M 128.82 826.61 5.16 240.15 1,200.74

410 BRICK WORK CM 210.09 142.50 1,990.65 585.81 2,929.05

411 a STONE MASONRY RANDOM DRY CM 216.60 56.01 394.94 166.89 834.44

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 102: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 102 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 256.80 84.89 1,088.12 357.45 1,787.26

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 299.40 56.01 441.07 199.12 995.60

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 342.00 84.89 1,146.85 393.44 1,967.18

411 g ROLL POINTING SM 45.73 5.78 45.19 24.18 120.88

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 450.00 134.30 1,075.48 414.95 2,074.73

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 130.65 230.36 364.67 181.42 907.10

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 127.61 297.19 469.67 223.62 1,118.09

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 124.80 514.83 579.39 304.76 1,523.78

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 130.64 639.81 869.23 409.92 2,049.60

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 150.47 704.13 1,174.27 507.22 2,536.09

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 187.45 868.93 1,770.19 706.64 3,533.21

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 242.58 961.94 2,215.55 855.02 4,275.09

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 283.84 1,168.07 3,093.28 1,136.30 5,681.49

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 338.93 1,362.74 4,690.46 1,598.03 7,990.16

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 130.65 263.77 385.04 194.87 974.33

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 127.61 297.19 502.47 231.82 1,159.09

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 121.96 514.83 605.63 310.61 1,553.03

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 130.64 639.81 929.27 424.93 2,124.65

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 150.47 704.13 1,640.19 623.70 3,118.49

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 187.45 868.93 2,232.67 822.26 4,111.31

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 242.58 961.94 2,845.31 1,012.46 5,062.29

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 283.84 1,168.07 3,719.24 1,292.79 6,463.94

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 338.93 1,362.74 5,122.55 1,706.06 8,530.28

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 49.73 68.08 237.18 88.75 443.74

502 bCM 457.35 309.47 2,298.52 766.34 3,831.68

507 a STEEL WIRE MESH FOR GABIONS KG 3.02 - 75.81 19.71 98.54

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 103: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 103 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 54.08 - 379.17 108.31 541.56

508 a BRICK PAVING (SINGLE COURSE) SM 68.16 15.80 157.02 60.25 301.23

508 b BRICK PAVING (DOUBLE COURSE) SM 123.36 15.80 311.90 112.77 563.83

509 a RIP RAP CLASS "A" CM 298.72 - 323.56 155.57 777.85

509 b RIP RAP CLASS "B" CM 288.18 - 320.97 152.29 761.44

509 c RIP RAP CLASS "C" CM 291.15 - 323.56 153.68 768.39

509 d GROUTED RIP RAP CLASS "A" CM 307.76 35.09 1,285.65 407.13 2,035.63

509 e GROUTED RIP RAP CLASS "B" CM 296.97 28.07 1,183.55 377.15 1,885.74

509 f GROUTED RIP RAP CLASS "C" CM 293.38 23.39 1,202.22 379.75 1,898.74

509 gCM 479.21 181.56 2,662.34 830.78 4,153.89

509 h FILTER LAYER OF GRANULAR MATERIAL CM 27.34 115.89 309.21 113.11 565.55

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 67.35 194.57 - 65.48 327.40

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 91.92 35.01 52.58 44.88 224.39

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 117.66 44.81 67.30 57.44 287.21

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 151.74 91.01 221.24 116.00 579.99

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 189.67 113.77 276.55 145.00 724.99

603 BRICK EDGING M 5.22 - 24.96 7.55 37.73

605 a CONCRETE BEAM GUARDRAIL M 44.45 14.67 417.91 119.26 596.29

605 c CONCRETE POST FOR GUARDRAIL M 54.58 13.10 413.36 120.26 601.30

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 142.15 128.42 6,660.05 1,732.66 8,663.28

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 42.04 192.63 7,331.61 1,891.57 9,457.85

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 142.15 272.87 8,766.65 2,295.42 11,477.09

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 457.43 304.65 16,006.25 4,192.08 20,960.41

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 91.49 60.93 7,101.11 1,813.38 9,066.91

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.26 318.03 1,590.13

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,542.39 446.56 2,232.79

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 104: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 104 / 244

Rate Analysis Summary ( Construction)District (32) Khushab

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.46 2.85 15.39 4.93 24.63

608 b2M 0.49 1.27 30.36 8.03 40.15

608 c1M 1.46 2.85 20.54 6.21 31.06

608 c2M 0.49 1.27 40.49 10.56 52.81

608 d1EACH 41.99 - 148.71 47.68 238.38

608 d2EACH 41.99 - 382.57 106.14 530.70

608 h1M 1.83 3.56 21.40 6.70 33.49

608 h2M 1.83 4.75 51.71 14.57 72.86

608 i1M 1.83 3.56 28.54 8.48 42.41

608 i2M 1.83 4.75 68.95 18.88 94.41

608 j1EACH 41.99 - 206.67 62.17 310.83

608 j2EACH 41.99 - 652.07 173.52 867.58

608 n1 EACH 34.70 - 99.14 33.46 167.30

608 n2 EACH 34.70 - 255.43 72.53 362.66

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 34.70 - 137.78 43.12 215.60

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 34.70 - 435.37 117.52 587.59

609 cEACH 5.56 46.68 167.51 54.94 274.69

609 dEACH 5.56 46.68 202.51 63.69 318.44

610 b RIGHT OF WAY MARKER EACH 60.35 60.88 206.58 81.95 409.76

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 390.23 476.40 1,383.35 562.50 2,812.48

610 d TEN KILOMETRE POST EACH 750.45 952.79 3,019.79 1,180.76 5,903.79

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 105: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 105 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.38 102.44 0.88 27.18 135.88

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.59 258.13 1.97 68.92 344.61

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.38 1,032.53 7.89 275.70 1,378.50

103 STRIPPING CM 1.83 59.42 - 15.31 76.56

104 COMPACTION OF NATURAL GROUND SM 0.26 5.92 0.62 1.70 8.50

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.12 86.79 - 22.48 112.39

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 92.94 193.76 46.20 83.23 416.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.11 214.84 - 56.99 284.94

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.63 167.12 - 43.94 219.69

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.55 78.63 - 20.30 101.48

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 92.94 193.76 46.20 83.23 416.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 14.81 199.88 - 53.67 268.36

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.62 167.24 - 43.47 217.33

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 5.20 89.04 0.31 23.64 118.19

107 bCM 47.03 165.86 53.31 66.55 332.75

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 82.26 258.51 30.80 92.89 464.46

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 69.98 193.04 - 65.76 328.78

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 42.30 160.37 - 50.67 253.34

107 d GRANULAR BACK FILL CM 25.57 83.07 337.20 111.46 557.30

107 e COMMON BACK FILL CM 19.14 37.31 4.13 15.15 75.73

108 aCM 5.14 106.71 4.13 29.00 144.98

108 biCM 15.08 302.97 48.81 91.72 458.58

108 biiCM 11.31 268.11 1.96 70.35 351.73

108 biiiCM 10.05 238.60 - 62.16 310.81

108 cCM 5.92 112.14 6.81 31.22 156.09

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 106: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 106 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.59 46.31 4.13 13.76 68.79

108 eCM 10.80 73.87 2.45 21.78 108.90

109 a SUB GRADE PREPARATION IN EARTH CUT SM 1.03 16.84 1.18 4.76 23.81

109 biSM 0.73 10.31 0.63 2.92 14.59

110 IMPROVED SUB-GRADE CM 7.42 75.50 50.67 33.40 166.99

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.62 9.38 0.64 2.66 13.30

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.93 9.92 0.74 2.90 14.49

201 GRANULAR SUB-BASE CM 6.00 106.91 467.28 145.05 725.24

202 AGGREGATE BASE CM 6.98 132.11 629.52 192.15 960.76

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 55.76 916.98 3,470.89 1,110.91 5,554.54

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 57.72 916.98 3,691.19 1,166.47 5,832.36

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 61.76 957.74 3,465.56 1,121.27 5,606.33

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 61.76 954.75 3,772.62 1,197.28 5,986.41

204 b CEMENT STABILIZED BASE CM 21.47 272.73 780.58 268.70 1,343.48

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 178.31 568.44 21,970.80 5,679.39 28,396.94

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 178.31 568.44 22,887.39 5,908.54 29,542.68

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 73.03 55.65 665.21 198.47 992.36

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 113.05 1,408.67 3,151.41 1,168.28 5,841.41

206 bCM 80.99 66.68 599.83 186.88 934.38

207 a DEEP PATCHING (0-15 cm) SM 1.27 30.14 1.02 8.11 40.54

207 b DEEP PATCHING (16-30 cm) SM 1.27 26.47 1.02 7.19 35.95

208 REINSTATEMENT OF ROAD SURFACE SM 1.35 37.00 0.45 9.70 48.50

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.48 70.82 0.55 18.21 91.06

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.30 14.16 0.11 3.64 18.21

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 21.98 5.72 28.59

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 107: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 107 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.21 0.67 21.98 5.72 28.58

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.68 2.50 12.51

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.15 2.37 11.85

304 a SINGLE SURFACE TREATMENT SM 0.57 4.16 43.78 12.13 60.64

304 b DOUBLE SURFACE TREATMENT SM 0.83 8.06 84.02 23.23 116.14

304 c TRIPLE SURFACE TREATMENT SM 1.40 11.08 100.63 28.28 141.39

304 d SEAL COAT SM 0.53 2.33 24.76 6.91 34.53

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 52.30 906.07 4,036.03 1,248.60 6,243.00

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 52.30 876.73 4,349.12 1,319.54 6,597.69

307 a DENSE GRADED HOT BIT-MAC CM 127.64 171.48 3,326.30 906.36 4,531.78

307 b OPEN GRADED HOT BIT-MAC CM 127.64 171.48 3,235.11 883.56 4,417.79

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.70 456.95 938.68 354.33 1,771.66

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 157.83 465.97 24,046.50 6,167.58 30,837.88

309 a COLD MILLING, 0 - 30 mm SM 0.71 16.87 7.54 6.28 31.40

309 b COLD MILLING, 0 - 50 mm SM 1.18 28.11 12.57 10.47 52.33

309 c COLD MILLING, 0 - 70 mm SM 1.77 42.16 18.85 15.70 78.48

401 ai CONCRETE CLASS "A3" (Underground) CM 384.45 643.62 3,161.14 1,047.30 5,236.51

401 aii CONCRETE CLASS "A3" (On ground) CM 384.45 643.62 3,370.04 1,099.53 5,497.64

401 aiii CONCRETE CLASS "A3" (Elevated) CM 384.45 643.62 3,787.84 1,203.98 6,019.89

401 b CONCRETE CLASS "B" CM 500.98 407.09 2,394.16 825.56 4,127.79

401 ci CONCRETE CLASS "C" (Underground) CM 379.76 258.76 2,846.33 871.21 4,356.06

401 cii CONCRETE CLASS "C" (On ground) CM 379.76 258.76 2,935.43 893.49 4,467.44

401 ciii CONCRETE CLASS "C" (Elevated) CM 379.76 258.76 3,113.62 938.04 4,690.18

401 d CONCRETE CLASS "D1" CM 595.07 810.64 4,011.32 1,354.26 6,771.29

401 e CONCRETE CLASS "Y" CM 833.94 258.76 3,446.11 1,134.70 5,673.51

401 f LEAN CONCRETE CM 329.55 252.12 1,941.94 630.90 3,154.51

Page 108: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 108 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,295.35 468.57 3,963.52 1,431.86 7,159.30

401 gii PRECAST CONCRETE CLASS "B" CM 1,295.35 468.57 3,564.37 1,332.07 6,660.36

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,150.12 - 42,364.33 10,878.61 54,393.06

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,150.12 - 44,464.33 11,403.61 57,018.06

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 941.99 2,335.68 37,999.44 10,319.28 51,596.39

405 aTON 2,015.46 6,882.66 80,753.57 22,412.92 112,064.61

405 b LAUNCHING OF GIRDER TON 47.14 403.69 - 112.71 563.54

406 aSM 85.37 - 183.38 67.19 335.94

406 b SM 85.37 - 192.09 69.37 346.83

406 c STEEL EXPANSION JOINTS KG 6.97 11.61 62.29 20.22 101.09

406 d WATER STOPS 6" SIZE M 69.95 - 309.12 94.77 473.84

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 30.55 - 1,410.87 360.36 1,801.78

406 g STEEL OR METAL BEARING DEVICES KG 15.33 30.66 82.45 32.11 160.55

407 d1M 250.73 847.08 492.03 397.46 1,987.30

407 d2M 376.10 1,270.62 738.05 596.19 2,980.96

407 d3M 376.10 1,270.62 577.06 555.95 2,779.73

407 d4M 626.83 2,117.70 732.60 869.28 4,346.41

407 d5M 537.28 1,815.17 677.05 757.38 3,786.88

407 d6M 940.24 3,176.55 970.00 1,271.70 6,358.49

407 h PILE LOAD TEST UP TO 120 TON EACH 16,480.20 19,990.40 75,648.36 28,029.74 140,148.70

407 i PILE LOAD TEST UP TO 240 TON EACH 33,018.12 19,990.40 151,296.72 51,076.31 255,381.55

407 j PILE LOAD TEST UP TO 360 TON EACH 49,513.80 19,990.40 226,945.08 74,112.32 370,561.60

407 k CONFIRMATORY BORING (NX SIZE) M 150.22 826.61 5.16 245.50 1,227.49

410 BRICK WORK CM 245.53 142.50 2,241.54 657.39 3,286.96

411 a STONE MASONRY RANDOM DRY CM 258.32 56.01 448.61 190.74 953.68

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 109: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 109 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 308.47 84.89 1,205.41 399.69 1,998.46

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 356.32 56.01 499.04 227.84 1,139.21

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 404.18 84.89 1,252.53 435.40 2,177.00

411 g ROLL POINTING SM 52.16 5.78 46.26 26.05 130.25

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 537.14 134.30 1,181.15 463.15 2,315.74

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 174.27 230.36 366.66 192.82 964.11

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 170.22 297.19 472.05 234.87 1,174.33

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 164.97 514.83 582.18 315.50 1,577.48

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 173.81 639.81 872.49 421.53 2,107.64

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 200.87 704.13 1,177.53 520.63 2,603.16

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 248.79 868.93 1,774.88 723.15 3,615.75

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 321.97 961.94 2,220.22 876.03 4,380.16

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 380.11 1,168.07 3,098.96 1,161.79 5,808.93

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 449.57 1,362.74 4,697.09 1,627.35 8,136.75

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 174.27 263.77 389.02 206.77 1,033.83

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 170.22 297.19 504.85 243.07 1,215.33

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 161.04 514.83 608.42 321.07 1,605.36

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 173.81 639.81 931.80 436.36 2,181.78

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 200.87 704.13 1,643.81 637.20 3,186.01

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 248.79 868.93 2,237.36 838.77 4,193.85

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 321.97 961.94 2,849.98 1,033.47 5,167.36

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 380.11 1,168.07 3,724.92 1,318.28 6,591.38

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 449.57 1,362.74 5,129.17 1,735.37 8,676.85

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 67.97 68.08 321.92 114.49 572.46

502 bCM 562.93 309.47 2,446.38 829.70 4,148.48

507 a STEEL WIRE MESH FOR GABIONS KG 3.99 - 76.80 20.20 100.99

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 110: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 110 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 74.22 - 431.67 126.47 632.36

508 a BRICK PAVING (SINGLE COURSE) SM 82.87 15.80 183.15 70.46 352.28

508 b BRICK PAVING (DOUBLE COURSE) SM 148.20 15.80 363.45 131.86 659.31

509 a RIP RAP CLASS "A" CM 356.75 - 377.24 183.50 917.49

509 b RIP RAP CLASS "B" CM 344.66 - 374.22 179.72 898.60

509 c RIP RAP CLASS "C" CM 346.73 - 377.24 180.99 904.96

509 d GROUTED RIP RAP CLASS "A" CM 420.41 35.09 1,370.29 456.45 2,282.24

509 e GROUTED RIP RAP CLASS "B" CM 405.18 28.07 1,264.46 424.43 2,122.14

509 f GROUTED RIP RAP CLASS "C" CM 400.43 23.39 1,286.64 427.62 2,138.08

509 gCM 592.20 181.56 2,802.16 893.98 4,469.90

509 h FILTER LAYER OF GRANULAR MATERIAL CM 37.35 115.89 337.48 122.68 613.40

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 78.66 194.57 - 68.31 341.54

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 112.38 35.01 61.30 52.17 260.86

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 143.85 44.81 78.47 66.78 333.91

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 182.14 91.01 242.50 128.91 644.56

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 227.67 113.77 303.12 161.14 805.70

603 BRICK EDGING M 6.60 - 28.80 8.85 44.25

605 a CONCRETE BEAM GUARDRAIL M 56.72 14.67 422.31 123.43 617.13

605 c CONCRETE POST FOR GUARDRAIL M 69.64 13.10 418.85 125.40 626.99

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 179.34 128.42 4,675.13 1,245.72 6,228.61

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 51.63 192.63 6,846.84 1,772.78 8,863.88

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 179.34 272.87 8,464.33 2,229.14 11,145.68

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 596.55 304.65 15,547.58 4,112.20 20,560.98

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 119.31 60.93 7,003.13 1,795.84 8,979.21

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,026.39 317.56 1,587.79

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,539.58 445.86 2,229.28

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 111: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 111 / 244

Rate Analysis Summary ( Construction)District (37) Lahore

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 2.01 2.85 15.38 5.06 25.30

608 b2M 0.67 1.27 30.25 8.05 40.24

608 c1M 2.01 2.85 20.52 6.35 31.73

608 c2M 0.67 1.27 40.34 10.57 52.85

608 d1EACH 54.02 - 148.57 50.65 253.24

608 d2EACH 54.02 - 381.18 108.80 544.00

608 h1M 2.52 3.56 21.39 6.87 34.34

608 h2M 2.52 4.75 51.71 14.75 73.73

608 i1M 2.52 3.56 28.52 8.65 43.25

608 i2M 2.52 4.75 68.95 19.06 95.28

608 j1EACH 54.02 - 206.53 65.14 325.69

608 j2EACH 54.02 - 652.07 176.52 882.61

608 n1 EACH 44.91 - 99.05 35.99 179.95

608 n2 EACH 44.91 - 254.50 74.85 374.26

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 44.91 - 137.69 45.65 228.25

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 44.91 - 435.37 120.07 600.35

609 cEACH 6.75 46.68 167.59 55.26 276.28

609 dEACH 6.75 46.68 202.59 64.01 320.03

610 b RIGHT OF WAY MARKER EACH 79.67 60.88 212.06 88.15 440.76

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 477.13 476.40 1,428.77 595.58 2,977.88

610 d TEN KILOMETRE POST EACH 923.88 952.79 3,107.56 1,246.06 6,230.29

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 112: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 112 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.45 6.96 - 1.85 9.26

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.41 102.44 5.13 28.00 139.98

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 12.92 258.13 11.55 70.65 353.25

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 51.66 1,032.53 46.20 282.60 1,412.99

103 STRIPPING CM 1.50 59.42 - 15.23 76.15

104 COMPACTION OF NATURAL GROUND SM 0.21 5.92 0.62 1.69 8.44

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.36 86.79 - 22.29 111.44

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 73.74 193.76 7.89 68.85 344.24

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.60 214.84 - 56.36 281.80

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.95 167.12 - 43.52 217.59

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.93 78.63 - 20.14 100.70

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 73.74 193.76 7.89 68.85 344.24

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.72 199.88 - 52.90 264.50

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.34 167.24 - 43.15 215.73

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.06 89.04 0.31 23.35 116.76

107 bCM 39.18 165.86 53.31 64.59 322.94

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 65.10 258.51 5.26 82.22 411.09

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 55.56 193.04 - 62.15 310.75

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 33.48 160.37 - 48.46 242.31

107 d GRANULAR BACK FILL CM 20.73 83.07 335.01 109.70 548.51

107 e COMMON BACK FILL CM 16.03 37.31 4.13 14.37 71.84

108 aCM 4.10 106.71 4.13 28.74 143.68

108 biCM 12.18 302.97 10.50 81.41 407.06

108 biiCM 9.14 268.11 1.96 69.80 349.01

108 biiiCM 8.12 238.60 - 61.68 308.40

108 cCM 4.76 112.14 6.81 30.93 154.64

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 113: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 113 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.69 46.31 4.13 13.53 67.66

108 eCM 8.78 73.87 2.45 21.28 106.38

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.82 16.84 1.18 4.71 23.55

109 biSM 0.59 10.31 0.63 2.88 14.41

110 IMPROVED SUB-GRADE CM 5.97 75.50 54.33 33.95 169.75

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.50 9.38 0.64 2.63 13.15

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.75 9.92 0.74 2.85 14.26

201 GRANULAR SUB-BASE CM 4.80 106.91 461.59 143.33 716.63

202 AGGREGATE BASE CM 5.46 132.11 619.08 189.16 945.81

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 46.04 916.98 3,476.77 1,109.95 5,549.74

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 47.51 916.98 3,698.19 1,165.67 5,828.35

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 50.87 957.74 3,471.47 1,120.02 5,600.10

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 50.87 954.75 3,779.97 1,196.40 5,981.99

204 b CEMENT STABILIZED BASE CM 17.01 272.73 771.75 265.37 1,326.86

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 142.42 568.44 22,123.80 5,708.67 28,543.33

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 142.42 568.44 23,025.76 5,934.16 29,670.78

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 61.80 55.65 654.19 192.91 964.55

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 92.05 1,408.67 3,150.15 1,162.72 5,813.59

206 bCM 68.60 66.68 518.47 163.44 817.19

207 a DEEP PATCHING (0-15 cm) SM 1.02 30.14 1.02 8.05 40.23

207 b DEEP PATCHING (16-30 cm) SM 1.02 26.47 1.02 7.13 35.64

208 REINSTATEMENT OF ROAD SURFACE SM 1.07 37.00 0.45 9.63 48.15

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.17 70.82 0.55 18.14 90.68

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.23 14.16 0.11 3.63 18.13

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.13 5.74 28.71

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 114: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 114 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.13 5.74 28.71

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.74 2.51 12.56

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.21 2.38 11.90

304 a SINGLE SURFACE TREATMENT SM 0.45 4.16 44.03 12.16 60.80

304 b DOUBLE SURFACE TREATMENT SM 0.65 8.06 84.42 23.28 116.41

304 c TRIPLE SURFACE TREATMENT SM 1.09 11.08 101.06 28.31 141.54

304 d SEAL COAT SM 0.41 2.33 24.90 6.91 34.55

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 42.76 906.07 4,047.18 1,249.00 6,245.01

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 42.76 876.73 4,362.43 1,320.48 6,602.40

307 a DENSE GRADED HOT BIT-MAC CM 104.99 171.48 3,339.08 903.89 4,519.44

307 b OPEN GRADED HOT BIT-MAC CM 104.99 171.48 3,244.56 880.26 4,401.29

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 17.72 456.95 940.27 353.74 1,768.68

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 127.07 465.97 24,199.50 6,198.14 30,990.68

309 a COLD MILLING, 0 - 30 mm SM 0.56 16.87 7.54 6.24 31.21

309 b COLD MILLING, 0 - 50 mm SM 0.93 28.11 12.57 10.40 52.01

309 c COLD MILLING, 0 - 70 mm SM 1.39 42.16 18.85 15.60 78.00

401 ai CONCRETE CLASS "A3" (Underground) CM 328.35 643.62 3,140.13 1,028.03 5,140.13

401 aii CONCRETE CLASS "A3" (On ground) CM 328.35 643.62 3,349.03 1,080.25 5,401.25

401 aiii CONCRETE CLASS "A3" (Elevated) CM 328.35 643.62 3,766.84 1,184.70 5,923.51

401 b CONCRETE CLASS "B" CM 418.56 407.09 2,354.21 794.97 3,974.83

401 ci CONCRETE CLASS "C" (Underground) CM 327.26 258.76 2,817.29 850.83 4,254.14

401 cii CONCRETE CLASS "C" (On ground) CM 327.26 258.76 2,906.39 873.10 4,365.51

401 ciii CONCRETE CLASS "C" (Elevated) CM 327.26 258.76 3,084.58 917.65 4,588.25

401 d CONCRETE CLASS "D1" CM 517.50 810.64 4,010.83 1,334.74 6,673.71

401 e CONCRETE CLASS "Y" CM 731.57 258.76 3,436.09 1,106.61 5,533.03

401 f LEAN CONCRETE CM 280.89 252.12 1,894.29 606.83 3,034.13

Page 115: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 115 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,123.07 468.57 3,937.98 1,382.41 6,912.03

401 gii PRECAST CONCRETE CLASS "B" CM 1,123.07 468.57 3,525.07 1,279.18 6,395.89

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,041.01 - 42,671.76 10,928.19 54,640.96

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,041.01 - 44,771.76 11,453.19 57,265.96

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 850.78 2,335.68 37,219.37 10,101.46 50,507.29

405 aTON 1,755.73 6,882.66 80,760.03 22,349.61 111,748.03

405 b LAUNCHING OF GIRDER TON 41.72 403.69 - 111.35 556.76

406 aSM 73.59 - 190.71 66.08 330.38

406 b SM 73.59 - 199.43 68.26 341.28

406 c STEEL EXPANSION JOINTS KG 6.34 11.61 60.73 19.67 98.35

406 d WATER STOPS 6" SIZE M 60.68 - 308.26 92.24 461.18

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.36 - 1,413.12 359.87 1,799.35

406 g STEEL OR METAL BEARING DEVICES KG 13.05 30.66 81.12 31.21 156.04

407 d1M 225.34 847.08 660.51 433.23 2,166.16

407 d2M 338.00 1,270.62 990.76 649.85 3,249.23

407 d3M 338.00 1,270.62 833.71 610.58 3,052.91

407 d4M 563.34 2,117.70 1,114.52 948.89 4,744.45

407 d5M 482.86 1,815.17 1,014.23 828.07 4,140.33

407 d6M 845.01 3,176.55 1,517.09 1,384.66 6,923.31

407 h PILE LOAD TEST UP TO 120 TON EACH 13,915.56 19,990.40 74,094.28 27,000.06 135,000.30

407 i PILE LOAD TEST UP TO 240 TON EACH 28,374.84 19,990.40 148,188.56 49,138.45 245,692.25

407 j PILE LOAD TEST UP TO 360 TON EACH 42,261.96 19,990.40 222,282.84 71,133.80 355,669.00

407 k CONFIRMATORY BORING (NX SIZE) M 133.32 826.61 5.16 241.27 1,206.36

410 BRICK WORK CM 215.39 142.50 2,012.95 592.71 2,963.55

411 a STONE MASONRY RANDOM DRY CM 225.08 56.01 518.54 199.91 999.54

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 116: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 116 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 268.88 84.89 1,237.84 397.90 1,989.51

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 311.48 56.01 574.52 235.50 1,177.51

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 354.08 84.89 1,302.14 435.28 2,176.39

411 g ROLL POINTING SM 46.21 5.78 45.73 24.43 122.15

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 470.48 134.30 1,230.77 458.89 2,294.44

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 148.07 230.36 365.69 186.03 930.15

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 145.03 297.19 470.89 228.28 1,141.39

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 139.24 514.83 580.76 308.71 1,543.54

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 147.04 639.81 870.87 414.43 2,072.15

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 169.05 704.13 1,175.91 512.27 2,561.36

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 208.76 868.93 1,772.59 712.57 3,562.85

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 270.16 961.94 2,218.06 862.54 4,312.70

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 318.19 1,168.07 3,096.33 1,145.65 5,728.24

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 377.10 1,362.74 4,694.02 1,608.47 8,042.33

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 148.07 263.77 386.50 199.59 997.93

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 145.03 297.19 503.69 236.48 1,182.39

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 135.87 514.83 607.00 314.43 1,572.13

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 147.04 639.81 930.51 429.34 2,146.70

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 169.05 704.13 1,642.13 628.83 3,144.14

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 208.76 868.93 2,235.07 828.19 4,140.95

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 270.16 961.94 2,847.82 1,019.98 5,099.90

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 318.19 1,168.07 3,722.29 1,302.14 6,510.69

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 377.10 1,362.74 5,126.10 1,716.49 8,582.43

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 56.54 68.08 300.73 106.34 531.69

502 bCM 475.58 309.47 2,407.54 798.15 3,990.74

507 a STEEL WIRE MESH FOR GABIONS KG 3.46 - 75.81 19.82 99.09

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 117: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 117 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 62.49 - 379.17 110.42 552.08

508 a BRICK PAVING (SINGLE COURSE) SM 72.01 15.80 159.67 61.87 309.35

508 b BRICK PAVING (DOUBLE COURSE) SM 129.61 15.80 316.66 115.52 577.59

509 a RIP RAP CLASS "A" CM 311.34 - 447.16 189.63 948.13

509 b RIP RAP CLASS "B" CM 301.15 - 443.59 186.19 930.93

509 c RIP RAP CLASS "C" CM 303.56 - 447.16 187.68 938.40

509 d GROUTED RIP RAP CLASS "A" CM 316.38 35.09 1,417.66 442.28 2,211.41

509 e GROUTED RIP RAP CLASS "B" CM 305.48 28.07 1,313.60 411.79 2,058.94

509 f GROUTED RIP RAP CLASS "C" CM 301.82 23.39 1,335.98 415.30 2,076.49

509 gCM 511.26 181.56 2,776.89 867.43 4,337.14

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.35 115.89 335.17 120.60 603.01

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 69.75 194.57 - 66.08 330.40

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 97.20 35.01 72.66 51.22 256.09

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 124.41 44.81 93.01 65.56 327.79

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 158.49 91.01 246.86 124.09 620.45

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 198.12 113.77 308.57 155.12 775.58

603 BRICK EDGING M 5.65 - 24.96 7.65 38.26

605 a CONCRETE BEAM GUARDRAIL M 49.15 14.67 423.06 121.72 608.60

605 c CONCRETE POST FOR GUARDRAIL M 60.34 13.10 419.59 123.26 616.29

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 152.58 128.42 4,688.08 1,242.27 6,211.35

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 44.97 192.63 6,855.13 1,773.18 8,865.91

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 152.58 272.87 8,477.92 2,225.84 11,129.21

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 511.47 304.65 15,577.85 4,098.49 20,492.46

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 102.29 60.93 7,021.06 1,796.07 8,980.35

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.95 318.45 1,592.24

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,544.93 447.19 2,235.96

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 118: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 118 / 244

Rate Analysis Summary ( Construction)District (40) Leiah

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.52 2.85 15.40 4.94 24.71

608 b2M 0.51 1.27 30.46 8.06 40.30

608 c1M 1.52 2.85 20.55 6.23 31.15

608 c2M 0.51 1.27 40.62 10.60 53.00

608 d1EACH 44.24 - 148.82 48.27 241.33

608 d2EACH 44.24 - 383.83 107.02 535.09

608 h1M 1.90 3.56 21.42 6.72 33.60

608 h2M 1.90 4.75 51.71 14.59 72.95

608 i1M 1.90 3.56 28.54 8.50 42.50

608 i2M 1.90 4.75 68.95 18.90 94.50

608 j1EACH 44.24 - 206.78 62.76 313.78

608 j2EACH 44.24 - 652.07 174.08 870.39

608 n1 EACH 36.54 - 99.22 33.94 169.70

608 n2 EACH 36.54 - 256.27 73.20 366.01

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 36.54 - 137.86 43.60 218.00

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 36.54 - 435.37 117.98 589.89

609 cEACH 5.86 46.68 167.58 55.03 275.15

609 dEACH 5.86 46.68 202.58 63.78 318.90

610 b RIGHT OF WAY MARKER EACH 68.69 60.88 211.64 85.30 426.51

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 422.67 476.40 1,420.68 579.94 2,899.69

610 d TEN KILOMETRE POST EACH 815.34 952.79 3,103.20 1,217.83 6,089.16

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 119: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 119 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.52 6.96 - 1.87 9.35

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.08 102.44 0.88 27.10 135.50

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 14.78 258.13 1.97 68.72 343.60

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 59.14 1,032.53 7.89 274.89 1,374.45

103 STRIPPING CM 1.72 59.42 - 15.29 76.43

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.78 86.79 - 22.39 111.96

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 84.76 193.76 46.20 81.18 405.90

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.19 214.84 - 56.76 283.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.94 167.12 - 43.77 218.83

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.28 78.63 - 20.23 101.14

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 84.76 193.76 46.20 81.18 405.90

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.46 199.88 - 53.34 266.68

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.15 167.24 - 43.35 216.74

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.76 89.04 0.31 23.53 117.64

107 bCM 43.15 165.86 53.31 65.58 327.90

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 74.80 258.51 30.80 91.03 455.14

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 63.78 193.04 - 64.21 321.03

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.47 160.37 - 49.71 248.55

107 d GRANULAR BACK FILL CM 23.58 83.07 307.17 103.46 517.28

107 e COMMON BACK FILL CM 18.08 37.31 4.13 14.88 74.40

108 aCM 4.75 106.71 4.13 28.90 144.49

108 biCM 14.01 302.97 48.81 91.45 457.24

108 biiCM 10.51 268.11 1.96 70.15 350.73

108 biiiCM 9.34 238.60 - 61.99 309.93

108 cCM 5.50 112.14 6.81 31.11 155.56

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 120: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 120 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.27 46.31 4.13 13.68 68.39

108 eCM 10.11 73.87 2.45 21.61 108.04

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.95 16.84 1.18 4.74 23.71

109 biSM 0.68 10.31 0.63 2.91 14.53

110 IMPROVED SUB-GRADE CM 6.99 75.50 52.37 33.72 168.58

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.58 9.38 0.64 2.65 13.25

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.87 9.16 0.74 2.69 13.46

201 GRANULAR SUB-BASE CM 5.55 106.91 476.30 147.19 735.95

202 AGGREGATE BASE CM 6.46 132.11 639.97 194.64 973.18

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 52.61 916.98 3,505.00 1,118.65 5,593.24

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 54.33 916.98 3,725.61 1,174.23 5,871.15

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 57.98 957.74 3,499.70 1,128.86 5,644.28

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 57.98 954.75 3,807.38 1,205.03 6,025.14

204 b CEMENT STABILIZED BASE CM 19.97 272.73 799.74 273.11 1,365.55

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 160.09 568.44 22,276.80 5,751.33 28,756.66

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 160.09 568.44 22,331.42 5,764.99 28,824.94

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 69.71 55.65 676.24 200.40 1,002.00

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 106.03 1,408.67 3,178.89 1,173.40 5,866.99

206 bCM 77.22 66.68 585.45 182.34 911.69

207 a DEEP PATCHING (0-15 cm) SM 1.19 30.14 1.02 8.09 40.44

207 b DEEP PATCHING (16-30 cm) SM 1.19 26.47 1.02 7.17 35.85

208 REINSTATEMENT OF ROAD SURFACE SM 1.27 37.00 0.45 9.68 48.40

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.34 70.82 0.55 18.18 90.89

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 22.28 5.79 28.94

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 121: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 121 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 22.28 5.79 28.93

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.91 2.56 12.79

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 8.93 2.31 11.56

304 a SINGLE SURFACE TREATMENT SM 0.52 4.16 43.22 11.98 59.88

304 b DOUBLE SURFACE TREATMENT SM 0.76 8.06 82.15 22.74 113.71

304 c TRIPLE SURFACE TREATMENT SM 1.27 11.08 98.34 27.67 138.36

304 d SEAL COAT SM 0.48 2.33 25.76 7.14 35.71

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 49.11 906.07 4,075.68 1,257.72 6,288.58

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 49.11 876.73 4,392.53 1,329.59 6,647.96

307 a DENSE GRADED HOT BIT-MAC CM 122.42 171.48 3,372.56 916.62 4,583.08

307 b OPEN GRADED HOT BIT-MAC CM 122.42 171.48 3,278.04 892.99 4,464.93

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.33 456.95 922.49 350.19 1,750.96

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 142.17 465.97 24,250.50 6,214.66 31,073.30

309 a COLD MILLING, 0 - 30 mm SM 0.66 16.87 7.54 6.27 31.34

309 b COLD MILLING, 0 - 50 mm SM 1.10 28.11 12.57 10.45 52.23

309 c COLD MILLING, 0 - 70 mm SM 1.64 42.16 18.85 15.66 78.31

401 ai CONCRETE CLASS "A3" (Underground) CM 361.52 643.62 3,230.16 1,058.83 5,294.13

401 aii CONCRETE CLASS "A3" (On ground) CM 361.52 643.62 3,439.06 1,111.05 5,555.25

401 aiii CONCRETE CLASS "A3" (Elevated) CM 361.52 643.62 3,856.86 1,215.50 6,077.50

401 b CONCRETE CLASS "B" CM 469.51 407.09 2,450.86 831.87 4,159.33

401 ci CONCRETE CLASS "C" (Underground) CM 358.72 258.76 2,912.99 882.62 4,413.09

401 cii CONCRETE CLASS "C" (On ground) CM 358.72 258.76 3,002.08 904.89 4,524.45

401 ciii CONCRETE CLASS "C" (Elevated) CM 358.72 258.76 3,180.27 949.44 4,747.19

401 d CONCRETE CLASS "D1" CM 559.75 810.64 4,092.61 1,365.75 6,828.75

401 e CONCRETE CLASS "Y" CM 774.77 258.76 3,517.99 1,137.88 5,689.40

401 f LEAN CONCRETE CM 314.20 252.12 1,990.89 639.30 3,196.51

Page 122: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 122 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,214.89 468.57 4,035.98 1,429.86 7,149.30

401 gii PRECAST CONCRETE CLASS "B" CM 1,214.89 468.57 3,623.52 1,326.75 6,633.73

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,077.80 - 42,672.44 10,937.56 54,687.80

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,077.80 - 44,772.44 11,462.56 57,312.80

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 881.40 2,335.68 37,289.50 10,126.65 50,633.23

405 aTON 1,963.83 6,882.66 80,755.54 22,400.51 112,002.54

405 b LAUNCHING OF GIRDER TON 46.52 403.69 - 112.55 562.76

406 aSM 80.34 - 191.59 67.98 339.91

406 b SM 80.34 - 190.52 67.72 338.58

406 c STEEL EXPANSION JOINTS KG 6.44 11.61 60.80 19.71 98.56

406 d WATER STOPS 6" SIZE M 69.49 - 307.78 94.32 471.59

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.91 - 1,413.49 360.10 1,800.50

406 g STEEL OR METAL BEARING DEVICES KG 13.90 30.66 81.19 31.44 157.19

407 d1M 250.44 847.08 558.00 413.88 2,069.40

407 d2M 375.67 1,270.62 837.00 620.82 3,104.11

407 d3M 375.67 1,270.62 641.64 571.98 2,859.91

407 d4M 626.11 2,117.70 794.39 884.55 4,422.75

407 d5M 536.67 1,815.17 739.84 772.92 3,864.60

407 d6M 939.17 3,176.55 1,036.90 1,288.16 6,440.78

407 h PILE LOAD TEST UP TO 120 TON EACH 18,660.24 19,990.40 69,433.80 27,021.11 135,105.55

407 i PILE LOAD TEST UP TO 240 TON EACH 31,777.92 19,990.40 138,867.60 47,658.98 238,294.90

407 j PILE LOAD TEST UP TO 360 TON EACH 47,388.24 19,990.40 208,301.40 68,920.01 344,600.05

407 k CONFIRMATORY BORING (NX SIZE) M 148.22 826.61 5.16 245.00 1,224.99

410 BRICK WORK CM 220.14 142.50 2,063.79 606.61 3,033.04

411 a STONE MASONRY RANDOM DRY CM 235.22 56.01 601.09 223.08 1,115.40

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 123: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 123 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 281.54 84.89 1,383.95 437.60 2,187.98

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 323.78 56.01 664.92 261.18 1,305.89

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 366.02 84.89 1,440.21 472.78 2,363.90

411 g ROLL POINTING SM 46.31 5.78 46.79 24.72 123.60

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 488.18 134.30 1,368.83 497.83 2,489.14

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 164.24 230.36 367.67 190.57 952.84

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 160.70 297.19 473.27 232.79 1,163.95

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 154.88 514.83 583.54 313.31 1,566.56

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 163.71 639.81 874.12 419.41 2,097.05

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 188.76 704.13 1,179.16 518.01 2,590.06

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 232.48 868.93 1,777.29 719.68 3,598.38

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 300.86 961.94 2,222.73 871.38 4,356.91

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 356.25 1,168.07 3,102.00 1,156.58 5,782.90

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 418.52 1,362.74 4,700.64 1,620.48 8,102.38

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 164.24 263.77 390.47 204.62 1,023.10

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 160.70 297.19 506.07 240.99 1,204.95

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 150.26 514.83 609.78 318.72 1,593.59

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 163.71 639.81 933.04 434.14 2,170.70

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 188.76 704.13 1,645.74 634.66 3,173.29

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 232.48 868.93 2,239.77 835.30 4,176.48

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 300.86 961.94 2,852.49 1,028.82 5,144.11

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 356.25 1,168.07 3,727.97 1,313.07 6,565.36

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 418.52 1,362.74 5,132.72 1,728.50 8,642.48

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 64.18 68.08 237.18 92.36 461.80

502 bCM 535.01 309.47 2,504.19 837.17 4,185.84

507 a STEEL WIRE MESH FOR GABIONS KG 3.57 - 75.81 19.85 99.23

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 124: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 124 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 70.65 - 443.33 128.50 642.48

508 a BRICK PAVING (SINGLE COURSE) SM 75.55 15.80 157.02 62.09 310.46

508 b BRICK PAVING (DOUBLE COURSE) SM 134.59 15.80 311.90 115.57 577.86

509 a RIP RAP CLASS "A" CM 322.55 - 529.71 213.07 1,065.33

509 b RIP RAP CLASS "B" CM 311.99 - 525.47 209.37 1,046.83

509 c RIP RAP CLASS "C" CM 313.43 - 529.71 210.79 1,053.93

509 d GROUTED RIP RAP CLASS "A" CM 392.17 35.09 1,513.85 485.28 2,426.39

509 e GROUTED RIP RAP CLASS "B" CM 377.24 28.07 1,407.71 453.26 2,266.28

509 f GROUTED RIP RAP CLASS "C" CM 372.78 23.39 1,431.50 456.92 2,284.59

509 gCM 560.59 181.56 2,868.19 902.59 4,512.93

509 h FILTER LAYER OF GRANULAR MATERIAL CM 35.59 115.89 307.06 114.64 573.18

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 77.78 194.57 - 68.09 340.44

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 102.91 35.01 86.08 56.00 280.00

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 131.72 44.81 110.18 71.68 358.39

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 165.52 91.01 263.56 130.02 650.11

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 206.90 113.77 329.45 162.53 812.65

603 BRICK EDGING M 6.12 - 24.96 7.77 38.85

605 a CONCRETE BEAM GUARDRAIL M 53.17 14.67 426.42 123.57 617.83

605 c CONCRETE POST FOR GUARDRAIL M 65.29 13.10 423.72 125.53 627.64

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 164.82 128.42 4,691.11 1,246.09 6,230.44

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 50.16 192.63 6,873.12 1,778.98 8,894.89

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 164.82 272.87 8,508.98 2,236.67 11,183.34

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 558.26 304.65 15,625.41 4,122.08 20,610.40

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 111.65 60.93 7,031.73 1,801.08 9,005.39

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,030.30 318.54 1,592.68

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,545.45 447.32 2,236.61

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 125: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 125 / 244

Rate Analysis Summary ( Construction)District (41 A) Lodheran

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 2.10 2.85 15.40 5.09 25.44

608 b2M 0.70 1.27 30.48 8.11 40.56

608 c1M 2.10 2.85 20.56 6.38 31.89

608 c2M 0.70 1.27 40.65 10.66 53.28

608 d1EACH 49.52 - 148.85 49.59 247.96

608 d2EACH 49.52 - 384.09 108.40 542.01

608 h1M 2.62 3.56 21.42 6.90 34.50

608 h2M 2.62 4.75 51.71 14.77 73.85

608 i1M 2.62 3.56 28.56 8.69 43.43

608 i2M 2.62 4.75 68.95 19.08 95.40

608 j1EACH 49.52 - 206.81 64.08 320.41

608 j2EACH 49.52 - 652.07 175.40 876.99

608 n1 EACH 41.89 - 99.23 35.28 176.40

608 n2 EACH 41.89 - 256.45 74.59 372.93

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 41.89 - 137.87 44.94 224.70

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 41.89 - 435.37 119.32 596.58

609 cEACH 6.65 46.68 167.66 55.25 276.24

609 dEACH 6.65 46.68 202.66 64.00 319.99

610 b RIGHT OF WAY MARKER EACH 75.90 60.88 215.27 88.01 440.06

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 435.87 476.40 1,451.89 591.04 2,955.20

610 d TEN KILOMETRE POST EACH 846.30 952.79 3,162.56 1,240.41 6,202.06

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 126: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 126 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.49 6.96 - 1.86 9.31

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.89 102.44 0.88 27.05 135.26

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 14.00 258.13 1.97 68.53 342.63

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 55.98 1,032.53 7.89 274.10 1,370.50

103 STRIPPING CM 1.68 59.42 - 15.28 76.38

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.10 86.79 - 22.47 112.36

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 88.37 193.76 46.20 82.08 410.41

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.22 214.84 - 56.77 283.83

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.07 167.12 - 43.80 218.99

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.53 78.63 - 20.29 101.45

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 88.37 193.76 46.20 82.08 410.41

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 14.11 199.88 - 53.50 267.49

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.18 167.24 - 43.36 216.78

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 5.01 89.04 0.31 23.59 117.95

107 bCM 43.94 165.86 53.31 65.78 328.89

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 78.42 258.51 30.80 91.93 459.66

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 66.52 193.04 - 64.89 324.45

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 40.33 160.37 - 50.18 250.88

107 d GRANULAR BACK FILL CM 23.59 83.07 282.24 97.23 486.13

107 e COMMON BACK FILL CM 16.93 37.31 4.13 14.59 72.96

108 aCM 4.86 106.71 4.13 28.93 144.63

108 biCM 14.03 302.97 48.81 91.45 457.26

108 biiCM 10.52 268.11 1.96 70.15 350.74

108 biiiCM 9.35 238.60 - 61.99 309.94

108 cCM 5.52 112.14 6.81 31.12 155.59

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 127: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 127 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.31 46.31 4.13 13.69 68.44

108 eCM 9.94 73.87 2.45 21.57 107.83

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.97 16.84 1.18 4.75 23.74

109 biSM 0.69 10.31 0.63 2.91 14.54

110 IMPROVED SUB-GRADE CM 6.91 75.50 54.33 34.19 170.93

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.57 9.38 0.64 2.65 13.24

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.86 9.92 0.74 2.88 14.40

201 GRANULAR SUB-BASE CM 5.63 106.91 441.75 138.57 692.86

202 AGGREGATE BASE CM 6.71 132.11 587.75 181.64 908.21

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 50.24 916.98 3,394.93 1,090.54 5,452.69

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 52.20 916.98 3,616.90 1,146.52 5,732.60

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 55.83 957.74 3,389.56 1,100.78 5,503.91

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 55.83 954.75 3,698.05 1,177.16 5,885.79

204 b CEMENT STABILIZED BASE CM 20.36 272.73 717.03 252.53 1,262.65

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 167.23 568.44 21,715.80 5,612.87 28,064.34

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 167.23 568.44 22,611.89 5,836.89 29,184.45

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.88 55.65 621.06 185.15 925.74

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 103.59 1,408.67 3,082.01 1,148.57 5,742.84

206 bCM 70.76 66.68 533.23 167.67 838.34

207 a DEEP PATCHING (0-15 cm) SM 1.18 30.14 1.02 8.09 40.43

207 b DEEP PATCHING (16-30 cm) SM 1.18 26.47 1.02 7.17 35.84

208 REINSTATEMENT OF ROAD SURFACE SM 1.29 37.00 0.45 9.69 48.43

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.40 70.82 0.55 18.19 90.96

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.28 14.16 0.11 3.64 18.19

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.21 0.67 21.72 5.65 28.25

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 128: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 128 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.72 5.65 28.24

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.58 2.48 12.38

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.04 2.34 11.70

304 a SINGLE SURFACE TREATMENT SM 0.55 4.16 42.96 11.92 59.59

304 b DOUBLE SURFACE TREATMENT SM 0.80 8.06 82.20 22.77 113.83

304 c TRIPLE SURFACE TREATMENT SM 1.34 11.08 98.30 27.68 138.40

304 d SEAL COAT SM 0.51 2.33 24.37 6.80 34.01

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 47.69 906.07 3,954.92 1,227.17 6,135.85

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 47.69 876.73 4,261.92 1,296.59 6,482.93

307 a DENSE GRADED HOT BIT-MAC CM 115.49 171.48 3,249.50 884.12 4,420.59

307 b OPEN GRADED HOT BIT-MAC CM 115.49 171.48 3,162.28 862.31 4,311.56

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 19.81 456.95 924.65 350.35 1,751.76

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 146.75 465.97 23,791.50 6,101.06 30,505.28

309 a COLD MILLING, 0 - 30 mm SM 0.67 16.87 7.54 6.27 31.35

309 b COLD MILLING, 0 - 50 mm SM 1.12 28.11 12.57 10.45 52.25

309 c COLD MILLING, 0 - 70 mm SM 1.68 42.16 18.85 15.67 78.36

401 ai CONCRETE CLASS "A3" (Underground) CM 363.90 643.62 3,090.65 1,024.54 5,122.71

401 aii CONCRETE CLASS "A3" (On ground) CM 363.90 643.62 3,299.55 1,076.77 5,383.84

401 aiii CONCRETE CLASS "A3" (Elevated) CM 363.90 643.62 3,717.35 1,181.22 5,906.09

401 b CONCRETE CLASS "B" CM 468.71 407.09 2,313.39 797.30 3,986.49

401 ci CONCRETE CLASS "C" (Underground) CM 354.21 258.76 2,766.33 844.83 4,224.13

401 cii CONCRETE CLASS "C" (On ground) CM 354.21 258.76 2,855.43 867.10 4,335.50

401 ciii CONCRETE CLASS "C" (Elevated) CM 354.21 258.76 3,033.62 911.65 4,558.24

401 d CONCRETE CLASS "D1" CM 563.34 810.64 3,962.73 1,334.18 6,670.89

401 e CONCRETE CLASS "Y" CM 784.40 258.76 3,386.78 1,107.49 5,537.43

401 f LEAN CONCRETE CM 297.26 252.12 1,855.18 601.14 3,005.70

Page 129: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 129 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,197.32 468.57 3,883.96 1,387.46 6,937.31

401 gii PRECAST CONCRETE CLASS "B" CM 1,197.32 468.57 3,481.10 1,286.75 6,433.74

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,097.96 - 42,670.98 10,942.24 54,711.18

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,097.96 - 44,770.98 11,467.24 57,336.18

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 900.26 2,335.68 37,138.92 10,093.72 50,468.58

405 aTON 2,099.70 6,882.66 80,759.34 22,435.43 112,177.13

405 b LAUNCHING OF GIRDER TON 49.36 403.69 - 113.26 566.31

406 aSM 79.72 - 186.38 66.53 332.63

406 b SM 79.72 - 195.09 68.70 343.51

406 c STEEL EXPANSION JOINTS KG 6.57 11.61 60.79 19.74 98.71

406 d WATER STOPS 6" SIZE M 65.11 - 309.75 93.72 468.58

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 29.12 - 1,411.57 360.17 1,800.86

406 g STEEL OR METAL BEARING DEVICES KG 14.30 30.66 81.15 31.53 157.64

407 d1M 262.40 847.08 559.81 417.32 2,086.61

407 d2M 393.61 1,270.62 839.72 625.99 3,129.94

407 d3M 393.61 1,270.62 644.36 577.15 2,885.74

407 d4M 656.01 2,117.70 798.93 893.16 4,465.80

407 d5M 562.30 1,815.17 743.73 780.30 3,901.50

407 d6M 984.02 3,176.55 1,043.71 1,301.07 6,505.35

407 h PILE LOAD TEST UP TO 120 TON EACH 14,471.40 19,990.40 69,433.80 25,973.90 129,869.50

407 i PILE LOAD TEST UP TO 240 TON EACH 28,629.00 19,990.40 138,867.60 46,871.75 234,358.75

407 j PILE LOAD TEST UP TO 360 TON EACH 42,817.80 19,990.40 208,301.40 67,777.40 338,887.00

407 k CONFIRMATORY BORING (NX SIZE) M 145.60 826.61 5.16 244.34 1,221.71

410 BRICK WORK CM 228.36 142.50 2,055.10 606.49 3,032.45

411 a STONE MASONRY RANDOM DRY CM 238.20 56.01 560.00 213.55 1,067.76

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 130: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 130 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 283.20 84.89 1,269.84 409.48 2,047.41

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 328.20 56.01 619.34 250.89 1,254.44

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 373.20 84.89 1,339.42 449.38 2,246.89

411 g ROLL POINTING SM 48.81 5.78 45.55 25.04 125.18

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 493.20 134.30 1,268.04 473.89 2,369.43

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 154.50 230.36 365.35 187.55 937.76

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 150.45 297.19 470.48 229.53 1,147.65

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 147.94 514.83 580.30 310.77 1,553.84

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 154.95 639.81 870.32 416.27 2,081.35

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 179.75 704.13 1,175.36 514.81 2,574.05

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 224.21 868.93 1,771.80 716.24 3,581.18

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 290.16 961.94 2,217.24 867.34 4,336.68

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 341.62 1,168.07 3,095.34 1,151.26 5,756.29

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 405.43 1,362.74 4,692.86 1,615.26 8,076.29

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 154.50 263.77 385.95 201.06 1,005.28

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 150.45 297.19 503.28 237.73 1,188.65

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 144.57 514.83 606.54 316.49 1,582.43

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 154.95 639.81 930.09 431.21 2,156.06

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 179.75 704.13 1,641.50 631.35 3,156.73

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 224.21 868.93 2,234.28 831.86 4,159.28

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 290.16 961.94 2,847.00 1,024.78 5,123.88

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 341.62 1,168.07 3,721.30 1,307.75 6,538.74

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 405.43 1,362.74 5,124.95 1,723.28 8,616.40

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 60.70 68.08 237.18 91.49 457.45

502 bCM 526.72 309.47 2,366.50 800.67 4,003.36

507 a STEEL WIRE MESH FOR GABIONS KG 3.77 - 75.81 19.90 99.48

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 131: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 131 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 65.30 - 420.00 121.33 606.63

508 a BRICK PAVING (SINGLE COURSE) SM 75.90 15.80 162.67 63.59 317.96

508 b BRICK PAVING (DOUBLE COURSE) SM 135.90 15.80 323.20 118.73 593.63

509 a RIP RAP CLASS "A" CM 329.09 - 488.63 204.43 1,022.15

509 b RIP RAP CLASS "B" CM 317.27 - 484.72 200.50 1,002.49

509 c RIP RAP CLASS "C" CM 319.40 - 488.63 202.01 1,010.04

509 d GROUTED RIP RAP CLASS "A" CM 315.34 35.09 1,464.01 453.61 2,268.05

509 e GROUTED RIP RAP CLASS "B" CM 303.56 28.07 1,359.17 422.70 2,113.50

509 f GROUTED RIP RAP CLASS "C" CM 298.87 23.39 1,380.65 425.73 2,128.64

509 gCM 540.88 181.56 2,735.78 864.56 4,322.78

509 h FILTER LAYER OF GRANULAR MATERIAL CM 33.00 115.89 282.27 107.79 538.95

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 76.20 194.57 - 67.69 338.46

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 102.94 35.01 79.40 54.34 271.69

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 131.76 44.81 101.63 69.55 347.75

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 167.76 91.01 247.83 126.65 633.25

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 209.70 113.77 309.78 158.31 791.56

603 BRICK EDGING M 5.99 - 25.92 7.98 39.89

605 a CONCRETE BEAM GUARDRAIL M 50.97 14.67 421.06 121.68 608.38

605 c CONCRETE POST FOR GUARDRAIL M 62.58 13.10 417.15 123.21 616.04

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 164.31 128.42 4,679.02 1,242.94 6,214.69

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 46.50 192.63 6,840.37 1,769.88 8,849.38

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 164.31 272.87 8,453.54 2,222.68 11,113.40

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 531.46 304.65 15,535.90 4,093.00 20,465.01

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 106.29 60.93 7,006.21 1,793.36 8,966.79

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.01 317.96 1,589.81

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,542.02 446.47 2,232.33

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 132: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 132 / 244

Rate Analysis Summary ( Construction)District (47 A) Mandi baha-udin

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.63 2.85 15.39 4.97 24.84

608 b2M 0.54 1.27 30.34 8.04 40.19

608 c1M 1.63 2.85 20.53 6.25 31.26

608 c2M 0.54 1.27 40.47 10.57 52.85

608 d1EACH 46.85 - 148.66 48.88 244.39

608 d2EACH 46.85 - 382.37 107.31 536.53

608 h1M 2.04 3.56 21.40 6.75 33.75

608 h2M 2.04 4.75 51.71 14.63 73.13

608 i1M 2.04 3.56 28.53 8.53 42.66

608 i2M 2.04 4.75 68.95 18.94 94.68

608 j1EACH 46.85 - 206.62 63.37 316.84

608 j2EACH 46.85 - 652.07 174.73 873.65

608 n1 EACH 38.75 - 99.11 34.47 172.33

608 n2 EACH 38.75 - 255.30 73.51 367.56

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.75 - 137.75 44.13 220.63

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.75 - 435.37 118.53 592.65

609 cEACH 6.09 46.68 167.56 55.08 275.41

609 dEACH 6.09 46.68 202.56 63.83 319.16

610 b RIGHT OF WAY MARKER EACH 70.46 60.88 209.52 85.22 426.08

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 435.90 476.40 1,404.29 579.15 2,895.74

610 d TEN KILOMETRE POST EACH 841.80 952.79 3,068.61 1,215.80 6,079.00

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 133: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 133 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.47 6.96 - 1.86 9.29

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.67 102.44 0.88 27.00 134.99

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.52 258.13 1.97 68.41 342.03

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 54.06 1,032.53 7.89 273.62 1,368.10

103 STRIPPING CM 1.61 59.42 - 15.26 76.29

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.78 86.79 - 22.39 111.96

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 79.76 193.76 46.20 79.93 399.65

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.01 214.84 - 56.46 282.31

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.25 167.12 - 43.59 217.96

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.27 78.63 - 20.23 101.13

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 79.76 193.76 46.20 79.93 399.65

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.70 199.88 - 53.15 265.73

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.55 167.24 - 43.20 215.99

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.56 89.04 0.31 23.48 117.39

107 bCM 40.86 165.86 53.31 65.01 325.04

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 70.55 258.51 30.80 89.97 449.83

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 59.74 193.04 - 63.20 315.98

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 36.28 160.37 - 49.16 245.81

107 d GRANULAR BACK FILL CM 22.19 83.07 270.72 94.00 469.98

107 e COMMON BACK FILL CM 16.67 37.31 4.13 14.53 72.64

108 aCM 4.36 106.71 4.13 28.80 144.00

108 biCM 12.88 302.97 48.81 91.17 455.83

108 biiCM 9.66 268.11 1.96 69.93 349.66

108 biiiCM 8.59 238.60 - 61.80 308.99

108 cCM 5.03 112.14 6.81 31.00 154.98

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 134: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 134 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.92 46.31 4.13 13.59 67.95

108 eCM 9.26 73.87 2.45 21.40 106.98

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.88 16.84 1.18 4.73 23.63

109 biSM 0.64 10.31 0.63 2.90 14.48

110 IMPROVED SUB-GRADE CM 6.31 75.50 54.47 34.07 170.35

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.54 9.38 0.64 2.64 13.20

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.80 9.92 0.74 2.87 14.33

201 GRANULAR SUB-BASE CM 5.08 106.91 468.52 145.13 725.64

202 AGGREGATE BASE CM 5.84 132.11 608.64 186.65 933.24

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.24 916.98 3,432.24 1,099.12 5,495.58

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.83 916.98 3,652.55 1,154.59 5,772.95

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 52.31 957.74 3,426.87 1,109.23 5,546.15

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 52.31 954.75 3,733.78 1,185.21 5,926.05

204 b CEMENT STABILIZED BASE CM 18.03 272.73 751.49 260.56 1,302.81

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 155.59 568.44 21,817.80 5,635.46 28,177.29

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 155.59 568.44 22,711.54 5,858.89 29,294.46

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.81 55.65 643.16 190.41 952.03

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 95.42 1,408.67 3,115.61 1,154.93 5,774.63

206 bCM 69.43 66.68 480.71 154.21 771.03

207 a DEEP PATCHING (0-15 cm) SM 1.09 30.14 1.02 8.06 40.31

207 b DEEP PATCHING (16-30 cm) SM 1.09 26.47 1.02 7.15 35.73

208 REINSTATEMENT OF ROAD SURFACE SM 1.15 37.00 0.45 9.65 48.25

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.33 70.82 0.55 18.18 90.88

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 135: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 135 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 21.82 5.67 28.34

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.62 2.49 12.43

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.08 2.35 11.75

304 a SINGLE SURFACE TREATMENT SM 0.49 4.16 43.32 11.99 59.96

304 b DOUBLE SURFACE TREATMENT SM 0.71 8.06 83.01 22.95 114.73

304 c TRIPLE SURFACE TREATMENT SM 1.19 11.08 99.36 27.91 139.54

304 d SEAL COAT SM 0.45 2.33 24.55 6.83 34.16

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 44.13 906.07 3,993.62 1,235.96 6,179.78

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 44.13 876.73 4,303.50 1,306.09 6,530.45

307 a DENSE GRADED HOT BIT-MAC CM 106.87 171.48 3,286.38 891.18 4,455.91

307 b OPEN GRADED HOT BIT-MAC CM 106.87 171.48 3,196.69 868.76 4,343.80

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.06 456.95 931.06 351.52 1,757.59

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 138.95 465.97 23,893.50 6,124.61 30,623.03

309 a COLD MILLING, 0 - 30 mm SM 0.60 16.87 7.54 6.25 31.26

309 b COLD MILLING, 0 - 50 mm SM 1.00 28.11 12.57 10.42 52.10

309 c COLD MILLING, 0 - 70 mm SM 1.50 42.16 18.85 15.63 78.14

401 ai CONCRETE CLASS "A3" (Underground) CM 331.79 643.62 3,095.47 1,017.72 5,088.60

401 aii CONCRETE CLASS "A3" (On ground) CM 331.79 643.62 3,304.37 1,069.95 5,349.73

401 aiii CONCRETE CLASS "A3" (Elevated) CM 331.79 643.62 3,722.18 1,174.40 5,871.99

401 b CONCRETE CLASS "B" CM 431.42 407.09 2,313.06 787.89 3,939.46

401 ci CONCRETE CLASS "C" (Underground) CM 329.21 258.76 2,772.46 840.11 4,200.54

401 cii CONCRETE CLASS "C" (On ground) CM 329.21 258.76 2,861.55 862.38 4,311.90

401 ciii CONCRETE CLASS "C" (Elevated) CM 329.21 258.76 3,039.75 906.93 4,534.65

401 d CONCRETE CLASS "D1" CM 517.38 810.64 3,966.91 1,323.73 6,618.66

401 e CONCRETE CLASS "Y" CM 730.10 258.76 3,392.55 1,095.35 5,476.76

401 f LEAN CONCRETE CM 285.55 252.12 1,854.68 598.09 2,990.44

Page 136: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 136 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,128.16 468.57 3,889.59 1,371.58 6,857.90

401 gii PRECAST CONCRETE CLASS "B" CM 1,128.16 468.57 3,482.75 1,269.87 6,349.35

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,054.90 - 42,576.74 10,907.91 54,539.55

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,054.90 - 44,676.74 11,432.91 57,164.55

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 851.65 2,335.68 38,248.00 10,358.83 51,794.16

405 aTON 1,804.18 6,882.66 80,755.91 22,360.69 111,803.44

405 b LAUNCHING OF GIRDER TON 42.62 403.69 - 111.58 557.89

406 aSM 73.69 - 188.84 65.63 328.16

406 b SM 73.69 - 197.57 67.82 339.08

406 c STEEL EXPANSION JOINTS KG 6.34 11.61 62.39 20.09 100.43

406 d WATER STOPS 6" SIZE M 60.60 - 308.84 92.36 461.80

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.79 - 1,412.36 359.79 1,798.94

406 g STEEL OR METAL BEARING DEVICES KG 13.39 30.66 82.84 31.72 158.61

407 d1M 231.63 847.08 632.06 427.69 2,138.46

407 d2M 347.45 1,270.62 948.10 641.54 3,207.71

407 d3M 347.45 1,270.62 718.36 584.11 2,920.54

407 d4M 579.08 2,117.70 876.43 893.30 4,466.51

407 d5M 496.35 1,815.17 819.98 782.88 3,914.38

407 d6M 868.62 3,176.55 1,134.18 1,294.84 6,474.19

407 h PILE LOAD TEST UP TO 120 TON EACH 13,468.20 19,990.40 64,772.44 24,557.76 122,788.80

407 i PILE LOAD TEST UP TO 240 TON EACH 28,485.00 19,990.40 129,544.88 44,505.07 222,525.35

407 j PILE LOAD TEST UP TO 360 TON EACH 42,491.40 19,990.40 194,317.32 64,199.78 320,998.90

407 k CONFIRMATORY BORING (NX SIZE) M 134.30 826.61 5.16 241.52 1,207.59

410 BRICK WORK CM 217.65 142.50 2,043.80 600.99 3,004.94

411 a STONE MASONRY RANDOM DRY CM 227.85 56.01 321.38 151.31 756.55

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 137: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 137 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 271.65 84.89 1,017.10 343.41 1,717.05

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 314.25 56.01 361.63 182.97 914.86

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 356.85 84.89 1,071.11 378.21 1,891.06

411 g ROLL POINTING SM 46.35 5.78 45.31 24.36 121.80

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 473.25 134.30 999.73 401.82 2,009.10

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 151.61 230.36 364.91 186.72 933.60

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 147.86 297.19 469.95 228.75 1,143.75

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 142.90 514.83 579.68 309.35 1,546.76

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 150.36 639.81 869.60 414.94 2,074.71

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 173.07 704.13 1,174.64 512.96 2,564.80

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 213.86 868.93 1,770.76 713.39 3,566.94

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 276.76 961.94 2,216.20 863.73 4,318.63

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 326.21 1,168.07 3,094.08 1,147.09 5,735.45

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 386.76 1,362.74 4,691.39 1,610.22 8,051.11

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 151.61 263.77 385.06 200.11 1,000.55

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 147.86 297.19 502.75 236.95 1,184.75

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 139.71 514.83 605.92 315.12 1,575.58

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 150.36 639.81 929.53 429.93 2,149.63

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 173.07 704.13 1,640.70 629.48 3,147.38

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 213.86 868.93 2,233.24 829.01 4,145.04

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 276.76 961.94 2,845.96 1,021.17 5,105.83

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 326.21 1,168.07 3,720.04 1,303.58 6,517.90

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 386.76 1,362.74 5,123.48 1,718.25 8,591.23

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 59.38 68.08 173.61 75.27 376.34

502 bCM 485.18 309.47 2,366.18 790.21 3,951.04

507 a STEEL WIRE MESH FOR GABIONS KG 3.62 - 75.81 19.86 99.29

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 138: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 138 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.38 - 379.17 110.89 554.44

508 a BRICK PAVING (SINGLE COURSE) SM 72.72 15.80 160.02 62.14 310.68

508 b BRICK PAVING (DOUBLE COURSE) SM 130.32 15.80 318.43 116.14 580.69

509 a RIP RAP CLASS "A" CM 314.55 - 250.00 141.14 705.69

509 b RIP RAP CLASS "B" CM 303.72 - 248.00 137.93 689.65

509 c RIP RAP CLASS "C" CM 305.70 - 250.00 138.93 694.63

509 d GROUTED RIP RAP CLASS "A" CM 343.34 35.09 1,220.55 399.75 1,998.73

509 e GROUTED RIP RAP CLASS "B" CM 331.38 28.07 1,118.15 369.40 1,847.00

509 f GROUTED RIP RAP CLASS "C" CM 327.45 23.39 1,136.76 371.90 1,859.50

509 gCM 512.80 181.56 2,735.51 857.47 4,287.34

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.00 115.89 270.39 104.57 522.85

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 72.00 194.57 - 66.64 333.21

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 98.95 35.01 40.63 43.65 218.24

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 126.66 44.81 52.00 55.87 279.34

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 160.74 91.01 209.04 115.20 575.99

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 200.93 113.77 261.30 144.00 720.00

603 BRICK EDGING M 5.79 - 25.92 7.93 39.64

605 a CONCRETE BEAM GUARDRAIL M 49.58 14.67 420.86 121.28 606.39

605 c CONCRETE POST FOR GUARDRAIL M 60.87 13.10 416.95 122.73 613.65

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 154.80 128.42 4,684.06 1,241.82 6,209.10

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 44.55 192.63 6,844.73 1,770.48 8,852.39

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 154.80 272.87 8,460.05 2,221.93 11,109.65

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 514.81 304.65 15,548.92 4,092.10 20,460.48

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 102.96 60.93 7,012.71 1,794.15 8,970.75

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.18 318.26 1,591.28

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,543.77 446.90 2,234.51

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 139: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 139 / 244

Rate Analysis Summary ( Construction)District (45) Mianwali

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.63 2.85 15.40 4.97 24.85

608 b2M 0.54 1.27 30.41 8.06 40.28

608 c1M 1.63 2.85 20.54 6.26 31.28

608 c2M 0.54 1.27 40.56 10.59 52.96

608 d1EACH 46.77 - 148.77 48.89 244.43

608 d2EACH 46.77 - 383.23 107.50 537.50

608 h1M 2.04 3.56 21.41 6.75 33.76

608 h2M 2.04 4.75 51.71 14.63 73.13

608 i1M 2.04 3.56 28.55 8.54 42.69

608 i2M 2.04 4.75 68.95 18.94 94.68

608 j1EACH 46.77 - 206.73 63.38 316.88

608 j2EACH 46.77 - 652.07 174.71 873.55

608 n1 EACH 38.67 - 99.18 34.46 172.31

608 n2 EACH 38.67 - 255.87 73.64 368.18

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.67 - 137.82 44.12 220.61

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.67 - 435.37 118.51 592.55

609 cEACH 5.80 46.68 167.54 55.01 275.03

609 dEACH 5.80 46.68 202.54 63.76 318.78

610 b RIGHT OF WAY MARKER EACH 69.41 60.88 209.67 84.99 424.95

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 428.33 476.40 1,404.60 577.33 2,886.66

610 d TEN KILOMETRE POST EACH 826.65 952.79 3,070.16 1,212.40 6,062.00

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 140: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 140 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.40 6.96 - 1.84 9.20

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.05 102.44 0.88 26.84 134.21

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 11.52 258.13 1.97 67.91 339.53

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 46.08 1,032.53 7.89 271.63 1,358.13

103 STRIPPING CM 1.44 59.42 - 15.22 76.08

104 COMPACTION OF NATURAL GROUND SM 0.21 5.92 0.62 1.69 8.44

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.70 86.79 - 22.37 111.86

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 76.56 193.76 46.20 79.13 395.65

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.64 214.84 - 56.37 281.85

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.11 167.12 - 43.56 217.79

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.21 78.63 - 20.21 101.05

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 76.56 193.76 46.20 79.13 395.65

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.21 199.88 - 53.02 265.11

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.41 167.24 - 43.16 215.81

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.47 89.04 0.31 23.46 117.28

107 bCM 39.21 165.86 53.31 64.60 322.98

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 67.84 258.51 30.80 89.29 446.44

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 57.51 193.04 - 62.64 313.19

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 34.89 160.37 - 48.82 244.08

107 d GRANULAR BACK FILL CM 19.74 83.07 314.43 104.31 521.55

107 e COMMON BACK FILL CM 13.82 37.31 4.13 13.82 69.08

108 aCM 4.27 106.71 4.13 28.78 143.89

108 biCM 12.15 302.97 48.81 90.98 454.91

108 biiCM 9.11 268.11 1.96 69.80 348.98

108 biiiCM 8.10 238.60 - 61.68 308.38

108 cCM 4.81 112.14 6.81 30.94 154.70

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 141: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 141 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.80 46.31 4.13 13.56 67.80

108 eCM 8.60 73.87 2.45 21.23 106.15

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.84 16.84 1.18 4.72 23.58

109 biSM 0.61 10.31 0.63 2.89 14.44

110 IMPROVED SUB-GRADE CM 5.95 75.50 48.96 32.60 163.01

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.50 9.38 0.64 2.63 13.15

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.76 9.92 0.74 2.86 14.28

201 GRANULAR SUB-BASE CM 4.90 106.91 436.15 136.99 684.95

202 AGGREGATE BASE CM 5.75 132.11 566.87 176.18 880.91

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 41.78 916.98 3,412.81 1,092.89 5,464.46

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 43.49 916.98 3,636.01 1,149.12 5,745.60

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 46.84 957.74 3,407.35 1,102.98 5,514.91

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 46.84 954.75 3,717.84 1,179.86 5,899.29

204 b CEMENT STABILIZED BASE CM 17.31 272.73 706.44 249.12 1,245.60

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 147.12 568.44 22,072.80 5,697.09 28,485.45

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 147.12 568.44 22,974.53 5,922.52 29,612.61

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 52.23 55.65 599.01 176.72 883.61

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 87.75 1,408.67 3,084.46 1,145.22 5,726.10

206 bCM 57.55 66.68 517.51 160.44 802.18

207 a DEEP PATCHING (0-15 cm) SM 1.04 30.14 1.02 8.05 40.25

207 b DEEP PATCHING (16-30 cm) SM 1.04 26.47 1.02 7.13 35.66

208 REINSTATEMENT OF ROAD SURFACE SM 1.10 37.00 0.45 9.64 48.19

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.29 70.82 0.55 18.17 90.83

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.26 14.16 0.11 3.63 18.16

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.08 5.73 28.66

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 142: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 142 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.08 5.73 28.66

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.72 2.51 12.54

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.19 2.38 11.88

304 a SINGLE SURFACE TREATMENT SM 0.47 4.16 43.58 12.05 60.26

304 b DOUBLE SURFACE TREATMENT SM 0.69 8.06 83.23 23.00 114.98

304 c TRIPLE SURFACE TREATMENT SM 1.16 11.08 99.41 27.91 139.56

304 d SEAL COAT SM 0.44 2.33 24.72 6.87 34.36

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 40.01 906.07 3,981.03 1,231.78 6,158.89

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 40.01 876.73 4,292.80 1,302.39 6,511.93

307 a DENSE GRADED HOT BIT-MAC CM 95.54 171.48 3,278.80 886.46 4,432.28

307 b OPEN GRADED HOT BIT-MAC CM 95.54 171.48 3,184.17 862.80 4,313.99

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 16.47 456.95 929.03 350.61 1,753.06

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 129.21 465.97 24,148.50 6,185.92 30,929.60

309 a COLD MILLING, 0 - 30 mm SM 0.57 16.87 7.54 6.25 31.23

309 b COLD MILLING, 0 - 50 mm SM 0.95 28.11 12.57 10.41 52.04

309 c COLD MILLING, 0 - 70 mm SM 1.43 42.16 18.85 15.61 78.05

401 ai CONCRETE CLASS "A3" (Underground) CM 327.33 643.62 3,125.09 1,024.01 5,120.05

401 aii CONCRETE CLASS "A3" (On ground) CM 327.33 643.62 3,333.99 1,076.24 5,381.18

401 aiii CONCRETE CLASS "A3" (Elevated) CM 327.33 643.62 3,751.79 1,180.69 5,903.43

401 b CONCRETE CLASS "B" CM 411.02 407.09 2,340.66 789.69 3,948.46

401 ci CONCRETE CLASS "C" (Underground) CM 315.27 258.76 2,793.03 841.77 4,208.83

401 cii CONCRETE CLASS "C" (On ground) CM 315.27 258.76 2,882.13 864.04 4,320.20

401 ciii CONCRETE CLASS "C" (Elevated) CM 315.27 258.76 3,060.32 908.59 4,542.94

401 d CONCRETE CLASS "D1" CM 511.76 810.64 3,992.69 1,328.77 6,643.86

401 e CONCRETE CLASS "Y" CM 712.73 258.76 3,420.74 1,098.06 5,490.29

401 f LEAN CONCRETE CM 253.23 252.12 1,882.23 596.90 2,984.48

Page 143: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 143 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,053.16 468.57 3,922.13 1,360.97 6,804.83

401 gii PRECAST CONCRETE CLASS "B" CM 1,053.16 468.57 3,506.91 1,257.16 6,285.80

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 997.00 - 42,565.72 10,890.68 54,453.40

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 997.00 - 44,665.72 11,415.68 57,078.40

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 816.76 2,335.68 37,112.48 10,066.23 50,331.15

405 aTON 1,711.38 6,882.66 80,755.70 22,337.44 111,687.18

405 b LAUNCHING OF GIRDER TON 39.87 403.69 - 110.89 554.45

406 aSM 70.52 - 189.92 65.11 325.55

406 b SM 70.52 - 198.63 67.29 336.44

406 c STEEL EXPANSION JOINTS KG 5.91 11.61 60.60 19.53 97.65

406 d WATER STOPS 6" SIZE M 57.77 - 308.03 91.45 457.25

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.33 - 1,412.87 359.80 1,799.00

406 g STEEL OR METAL BEARING DEVICES KG 12.34 30.66 81.01 31.00 155.01

407 d1M 211.09 847.08 552.95 402.78 2,013.90

407 d2M 316.64 1,270.62 829.42 604.17 3,020.85

407 d3M 316.64 1,270.62 634.06 555.33 2,776.65

407 d4M 527.73 2,117.70 781.77 856.80 4,284.00

407 d5M 452.34 1,815.17 729.01 749.13 3,745.65

407 d6M 791.59 3,176.55 1,017.96 1,246.53 6,232.63

407 h PILE LOAD TEST UP TO 120 TON EACH 11,748.24 19,990.40 72,583.32 26,080.49 130,402.45

407 i PILE LOAD TEST UP TO 240 TON EACH 22,913.52 19,990.40 145,166.64 47,017.64 235,088.20

407 j PILE LOAD TEST UP TO 360 TON EACH 34,428.24 19,990.40 217,749.96 68,042.15 340,210.75

407 k CONFIRMATORY BORING (NX SIZE) M 116.19 826.61 5.16 236.99 1,184.95

410 BRICK WORK CM 204.73 142.50 2,033.38 595.15 2,975.76

411 a STONE MASONRY RANDOM DRY CM 213.30 56.01 485.30 188.65 943.26

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 144: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 144 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 251.84 84.89 1,230.50 391.81 1,959.04

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 292.92 56.01 538.67 221.90 1,109.50

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 334.00 84.89 1,285.26 426.04 2,130.19

411 g ROLL POINTING SM 44.19 5.78 46.14 24.03 120.14

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 437.62 134.30 1,213.88 446.45 2,232.25

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 128.60 230.36 366.46 181.36 906.78

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 125.05 297.19 471.81 223.51 1,117.56

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 124.97 514.83 581.85 305.41 1,527.06

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 129.97 639.81 872.13 410.48 2,052.39

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 150.66 704.13 1,177.17 507.99 2,539.95

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 188.67 868.93 1,774.41 708.00 3,540.01

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 244.16 961.94 2,219.84 856.49 4,282.43

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 286.09 1,168.07 3,098.50 1,138.17 5,690.83

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 341.39 1,362.74 4,696.55 1,600.17 8,000.85

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 128.60 263.77 388.15 195.13 975.65

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 125.05 297.19 504.61 231.71 1,158.56

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 122.27 514.83 608.09 311.30 1,556.49

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 129.97 639.81 931.50 425.32 2,126.60

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 150.66 704.13 1,643.51 624.58 3,122.88

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 188.67 868.93 2,236.89 823.62 4,118.11

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 244.16 961.94 2,849.60 1,013.93 5,069.63

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 286.09 1,168.07 3,724.46 1,294.66 6,473.28

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 341.39 1,362.74 5,128.63 1,708.19 8,540.95

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 50.40 68.08 280.13 99.65 498.26

502 bCM 464.98 309.47 2,393.77 792.06 3,960.28

507 a STEEL WIRE MESH FOR GABIONS KG 3.32 - 77.80 20.28 101.40

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 145: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 145 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 53.67 - 437.50 122.79 613.96

508 a BRICK PAVING (SINGLE COURSE) SM 66.60 15.80 158.81 60.30 301.51

508 b BRICK PAVING (DOUBLE COURSE) SM 119.68 15.80 315.12 112.65 563.25

509 a RIP RAP CLASS "A" CM 291.29 - 413.93 176.31 881.53

509 b RIP RAP CLASS "B" CM 280.29 - 410.61 172.73 863.63

509 c RIP RAP CLASS "C" CM 282.66 - 413.93 174.15 870.74

509 d GROUTED RIP RAP CLASS "A" CM 445.85 35.09 1,385.25 466.55 2,332.74

509 e GROUTED RIP RAP CLASS "B" CM 429.48 28.07 1,281.38 434.73 2,173.66

509 f GROUTED RIP RAP CLASS "C" CM 424.88 23.39 1,303.36 437.91 2,189.54

509 gCM 470.25 181.56 2,761.49 853.33 4,266.63

509 h FILTER LAYER OF GRANULAR MATERIAL CM 27.43 115.89 314.56 114.47 572.35

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 60.70 194.57 - 63.82 319.09

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 90.63 35.01 67.26 48.23 241.13

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 116.00 44.81 86.10 61.73 308.64

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 148.87 91.01 244.93 121.20 606.01

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 186.09 113.77 306.16 151.51 757.53

603 BRICK EDGING M 5.20 - 24.96 7.54 37.70

605 a CONCRETE BEAM GUARDRAIL M 43.38 14.67 421.90 119.99 599.94

605 c CONCRETE POST FOR GUARDRAIL M 53.27 13.10 418.25 121.16 605.78

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 142.12 128.42 4,680.70 1,237.81 6,189.05

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 41.61 192.63 6,850.13 1,771.09 8,855.46

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 142.12 272.87 8,470.22 2,221.30 11,106.51

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 446.25 304.65 15,565.28 4,079.05 20,395.23

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 89.25 60.93 7,017.32 1,791.88 8,959.38

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.58 318.36 1,591.78

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,544.37 447.05 2,235.26

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 146: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 146 / 244

Rate Analysis Summary ( Construction)District (46) Multan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 2.33 2.85 15.39 5.14 25.71

608 b2M 0.78 1.27 30.44 8.12 40.61

608 c1M 2.33 2.85 20.55 6.43 32.16

608 c2M 0.78 1.27 40.60 10.66 53.31

608 d1EACH 56.03 - 148.80 51.21 256.04

608 d2EACH 56.03 - 383.56 109.90 549.49

608 h1M 2.91 3.56 21.41 6.97 34.85

608 h2M 2.91 4.75 51.71 14.84 74.21

608 i1M 2.91 3.56 28.55 8.76 43.78

608 i2M 2.91 4.75 68.95 19.15 95.76

608 j1EACH 56.03 - 206.76 65.70 328.49

608 j2EACH 56.03 - 652.07 177.03 885.13

608 n1 EACH 47.31 - 99.20 36.63 183.14

608 n2 EACH 47.31 - 256.09 75.85 379.25

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 47.31 - 137.84 46.29 231.44

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 47.31 - 435.37 120.67 603.35

609 cEACH 5.66 46.68 167.60 54.99 274.93

609 dEACH 5.66 46.68 202.60 63.74 318.68

610 b RIGHT OF WAY MARKER EACH 58.62 60.88 210.84 82.59 412.93

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 380.96 476.40 1,415.43 568.20 2,840.99

610 d TEN KILOMETRE POST EACH 732.84 952.79 3,089.29 1,193.73 5,968.65

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 147: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 147 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.52 6.96 - 1.87 9.35

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.04 102.44 0.88 27.09 135.45

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 14.84 258.13 1.97 68.74 343.68

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 59.35 1,032.53 7.89 274.94 1,374.71

103 STRIPPING CM 1.71 59.42 - 15.28 76.41

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.61 86.79 - 22.35 111.75

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 82.47 193.76 46.20 80.61 403.04

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.96 214.84 - 56.70 283.50

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.84 167.12 - 43.74 218.70

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.13 78.63 - 20.19 100.95

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 82.47 193.76 46.20 80.61 403.04

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.09 199.88 - 53.24 266.21

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.02 167.24 - 43.32 216.58

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.56 89.04 0.31 23.48 117.39

107 bCM 43.35 165.86 53.31 65.63 328.15

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 72.73 258.51 30.80 90.51 452.55

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 62.11 193.04 - 63.79 318.94

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 37.40 160.37 - 49.44 247.21

107 d GRANULAR BACK FILL CM 23.54 83.07 307.26 103.47 517.34

107 e COMMON BACK FILL CM 18.51 37.31 4.13 14.99 74.94

108 aCM 4.61 106.71 4.13 28.86 144.31

108 biCM 13.78 302.97 48.81 91.39 456.95

108 biiCM 10.34 268.11 1.96 70.10 350.51

108 biiiCM 9.19 238.60 - 61.95 309.74

108 cCM 5.39 112.14 6.81 31.09 155.43

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 148: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 148 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.16 46.31 4.13 13.65 68.25

108 eCM 10.00 73.87 2.45 21.58 107.90

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.93 16.84 1.18 4.74 23.69

109 biSM 0.66 10.31 0.63 2.90 14.50

110 IMPROVED SUB-GRADE CM 6.76 75.50 53.08 33.84 169.18

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.57 9.38 0.64 2.65 13.24

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.86 9.92 0.74 2.88 14.40

201 GRANULAR SUB-BASE CM 5.42 106.91 435.25 136.90 684.48

202 AGGREGATE BASE CM 6.09 132.11 556.42 173.66 868.28

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 52.85 916.98 3,424.96 1,098.70 5,493.49

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 54.46 916.98 3,648.72 1,155.04 5,775.20

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 58.35 957.74 3,419.73 1,108.96 5,544.78

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 58.35 954.75 3,731.11 1,186.05 5,930.26

204 b CEMENT STABILIZED BASE CM 19.08 272.73 700.18 248.00 1,239.99

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 161.47 568.44 22,225.80 5,738.93 28,694.64

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 161.47 568.44 23,132.82 5,965.68 29,828.41

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 71.61 55.65 587.97 178.81 894.04

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 105.09 1,408.67 3,083.75 1,149.38 5,746.89

206 bCM 79.48 66.68 478.88 156.26 781.30

207 a DEEP PATCHING (0-15 cm) SM 1.16 30.14 1.02 8.08 40.40

207 b DEEP PATCHING (16-30 cm) SM 1.16 26.47 1.02 7.16 35.81

208 REINSTATEMENT OF ROAD SURFACE SM 1.19 37.00 0.45 9.66 48.30

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.32 70.82 0.55 18.17 90.86

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.26 14.16 0.11 3.63 18.16

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 22.23 5.78 28.88

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 149: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 149 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 22.23 5.77 28.86

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.78 2.53 12.63

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.25 2.39 11.96

304 a SINGLE SURFACE TREATMENT SM 0.50 4.16 43.83 12.12 60.61

304 b DOUBLE SURFACE TREATMENT SM 0.73 8.06 83.64 23.11 115.54

304 c TRIPLE SURFACE TREATMENT SM 1.23 11.08 99.85 28.04 140.20

304 d SEAL COAT SM 0.46 2.33 24.87 6.92 34.58

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 48.88 906.07 4,002.76 1,239.43 6,197.14

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 48.88 876.73 4,318.03 1,310.91 6,554.55

307 a DENSE GRADED HOT BIT-MAC CM 120.29 171.48 3,303.64 898.85 4,494.26

307 b OPEN GRADED HOT BIT-MAC CM 120.29 171.48 3,202.34 873.53 4,367.64

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 20.24 456.95 930.63 351.96 1,759.78

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 144.58 465.97 24,301.50 6,228.01 31,140.06

309 a COLD MILLING, 0 - 30 mm SM 0.63 16.87 7.54 6.26 31.30

309 b COLD MILLING, 0 - 50 mm SM 1.05 28.11 12.57 10.43 52.16

309 c COLD MILLING, 0 - 70 mm SM 1.57 42.16 18.85 15.65 78.23

401 ai CONCRETE CLASS "A3" (Underground) CM 352.38 643.62 3,137.44 1,033.36 5,166.80

401 aii CONCRETE CLASS "A3" (On ground) CM 352.38 643.62 3,346.34 1,085.59 5,427.93

401 aiii CONCRETE CLASS "A3" (Elevated) CM 352.38 643.62 3,764.14 1,190.04 5,950.18

401 b CONCRETE CLASS "B" CM 460.64 407.09 2,349.72 804.36 4,021.81

401 ci CONCRETE CLASS "C" (Underground) CM 354.12 258.76 2,801.75 853.66 4,268.29

401 cii CONCRETE CLASS "C" (On ground) CM 354.12 258.76 2,890.85 875.93 4,379.66

401 ciii CONCRETE CLASS "C" (Elevated) CM 354.12 258.76 3,069.04 920.48 4,602.40

401 d CONCRETE CLASS "D1" CM 549.00 810.64 4,003.28 1,340.73 6,703.65

401 e CONCRETE CLASS "Y" CM 776.76 258.76 3,433.21 1,117.18 5,585.91

401 f LEAN CONCRETE CM 315.47 252.12 1,891.25 614.71 3,073.55

Page 150: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 150 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,219.79 468.57 3,935.90 1,406.07 7,030.33

401 gii PRECAST CONCRETE CLASS "B" CM 1,219.79 468.57 3,515.17 1,300.88 6,504.41

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,049.43 - 42,566.02 10,903.86 54,519.31

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,049.43 - 44,666.02 11,428.86 57,144.31

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 868.28 2,335.68 37,143.46 10,086.86 50,434.28

405 aTON 1,909.48 6,882.66 80,754.63 22,386.69 111,933.46

405 b LAUNCHING OF GIRDER TON 45.39 403.69 - 112.27 561.35

406 aSM 79.42 - 190.67 67.52 337.61

406 b SM 79.42 - 199.39 69.70 348.51

406 c STEEL EXPANSION JOINTS KG 6.55 11.61 60.61 19.69 98.46

406 d WATER STOPS 6" SIZE M 65.49 - 307.88 93.34 466.71

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.87 - 1,413.17 360.26 1,801.30

406 g STEEL OR METAL BEARING DEVICES KG 14.36 30.66 81.02 31.51 157.55

407 d1M 245.14 847.08 578.96 417.80 2,088.98

407 d2M 367.71 1,270.62 868.45 626.70 3,133.48

407 d3M 367.71 1,270.62 673.09 577.86 2,889.28

407 d4M 612.86 2,117.70 846.81 894.34 4,471.71

407 d5M 525.30 1,815.17 784.76 781.31 3,906.54

407 d6M 919.28 3,176.55 1,115.53 1,302.84 6,514.20

407 h PILE LOAD TEST UP TO 120 TON EACH 16,074.66 19,990.40 72,541.08 27,151.54 135,757.68

407 i PILE LOAD TEST UP TO 240 TON EACH 32,965.38 19,990.40 145,082.16 49,509.49 247,547.43

407 j PILE LOAD TEST UP TO 360 TON EACH 49,108.26 19,990.40 217,623.24 71,680.48 358,402.38

407 k CONFIRMATORY BORING (NX SIZE) M 149.11 826.61 5.16 245.22 1,226.10

410 BRICK WORK CM 231.07 142.50 2,044.64 604.55 3,022.76

411 a STONE MASONRY RANDOM DRY CM 205.11 42.98 459.71 176.95 884.75

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 151: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 151 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 241.72 63.18 1,124.18 357.27 1,786.35

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 280.53 42.98 511.55 208.77 1,043.83

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 319.34 63.18 1,184.31 391.71 1,958.54

411 g ROLL POINTING SM 48.98 5.78 46.38 25.29 126.43

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 511.36 134.30 1,203.81 462.37 2,311.84

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 169.17 230.36 366.90 191.61 958.04

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 165.83 297.19 472.34 233.84 1,169.20

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 158.22 514.83 582.46 313.88 1,569.39

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 167.67 639.81 872.85 420.08 2,100.41

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 192.78 704.13 1,177.89 518.70 2,593.50

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 237.01 868.93 1,775.45 720.35 3,601.74

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 306.72 961.94 2,220.88 872.39 4,361.93

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 362.68 1,168.07 3,099.75 1,157.63 5,788.13

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 427.96 1,362.74 4,698.01 1,622.18 8,110.89

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 169.17 263.77 389.03 205.49 1,027.46

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 165.83 297.19 505.14 242.04 1,210.20

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 154.29 514.83 608.70 319.46 1,597.28

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 167.67 639.81 932.06 434.89 2,174.43

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 192.78 704.13 1,644.31 635.31 3,176.53

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 237.01 868.93 2,237.93 835.97 4,179.84

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 306.72 961.94 2,850.64 1,029.83 5,149.13

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 362.68 1,168.07 3,725.72 1,314.12 6,570.59

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 427.96 1,362.74 5,130.10 1,730.20 8,651.00

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 65.11 68.08 279.55 103.19 515.93

502 bCM 519.62 309.47 2,402.83 807.98 4,039.90

507 a STEEL WIRE MESH FOR GABIONS KG 3.65 - 75.81 19.87 99.33

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 152: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 152 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 72.30 - 420.00 123.08 615.38

508 a BRICK PAVING (SINGLE COURSE) SM 78.81 15.80 158.79 63.35 316.75

508 b BRICK PAVING (DOUBLE COURSE) SM 141.11 15.80 315.08 118.00 589.99

509 a RIP RAP CLASS "A" CM 276.64 - 394.83 167.87 839.34

509 b RIP RAP CLASS "B" CM 266.13 - 391.67 164.45 822.25

509 c RIP RAP CLASS "C" CM 268.23 - 394.83 165.77 828.83

509 d GROUTED RIP RAP CLASS "A" CM 337.72 35.09 1,365.31 434.53 2,172.65

509 e GROUTED RIP RAP CLASS "B" CM 325.93 28.07 1,261.70 403.93 2,019.63

509 f GROUTED RIP RAP CLASS "C" CM 321.89 23.39 1,283.10 407.10 2,035.48

509 gCM 563.18 181.56 2,770.02 878.69 4,393.45

509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.24 115.89 307.43 114.89 574.45

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 78.32 194.57 - 68.22 341.11

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 86.88 26.87 64.16 44.48 222.39

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 111.21 34.39 82.12 56.93 284.65

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 142.26 66.70 231.72 110.17 550.85

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 177.82 83.38 289.66 137.72 688.58

603 BRICK EDGING M 6.30 - 24.96 7.82 39.08

605 a CONCRETE BEAM GUARDRAIL M 54.72 14.67 422.37 122.94 614.70

605 c CONCRETE POST FOR GUARDRAIL M 67.19 13.10 418.83 124.78 623.90

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 169.06 128.42 4,680.32 1,244.45 6,222.25

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 50.03 192.63 6,852.53 1,773.80 8,868.99

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 169.06 272.87 8,474.49 2,229.11 11,145.53

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 578.09 304.65 15,572.50 4,113.81 20,569.05

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 115.62 60.93 7,019.74 1,799.07 8,995.36

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.88 318.43 1,592.15

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,544.82 447.17 2,235.83

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 153: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 153 / 244

Rate Analysis Summary ( Construction)District (47) Muzaffargarh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.66 2.85 15.40 4.98 24.89

608 b2M 0.55 1.27 30.45 8.07 40.34

608 c1M 1.66 2.85 20.55 6.27 31.33

608 c2M 0.55 1.27 40.62 10.61 53.05

608 d1EACH 47.21 - 148.82 49.01 245.04

608 d2EACH 47.21 - 383.76 107.74 538.71

608 h1M 2.07 3.56 21.42 6.76 33.81

608 h2M 2.07 4.75 51.71 14.63 73.16

608 i1M 2.07 3.56 28.56 8.55 42.74

608 i2M 2.07 4.75 68.95 18.94 94.71

608 j1EACH 47.21 - 206.78 63.50 317.49

608 j2EACH 47.21 - 652.07 174.82 874.10

608 n1 EACH 39.01 - 99.21 34.56 172.78

608 n2 EACH 39.01 - 256.23 73.81 369.05

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 39.01 - 137.85 44.22 221.08

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 39.01 - 435.37 118.60 592.98

609 cEACH 6.54 46.68 167.62 55.21 276.05

609 dEACH 6.54 46.68 202.62 63.96 319.80

610 b RIGHT OF WAY MARKER EACH 77.71 60.88 211.36 87.49 437.44

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 454.66 476.40 1,420.01 587.77 2,938.84

610 d TEN KILOMETRE POST EACH 881.99 952.79 3,097.78 1,233.14 6,165.70

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 154: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 154 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.47 6.96 - 1.86 9.29

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.65 102.44 0.88 26.99 134.96

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.45 258.13 1.97 68.39 341.94

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 53.81 1,032.53 7.89 273.56 1,367.79

103 STRIPPING CM 1.58 59.42 - 15.25 76.25

104 COMPACTION OF NATURAL GROUND SM 0.22 5.92 0.62 1.69 8.45

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.63 86.79 - 22.36 111.78

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 78.54 193.76 46.20 79.63 398.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.24 214.84 - 56.52 282.60

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.43 167.12 - 43.64 218.19

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.15 78.63 - 20.20 100.98

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 78.54 193.76 46.20 79.63 398.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.48 199.88 - 53.09 265.45

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.68 167.24 - 43.23 216.15

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.45 89.04 0.31 23.45 117.25

107 bCM 40.95 165.86 53.31 65.03 325.15

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 69.35 258.51 30.80 89.67 448.33

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 59.07 193.04 - 63.03 315.14

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 35.67 160.37 - 49.01 245.05

107 d GRANULAR BACK FILL CM 21.56 83.07 331.09 108.93 544.65

107 e COMMON BACK FILL CM 16.30 37.31 4.13 14.44 72.18

108 aCM 4.40 106.71 4.13 28.81 144.05

108 biCM 12.90 302.97 48.81 91.17 455.85

108 biiCM 9.68 268.11 1.96 69.94 349.69

108 biiiCM 8.60 238.60 - 61.80 309.00

108 cCM 5.07 112.14 6.81 31.01 155.03

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 155: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 155 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.95 46.31 4.13 13.60 67.99

108 eCM 9.28 73.87 2.45 21.40 107.00

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.88 16.84 1.18 4.73 23.63

109 biSM 0.63 10.31 0.63 2.89 14.46

110 IMPROVED SUB-GRADE CM 6.43 75.50 54.33 34.07 170.33

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.53 9.38 0.64 2.64 13.19

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.81 9.92 0.74 2.87 14.34

201 GRANULAR SUB-BASE CM 5.21 106.91 549.03 165.29 826.44

202 AGGREGATE BASE CM 6.06 132.11 671.29 202.37 1,011.83

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.88 916.98 3,514.68 1,119.89 5,599.43

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 49.50 916.98 3,729.06 1,173.89 5,869.43

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 53.16 957.74 3,509.53 1,130.11 5,650.54

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 53.16 954.75 3,810.13 1,204.51 6,022.55

204 b CEMENT STABILIZED BASE CM 18.63 272.73 844.90 284.07 1,420.33

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 153.21 568.44 21,817.80 5,634.86 28,174.31

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 153.21 568.44 22,722.60 5,861.06 29,305.31

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.68 55.65 709.35 206.92 1,034.60

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 97.17 1,408.67 3,193.61 1,174.86 5,874.31

206 bCM 69.55 66.68 670.40 201.66 1,008.29

207 a DEEP PATCHING (0-15 cm) SM 1.09 30.14 1.02 8.06 40.31

207 b DEEP PATCHING (16-30 cm) SM 1.09 26.47 1.02 7.15 35.73

208 REINSTATEMENT OF ROAD SURFACE SM 1.19 37.00 0.45 9.66 48.30

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.29 70.82 0.55 18.17 90.83

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.26 14.16 0.11 3.63 18.16

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 156: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 156 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 21.82 5.67 28.34

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.62 2.48 12.41

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.09 2.35 11.75

304 a SINGLE SURFACE TREATMENT SM 0.48 4.16 43.76 12.10 60.50

304 b DOUBLE SURFACE TREATMENT SM 0.70 8.06 84.24 23.25 116.25

304 c TRIPLE SURFACE TREATMENT SM 1.18 11.08 101.10 28.34 141.70

304 d SEAL COAT SM 0.44 2.33 24.74 6.88 34.39

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 44.91 906.07 4,076.65 1,256.91 6,284.54

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 44.91 876.73 4,391.41 1,328.26 6,641.31

307 a DENSE GRADED HOT BIT-MAC CM 109.21 171.48 3,364.65 911.34 4,556.68

307 b OPEN GRADED HOT BIT-MAC CM 109.21 171.48 3,270.40 887.77 4,438.86

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.35 456.95 943.10 354.60 1,773.00

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 136.31 465.97 23,893.50 6,123.95 30,619.73

309 a COLD MILLING, 0 - 30 mm SM 0.61 16.87 7.54 6.26 31.28

309 b COLD MILLING, 0 - 50 mm SM 1.02 28.11 12.57 10.43 52.13

309 c COLD MILLING, 0 - 70 mm SM 1.53 42.16 18.85 15.64 78.18

401 ai CONCRETE CLASS "A3" (Underground) CM 337.95 643.62 3,345.21 1,081.70 5,408.48

401 aii CONCRETE CLASS "A3" (On ground) CM 337.95 643.62 3,554.11 1,133.92 5,669.60

401 aiii CONCRETE CLASS "A3" (Elevated) CM 337.95 643.62 3,971.91 1,238.37 6,191.85

401 b CONCRETE CLASS "B" CM 436.44 407.09 2,567.61 852.79 4,263.93

401 ci CONCRETE CLASS "C" (Underground) CM 332.57 258.76 3,034.37 906.43 4,532.13

401 cii CONCRETE CLASS "C" (On ground) CM 332.57 258.76 3,123.47 928.70 4,643.50

401 ciii CONCRETE CLASS "C" (Elevated) CM 332.57 258.76 3,301.66 973.25 4,866.24

401 d CONCRETE CLASS "D1" CM 525.27 810.64 4,204.21 1,385.03 6,925.15

401 e CONCRETE CLASS "Y" CM 737.11 258.76 3,627.60 1,155.87 5,779.34

401 f LEAN CONCRETE CM 284.85 252.12 2,105.16 660.53 3,302.66

Page 157: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 157 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,128.03 468.57 4,160.61 1,439.30 7,196.51

401 gii PRECAST CONCRETE CLASS "B" CM 1,128.03 468.57 3,742.65 1,334.81 6,674.06

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,004.79 - 42,670.65 10,918.86 54,594.30

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,004.79 - 44,770.65 11,443.86 57,219.30

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 832.57 2,335.68 37,105.70 10,068.49 50,342.44

405 aTON 1,909.48 6,882.66 80,769.74 22,390.47 111,952.35

405 b LAUNCHING OF GIRDER TON 45.39 403.69 - 112.27 561.35

406 aSM 74.18 - 184.89 64.77 323.84

406 b SM 74.18 - 193.60 66.95 334.73

406 c STEEL EXPANSION JOINTS KG 6.19 11.61 60.84 19.66 98.30

406 d WATER STOPS 6" SIZE M 61.03 - 309.39 92.61 463.03

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 26.63 - 1,411.21 359.46 1,797.30

406 g STEEL OR METAL BEARING DEVICES KG 13.37 30.66 81.19 31.31 156.53

407 d1M 245.82 847.08 548.65 410.39 2,051.94

407 d2M 368.73 1,270.62 822.97 615.58 3,077.90

407 d3M 368.73 1,270.62 627.61 566.74 2,833.70

407 d4M 614.55 2,117.70 771.02 875.82 4,379.09

407 d5M 526.76 1,815.17 719.80 765.43 3,827.16

407 d6M 921.83 3,176.55 1,001.84 1,275.06 6,375.28

407 h PILE LOAD TEST UP TO 120 TON EACH 14,065.86 19,990.40 70,987.00 26,260.82 131,304.08

407 i PILE LOAD TEST UP TO 240 TON EACH 28,501.38 19,990.40 141,974.00 47,616.45 238,082.23

407 j PILE LOAD TEST UP TO 360 TON EACH 42,412.26 19,990.40 212,961.00 68,840.92 344,204.58

407 k CONFIRMATORY BORING (NX SIZE) M 139.81 826.61 5.16 242.90 1,214.48

410 BRICK WORK CM 215.74 142.50 2,169.04 631.82 3,159.10

411 a STONE MASONRY RANDOM DRY CM 227.58 56.01 665.13 237.18 1,185.90

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 158: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 158 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 271.25 84.89 1,516.35 468.12 2,340.61

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 313.58 56.01 732.88 275.62 1,378.09

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 355.92 84.89 1,560.34 500.29 2,501.44

411 g ROLL POINTING SM 46.00 5.78 47.98 24.94 124.70

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 471.92 134.30 1,488.96 523.80 2,618.98

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 150.01 230.36 413.12 198.37 991.86

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 146.67 297.19 492.94 234.20 1,171.00

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 142.23 514.83 617.67 318.68 1,593.41

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 149.75 639.81 1,431.03 555.15 2,775.74

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 172.60 704.13 1,890.18 691.73 3,458.64

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 213.45 868.93 2,671.45 938.46 4,692.29

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 276.23 961.94 2,936.43 1,043.65 5,218.25

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 325.65 1,168.07 3,426.43 1,230.04 6,150.19

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 385.69 1,362.74 4,818.15 1,641.65 8,208.23

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 150.01 263.77 394.68 202.12 1,010.58

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 146.67 297.19 508.73 238.15 1,190.74

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 138.85 514.83 612.86 316.64 1,583.18

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 149.75 639.81 935.84 431.35 2,156.75

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 172.60 704.13 1,649.81 631.64 3,158.18

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 213.45 868.93 2,245.01 831.85 4,159.24

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 276.23 961.94 2,857.75 1,023.98 5,119.90

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 325.65 1,168.07 3,734.35 1,307.02 6,535.09

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 385.69 1,362.74 5,140.18 1,722.15 8,610.76

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 58.12 68.08 258.36 96.14 480.70

502 bCM 489.75 309.47 2,621.39 855.15 4,275.76

507 a STEEL WIRE MESH FOR GABIONS KG 3.44 - 75.81 19.81 99.06

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 159: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 159 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.67 - 431.67 123.84 619.18

508 a BRICK PAVING (SINGLE COURSE) SM 72.39 15.80 163.56 62.94 314.69

508 b BRICK PAVING (DOUBLE COURSE) SM 129.73 15.80 324.79 117.58 587.90

509 a RIP RAP CLASS "A" CM 312.25 - 593.75 226.50 1,132.50

509 b RIP RAP CLASS "B" CM 301.67 - 589.00 222.67 1,113.34

509 c RIP RAP CLASS "C" CM 303.72 - 593.75 224.37 1,121.84

509 d GROUTED RIP RAP CLASS "A" CM 365.83 35.09 1,651.18 513.03 2,565.13

509 e GROUTED RIP RAP CLASS "B" CM 353.42 28.07 1,536.92 479.60 2,398.01

509 f GROUTED RIP RAP CLASS "C" CM 349.20 23.39 1,563.44 484.01 2,420.04

509 gCM 516.28 181.56 2,983.54 920.35 4,601.73

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.15 115.89 330.99 119.76 598.79

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 73.36 194.57 - 66.98 334.91

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 98.32 35.01 96.48 57.45 287.26

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 125.84 44.81 123.50 73.54 367.69

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 159.71 91.01 285.50 134.06 670.28

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 199.64 113.77 356.87 167.57 837.85

603 BRICK EDGING M 5.75 - 25.92 7.92 39.59

605 a CONCRETE BEAM GUARDRAIL M 49.15 14.67 430.81 123.66 618.29

605 c CONCRETE POST FOR GUARDRAIL M 60.35 13.10 429.09 125.64 628.18

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 155.09 128.42 4,688.96 1,243.12 6,215.59

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 45.94 192.63 6,883.94 1,780.63 8,903.14

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 155.09 272.87 8,529.67 2,239.41 11,197.04

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 514.97 304.65 15,647.89 4,116.88 20,584.39

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 102.99 60.93 7,025.97 1,797.47 8,987.36

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.22 317.77 1,588.83

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,540.83 446.17 2,230.84

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 160: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 160 / 244

Rate Analysis Summary ( Construction)District (49 A) Narowal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.71 2.85 15.38 4.99 24.93

608 b2M 0.57 1.27 30.30 8.04 40.18

608 c1M 1.71 2.85 20.53 6.27 31.36

608 c2M 0.57 1.27 40.41 10.56 52.81

608 d1EACH 51.49 - 148.64 50.03 250.16

608 d2EACH 51.49 - 381.84 108.33 541.66

608 h1M 2.13 3.56 21.40 6.77 33.86

608 h2M 2.13 4.75 51.71 14.65 73.24

608 i1M 2.13 3.56 28.53 8.56 42.78

608 i2M 2.13 4.75 68.95 18.96 94.79

608 j1EACH 51.49 - 206.60 64.52 322.61

608 j2EACH 51.49 - 652.07 175.89 879.45

608 n1 EACH 42.38 - 99.09 35.37 176.84

608 n2 EACH 42.38 - 254.95 74.33 371.66

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 42.38 - 137.73 45.03 225.14

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 42.38 - 435.37 119.44 597.19

609 cEACH 6.12 46.68 167.76 55.14 275.70

609 dEACH 6.12 46.68 202.76 63.89 319.45

610 b RIGHT OF WAY MARKER EACH 68.69 60.88 219.98 87.39 436.94

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 416.35 476.40 1,490.17 595.73 2,978.65

610 d TEN KILOMETRE POST EACH 805.36 952.79 3,239.39 1,249.39 6,246.93

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 161: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 161 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.45 6.96 - 1.85 9.26

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.41 102.44 0.88 26.93 134.66

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 12.92 258.13 1.97 68.26 341.28

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 51.66 1,032.53 7.89 273.02 1,365.10

103 STRIPPING CM 1.51 59.42 - 15.23 76.16

104 COMPACTION OF NATURAL GROUND SM 0.21 5.92 0.62 1.69 8.44

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.36 86.79 - 22.29 111.44

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 73.50 193.76 46.20 78.37 391.83

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.59 214.84 - 56.36 281.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.97 167.12 - 43.52 217.61

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.93 78.63 - 20.14 100.70

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 73.50 193.76 46.20 78.37 391.83

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.67 199.88 - 52.89 264.44

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.34 167.24 - 43.15 215.73

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.09 89.04 0.31 23.36 116.80

107 bCM 39.21 165.86 53.31 64.60 322.98

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 64.86 258.51 30.80 88.54 442.71

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 55.33 193.04 - 62.09 310.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 33.35 160.37 - 48.43 242.15

107 d GRANULAR BACK FILL CM 20.69 83.07 313.74 104.38 521.88

107 e COMMON BACK FILL CM 16.03 37.31 4.13 14.37 71.84

108 aCM 4.11 106.71 4.13 28.74 143.69

108 biCM 12.20 302.97 48.81 91.00 454.98

108 biiCM 9.15 268.11 1.96 69.81 349.03

108 biiiCM 8.13 238.60 - 61.68 308.41

108 cCM 4.78 112.14 6.81 30.93 154.66

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 162: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 162 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.70 46.31 4.13 13.54 67.68

108 eCM 8.82 73.87 2.45 21.29 106.43

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.82 16.84 1.18 4.71 23.55

109 biSM 0.59 10.31 0.63 2.88 14.41

110 IMPROVED SUB-GRADE CM 5.98 75.50 54.33 33.95 169.76

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.51 9.38 0.64 2.63 13.16

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.76 9.92 0.74 2.86 14.28

201 GRANULAR SUB-BASE CM 4.81 106.91 484.41 149.03 745.16

202 AGGREGATE BASE CM 5.44 132.11 598.19 183.94 919.68

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 46.10 916.98 3,386.55 1,087.41 5,437.04

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 47.57 916.98 3,630.63 1,148.80 5,743.98

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 51.00 957.74 3,381.09 1,097.46 5,487.29

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 51.00 954.75 3,712.65 1,179.60 5,898.00

204 b CEMENT STABILIZED BASE CM 16.95 272.73 645.05 233.68 1,168.41

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 143.55 568.44 22,174.80 5,721.70 28,608.49

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 143.55 568.44 23,092.99 5,951.25 29,756.23

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 61.87 55.65 632.11 187.41 937.04

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 92.32 1,408.67 3,106.64 1,151.91 5,759.54

206 bCM 68.61 66.68 523.32 164.65 823.26

207 a DEEP PATCHING (0-15 cm) SM 1.03 30.14 1.02 8.05 40.24

207 b DEEP PATCHING (16-30 cm) SM 1.03 26.47 1.02 7.13 35.65

208 REINSTATEMENT OF ROAD SURFACE SM 1.06 37.00 0.45 9.63 48.14

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.19 70.82 0.55 18.14 90.70

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63 18.14

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.18 5.76 28.78

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 163: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 163 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.18 5.76 28.78

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.76 2.52 12.59

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.24 2.39 11.94

304 a SINGLE SURFACE TREATMENT SM 0.45 4.16 43.82 12.11 60.54

304 b DOUBLE SURFACE TREATMENT SM 0.65 8.06 84.05 23.19 115.95

304 c TRIPLE SURFACE TREATMENT SM 1.10 11.08 100.41 28.15 140.74

304 d SEAL COAT SM 0.41 2.33 24.56 6.83 34.13

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 42.83 906.07 3,963.30 1,228.05 6,140.25

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 42.83 876.73 4,268.77 1,297.08 6,485.41

307 a DENSE GRADED HOT BIT-MAC CM 104.99 171.48 3,243.99 880.12 4,400.58

307 b OPEN GRADED HOT BIT-MAC CM 104.99 171.48 3,181.47 864.49 4,322.43

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 17.72 456.95 937.45 353.03 1,765.15

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 128.19 465.97 24,250.50 6,211.17 31,055.83

309 a COLD MILLING, 0 - 30 mm SM 0.56 16.87 7.54 6.24 31.21

309 b COLD MILLING, 0 - 50 mm SM 0.93 28.11 12.57 10.40 52.01

309 c COLD MILLING, 0 - 70 mm SM 1.39 42.16 18.85 15.60 78.00

401 ai CONCRETE CLASS "A3" (Underground) CM 325.33 643.62 3,187.04 1,039.00 5,194.99

401 aii CONCRETE CLASS "A3" (On ground) CM 325.33 643.62 3,395.94 1,091.22 5,456.11

401 aiii CONCRETE CLASS "A3" (Elevated) CM 325.33 643.62 3,813.75 1,195.68 5,978.38

401 b CONCRETE CLASS "B" CM 416.55 407.09 2,471.97 823.90 4,119.51

401 ci CONCRETE CLASS "C" (Underground) CM 324.41 258.76 2,892.14 868.83 4,344.14

401 cii CONCRETE CLASS "C" (On ground) CM 324.41 258.76 2,981.24 891.10 4,455.51

401 ciii CONCRETE CLASS "C" (Elevated) CM 324.41 258.76 3,159.43 935.65 4,678.25

401 d CONCRETE CLASS "D1" CM 511.48 810.64 4,056.10 1,344.56 6,722.78

401 e CONCRETE CLASS "Y" CM 723.10 258.76 3,457.49 1,109.84 5,549.19

401 f LEAN CONCRETE CM 279.88 252.12 2,013.82 636.46 3,182.28

Page 164: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 164 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,111.76 468.57 3,984.27 1,391.15 6,955.75

401 gii PRECAST CONCRETE CLASS "B" CM 1,111.76 468.57 3,640.45 1,305.20 6,525.98

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 981.01 - 42,565.11 10,886.53 54,432.65

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 981.01 - 44,665.11 11,411.53 57,057.65

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 801.22 2,335.68 37,050.00 10,046.73 50,233.63

405 aTON 1,827.91 6,882.66 80,757.24 22,366.95 111,834.76

405 b LAUNCHING OF GIRDER TON 43.68 403.69 - 111.84 559.21

406 aSM 72.70 - 185.96 64.67 323.33

406 b SM 72.70 - 194.67 66.84 334.21

406 c STEEL EXPANSION JOINTS KG 5.98 11.61 60.71 19.58 97.88

406 d WATER STOPS 6" SIZE M 60.08 - 308.68 92.19 460.95

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 25.97 - 1,411.77 359.44 1,797.18

406 g STEEL OR METAL BEARING DEVICES KG 12.67 30.66 81.07 31.10 155.50

407 d1M 236.18 847.08 561.46 411.18 2,055.90

407 d2M 354.27 1,270.62 842.20 616.77 3,083.86

407 d3M 354.27 1,270.62 646.84 567.93 2,839.66

407 d4M 590.46 2,117.70 803.06 877.81 4,389.03

407 d5M 506.11 1,815.17 747.26 767.14 3,835.68

407 d6M 885.69 3,176.55 1,049.90 1,278.04 6,390.18

407 h PILE LOAD TEST UP TO 120 TON EACH 13,892.04 19,990.40 69,433.80 25,829.06 129,145.30

407 i PILE LOAD TEST UP TO 240 TON EACH 28,446.84 19,990.40 138,867.60 46,826.21 234,131.05

407 j PILE LOAD TEST UP TO 360 TON EACH 42,238.44 19,990.40 208,301.40 67,632.56 338,162.80

407 k CONFIRMATORY BORING (NX SIZE) M 137.33 826.61 5.16 242.28 1,211.38

410 BRICK WORK CM 213.12 142.50 2,101.14 614.19 3,070.95

411 a STONE MASONRY RANDOM DRY CM 223.66 56.01 563.58 210.81 1,054.06

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 165: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 165 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 267.16 84.89 1,393.47 436.38 2,181.90

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 309.16 56.01 623.20 247.09 1,235.46

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 351.16 84.89 1,433.32 467.34 2,336.71

411 g ROLL POINTING SM 45.61 5.78 47.56 24.74 123.69

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 466.66 134.30 1,361.94 490.73 2,453.63

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 147.94 230.36 369.10 186.85 934.25

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 144.90 297.19 474.99 229.27 1,146.35

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 139.08 514.83 585.55 309.87 1,549.33

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 146.89 639.81 876.46 415.79 2,078.95

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 168.91 704.13 1,181.50 513.64 2,568.18

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 208.39 868.93 1,780.67 714.50 3,572.49

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 269.68 961.94 2,226.07 864.42 4,322.11

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 317.82 1,168.07 3,106.06 1,147.99 5,739.94

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 376.42 1,362.74 4,705.37 1,611.13 8,055.66

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 147.94 263.77 393.45 201.29 1,006.45

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 144.90 297.19 507.79 237.47 1,187.35

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 135.71 514.83 611.79 315.58 1,577.91

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 146.89 639.81 934.87 430.39 2,151.96

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 168.91 704.13 1,648.33 630.34 3,151.71

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 208.39 868.93 2,243.15 830.12 4,150.59

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 269.68 961.94 2,855.83 1,021.86 5,109.31

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 317.82 1,168.07 3,732.02 1,304.48 6,522.39

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 376.42 1,362.74 5,137.45 1,719.15 8,595.76

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 56.65 68.08 237.18 90.48 452.39

502 bCM 472.56 309.47 2,525.08 826.78 4,133.89

507 a STEEL WIRE MESH FOR GABIONS KG 3.33 - 77.80 20.28 101.41

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 166: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 166 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 62.60 - 431.67 123.57 617.84

508 a BRICK PAVING (SINGLE COURSE) SM 71.47 15.80 157.02 61.07 305.36

508 b BRICK PAVING (DOUBLE COURSE) SM 128.47 15.80 311.90 114.04 570.21

509 a RIP RAP CLASS "A" CM 308.51 - 492.20 200.18 1,000.89

509 b RIP RAP CLASS "B" CM 298.41 - 488.26 196.67 983.34

509 c RIP RAP CLASS "C" CM 300.67 - 492.20 198.22 991.09

509 d GROUTED RIP RAP CLASS "A" CM 341.89 35.09 1,536.04 478.26 2,391.28

509 e GROUTED RIP RAP CLASS "B" CM 330.21 28.07 1,423.95 445.56 2,227.79

509 f GROUTED RIP RAP CLASS "C" CM 326.48 23.39 1,450.85 450.18 2,250.90

509 gCM 507.75 181.56 2,885.58 893.72 4,468.61

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.45 115.89 313.60 115.24 576.18

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 72.15 194.57 - 66.68 333.40

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 96.66 35.01 79.98 52.91 264.56

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 123.72 44.81 102.38 67.73 338.64

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 157.32 91.01 267.43 128.94 644.70

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 196.65 113.77 334.29 161.18 805.89

603 BRICK EDGING M 5.63 - 24.96 7.65 38.24

605 a CONCRETE BEAM GUARDRAIL M 48.74 14.67 423.64 121.76 608.81

605 c CONCRETE POST FOR GUARDRAIL M 59.85 13.10 420.38 123.33 616.66

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 151.48 128.42 4,679.01 1,239.73 6,198.64

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 45.00 192.63 6,865.96 1,775.90 8,879.49

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 151.48 272.87 8,498.72 2,230.77 11,153.84

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 509.22 304.65 15,602.43 4,104.08 20,520.38

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 101.84 60.93 7,018.02 1,795.20 8,975.99

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.56 317.85 1,589.25

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.35 446.30 2,231.49

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 167: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 167 / 244

Rate Analysis Summary ( Construction)District (50) Okara

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.63 2.85 15.38 4.97 24.83

608 b2M 0.54 1.27 30.32 8.03 40.16

608 c1M 1.63 2.85 20.53 6.25 31.26

608 c2M 0.54 1.27 40.44 10.56 52.81

608 d1EACH 46.96 - 148.65 48.90 244.51

608 d2EACH 46.96 - 382.04 107.25 536.25

608 h1M 2.04 3.56 21.40 6.75 33.75

608 h2M 2.04 4.75 51.71 14.63 73.13

608 i1M 2.04 3.56 28.53 8.53 42.66

608 i2M 2.04 4.75 68.95 18.94 94.68

608 j1EACH 46.96 - 206.61 63.39 316.96

608 j2EACH 46.96 - 652.07 174.76 873.79

608 n1 EACH 38.86 - 99.10 34.49 172.45

608 n2 EACH 38.86 - 255.08 73.49 367.43

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.86 - 137.74 44.15 220.75

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.86 - 435.37 118.56 592.79

609 cEACH 5.91 46.68 167.71 55.08 275.38

609 dEACH 5.91 46.68 202.71 63.83 319.13

610 b RIGHT OF WAY MARKER EACH 68.11 60.88 212.75 85.44 427.18

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 411.31 476.40 1,433.54 580.31 2,901.56

610 d TEN KILOMETRE POST EACH 795.61 952.79 3,120.63 1,217.26 6,086.29

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 168: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 168 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.45 6.96 - 1.85 9.26

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.41 102.44 0.88 26.93 134.66

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 12.92 258.13 1.97 68.26 341.28

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 51.66 1,032.53 7.89 273.02 1,365.10

103 STRIPPING CM 1.50 59.42 - 15.23 76.15

104 COMPACTION OF NATURAL GROUND SM 0.21 5.92 0.62 1.69 8.44

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.36 86.79 - 22.29 111.44

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 73.25 193.76 46.20 78.30 391.51

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.53 214.84 - 56.34 281.71

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.91 167.12 - 43.51 217.54

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.93 78.63 - 20.14 100.70

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 73.25 193.76 46.20 78.30 391.51

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.64 199.88 - 52.88 264.40

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.30 167.24 - 43.14 215.68

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.06 89.04 0.31 23.35 116.76

107 bCM 39.98 165.86 53.31 64.79 323.94

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 64.67 258.51 30.80 88.50 442.48

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 55.16 193.04 - 62.05 310.25

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 33.26 160.37 - 48.41 242.04

107 d GRANULAR BACK FILL CM 20.69 83.07 327.34 107.78 538.88

107 e COMMON BACK FILL CM 16.03 37.31 4.13 14.37 71.84

108 aCM 4.08 106.71 4.13 28.73 143.65

108 biCM 12.13 302.97 48.81 90.98 454.89

108 biiCM 9.10 268.11 1.96 69.79 348.96

108 biiiCM 8.09 238.60 - 61.67 308.36

108 cCM 4.75 112.14 6.81 30.93 154.63

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 169: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 169 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.67 46.31 4.13 13.53 67.64

108 eCM 8.76 73.87 2.45 21.27 106.35

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.82 16.84 1.18 4.71 23.55

109 biSM 0.58 10.31 0.63 2.88 14.40

110 IMPROVED SUB-GRADE CM 5.95 75.50 56.45 34.48 172.38

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.50 9.38 0.64 2.63 13.15

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.75 9.92 0.74 2.85 14.26

201 GRANULAR SUB-BASE CM 4.79 106.91 529.03 160.18 800.91

202 AGGREGATE BASE CM 5.44 132.11 639.97 194.38 971.90

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 46.04 916.98 3,452.05 1,103.77 5,518.84

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 47.51 916.98 3,698.18 1,165.67 5,828.34

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 50.87 957.74 3,446.97 1,113.90 5,569.48

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 50.87 954.75 3,780.75 1,196.59 5,982.96

204 b CEMENT STABILIZED BASE CM 16.95 272.73 688.59 244.57 1,222.84

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 142.42 568.44 22,378.80 5,772.42 28,862.08

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 142.42 568.44 23,299.10 6,002.49 30,012.45

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 61.77 55.65 676.24 198.42 992.08

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 92.05 1,408.67 3,168.23 1,167.24 5,836.19

206 bCM 68.56 66.68 585.74 180.25 901.23

207 a DEEP PATCHING (0-15 cm) SM 1.02 30.14 1.02 8.05 40.23

207 b DEEP PATCHING (16-30 cm) SM 1.02 26.47 1.02 7.13 35.64

208 REINSTATEMENT OF ROAD SURFACE SM 1.06 37.00 0.45 9.63 48.14

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.17 70.82 0.55 18.14 90.68

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.23 14.16 0.11 3.63 18.13

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.39 5.81 29.04

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 170: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 170 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.39 5.81 29.04

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.84 2.54 12.69

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.32 2.41 12.04

304 a SINGLE SURFACE TREATMENT SM 0.45 4.16 44.50 12.28 61.39

304 b DOUBLE SURFACE TREATMENT SM 0.65 8.06 85.63 23.59 117.93

304 c TRIPLE SURFACE TREATMENT SM 1.09 11.08 102.44 28.65 143.26

304 d SEAL COAT SM 0.41 2.33 24.82 6.89 34.45

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 42.76 906.07 4,041.70 1,247.63 6,238.16

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 42.76 876.73 4,352.79 1,318.07 6,590.35

307 a DENSE GRADED HOT BIT-MAC CM 104.99 171.48 3,317.65 898.53 4,492.65

307 b OPEN GRADED HOT BIT-MAC CM 104.99 171.48 3,253.41 882.47 4,412.35

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 17.72 456.95 950.28 356.24 1,781.19

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 127.07 465.97 24,454.50 6,261.89 31,309.43

309 a COLD MILLING, 0 - 30 mm SM 0.56 16.87 7.54 6.24 31.21

309 b COLD MILLING, 0 - 50 mm SM 0.93 28.11 12.57 10.40 52.01

309 c COLD MILLING, 0 - 70 mm SM 1.39 42.16 18.85 15.60 78.00

401 ai CONCRETE CLASS "A3" (Underground) CM 340.69 643.62 3,213.83 1,049.54 5,247.68

401 aii CONCRETE CLASS "A3" (On ground) CM 340.69 643.62 3,422.73 1,101.76 5,508.80

401 aiii CONCRETE CLASS "A3" (Elevated) CM 340.69 643.62 3,840.53 1,206.21 6,031.05

401 b CONCRETE CLASS "B" CM 427.46 407.09 2,506.38 835.23 4,176.16

401 ci CONCRETE CLASS "C" (Underground) CM 339.04 258.76 2,929.71 881.88 4,409.39

401 cii CONCRETE CLASS "C" (On ground) CM 339.04 258.76 3,018.80 904.15 4,520.75

401 ciii CONCRETE CLASS "C" (Elevated) CM 339.04 258.76 3,197.00 948.70 4,743.50

401 d CONCRETE CLASS "D1" CM 541.84 810.64 4,081.62 1,358.53 6,792.63

401 e CONCRETE CLASS "Y" CM 767.35 258.76 3,479.91 1,126.51 5,632.53

401 f LEAN CONCRETE CM 285.34 252.12 2,048.12 646.40 3,231.98

Page 171: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 171 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,161.76 468.57 4,012.91 1,410.81 7,054.05

401 gii PRECAST CONCRETE CLASS "B" CM 1,161.76 468.57 3,678.51 1,327.21 6,636.05

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,041.01 - 42,564.98 10,901.50 54,507.49

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,041.01 - 44,664.98 11,426.50 57,132.49

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 849.22 2,335.68 37,035.85 10,055.19 50,275.94

405 aTON 1,827.91 6,882.66 80,757.24 22,366.95 111,834.76

405 b LAUNCHING OF GIRDER TON 43.68 403.69 - 111.84 559.21

406 aSM 76.04 - 187.80 65.96 329.80

406 b SM 76.04 - 196.52 68.14 340.70

406 c STEEL EXPANSION JOINTS KG 6.32 11.61 60.60 19.63 98.16

406 d WATER STOPS 6" SIZE M 63.08 - 308.87 92.99 464.94

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.47 - 1,412.44 359.98 1,799.89

406 g STEEL OR METAL BEARING DEVICES KG 12.97 30.66 80.99 31.16 155.78

407 d1M 236.68 847.08 571.33 413.77 2,068.86

407 d2M 355.02 1,270.62 857.00 620.66 3,103.30

407 d3M 355.02 1,270.62 661.64 571.82 2,859.10

407 d4M 591.71 2,117.70 827.73 884.29 4,421.43

407 d5M 507.18 1,815.17 768.41 772.69 3,863.45

407 d6M 887.56 3,176.55 1,086.90 1,287.75 6,438.76

407 h PILE LOAD TEST UP TO 120 TON EACH 13,892.04 19,990.40 69,433.80 25,829.06 129,145.30

407 i PILE LOAD TEST UP TO 240 TON EACH 28,446.84 19,990.40 138,867.60 46,826.21 234,131.05

407 j PILE LOAD TEST UP TO 360 TON EACH 42,238.44 19,990.40 208,301.40 67,632.56 338,162.80

407 k CONFIRMATORY BORING (NX SIZE) M 137.33 826.61 5.16 242.28 1,211.38

410 BRICK WORK CM 224.99 142.50 2,151.14 629.66 3,148.29

411 a STONE MASONRY RANDOM DRY CM 233.48 56.01 697.50 246.75 1,233.74

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 172: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 172 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 278.48 84.89 1,527.40 472.69 2,363.46

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 323.48 56.01 767.84 286.83 1,434.16

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 368.48 84.89 1,577.96 507.83 2,539.16

411 g ROLL POINTING SM 48.61 5.78 47.56 25.49 127.44

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 488.48 134.30 1,506.58 532.34 2,661.70

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 149.27 230.36 369.10 187.18 935.91

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 146.23 297.19 474.99 229.60 1,148.01

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 140.25 514.83 585.55 310.16 1,550.79

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 147.95 639.81 876.46 416.06 2,080.28

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 169.96 704.13 1,181.50 513.90 2,569.49

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 210.13 868.93 1,780.67 714.93 3,574.66

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 271.93 961.94 2,226.07 864.99 4,324.93

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 319.48 1,168.07 3,106.06 1,148.40 5,742.01

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 379.61 1,362.74 4,705.37 1,611.93 8,059.65

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 149.27 263.77 393.45 201.62 1,008.11

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 146.23 297.19 507.79 237.80 1,189.01

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 136.87 514.83 611.79 315.87 1,579.36

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 147.95 639.81 934.87 430.66 2,153.29

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 169.96 704.13 1,648.33 630.61 3,153.03

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 210.13 868.93 2,243.15 830.55 4,152.76

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 271.93 961.94 2,855.83 1,022.43 5,112.13

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 319.48 1,168.07 3,732.02 1,304.89 6,524.46

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 379.61 1,362.74 5,137.45 1,719.95 8,599.75

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 56.54 68.08 237.18 90.45 452.25

502 bCM 488.48 309.47 2,559.49 839.36 4,196.80

507 a STEEL WIRE MESH FOR GABIONS KG 3.46 - 75.81 19.82 99.09

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 173: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 173 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 62.49 - 443.33 126.46 632.28

508 a BRICK PAVING (SINGLE COURSE) SM 74.41 15.80 162.67 63.22 316.10

508 b BRICK PAVING (DOUBLE COURSE) SM 134.41 15.80 323.20 118.35 591.76

509 a RIP RAP CLASS "A" CM 323.34 - 626.13 237.37 1,186.84

509 b RIP RAP CLASS "B" CM 312.67 - 621.12 233.45 1,167.24

509 c RIP RAP CLASS "C" CM 315.56 - 626.13 235.42 1,177.11

509 d GROUTED RIP RAP CLASS "A" CM 316.06 35.09 1,669.01 505.04 2,525.20

509 e GROUTED RIP RAP CLASS "B" CM 305.22 28.07 1,555.94 472.31 2,361.54

509 f GROUTED RIP RAP CLASS "C" CM 301.60 23.39 1,583.80 477.20 2,385.99

509 gCM 525.71 181.56 2,918.15 906.36 4,531.78

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.35 115.89 327.12 118.59 592.95

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 72.15 194.57 - 66.68 333.40

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 100.20 35.01 101.75 59.24 296.20

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 128.25 44.81 130.23 75.82 379.11

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 164.25 91.01 287.19 135.61 678.06

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 205.32 113.77 358.99 169.52 847.60

603 BRICK EDGING M 5.77 - 25.92 7.92 39.61

605 a CONCRETE BEAM GUARDRAIL M 50.14 14.67 424.66 122.37 611.84

605 c CONCRETE POST FOR GUARDRAIL M 61.56 13.10 421.61 124.07 620.34

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 155.26 128.42 4,685.31 1,242.25 6,211.24

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 46.17 192.63 6,875.26 1,778.52 8,892.58

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 155.26 272.87 8,513.80 2,235.48 11,177.41

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 517.88 304.65 15,627.28 4,112.45 20,562.26

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 103.58 60.93 7,025.67 1,797.55 8,987.73

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.37 318.05 1,590.26

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,542.55 446.60 2,232.99

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 174: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 174 / 244

Rate Analysis Summary ( Construction)District (53 A) Pakpattan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.48 2.85 15.39 4.93 24.65

608 b2M 0.49 1.27 30.37 8.03 40.16

608 c1M 1.48 2.85 20.54 6.22 31.09

608 c2M 0.49 1.27 40.51 10.57 52.84

608 d1EACH 43.85 - 148.72 48.14 240.71

608 d2EACH 43.85 - 382.77 106.66 533.28

608 h1M 1.86 3.56 21.41 6.71 33.54

608 h2M 1.86 4.75 51.71 14.58 72.90

608 i1M 1.86 3.56 28.54 8.49 42.45

608 i2M 1.86 4.75 68.95 18.89 94.45

608 j1EACH 43.85 - 206.68 62.63 313.16

608 j2EACH 43.85 - 652.07 173.98 869.90

608 n1 EACH 36.15 - 99.15 33.83 169.13

608 n2 EACH 36.15 - 255.56 72.93 364.64

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 36.15 - 137.79 43.49 217.43

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 36.15 - 435.37 117.88 589.40

609 cEACH 6.01 46.68 167.71 55.10 275.50

609 dEACH 6.01 46.68 202.71 63.85 319.25

610 b RIGHT OF WAY MARKER EACH 69.09 60.88 213.82 85.95 429.74

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 427.47 476.40 1,442.20 586.52 2,932.59

610 d TEN KILOMETRE POST EACH 824.94 952.79 3,138.14 1,228.97 6,144.84

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 175: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 175 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.17 102.44 0.88 27.12 135.61

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.14 258.13 1.97 68.81 344.05

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 60.54 1,032.53 7.89 275.24 1,376.20

103 STRIPPING CM 1.73 59.42 - 15.29 76.44

104 COMPACTION OF NATURAL GROUND SM 0.24 5.92 0.62 1.70 8.48

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.81 86.79 - 22.40 112.00

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 85.85 193.76 46.20 81.45 407.26

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.21 214.84 - 56.76 283.81

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.98 167.12 - 43.78 218.88

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.30 78.63 - 20.23 101.16

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 85.85 193.76 46.20 81.45 407.26

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.67 199.88 - 53.39 266.94

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.14 167.24 - 43.35 216.73

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.71 89.04 0.31 23.52 117.58

107 bCM 42.96 165.86 53.31 65.53 327.66

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.93 258.51 30.80 91.31 456.55

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 64.71 193.04 - 64.44 322.19

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 39.05 160.37 - 49.86 249.28

107 d GRANULAR BACK FILL CM 24.34 83.07 340.40 111.95 559.76

107 e COMMON BACK FILL CM 18.76 37.31 4.13 15.05 75.25

108 aCM 4.73 106.71 4.13 28.89 144.46

108 biCM 14.10 302.97 48.81 91.47 457.35

108 biiCM 10.57 268.11 1.96 70.16 350.80

108 biiiCM 9.40 238.60 - 62.00 310.00

108 cCM 5.51 112.14 6.81 31.12 155.58

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 176: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 176 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.24 46.31 4.13 13.67 68.35

108 eCM 10.15 73.87 2.45 21.62 108.09

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.95 16.84 1.18 4.74 23.71

109 biSM 0.68 10.31 0.63 2.91 14.53

110 IMPROVED SUB-GRADE CM 6.94 75.50 50.65 33.27 166.36

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.58 9.38 0.64 2.65 13.25

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.86 9.92 0.74 2.88 14.40

201 GRANULAR SUB-BASE CM 5.57 106.91 574.86 171.84 859.18

202 AGGREGATE BASE CM 6.44 132.11 702.62 210.29 1,051.46

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 53.81 916.98 3,571.16 1,135.49 5,677.44

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 55.56 916.98 3,790.05 1,190.65 5,953.24

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 59.30 957.74 3,565.96 1,145.75 5,728.75

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 59.30 954.75 3,871.58 1,221.41 6,107.04

204 b CEMENT STABILIZED BASE CM 20.02 272.73 873.18 291.48 1,457.41

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 164.83 568.44 22,174.80 5,727.02 28,635.09

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 164.83 568.44 22,961.46 5,923.68 29,618.41

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 71.89 55.65 742.47 217.50 1,087.51

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 107.43 1,408.67 3,252.54 1,192.16 5,960.80

206 bCM 79.92 66.68 642.18 197.20 985.98

207 a DEEP PATCHING (0-15 cm) SM 1.17 30.14 1.02 8.08 40.41

207 b DEEP PATCHING (16-30 cm) SM 1.17 26.47 1.02 7.17 35.83

208 REINSTATEMENT OF ROAD SURFACE SM 1.26 37.00 0.45 9.68 48.39

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.33 70.82 0.55 18.18 90.88

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 22.18 5.76 28.81

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 177: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 177 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 22.18 5.76 28.81

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.91 2.56 12.79

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.18 2.38 11.88

304 a SINGLE SURFACE TREATMENT SM 0.53 4.16 43.54 12.06 60.29

304 b DOUBLE SURFACE TREATMENT SM 0.77 8.06 83.25 23.02 115.10

304 c TRIPLE SURFACE TREATMENT SM 1.29 11.08 99.93 28.08 140.38

304 d SEAL COAT SM 0.49 2.33 25.89 7.18 35.89

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 50.02 906.07 4,141.24 1,274.33 6,371.66

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 50.02 876.73 4,460.59 1,346.84 6,734.18

307 a DENSE GRADED HOT BIT-MAC CM 123.18 171.48 3,430.15 931.20 4,656.01

307 b OPEN GRADED HOT BIT-MAC CM 123.18 171.48 3,338.79 908.36 4,541.81

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 20.82 456.95 934.53 353.08 1,765.38

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 146.53 465.97 24,250.50 6,215.75 31,078.75

309 a COLD MILLING, 0 - 30 mm SM 0.66 16.87 7.54 6.27 31.34

309 b COLD MILLING, 0 - 50 mm SM 1.10 28.11 12.57 10.45 52.23

309 c COLD MILLING, 0 - 70 mm SM 1.65 42.16 18.85 15.67 78.33

401 ai CONCRETE CLASS "A3" (Underground) CM 345.43 643.62 3,315.44 1,076.12 5,380.61

401 aii CONCRETE CLASS "A3" (On ground) CM 345.43 643.62 3,524.34 1,128.35 5,641.74

401 aiii CONCRETE CLASS "A3" (Elevated) CM 345.43 643.62 3,942.14 1,232.80 6,163.99

401 b CONCRETE CLASS "B" CM 460.56 407.09 2,549.32 854.24 4,271.21

401 ci CONCRETE CLASS "C" (Underground) CM 345.43 258.76 3,014.19 904.60 4,522.98

401 cii CONCRETE CLASS "C" (On ground) CM 345.43 258.76 3,103.29 926.87 4,634.35

401 ciii CONCRETE CLASS "C" (Elevated) CM 345.43 258.76 3,281.48 971.42 4,857.09

401 d CONCRETE CLASS "D1" CM 529.88 810.64 4,167.39 1,376.98 6,884.89

401 e CONCRETE CLASS "Y" CM 744.05 258.76 3,592.49 1,148.83 5,744.13

401 f LEAN CONCRETE CM 313.04 252.12 2,090.74 663.98 3,319.88

Page 178: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 178 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,190.58 468.57 4,129.04 1,447.05 7,235.24

401 gii PRECAST CONCRETE CLASS "B" CM 1,190.58 468.57 3,727.12 1,346.57 6,732.84

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,018.32 - 42,671.26 10,922.40 54,611.98

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,018.32 - 44,771.26 11,447.40 57,236.98

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 854.22 2,335.68 37,167.69 10,089.40 50,446.99

405 aTON 1,984.20 6,882.66 80,748.52 22,403.85 112,019.23

405 b LAUNCHING OF GIRDER TON 46.95 403.69 - 112.66 563.30

406 aSM 77.83 - 192.28 67.53 337.64

406 b SM 77.83 - 200.99 69.71 348.53

406 c STEEL EXPANSION JOINTS KG 6.44 11.61 60.56 19.65 98.26

406 d WATER STOPS 6" SIZE M 63.70 - 307.05 92.69 463.44

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.16 - 1,413.63 360.20 1,800.99

406 g STEEL OR METAL BEARING DEVICES KG 14.73 30.66 80.98 31.59 157.96

407 d1M 252.22 847.08 559.91 414.80 2,074.01

407 d2M 378.33 1,270.62 839.86 622.20 3,111.01

407 d3M 378.33 1,270.62 644.50 573.36 2,866.81

407 d4M 630.54 2,117.70 799.16 886.85 4,434.25

407 d5M 540.46 1,815.17 743.93 774.89 3,874.45

407 d6M 945.81 3,176.55 1,044.06 1,291.61 6,458.03

407 h PILE LOAD TEST UP TO 120 TON EACH 16,230.41 19,990.40 68,811.91 26,258.18 131,290.90

407 i PILE LOAD TEST UP TO 240 TON EACH 33,015.60 19,990.40 137,623.82 47,657.46 238,287.28

407 j PILE LOAD TEST UP TO 360 TON EACH 49,267.61 19,990.40 206,435.73 68,923.44 344,617.18

407 k CONFIRMATORY BORING (NX SIZE) M 151.38 826.61 5.16 245.79 1,228.94

410 BRICK WORK CM 222.24 142.50 2,095.49 615.06 3,075.29

411 a STONE MASONRY RANDOM DRY CM 235.73 56.01 573.55 216.32 1,081.61

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 179: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 179 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 283.19 84.89 1,396.38 441.12 2,205.58

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 325.67 56.01 633.98 253.92 1,269.58

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 368.15 84.89 1,438.79 472.96 2,364.79

411 g ROLL POINTING SM 46.70 5.78 47.44 24.98 124.90

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 493.05 134.30 1,367.42 498.69 2,493.46

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 168.92 230.36 368.88 192.04 960.20

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 165.30 297.19 474.72 234.30 1,171.51

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 158.13 514.83 585.24 314.55 1,572.75

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 167.59 639.81 876.10 420.88 2,104.38

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 193.46 704.13 1,181.14 519.68 2,598.41

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 238.34 868.93 1,780.14 721.85 3,609.26

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 308.44 961.94 2,225.55 873.98 4,369.91

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 365.61 1,168.07 3,105.42 1,159.78 5,798.88

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 430.40 1,362.74 4,704.63 1,624.44 8,122.21

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 168.92 263.77 393.01 206.43 1,032.13

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 165.30 297.19 507.52 242.50 1,212.51

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 154.19 514.83 611.48 320.13 1,600.63

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 167.59 639.81 934.58 435.50 2,177.48

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 193.46 704.13 1,647.92 636.38 3,181.89

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 238.34 868.93 2,242.62 837.47 4,187.36

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 308.44 961.94 2,855.31 1,031.42 5,157.11

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 365.61 1,168.07 3,731.39 1,316.27 6,581.34

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 430.40 1,362.74 5,136.71 1,732.46 8,662.31

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 65.90 68.08 228.70 90.67 453.35

502 bCM 514.81 309.47 2,602.43 856.68 4,283.39

507 a STEEL WIRE MESH FOR GABIONS KG 3.63 - 75.81 19.86 99.30

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 180: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 180 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 72.73 - 457.05 132.45 662.23

508 a BRICK PAVING (SINGLE COURSE) SM 76.68 15.80 156.67 62.29 311.44

508 b BRICK PAVING (DOUBLE COURSE) SM 136.64 15.80 311.26 115.93 579.63

509 a RIP RAP CLASS "A" CM 326.99 - 502.18 207.29 1,036.46

509 b RIP RAP CLASS "B" CM 316.55 - 498.16 203.68 1,018.39

509 c RIP RAP CLASS "C" CM 317.92 - 502.18 205.03 1,025.13

509 d GROUTED RIP RAP CLASS "A" CM 378.33 35.09 1,520.97 483.60 2,417.99

509 e GROUTED RIP RAP CLASS "B" CM 363.52 28.07 1,411.43 450.76 2,253.78

509 f GROUTED RIP RAP CLASS "C" CM 359.02 23.39 1,436.61 454.76 2,273.78

509 gCM 551.89 181.56 2,958.80 923.06 4,615.31

509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.38 115.89 340.06 123.08 615.41

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 79.44 194.57 - 68.50 342.51

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 103.95 35.01 81.60 55.14 275.70

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 133.05 44.81 104.45 70.58 352.89

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 167.04 91.01 265.17 130.81 654.03

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 208.79 113.77 331.46 163.51 817.53

603 BRICK EDGING M 6.19 - 24.96 7.79 38.94

605 a CONCRETE BEAM GUARDRAIL M 53.87 14.67 429.64 124.55 622.73

605 c CONCRETE POST FOR GUARDRAIL M 66.14 13.10 427.64 126.72 633.60

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 167.74 128.42 4,697.52 1,248.42 6,242.10

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 47.91 192.63 6,891.67 1,783.05 8,915.26

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 167.74 272.87 8,540.14 2,245.19 11,225.94

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 573.77 304.65 15,673.32 4,137.94 20,689.68

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 114.75 60.93 7,042.73 1,804.60 9,023.01

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,030.72 318.64 1,593.20

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,546.08 447.48 2,237.40

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 181: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 181 / 244

Rate Analysis Summary ( Construction)District (55) Rahim Yar Khan

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 2.07 2.85 15.41 5.08 25.41

608 b2M 0.69 1.27 30.52 8.12 40.60

608 c1M 2.07 2.85 20.56 6.37 31.85

608 c2M 0.69 1.27 40.71 10.67 53.34

608 d1EACH 47.12 - 148.90 49.01 245.03

608 d2EACH 47.12 - 384.62 107.94 539.68

608 h1M 2.59 3.56 21.42 6.89 34.46

608 h2M 2.59 4.75 51.71 14.76 73.81

608 i1M 2.59 3.56 28.57 8.68 43.40

608 i2M 2.59 4.75 68.95 19.07 95.36

608 j1EACH 47.12 - 206.86 63.50 317.48

608 j2EACH 47.12 - 652.07 174.80 873.99

608 n1 EACH 39.95 - 99.27 34.81 174.03

608 n2 EACH 39.95 - 256.80 74.19 370.94

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 39.95 - 137.91 44.47 222.33

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 39.95 - 435.37 118.83 594.15

609 cEACH 6.15 46.68 167.70 55.13 275.66

609 dEACH 6.15 46.68 202.70 63.88 319.41

610 b RIGHT OF WAY MARKER EACH 77.22 60.88 218.71 89.20 446.01

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 443.09 476.40 1,481.91 600.35 3,001.75

610 d TEN KILOMETRE POST EACH 861.19 952.79 3,218.93 1,258.23 6,291.14

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 182: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 182 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.40 6.96 - 1.84 9.20

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 3.94 102.44 0.88 26.82 134.08

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 11.39 258.13 1.97 67.87 339.36

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 45.58 1,032.53 7.89 271.50 1,357.50

103 STRIPPING CM 1.36 59.42 - 15.20 75.98

104 COMPACTION OF NATURAL GROUND SM 0.19 5.92 0.62 1.68 8.41

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.35 86.79 - 22.29 111.43

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 69.45 193.76 46.20 77.35 386.76

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 9.78 214.84 - 56.16 280.78

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.46 167.12 - 43.40 216.98

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.93 78.63 - 20.14 100.70

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 69.45 193.76 46.20 77.35 386.76

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.07 199.88 - 52.74 263.69

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 4.94 167.24 - 43.05 215.23

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 3.93 89.04 0.31 23.32 116.60

107 bCM 35.77 165.86 53.31 63.74 318.68

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 61.48 258.51 30.80 87.70 438.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 52.27 193.04 - 61.33 306.64

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 31.62 160.37 - 48.00 239.99

107 d GRANULAR BACK FILL CM 18.84 83.07 228.96 82.72 413.59

107 e COMMON BACK FILL CM 13.92 37.31 4.13 13.84 69.20

108 aCM 3.85 106.71 4.13 28.67 143.36

108 biCM 11.23 302.97 48.81 90.75 453.76

108 biiCM 8.42 268.11 1.96 69.62 348.11

108 biiiCM 7.48 238.60 - 61.52 307.60

108 cCM 4.41 112.14 6.81 30.84 154.20

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 183: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 183 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.44 46.31 4.13 13.47 67.35

108 eCM 8.02 73.87 2.45 21.09 105.43

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.77 16.84 1.18 4.70 23.49

109 biSM 0.55 10.31 0.63 2.87 14.36

110 IMPROVED SUB-GRADE CM 5.51 75.50 54.33 33.84 169.18

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.46 9.38 0.64 2.62 13.10

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.69 9.92 0.74 2.84 14.19

201 GRANULAR SUB-BASE CM 4.48 106.91 388.36 124.94 624.69

202 AGGREGATE BASE CM 5.21 132.11 566.87 176.05 880.24

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 41.13 916.98 3,428.97 1,096.77 5,483.85

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 42.62 916.98 3,654.63 1,153.56 5,767.79

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 45.67 957.74 3,423.49 1,106.73 5,533.63

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 45.67 954.75 3,736.82 1,184.31 5,921.55

204 b CEMENT STABILIZED BASE CM 15.96 272.73 704.53 248.31 1,241.53

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 135.14 568.44 22,378.80 5,770.60 28,852.98

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 135.14 568.44 22,433.14 5,784.18 28,920.90

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 53.06 55.65 599.03 176.94 884.68

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 84.28 1,408.67 3,097.72 1,147.67 5,738.34

206 bCM 58.76 66.68 517.08 160.63 803.15

207 a DEEP PATCHING (0-15 cm) SM 0.95 30.14 1.02 8.03 40.14

207 b DEEP PATCHING (16-30 cm) SM 0.95 26.47 1.02 7.11 35.55

208 REINSTATEMENT OF ROAD SURFACE SM 1.01 37.00 0.45 9.62 48.08

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.12 70.82 0.55 18.12 90.61

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.22 14.16 0.11 3.62 18.11

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.39 5.81 29.04

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 184: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 184 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.16 0.67 22.39 5.81 29.03

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.95 2.57 12.83

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 8.97 2.32 11.60

304 a SINGLE SURFACE TREATMENT SM 0.44 4.16 42.94 11.89 59.43

304 b DOUBLE SURFACE TREATMENT SM 0.64 8.06 81.15 22.46 112.31

304 c TRIPLE SURFACE TREATMENT SM 1.08 11.08 96.82 27.25 136.23

304 d SEAL COAT SM 0.41 2.33 25.67 7.10 35.51

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 38.76 906.07 4,002.59 1,236.86 6,184.28

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 38.76 876.73 4,316.73 1,308.06 6,540.28

307 a DENSE GRADED HOT BIT-MAC CM 95.54 171.48 3,306.96 893.50 4,467.48

307 b OPEN GRADED HOT BIT-MAC CM 95.54 171.48 3,211.71 869.68 4,348.41

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 16.12 456.95 910.84 345.98 1,729.89

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 119.66 465.97 24,352.50 6,234.53 31,172.66

309 a COLD MILLING, 0 - 30 mm SM 0.53 16.87 7.54 6.24 31.18

309 b COLD MILLING, 0 - 50 mm SM 0.88 28.11 12.57 10.39 51.95

309 c COLD MILLING, 0 - 70 mm SM 1.33 42.16 18.85 15.59 77.93

401 ai CONCRETE CLASS "A3" (Underground) CM 297.38 643.62 3,116.38 1,014.35 5,071.73

401 aii CONCRETE CLASS "A3" (On ground) CM 297.38 643.62 3,325.28 1,066.57 5,332.85

401 aiii CONCRETE CLASS "A3" (Elevated) CM 297.38 643.62 3,743.08 1,171.02 5,855.10

401 b CONCRETE CLASS "B" CM 379.98 407.09 2,331.99 779.77 3,898.83

401 ci CONCRETE CLASS "C" (Underground) CM 291.89 258.76 2,784.33 833.75 4,168.73

401 cii CONCRETE CLASS "C" (On ground) CM 291.89 258.76 2,873.42 856.02 4,280.09

401 ciii CONCRETE CLASS "C" (Elevated) CM 291.89 258.76 3,051.61 900.57 4,502.83

401 d CONCRETE CLASS "D1" CM 464.49 810.64 3,985.03 1,315.04 6,575.20

401 e CONCRETE CLASS "Y" CM 651.05 258.76 3,412.17 1,080.50 5,402.48

401 f LEAN CONCRETE CM 245.75 252.12 1,873.35 592.81 2,964.03

Page 185: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 185 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 990.52 468.57 3,912.45 1,342.89 6,714.43

401 gii PRECAST CONCRETE CLASS "B" CM 990.52 468.57 3,498.54 1,239.41 6,197.04

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 899.22 - 42,672.73 10,892.99 54,464.94

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 899.22 - 44,772.73 11,417.99 57,089.94

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 735.94 2,335.68 37,319.37 10,097.75 50,488.74

405 aTON 1,834.77 6,882.66 80,895.05 22,403.12 112,015.60

405 b LAUNCHING OF GIRDER TON 43.83 403.69 - 111.88 559.40

406 aSM 65.51 - 193.33 64.71 323.55

406 b SM 65.51 - 202.04 66.89 334.44

406 c STEEL EXPANSION JOINTS KG 5.41 11.61 60.78 19.45 97.25

406 d WATER STOPS 6" SIZE M 53.81 - 307.47 90.32 451.60

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 23.81 - 1,414.07 359.47 1,797.35

406 g STEEL OR METAL BEARING DEVICES KG 11.55 30.66 81.19 30.85 154.25

407 d1M 235.78 847.08 699.06 445.48 2,227.40

407 d2M 353.66 1,270.62 1,048.60 668.22 3,341.10

407 d3M 353.66 1,270.62 784.49 602.19 3,010.96

407 d4M 589.44 2,117.70 940.81 911.99 4,559.94

407 d5M 505.23 1,815.17 884.98 801.35 4,006.73

407 d6M 884.16 3,176.55 1,204.96 1,316.42 6,582.09

407 h PILE LOAD TEST UP TO 120 TON EACH 11,962.62 19,990.40 67,879.72 24,958.19 124,790.93

407 i PILE LOAD TEST UP TO 240 TON EACH 24,131.34 19,990.40 135,759.44 44,970.30 224,851.48

407 j PILE LOAD TEST UP TO 360 TON EACH 35,773.02 19,990.40 203,639.16 64,850.65 324,253.23

407 k CONFIRMATORY BORING (NX SIZE) M 128.54 826.61 5.16 240.08 1,200.39

410 BRICK WORK CM 190.05 142.50 2,077.70 602.56 3,012.81

411 a STONE MASONRY RANDOM DRY CM 198.58 56.01 510.40 191.25 956.24

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 186: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 186 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 236.28 84.89 1,248.49 392.42 1,962.08

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 273.88 56.01 565.77 223.92 1,119.58

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 311.48 84.89 1,307.04 425.85 2,129.26

411 g ROLL POINTING SM 40.73 5.78 46.02 23.13 115.66

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 411.98 134.30 1,235.66 445.49 2,227.43

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 128.12 230.36 366.23 181.18 905.89

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 125.06 297.19 471.54 223.45 1,117.24

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 121.98 514.83 581.54 304.59 1,522.94

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 128.07 639.81 871.77 409.91 2,049.56

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 147.97 704.13 1,176.81 507.23 2,536.14

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 183.83 868.93 1,773.89 706.66 3,533.31

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 237.90 961.94 2,219.32 854.79 4,273.95

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 279.95 1,168.07 3,097.86 1,136.47 5,682.35

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 332.30 1,362.74 4,695.81 1,597.71 7,988.56

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 128.12 263.77 387.71 194.90 974.50

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 125.06 297.19 504.34 231.65 1,158.24

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 119.14 514.83 607.78 310.44 1,552.19

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 128.07 639.81 931.22 424.78 2,123.88

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 147.97 704.13 1,643.11 623.80 3,119.01

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 183.83 868.93 2,236.37 822.28 4,111.41

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 237.90 961.94 2,849.08 1,012.23 5,061.15

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 279.95 1,168.07 3,723.83 1,292.96 6,464.81

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 332.30 1,362.74 5,127.89 1,705.73 8,528.66

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 49.72 68.08 215.99 83.45 417.24

502 bCM 429.39 309.47 2,385.10 780.99 3,904.95

507 a STEEL WIRE MESH FOR GABIONS KG 3.05 - 75.81 19.72 98.58

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 187: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 187 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 54.04 - 408.33 115.59 577.96

508 a BRICK PAVING (SINGLE COURSE) SM 63.13 15.80 161.79 60.18 300.90

508 b BRICK PAVING (DOUBLE COURSE) SM 113.33 15.80 321.61 112.69 563.43

509 a RIP RAP CLASS "A" CM 273.70 - 439.03 178.18 890.91

509 b RIP RAP CLASS "B" CM 264.16 - 435.51 174.92 874.59

509 c RIP RAP CLASS "C" CM 266.14 - 439.03 176.29 881.46

509 d GROUTED RIP RAP CLASS "A" CM 291.71 35.09 1,432.09 439.72 2,198.61

509 e GROUTED RIP RAP CLASS "B" CM 280.89 28.07 1,325.76 408.68 2,043.40

509 f GROUTED RIP RAP CLASS "C" CM 277.27 23.39 1,348.75 412.35 2,061.76

509 gCM 448.47 181.56 2,753.28 845.83 4,229.14

509 h FILTER LAYER OF GRANULAR MATERIAL CM 27.28 115.89 229.14 93.08 465.39

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 67.45 194.57 - 65.51 327.53

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 85.54 35.01 71.34 47.97 239.86

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 109.49 44.81 91.32 61.41 307.03

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 139.57 91.01 243.09 118.42 592.09

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 174.46 113.77 303.87 148.03 740.13

603 BRICK EDGING M 4.96 - 25.92 7.72 38.60

605 a CONCRETE BEAM GUARDRAIL M 42.44 14.67 422.04 119.79 598.94

605 c CONCRETE POST FOR GUARDRAIL M 52.11 13.10 418.36 120.89 604.46

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 134.98 128.42 4,684.41 1,236.95 6,184.76

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 39.23 192.63 6,853.92 1,771.45 8,857.23

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 134.98 272.87 8,476.01 2,220.97 11,104.83

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 441.67 304.65 15,578.19 4,081.13 20,405.64

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 88.33 60.93 7,024.97 1,793.56 8,967.79

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,031.10 318.74 1,593.68

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,546.65 447.62 2,238.11

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 188: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 188 / 244

Rate Analysis Summary ( Construction)District (56) Rajan Pur

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.46 2.85 15.41 4.93 24.65

608 b2M 0.49 1.27 30.53 8.07 40.36

608 c1M 1.46 2.85 20.56 6.22 31.09

608 c2M 0.49 1.27 40.72 10.62 53.10

608 d1EACH 38.56 - 148.91 46.87 234.34

608 d2EACH 38.56 - 384.69 105.81 529.06

608 h1M 1.83 3.56 21.43 6.71 33.53

608 h2M 1.83 4.75 51.71 14.57 72.86

608 i1M 1.83 3.56 28.57 8.49 42.45

608 i2M 1.83 4.75 68.95 18.88 94.41

608 j1EACH 38.56 - 206.87 61.36 306.79

608 j2EACH 38.56 - 652.07 172.66 863.29

608 n1 EACH 32.08 - 99.27 32.84 164.19

608 n2 EACH 32.08 - 256.85 72.23 361.16

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 32.08 - 137.91 42.50 212.49

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 32.08 - 435.37 116.86 584.31

609 cEACH 5.17 46.68 167.59 54.86 274.30

609 dEACH 5.17 46.68 202.59 63.61 318.05

610 b RIGHT OF WAY MARKER EACH 58.69 60.88 210.59 82.54 412.70

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 362.62 476.40 1,413.62 563.16 2,815.80

610 d TEN KILOMETRE POST EACH 700.23 952.79 3,086.16 1,184.80 5,923.98

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 189: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 189 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.48 6.96 - 1.86 9.30

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.77 102.44 0.88 27.02 135.11

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.73 258.13 1.97 68.46 342.29

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 54.90 1,032.53 7.89 273.83 1,369.15

103 STRIPPING CM 1.64 59.42 - 15.27 76.33

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.91 86.79 - 22.43 112.13

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 84.72 193.76 46.20 81.17 405.85

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.83 214.84 - 56.67 283.34

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.81 167.12 - 43.73 218.66

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.38 78.63 - 20.25 101.26

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 84.72 193.76 46.20 81.17 405.85

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 13.51 199.88 - 53.35 266.74

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.98 167.24 - 43.31 216.53

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.79 89.04 0.31 23.54 117.68

107 bCM 42.18 165.86 53.31 65.34 326.69

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 75.08 258.51 30.80 91.10 455.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 63.77 193.04 - 64.20 321.01

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 38.61 160.37 - 49.75 248.73

107 d GRANULAR BACK FILL CM 22.86 83.07 273.87 94.95 474.75

107 e COMMON BACK FILL CM 16.71 37.31 4.13 14.54 72.69

108 aCM 4.68 106.71 4.13 28.88 144.40

108 biCM 13.59 302.97 48.81 91.34 456.71

108 biiCM 10.19 268.11 1.96 70.07 350.33

108 biiiCM 9.06 238.60 - 61.92 309.58

108 cCM 5.34 112.14 6.81 31.07 155.36

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 190: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 190 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.16 46.31 4.13 13.65 68.25

108 eCM 9.68 73.87 2.45 21.50 107.50

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.93 16.84 1.18 4.74 23.69

109 biSM 0.67 10.31 0.63 2.90 14.51

110 IMPROVED SUB-GRADE CM 6.68 75.50 54.33 34.13 170.64

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.56 9.38 0.64 2.65 13.23

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.83 9.92 0.74 2.87 14.36

201 GRANULAR SUB-BASE CM 5.43 106.91 397.51 127.46 637.31

202 AGGREGATE BASE CM 6.39 132.11 525.11 165.90 829.51

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 49.22 916.98 3,318.64 1,071.21 5,356.05

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 51.05 916.98 3,544.20 1,128.06 5,640.29

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 54.65 957.74 3,313.25 1,081.41 5,407.05

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 54.65 954.75 3,625.61 1,158.75 5,793.76

204 b CEMENT STABILIZED BASE CM 19.51 272.73 632.26 231.13 1,155.63

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 161.59 568.44 21,664.80 5,598.71 27,993.54

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 161.59 568.44 22,552.65 5,820.67 29,103.35

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.40 55.65 554.86 168.48 842.39

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 100.84 1,408.67 3,002.47 1,128.00 5,639.98

206 bCM 70.24 66.68 401.73 134.66 673.31

207 a DEEP PATCHING (0-15 cm) SM 1.15 30.14 1.02 8.08 40.39

207 b DEEP PATCHING (16-30 cm) SM 1.15 26.47 1.02 7.16 35.80

208 REINSTATEMENT OF ROAD SURFACE SM 1.23 37.00 0.45 9.67 48.35

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.35 70.82 0.55 18.18 90.90

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.20 0.67 21.67 5.64 28.18

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 191: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 191 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.67 5.63 28.16

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.56 2.47 12.35

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.02 2.34 11.68

304 a SINGLE SURFACE TREATMENT SM 0.52 4.16 42.43 11.78 58.89

304 b DOUBLE SURFACE TREATMENT SM 0.76 8.06 80.80 22.41 112.03

304 c TRIPLE SURFACE TREATMENT SM 1.28 11.08 96.34 27.18 135.88

304 d SEAL COAT SM 0.49 2.33 24.15 6.74 33.71

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 46.49 906.07 3,880.69 1,208.31 6,041.56

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 46.49 876.73 4,184.08 1,276.83 6,384.13

307 a DENSE GRADED HOT BIT-MAC CM 112.86 171.48 3,182.48 866.71 4,333.53

307 b OPEN GRADED HOT BIT-MAC CM 112.86 171.48 3,094.82 844.79 4,223.95

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 19.29 456.95 911.40 346.91 1,734.55

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 142.39 465.97 23,740.50 6,087.22 30,436.08

309 a COLD MILLING, 0 - 30 mm SM 0.64 16.87 7.54 6.26 31.31

309 b COLD MILLING, 0 - 50 mm SM 1.07 28.11 12.57 10.44 52.19

309 c COLD MILLING, 0 - 70 mm SM 1.61 42.16 18.85 15.66 78.28

401 ai CONCRETE CLASS "A3" (Underground) CM 344.28 643.62 2,959.29 986.80 4,933.99

401 aii CONCRETE CLASS "A3" (On ground) CM 344.28 643.62 3,168.20 1,039.03 5,195.13

401 aiii CONCRETE CLASS "A3" (Elevated) CM 344.28 643.62 3,586.00 1,143.48 5,717.38

401 b CONCRETE CLASS "B" CM 448.42 407.09 2,185.12 760.16 3,800.79

401 ci CONCRETE CLASS "C" (Underground) CM 337.29 258.76 2,624.42 805.12 4,025.59

401 cii CONCRETE CLASS "C" (On ground) CM 337.29 258.76 2,713.51 827.39 4,136.95

401 ciii CONCRETE CLASS "C" (Elevated) CM 337.29 258.76 2,891.71 871.94 4,359.70

401 d CONCRETE CLASS "D1" CM 530.83 810.64 3,828.31 1,292.45 6,462.23

401 e CONCRETE CLASS "Y" CM 740.55 258.76 3,259.15 1,064.62 5,323.08

401 f LEAN CONCRETE CM 289.29 252.12 1,732.55 568.49 2,842.45

Page 192: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 192 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,144.04 468.57 3,742.77 1,338.85 6,694.23

401 gii PRECAST CONCRETE CLASS "B" CM 1,144.04 468.57 3,347.11 1,239.93 6,199.65

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,030.44 - 42,571.63 10,900.52 54,502.59

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,030.44 - 44,671.63 11,425.52 57,127.59

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 844.89 2,335.68 37,721.62 10,225.55 51,127.74

405 aTON 2,031.81 6,882.66 80,755.64 22,417.53 112,087.64

405 b LAUNCHING OF GIRDER TON 47.94 403.69 - 112.91 564.54

406 aSM 75.84 - 188.29 66.03 330.16

406 b SM 75.84 - 197.02 68.22 341.08

406 c STEEL EXPANSION JOINTS KG 6.21 11.61 61.61 19.86 99.29

406 d WATER STOPS 6" SIZE M 61.94 - 310.07 93.00 465.01

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.38 - 1,412.11 359.87 1,799.36

406 g STEEL OR METAL BEARING DEVICES KG 13.70 30.66 81.88 31.56 157.80

407 d1M 255.54 847.08 558.00 415.16 2,075.78

407 d2M 383.30 1,270.62 837.00 622.73 3,113.65

407 d3M 383.30 1,270.62 641.64 573.89 2,869.45

407 d4M 638.84 2,117.70 794.39 887.73 4,438.66

407 d5M 547.58 1,815.17 739.84 775.65 3,878.24

407 d6M 958.26 3,176.55 1,036.90 1,292.93 6,464.64

407 h PILE LOAD TEST UP TO 120 TON EACH 14,326.74 19,990.40 69,433.80 25,937.74 129,688.68

407 i PILE LOAD TEST UP TO 240 TON EACH 28,583.46 19,990.40 138,867.60 46,860.37 234,301.83

407 j PILE LOAD TEST UP TO 360 TON EACH 42,673.14 19,990.40 208,301.40 67,741.24 338,706.18

407 k CONFIRMATORY BORING (NX SIZE) M 143.54 826.61 5.16 243.83 1,219.14

410 BRICK WORK CM 216.93 142.50 2,112.40 617.96 3,089.79

411 a STONE MASONRY RANDOM DRY CM 228.04 56.01 446.38 182.61 913.04

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 193: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 193 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 271.70 84.89 1,104.25 365.21 1,826.05

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 314.04 56.01 502.08 218.03 1,090.16

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 356.38 84.89 1,181.38 405.66 2,028.31

411 g ROLL POINTING SM 46.10 5.78 44.60 24.12 120.60

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 472.38 134.30 1,110.00 429.17 2,145.85

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 151.95 230.36 363.57 186.47 932.35

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 148.15 297.19 468.34 228.42 1,142.10

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 144.86 514.83 577.85 309.39 1,546.93

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 152.14 639.81 867.43 414.85 2,074.23

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 176.25 704.13 1,172.47 513.21 2,566.06

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 219.03 868.93 1,767.58 713.89 3,569.43

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 283.45 961.94 2,212.95 864.59 4,322.93

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 334.42 1,168.07 3,090.13 1,148.16 5,740.78

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 395.93 1,362.74 4,686.78 1,611.36 8,056.81

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 151.95 263.77 382.84 199.64 998.20

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 148.15 297.19 501.14 236.62 1,183.10

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 141.48 514.83 604.09 315.10 1,575.50

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 152.14 639.81 927.86 429.95 2,149.76

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 176.25 704.13 1,638.19 629.64 3,148.21

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 219.03 868.93 2,230.06 829.51 4,147.53

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 283.45 961.94 2,842.71 1,022.03 5,110.13

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 334.42 1,168.07 3,716.09 1,304.65 6,523.23

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 395.93 1,362.74 5,118.87 1,719.39 8,596.93

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 59.72 68.08 237.18 91.25 456.23

502 bCM 502.74 309.47 2,237.34 762.39 3,811.94

507 a STEEL WIRE MESH FOR GABIONS KG 3.58 - 75.81 19.85 99.24

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 194: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 194 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.65 - 353.49 104.54 522.68

508 a BRICK PAVING (SINGLE COURSE) SM 72.89 15.80 173.97 65.67 328.33

508 b BRICK PAVING (DOUBLE COURSE) SM 130.23 15.80 345.80 122.96 614.79

509 a RIP RAP CLASS "A" CM 314.42 - 375.00 172.36 861.78

509 b RIP RAP CLASS "B" CM 303.40 - 372.00 168.85 844.25

509 c RIP RAP CLASS "C" CM 305.17 - 375.00 170.04 850.21

509 d GROUTED RIP RAP CLASS "A" CM 357.68 35.09 1,206.65 399.86 1,999.28

509 e GROUTED RIP RAP CLASS "B" CM 344.60 28.07 1,108.63 370.33 1,851.63

509 f GROUTED RIP RAP CLASS "C" CM 340.15 23.39 1,126.76 372.58 1,862.88

509 gCM 520.99 181.56 2,604.51 826.77 4,133.83

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.64 115.89 273.94 105.62 528.09

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 75.19 194.57 - 67.44 337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 99.03 35.01 60.94 48.75 243.73

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 126.76 44.81 78.00 62.39 311.96

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 160.63 91.01 223.23 118.72 593.59

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 200.78 113.77 279.04 148.40 741.99

603 BRICK EDGING M 5.81 - 27.84 8.41 42.06

605 a CONCRETE BEAM GUARDRAIL M 49.53 14.67 415.49 119.92 599.61

605 c CONCRETE POST FOR GUARDRAIL M 60.81 13.10 410.40 121.08 605.39

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 158.61 128.42 4,670.66 1,239.42 6,197.11

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 45.26 192.63 6,818.67 1,764.14 8,820.70

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 158.61 272.87 8,415.21 2,211.67 11,058.36

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 520.25 304.65 15,481.15 4,076.51 20,382.56

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 104.05 60.93 6,998.54 1,790.88 8,954.40

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.00 318.21 1,591.05

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,543.50 446.84 2,234.18

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 195: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 195 / 244

Rate Analysis Summary ( Construction)District (57) Rawalpindi

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.76 2.85 15.40 5.00 25.01

608 b2M 0.59 1.27 30.41 8.07 40.34

608 c1M 1.76 2.85 20.54 6.29 31.44

608 c2M 0.59 1.27 40.55 10.60 53.01

608 d1EACH 48.28 - 148.76 49.26 246.30

608 d2EACH 48.28 - 383.17 107.86 539.31

608 h1M 2.20 3.56 21.41 6.79 33.96

608 h2M 2.20 4.75 51.71 14.67 73.33

608 i1M 2.20 3.56 28.55 8.58 42.89

608 i2M 2.20 4.75 68.95 18.98 94.88

608 j1EACH 48.28 - 206.72 63.75 318.75

608 j2EACH 48.28 - 652.07 175.09 875.44

608 n1 EACH 40.08 - 99.17 34.81 174.06

608 n2 EACH 40.08 - 255.83 73.98 369.89

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 40.08 - 137.81 44.47 222.36

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 40.08 - 435.37 118.86 594.31

609 cEACH 5.95 46.68 167.46 55.02 275.11

609 dEACH 5.95 46.68 202.46 63.77 318.86

610 b RIGHT OF WAY MARKER EACH 69.25 60.88 203.98 83.53 417.64

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 419.31 476.40 1,361.28 564.25 2,821.24

610 d TEN KILOMETRE POST EACH 811.28 952.79 2,977.37 1,185.36 5,926.80

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 196: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 196 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.45 6.96 - 1.85 9.26

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.41 102.44 0.88 26.93 134.66

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 12.92 258.13 1.97 68.26 341.28

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 51.66 1,032.53 7.89 273.02 1,365.10

103 STRIPPING CM 1.51 59.42 - 15.23 76.16

104 COMPACTION OF NATURAL GROUND SM 0.21 5.92 0.62 1.69 8.44

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.36 86.79 - 22.29 111.44

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 73.50 193.76 46.20 78.37 391.83

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.59 214.84 - 56.36 281.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.97 167.12 - 43.52 217.61

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.93 78.63 - 20.14 100.70

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 73.50 193.76 46.20 78.37 391.83

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.67 199.88 - 52.89 264.44

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.34 167.24 - 43.15 215.73

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.09 89.04 0.31 23.36 116.80

107 bCM 40.21 165.86 53.31 64.85 324.23

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 64.86 258.51 30.80 88.54 442.71

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 55.33 193.04 - 62.09 310.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 33.35 160.37 - 48.43 242.15

107 d GRANULAR BACK FILL CM 20.69 83.07 342.32 111.52 557.60

107 e COMMON BACK FILL CM 16.03 37.31 4.13 14.37 71.84

108 aCM 4.11 106.71 4.13 28.74 143.69

108 biCM 12.20 302.97 48.81 91.00 454.98

108 biiCM 9.15 268.11 1.96 69.81 349.03

108 biiiCM 8.13 238.60 - 61.68 308.41

108 cCM 4.78 112.14 6.81 30.93 154.66

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 197: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 197 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.70 46.31 4.13 13.54 67.68

108 eCM 8.82 73.87 2.45 21.29 106.43

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.82 16.84 1.18 4.71 23.55

109 biSM 0.59 10.31 0.63 2.88 14.41

110 IMPROVED SUB-GRADE CM 5.98 75.50 54.33 33.95 169.76

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.51 9.38 0.64 2.63 13.16

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.76 9.92 0.74 2.86 14.28

201 GRANULAR SUB-BASE CM 4.81 106.91 509.69 155.35 776.76

202 AGGREGATE BASE CM 5.44 132.11 619.08 189.16 945.79

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 46.10 916.98 3,445.14 1,102.06 5,510.28

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 47.57 916.98 3,685.01 1,162.39 5,811.95

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 51.00 957.74 3,439.71 1,112.11 5,560.56

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 51.00 954.75 3,766.63 1,193.10 5,965.48

204 b CEMENT STABILIZED BASE CM 16.95 272.73 740.83 257.63 1,288.14

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 143.55 568.44 22,123.80 5,708.95 28,544.74

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 143.55 568.44 23,037.27 5,937.32 29,686.58

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 61.87 55.65 712.85 207.59 1,037.96

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 92.32 1,408.67 3,140.86 1,160.46 5,802.31

206 bCM 68.61 66.68 561.95 174.31 871.55

207 a DEEP PATCHING (0-15 cm) SM 1.03 30.14 1.02 8.05 40.24

207 b DEEP PATCHING (16-30 cm) SM 1.03 26.47 1.02 7.13 35.65

208 REINSTATEMENT OF ROAD SURFACE SM 1.06 37.00 0.45 9.63 48.14

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.19 70.82 0.55 18.14 90.70

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63 18.14

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.13 5.74 28.71

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 198: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 198 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.13 5.74 28.71

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.74 2.51 12.56

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.21 2.38 11.90

304 a SINGLE SURFACE TREATMENT SM 0.45 4.16 43.95 12.14 60.70

304 b DOUBLE SURFACE TREATMENT SM 0.65 8.06 84.35 23.27 116.33

304 c TRIPLE SURFACE TREATMENT SM 1.10 11.08 100.93 28.28 141.39

304 d SEAL COAT SM 0.41 2.33 24.77 6.88 34.39

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 42.83 906.07 4,029.21 1,244.53 6,222.64

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 42.83 876.73 4,350.01 1,317.39 6,586.96

307 a DENSE GRADED HOT BIT-MAC CM 104.99 171.48 3,313.74 897.55 4,487.76

307 b OPEN GRADED HOT BIT-MAC CM 104.99 171.48 3,232.74 877.30 4,386.51

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 17.72 456.95 940.27 353.74 1,768.68

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 128.19 465.97 24,199.50 6,198.42 30,992.08

309 a COLD MILLING, 0 - 30 mm SM 0.56 16.87 7.54 6.24 31.21

309 b COLD MILLING, 0 - 50 mm SM 0.93 28.11 12.57 10.40 52.01

309 c COLD MILLING, 0 - 70 mm SM 1.39 42.16 18.85 15.60 78.00

401 ai CONCRETE CLASS "A3" (Underground) CM 341.16 643.62 3,242.37 1,056.79 5,283.94

401 aii CONCRETE CLASS "A3" (On ground) CM 341.16 643.62 3,451.27 1,109.01 5,545.06

401 aiii CONCRETE CLASS "A3" (Elevated) CM 341.16 643.62 3,869.08 1,213.47 6,067.33

401 b CONCRETE CLASS "B" CM 428.21 407.09 2,486.97 830.57 4,152.84

401 ci CONCRETE CLASS "C" (Underground) CM 339.41 258.76 2,939.55 884.43 4,422.15

401 cii CONCRETE CLASS "C" (On ground) CM 339.41 258.76 3,028.65 906.71 4,533.53

401 ciii CONCRETE CLASS "C" (Elevated) CM 339.41 258.76 3,206.84 951.25 4,756.26

401 d CONCRETE CLASS "D1" CM 542.31 810.64 4,109.36 1,365.58 6,827.89

401 e CONCRETE CLASS "Y" CM 768.10 258.76 3,517.56 1,136.11 5,680.53

401 f LEAN CONCRETE CM 285.72 252.12 2,028.77 641.65 3,208.26

Page 199: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 199 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,161.76 468.57 4,046.64 1,419.24 7,096.21

401 gii PRECAST CONCRETE CLASS "B" CM 1,161.76 468.57 3,658.93 1,322.32 6,611.58

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,041.01 - 42,565.00 10,901.50 54,507.51

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,041.01 - 44,665.00 11,426.50 57,132.51

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 849.22 2,335.68 37,038.01 10,055.73 50,278.64

405 aTON 1,827.91 6,882.66 80,758.83 22,367.35 111,836.75

405 b LAUNCHING OF GIRDER TON 43.68 403.69 - 111.84 559.21

406 aSM 76.04 - 186.51 65.64 328.19

406 b SM 76.04 - 195.24 67.82 339.10

406 c STEEL EXPANSION JOINTS KG 6.32 11.61 60.90 19.71 98.54

406 d WATER STOPS 6" SIZE M 63.08 - 308.63 92.93 464.64

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.47 - 1,411.89 359.84 1,799.20

406 g STEEL OR METAL BEARING DEVICES KG 12.97 30.66 81.26 31.22 156.11

407 d1M 236.68 847.08 555.33 409.77 2,048.86

407 d2M 355.02 1,270.62 833.00 614.66 3,073.30

407 d3M 355.02 1,270.62 637.64 565.82 2,829.10

407 d4M 591.71 2,117.70 787.73 874.29 4,371.43

407 d5M 507.18 1,815.17 734.12 764.12 3,820.59

407 d6M 887.56 3,176.55 1,026.90 1,272.75 6,363.76

407 h PILE LOAD TEST UP TO 120 TON EACH 13,892.04 19,990.40 72,541.08 26,605.88 133,029.40

407 i PILE LOAD TEST UP TO 240 TON EACH 28,446.84 19,990.40 145,082.16 48,379.85 241,899.25

407 j PILE LOAD TEST UP TO 360 TON EACH 42,238.44 19,990.40 217,623.24 69,963.02 349,815.10

407 k CONFIRMATORY BORING (NX SIZE) M 137.33 826.61 5.16 242.28 1,211.38

410 BRICK WORK CM 225.12 142.50 2,095.49 615.78 3,078.89

411 a STONE MASONRY RANDOM DRY CM 234.16 56.01 537.14 206.83 1,034.14

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 200: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 200 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 279.16 84.89 1,359.97 431.01 2,155.03

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 324.16 56.01 594.65 243.71 1,218.53

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 369.16 84.89 1,399.47 463.38 2,316.90

411 g ROLL POINTING SM 48.61 5.78 47.44 25.46 127.29

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 489.16 134.30 1,328.09 487.89 2,439.44

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 149.44 230.36 368.88 187.17 935.85

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 146.40 297.19 474.72 229.58 1,147.89

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 140.58 514.83 585.24 310.16 1,550.81

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 148.26 639.81 876.10 416.04 2,080.21

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 170.27 704.13 1,181.14 513.89 2,569.43

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 210.43 868.93 1,780.14 714.88 3,574.38

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 272.33 961.94 2,225.55 864.96 4,324.78

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 319.97 1,168.07 3,105.43 1,148.37 5,741.84

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 380.17 1,362.74 4,704.63 1,611.89 8,059.43

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 149.44 263.77 393.01 201.56 1,007.78

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 146.40 297.19 507.52 237.78 1,188.89

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 137.21 514.83 611.48 315.88 1,579.40

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 148.26 639.81 934.59 430.67 2,153.33

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 170.27 704.13 1,647.92 630.58 3,152.90

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 210.43 868.93 2,242.62 830.50 4,152.48

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 272.33 961.94 2,855.31 1,022.40 5,111.98

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 319.97 1,168.07 3,731.39 1,304.86 6,524.29

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 380.17 1,362.74 5,136.72 1,719.91 8,599.54

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 56.65 68.08 279.55 101.07 505.35

502 bCM 489.23 309.47 2,540.08 834.70 4,173.48

507 a STEEL WIRE MESH FOR GABIONS KG 3.46 - 75.81 19.82 99.09

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 201: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 201 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 62.60 - 437.50 125.03 625.13

508 a BRICK PAVING (SINGLE COURSE) SM 74.47 15.80 158.79 62.27 311.33

508 b BRICK PAVING (DOUBLE COURSE) SM 134.47 15.80 315.08 116.34 581.69

509 a RIP RAP CLASS "A" CM 323.51 - 465.76 197.32 986.59

509 b RIP RAP CLASS "B" CM 312.81 - 462.04 193.71 968.56

509 c RIP RAP CLASS "C" CM 315.67 - 465.76 195.36 976.79

509 d GROUTED RIP RAP CLASS "A" CM 341.56 35.09 1,542.63 479.82 2,399.10

509 e GROUTED RIP RAP CLASS "B" CM 329.95 28.07 1,427.31 446.33 2,231.66

509 f GROUTED RIP RAP CLASS "C" CM 326.26 23.39 1,455.04 451.17 2,255.86

509 gCM 526.08 181.56 2,911.47 904.78 4,523.89

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.45 115.89 342.29 122.41 612.04

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 72.15 194.57 - 66.68 333.40

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 100.41 35.01 75.69 52.78 263.89

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 128.52 44.81 96.88 67.55 337.76

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 164.52 91.01 264.14 129.92 649.59

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 205.65 113.77 330.17 162.40 811.99

603 BRICK EDGING M 5.78 - 24.96 7.69 38.43

605 a CONCRETE BEAM GUARDRAIL M 50.14 14.67 426.40 122.80 614.01

605 c CONCRETE POST FOR GUARDRAIL M 61.56 13.10 423.74 124.60 623.00

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 155.48 128.42 4,685.22 1,242.28 6,211.40

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 46.50 192.63 6,873.74 1,778.22 8,891.09

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 155.48 272.87 8,511.99 2,235.09 11,175.43

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 518.22 304.65 15,623.17 4,111.51 20,557.55

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 103.64 60.93 7,023.17 1,796.94 8,984.68

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.86 317.93 1,589.63

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.80 446.41 2,232.05

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 202: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 202 / 244

Rate Analysis Summary ( Construction)District (58) Sahiwal

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.60 2.85 15.39 4.96 24.80

608 b2M 0.53 1.27 30.34 8.04 40.18

608 c1M 1.60 2.85 20.53 6.25 31.23

608 c2M 0.53 1.27 40.46 10.57 52.83

608 d1EACH 46.57 - 148.68 48.81 244.06

608 d2EACH 46.57 - 382.31 107.22 536.10

608 h1M 2.00 3.56 21.40 6.74 33.70

608 h2M 2.00 4.75 51.71 14.62 73.08

608 i1M 2.00 3.56 28.54 8.53 42.63

608 i2M 2.00 4.75 68.95 18.93 94.63

608 j1EACH 46.57 - 206.64 63.30 316.51

608 j2EACH 46.57 - 652.07 174.66 873.30

608 n1 EACH 38.47 - 99.12 34.40 171.99

608 n2 EACH 38.47 - 255.26 73.43 367.16

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.47 - 137.76 44.06 220.29

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.47 - 435.37 118.46 592.30

609 cEACH 6.09 46.68 167.70 55.12 275.59

609 dEACH 6.09 46.68 202.70 63.87 319.34

610 b RIGHT OF WAY MARKER EACH 69.11 60.88 215.66 86.41 432.06

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 427.81 476.40 1,456.88 590.27 2,951.36

610 d TEN KILOMETRE POST EACH 825.61 952.79 3,168.08 1,236.62 6,183.10

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 203: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 203 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.47 6.96 - 1.86 9.29

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.65 102.44 0.88 26.99 134.96

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.46 258.13 1.97 68.39 341.95

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 53.82 1,032.53 7.89 273.56 1,367.80

103 STRIPPING CM 1.59 59.42 - 15.25 76.26

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.73 86.79 - 22.38 111.90

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 80.94 193.76 46.20 80.23 401.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.41 214.84 - 56.56 282.81

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.52 167.12 - 43.66 218.30

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.23 78.63 - 20.22 101.08

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 80.94 193.76 46.20 80.23 401.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.89 199.88 - 53.19 265.96

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.76 167.24 - 43.25 216.25

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.55 89.04 0.31 23.48 117.38

107 bCM 42.07 165.86 53.31 65.31 326.55

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 71.64 258.51 30.80 90.24 451.19

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 60.93 193.04 - 63.49 317.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 36.84 160.37 - 49.30 246.51

107 d GRANULAR BACK FILL CM 22.14 83.07 270.57 93.95 469.73

107 e COMMON BACK FILL CM 16.48 37.31 4.13 14.48 72.40

108 aCM 4.48 106.71 4.13 28.83 144.15

108 biCM 13.11 302.97 48.81 91.22 456.11

108 biiCM 9.84 268.11 1.96 69.98 349.89

108 biiiCM 8.74 238.60 - 61.84 309.18

108 cCM 5.15 112.14 6.81 31.03 155.13

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 204: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 204 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.00 46.31 4.13 13.61 68.05

108 eCM 9.38 73.87 2.45 21.43 107.13

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.90 16.84 1.18 4.73 23.65

109 biSM 0.64 10.31 0.63 2.90 14.48

110 IMPROVED SUB-GRADE CM 6.44 75.50 54.33 34.07 170.34

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.54 9.38 0.64 2.64 13.20

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.81 9.92 0.74 2.87 14.34

201 GRANULAR SUB-BASE CM 5.22 106.91 380.61 123.19 615.93

202 AGGREGATE BASE CM 6.07 132.11 504.21 160.60 802.99

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 48.17 916.98 3,317.28 1,070.61 5,353.04

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 49.88 916.98 3,544.42 1,127.82 5,639.10

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 53.41 957.74 3,312.10 1,080.81 5,404.06

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 53.41 954.75 3,626.43 1,158.65 5,793.24

204 b CEMENT STABILIZED BASE CM 18.65 272.73 610.31 225.42 1,127.11

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 155.39 568.44 21,817.80 5,635.41 28,177.04

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 155.39 568.44 22,718.32 5,860.54 29,302.69

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.87 55.65 532.80 162.83 814.15

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 97.96 1,408.67 2,988.73 1,123.84 5,619.20

206 bCM 69.68 66.68 475.90 153.07 765.33

207 a DEEP PATCHING (0-15 cm) SM 1.11 30.14 1.02 8.07 40.34

207 b DEEP PATCHING (16-30 cm) SM 1.11 26.47 1.02 7.15 35.75

208 REINSTATEMENT OF ROAD SURFACE SM 1.18 37.00 0.45 9.66 48.29

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.30 70.82 0.55 18.17 90.84

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.26 14.16 0.11 3.63 18.16

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 205: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 205 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 21.82 5.67 28.35

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.62 2.49 12.43

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.09 2.35 11.76

304 a SINGLE SURFACE TREATMENT SM 0.50 4.16 42.61 11.82 59.09

304 b DOUBLE SURFACE TREATMENT SM 0.72 8.06 81.00 22.45 112.23

304 c TRIPLE SURFACE TREATMENT SM 1.22 11.08 96.49 27.20 135.99

304 d SEAL COAT SM 0.46 2.33 24.27 6.77 33.83

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 45.26 906.07 3,889.15 1,210.12 6,050.60

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 45.26 876.73 4,195.29 1,279.32 6,396.60

307 a DENSE GRADED HOT BIT-MAC CM 110.24 171.48 3,194.91 869.16 4,345.79

307 b OPEN GRADED HOT BIT-MAC CM 110.24 171.48 3,101.19 845.73 4,228.64

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.76 456.95 910.99 346.68 1,733.38

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 137.47 465.97 23,893.50 6,124.24 30,621.18

309 a COLD MILLING, 0 - 30 mm SM 0.61 16.87 7.54 6.26 31.28

309 b COLD MILLING, 0 - 50 mm SM 1.02 28.11 12.57 10.43 52.13

309 c COLD MILLING, 0 - 70 mm SM 1.54 42.16 18.85 15.64 78.19

401 ai CONCRETE CLASS "A3" (Underground) CM 352.53 643.62 3,026.26 1,005.60 5,028.01

401 aii CONCRETE CLASS "A3" (On ground) CM 352.53 643.62 3,235.16 1,057.83 5,289.14

401 aiii CONCRETE CLASS "A3" (Elevated) CM 352.53 643.62 3,652.96 1,162.28 5,811.39

401 b CONCRETE CLASS "B" CM 448.46 407.09 2,244.79 775.09 3,875.43

401 ci CONCRETE CLASS "C" (Underground) CM 346.81 258.76 2,685.49 822.77 4,113.83

401 cii CONCRETE CLASS "C" (On ground) CM 346.81 258.76 2,774.59 845.04 4,225.20

401 ciii CONCRETE CLASS "C" (Elevated) CM 346.81 258.76 2,952.78 889.59 4,447.94

401 d CONCRETE CLASS "D1" CM 552.83 810.64 3,903.35 1,316.71 6,583.53

401 e CONCRETE CLASS "Y" CM 776.25 258.76 3,327.97 1,090.75 5,453.73

401 f LEAN CONCRETE CM 291.49 252.12 1,786.59 582.55 2,912.75

Page 206: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 206 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,179.55 468.57 3,813.74 1,365.47 6,827.33

401 gii PRECAST CONCRETE CLASS "B" CM 1,179.55 468.57 3,405.50 1,263.41 6,317.03

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,069.48 - 42,565.01 10,908.62 54,543.11

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,069.48 - 44,665.01 11,433.62 57,168.11

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 874.74 2,335.68 37,039.51 10,062.48 50,312.41

405 aTON 1,963.83 6,882.66 80,760.39 22,401.72 112,008.60

405 b LAUNCHING OF GIRDER TON 46.52 403.69 - 112.55 562.76

406 aSM 77.88 - 186.29 66.04 330.21

406 b SM 77.88 - 195.01 68.22 341.11

406 c STEEL EXPANSION JOINTS KG 6.45 11.61 60.65 19.68 98.39

406 d WATER STOPS 6" SIZE M 64.10 - 309.15 93.31 466.56

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 28.29 - 1,411.63 359.98 1,799.90

406 g STEEL OR METAL BEARING DEVICES KG 13.63 30.66 81.03 31.33 156.65

407 d1M 249.55 847.08 553.60 412.56 2,062.79

407 d2M 374.32 1,270.62 830.40 618.84 3,094.18

407 d3M 374.32 1,270.62 635.04 570.00 2,849.98

407 d4M 623.87 2,117.70 783.39 881.24 4,406.20

407 d5M 534.74 1,815.17 730.41 770.08 3,850.40

407 d6M 935.80 3,176.55 1,020.40 1,283.19 6,415.94

407 h PILE LOAD TEST UP TO 120 TON EACH 14,181.84 19,990.40 69,433.80 25,901.51 129,507.55

407 i PILE LOAD TEST UP TO 240 TON EACH 28,537.92 19,990.40 138,867.60 46,848.98 234,244.90

407 j PILE LOAD TEST UP TO 360 TON EACH 42,528.24 19,990.40 208,301.40 67,705.01 338,525.05

407 k CONFIRMATORY BORING (NX SIZE) M 141.47 826.61 5.16 243.31 1,216.55

410 BRICK WORK CM 226.74 142.50 2,055.10 606.09 3,030.43

411 a STONE MASONRY RANDOM DRY CM 236.18 56.01 327.05 154.81 774.05

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 207: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 207 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 281.18 84.89 1,036.89 350.74 1,753.70

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 326.18 56.01 367.76 187.49 937.44

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 371.18 84.89 1,087.83 385.98 1,929.88

411 g ROLL POINTING SM 48.71 5.78 45.55 25.01 125.05

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 491.18 134.30 1,016.46 410.49 2,052.43

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 151.97 230.36 365.35 186.92 934.60

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 148.43 297.19 470.48 229.03 1,145.13

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 144.26 514.83 580.30 309.85 1,549.24

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 151.60 639.81 870.32 415.43 2,077.16

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 175.01 704.13 1,175.36 513.63 2,568.13

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 217.32 868.93 1,771.80 714.51 3,572.56

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 281.24 961.94 2,217.24 865.11 4,325.53

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 330.79 1,168.07 3,095.34 1,148.55 5,742.75

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 392.80 1,362.74 4,692.86 1,612.10 8,060.50

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 151.97 263.77 385.95 200.42 1,002.11

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 148.43 297.19 503.28 237.23 1,186.13

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 140.89 514.83 606.54 315.57 1,577.83

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 151.60 639.81 930.09 430.38 2,151.88

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 175.01 704.13 1,641.50 630.16 3,150.80

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 217.32 868.93 2,234.28 830.13 4,150.66

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 281.24 961.94 2,847.00 1,022.55 5,112.73

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 330.79 1,168.07 3,721.30 1,305.04 6,525.20

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 392.80 1,362.74 5,124.95 1,720.12 8,600.61

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 58.68 68.08 237.18 90.99 454.93

502 bCM 507.98 309.47 2,297.90 778.84 3,894.19

507 a STEEL WIRE MESH FOR GABIONS KG 3.61 - 75.81 19.86 99.28

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 208: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 208 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.95 - 379.17 110.78 553.90

508 a BRICK PAVING (SINGLE COURSE) SM 75.19 15.80 162.67 63.42 317.08

508 b BRICK PAVING (DOUBLE COURSE) SM 135.19 15.80 323.20 118.55 592.74

509 a RIP RAP CLASS "A" CM 326.30 - 255.68 145.50 727.48

509 b RIP RAP CLASS "B" CM 315.04 - 253.63 142.17 710.84

509 c RIP RAP CLASS "C" CM 317.53 - 255.68 143.30 716.51

509 d GROUTED RIP RAP CLASS "A" CM 362.05 35.09 1,255.74 413.22 2,066.10

509 e GROUTED RIP RAP CLASS "B" CM 349.05 28.07 1,150.21 381.83 1,909.16

509 f GROUTED RIP RAP CLASS "C" CM 344.88 23.39 1,170.35 384.66 1,923.28

509 gCM 533.48 181.56 2,670.84 846.47 4,232.35

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.22 115.89 270.66 104.69 523.46

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 74.18 194.57 - 67.19 335.94

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 101.67 35.01 41.55 44.56 222.79

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 130.14 44.81 53.18 57.03 285.16

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 166.14 91.01 214.52 117.92 589.59

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 207.68 113.77 268.15 147.40 737.00

603 BRICK EDGING M 5.88 - 25.92 7.95 39.75

605 a CONCRETE BEAM GUARDRAIL M 50.55 14.67 418.02 120.81 604.05

605 c CONCRETE POST FOR GUARDRAIL M 62.07 13.10 413.52 122.17 610.86

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 159.90 128.42 4,670.12 1,239.61 6,198.05

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 46.50 192.63 6,827.05 1,766.55 8,832.73

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 159.90 272.87 8,431.81 2,216.15 11,080.73

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 524.85 304.65 15,503.05 4,083.14 20,415.69

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 104.97 60.93 6,999.33 1,791.31 8,956.54

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.92 317.94 1,589.70

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.88 446.43 2,232.15

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 209: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 209 / 244

Rate Analysis Summary ( Construction)District (60) Sargodha

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.73 2.85 15.39 4.99 24.96

608 b2M 0.58 1.27 30.34 8.05 40.24

608 c1M 1.73 2.85 20.53 6.28 31.39

608 c2M 0.58 1.27 40.47 10.58 52.90

608 d1EACH 47.56 - 148.69 49.06 245.31

608 d2EACH 47.56 - 382.37 107.48 537.41

608 h1M 2.17 3.56 21.40 6.78 33.91

608 h2M 2.17 4.75 51.71 14.66 73.29

608 i1M 2.17 3.56 28.54 8.57 42.84

608 i2M 2.17 4.75 68.95 18.97 94.84

608 j1EACH 47.56 - 206.65 63.55 317.76

608 j2EACH 47.56 - 652.07 174.91 874.54

608 n1 EACH 39.46 - 99.12 34.65 173.23

608 n2 EACH 39.46 - 255.30 73.69 368.45

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 39.46 - 137.76 44.31 221.53

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 39.46 - 435.37 118.71 593.54

609 cEACH 6.09 46.68 167.56 55.08 275.41

609 dEACH 6.09 46.68 202.56 63.83 319.16

610 b RIGHT OF WAY MARKER EACH 69.79 60.88 206.71 84.35 421.73

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 431.85 476.40 1,381.03 572.32 2,861.60

610 d TEN KILOMETRE POST EACH 833.71 952.79 3,021.79 1,202.07 6,010.36

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 210: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 210 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

101 CLEARING AND GRUBBING SM 0.46 6.96 - 1.86

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.53 102.44 0.88 26.96

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.19 258.13 1.97 68.32

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 52.74 1,032.53 7.89 273.29

103 STRIPPING CM 1.53 59.42 - 15.24

104 COMPACTION OF NATURAL GROUND SM 0.22 5.92 0.62 1.69

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.54 86.79 - 22.33

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 76.72 193.76 46.20 79.17

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.87 214.84 - 56.43

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.13 167.12 - 43.56

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.08 78.63 - 20.18

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 76.72 193.76 46.20 79.17

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.22 199.88 - 53.03

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.47 167.24 - 43.18

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.26 89.04 0.31 23.40

107 bCM 38.79 165.86 53.31 64.49

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 67.88 258.51 30.80 89.30

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 57.80 193.04 - 62.71

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 34.91 160.37 - 48.82

107 d GRANULAR BACK FILL CM 21.41 83.07 288.79 98.32

107 e COMMON BACK FILL CM 16.26 37.31 4.13 14.43

108 aCM 4.24 106.71 4.13 28.77

108 biCM 12.52 302.97 48.81 91.08

108 biiCM 9.39 268.11 1.96 69.87

108 biiiCM 8.35 238.60 - 61.74

108 cCM 4.90 112.14 6.81 30.96

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 211: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 211 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.79 46.31 4.13 13.56

108 eCM 8.99 73.87 2.45 21.33

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.85 16.84 1.18 4.72

109 biSM 0.61 10.31 0.63 2.89

110 IMPROVED SUB-GRADE CM 6.16 75.50 51.54 33.30

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.52 9.38 0.64 2.64

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.77 9.92 0.74 2.86

201 GRANULAR SUB-BASE CM 4.96 106.91 433.69 136.39

202 AGGREGATE BASE CM 5.75 132.11 566.87 176.18

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.01 916.98 3,399.87 1,090.97

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.60 916.98 3,629.36 1,148.74

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 51.94 957.74 3,394.47 1,101.04

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 51.94 954.75 3,711.38 1,179.52

204 b CEMENT STABILIZED BASE CM 17.80 272.73 679.09 242.41

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 147.22 568.44 22,123.80 5,709.87

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 147.22 568.44 23,043.87 5,939.88

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.18 55.65 599.00 179.21

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 94.60 1,408.67 3,081.88 1,146.29

206 bCM 69.04 66.68 488.34 156.02

207 a DEEP PATCHING (0-15 cm) SM 1.05 30.14 1.02 8.05

207 b DEEP PATCHING (16-30 cm) SM 1.05 26.47 1.02 7.14

208 REINSTATEMENT OF ROAD SURFACE SM 1.12 37.00 0.45 9.64

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.21 70.82 0.55 18.15

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.13 5.75

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 212: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 212 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.13 5.75

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.74 2.51

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.22 2.38

304 a SINGLE SURFACE TREATMENT SM 0.47 4.16 43.63 12.07

304 b DOUBLE SURFACE TREATMENT SM 0.69 8.06 83.38 23.03

304 c TRIPLE SURFACE TREATMENT SM 1.15 11.08 99.56 27.95

304 d SEAL COAT SM 0.44 2.33 24.68 6.86

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 43.90 906.07 3,972.81 1,230.70

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 43.90 876.73 4,283.17 1,300.95

307 a DENSE GRADED HOT BIT-MAC CM 107.62 171.48 3,267.28 886.60

307 b OPEN GRADED HOT BIT-MAC CM 107.62 171.48 3,180.08 864.80

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.24 456.95 930.23 351.36

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 130.59 465.97 24,199.50 6,199.02

309 a COLD MILLING, 0 - 30 mm SM 0.59 16.87 7.54 6.25

309 b COLD MILLING, 0 - 50 mm SM 0.98 28.11 12.57 10.42

309 c COLD MILLING, 0 - 70 mm SM 1.47 42.16 18.85 15.62

401 ai CONCRETE CLASS "A3" (Underground) CM 316.28 643.62 3,091.94 1,012.96

401 aii CONCRETE CLASS "A3" (On ground) CM 316.28 643.62 3,300.84 1,065.19

401 aiii CONCRETE CLASS "A3" (Elevated) CM 316.28 643.62 3,718.64 1,169.64

401 b CONCRETE CLASS "B" CM 414.70 407.09 2,322.56 786.09

401 ci CONCRETE CLASS "C" (Underground) CM 313.89 258.76 2,767.50 835.04

401 cii CONCRETE CLASS "C" (On ground) CM 313.89 258.76 2,856.60 857.31

401 ciii CONCRETE CLASS "C" (Elevated) CM 313.89 258.76 3,034.79 901.86

401 d CONCRETE CLASS "D1" CM 488.52 810.64 3,964.35 1,315.88

401 e CONCRETE CLASS "Y" CM 685.24 258.76 3,385.84 1,082.46

401 f LEAN CONCRETE CM 276.78 252.12 1,864.92 598.46

Page 213: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 213 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,075.73 468.57 3,884.79 1,357.27

401 gii PRECAST CONCRETE CLASS "B" CM 1,075.73 468.57 3,488.29 1,258.15

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 941.33 - 42,670.56 10,902.97

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 941.33 - 44,770.56 11,427.97

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 793.65 2,335.68 37,096.05 10,056.35

405 aTON 1,895.98 6,882.66 80,761.19 22,384.96

405 b LAUNCHING OF GIRDER TON 45.10 403.69 - 112.20

406 aSM 70.63 - 184.41 63.76

406 b SM 70.63 - 193.12 65.94

406 c STEEL EXPANSION JOINTS KG 5.95 11.61 60.85 19.60

406 d WATER STOPS 6" SIZE M 57.89 - 309.17 91.77

406 eccm 0.01 - 1.22 0.31

406 f ASPHALT FELT (3 PLY) SM 25.03 - 1,411.27 359.08

406 g STEEL OR METAL BEARING DEVICES KG 13.30 30.66 81.20 31.29

407 d1M 243.12 847.08 566.15 414.09

407 d2M 364.68 1,270.62 849.22 621.13

407 d3M 364.68 1,270.62 653.86 572.29

407 d4M 607.81 2,117.70 814.77 885.07

407 d5M 520.98 1,815.17 757.30 773.36

407 d6M 911.71 3,176.55 1,067.46 1,288.93

407 h PILE LOAD TEST UP TO 120 TON EACH 14,037.18 19,990.40 70,987.00 26,253.65

407 i PILE LOAD TEST UP TO 240 TON EACH 28,492.38 19,990.40 141,974.00 47,614.20

407 j PILE LOAD TEST UP TO 360 TON EACH 42,383.58 19,990.40 212,961.00 68,833.75

407 k CONFIRMATORY BORING (NX SIZE) M 139.40 826.61 5.16 242.79

410 BRICK WORK CM 202.88 142.50 2,072.05 604.36

411 a STONE MASONRY RANDOM DRY CM 213.88 56.01 502.71 193.15

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 214: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 214 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 256.04 84.89 1,233.74 393.67

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 295.34 56.01 557.47 227.21

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 334.64 84.89 1,293.44 428.24

411 g ROLL POINTING SM 42.96 5.78 45.91 23.66

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 446.10 134.30 1,222.06 450.62

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 147.52 230.36 366.01 185.97

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 144.23 297.19 471.28 228.18

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 138.90 514.83 581.23 308.74

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 146.73 639.81 871.41 414.49

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 169.44 704.13 1,176.45 512.51

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 209.39 868.93 1,773.36 712.92

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 270.97 961.94 2,218.80 862.93

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 320.35 1,168.07 3,097.23 1,146.41

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 378.25 1,362.74 4,695.07 1,609.02

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 147.52 263.77 387.27 199.64

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 144.23 297.19 504.08 236.38

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 135.53 514.83 607.47 314.46

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 146.73 639.81 930.93 429.37

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 169.44 704.13 1,642.71 629.07

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 209.39 868.93 2,235.84 828.54

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 270.97 961.94 2,848.56 1,020.37

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 320.35 1,168.07 3,723.19 1,302.90

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 378.25 1,362.74 5,127.16 1,717.04

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 57.44 68.08 258.36 95.97

502 bCM 465.47 309.47 2,375.67 787.65

507 a STEEL WIRE MESH FOR GABIONS KG 3.30 - 75.81 19.78

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 215: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 215 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.05 - 408.33 117.85

508 a BRICK PAVING (SINGLE COURSE) SM 69.00 15.80 163.56 62.09

508 b BRICK PAVING (DOUBLE COURSE) SM 123.30 15.80 324.79 115.97

509 a RIP RAP CLASS "A" CM 296.09 - 431.34 181.86

509 b RIP RAP CLASS "B" CM 286.31 - 427.89 178.55

509 c RIP RAP CLASS "C" CM 287.90 - 431.34 179.81

509 d GROUTED RIP RAP CLASS "A" CM 318.20 35.09 1,434.96 447.06

509 e GROUTED RIP RAP CLASS "B" CM 306.67 28.07 1,327.61 415.59

509 f GROUTED RIP RAP CLASS "C" CM 302.80 23.39 1,350.53 419.18

509 gCM 494.23 181.56 2,744.42 855.05

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.63 115.89 288.92 109.11

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 73.16 194.57 - 66.93

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 93.50 35.01 70.09 49.65

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 119.68 44.81 89.72 63.55

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 151.12 91.01 244.56 121.67

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 188.90 113.77 305.70 152.09

603 BRICK EDGING M 5.51 - 25.92 7.86

605 a CONCRETE BEAM GUARDRAIL M 47.70 14.67 420.99 120.84

605 c CONCRETE POST FOR GUARDRAIL M 58.57 13.10 417.07 122.19

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 149.65 128.42 4,673.93 1,238.00

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 42.98 192.63 6,837.46 1,768.27

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 149.65 272.87 8,449.55 2,218.02

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 503.78 304.65 15,526.60 4,083.76

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 100.76 60.93 7,000.37 1,790.52

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,026.82 317.67

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,540.23 446.02

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 216: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 216 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.55 2.85 15.38 4.95

608 b2M 0.52 1.27 30.27 8.02

608 c1M 1.55 2.85 20.52 6.23

608 c2M 0.52 1.27 40.38 10.54

608 d1EACH 42.77 - 148.60 47.84

608 d2EACH 42.77 - 381.51 106.07

608 h1M 1.94 3.56 21.39 6.72

608 h2M 1.94 4.75 51.71 14.60

608 i1M 1.94 3.56 28.53 8.51

608 i2M 1.94 4.75 68.95 18.91

608 j1EACH 42.77 - 206.56 62.33

608 j2EACH 42.77 - 652.07 173.71

608 n1 EACH 35.48 - 99.07 33.64

608 n2 EACH 35.48 - 254.72 72.55

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 35.48 - 137.71 43.30

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 35.48 - 435.37 117.71

609 cEACH 5.57 46.68 167.58 54.96

609 dEACH 5.57 46.68 202.58 63.71

610 b RIGHT OF WAY MARKER EACH 67.50 60.88 209.48 84.47

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 397.83 476.40 1,404.59 569.71

610 d TEN KILOMETRE POST EACH 771.35 952.79 3,067.89 1,198.01

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 217: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 217 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

9.28

134.81

341.61

1,366.45

76.19

8.45

111.66

395.85

282.14

217.81

100.89

395.85

265.13

215.89

117.01

322.45

446.49

313.55

244.10

491.59

72.13

143.85

455.38

349.33

308.69

154.81

Quantity Surveying &Estimation Specialist, NHA

Page 218: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 218 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

Quantity Surveying &Estimation Specialist, NHA

67.79

106.64

23.59

14.44

166.50

13.18

14.29

681.95

880.91

5,454.83

5,743.68

5,505.19

5,897.59

1,212.03

28,549.33

29,699.41

896.04

5,731.44

780.08

40.26

35.68

48.21

90.73

18.14

28.73

Page 219: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 219 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

Quantity Surveying &Estimation Specialist, NHA

28.73

12.56

11.91

60.33

115.16

139.74

34.31

6,153.48

6,504.75

4,432.98

4,323.98

1,756.78

30,995.08

31.25

52.08

78.10

5,064.80

5,325.93

5,848.18

3,930.44

4,175.19

4,286.56

4,509.30

6,579.39

5,412.30

2,992.28

Page 220: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 220 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

Quantity Surveying &Estimation Specialist, NHA

6,786.36

6,290.74

54,514.86

57,139.86

50,281.73

111,924.79

560.99

318.80

329.69

98.01

458.83

1.54

1,795.38

156.45

2,070.44

3,105.65

2,861.45

4,425.35

3,866.81

6,444.65

131,268.23

238,070.98

344,168.73

1,213.96

3,021.79

965.75

Page 221: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 221 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

Quantity Surveying &Estimation Specialist, NHA

1,968.34

1,136.03

2,141.21

118.31

2,253.08

929.86

1,140.88

1,543.70

2,072.44

2,562.53

3,564.60

4,314.64

5,732.06

8,045.08

998.20

1,181.88

1,572.29

2,146.84

3,145.35

4,142.70

5,101.84

6,514.51

8,585.19

479.85

3,938.26

98.89

Page 222: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 222 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

Quantity Surveying &Estimation Specialist, NHA

589.23

310.45

579.86

909.29

892.75

899.05

2,235.31

2,077.94

2,095.90

4,275.26

545.55

334.66

248.25

317.76

608.36

760.46

39.29

604.20

610.93

6,190.00

8,841.34

11,090.09

20,418.79

8,952.58

1,588.33

2,230.09

Page 223: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 223 / 244

Rate Analysis Summary ( Construction)District (61) Sheikhupura

RATE

Quantity Surveying &Estimation Specialist, NHA

24.73

40.08

31.15

52.71

239.21

530.35

33.61

73.00

42.54

94.55

311.66

868.55

168.19

362.75

216.49

588.56

274.79

318.54

422.33

2,848.53

5,990.04

Page 224: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 224 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.47 6.96 - 1.86 9.29

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.65 102.44 0.88 26.99 134.96

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.46 258.13 1.97 68.39 341.95

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 53.82 1,032.53 7.89 273.56 1,367.80

103 STRIPPING CM 1.61 59.42 - 15.26 76.29

104 COMPACTION OF NATURAL GROUND SM 0.23 5.92 0.62 1.69 8.46

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.73 86.79 - 22.38 111.90

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 81.57 193.76 46.20 80.38 401.91

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 11.58 214.84 - 56.61 283.03

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.66 167.12 - 43.70 218.48

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.23 78.63 - 20.22 101.08

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 81.57 193.76 46.20 80.38 401.91

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.98 199.88 - 53.22 266.08

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.86 167.24 - 43.28 216.38

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.64 89.04 0.31 23.50 117.49

107 bCM 42.76 165.86 53.31 65.48 327.41

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 72.11 258.51 30.80 90.36 451.78

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 61.35 193.04 - 63.60 317.99

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 37.08 160.37 - 49.36 246.81

107 d GRANULAR BACK FILL CM 22.14 83.07 297.84 100.76 503.81

107 e COMMON BACK FILL CM 16.48 37.31 4.13 14.48 72.40

108 aCM 4.56 106.71 4.13 28.85 144.25

108 biCM 13.28 302.97 48.81 91.27 456.33

108 biiCM 9.96 268.11 1.96 70.01 350.04

108 biiiCM 8.85 238.60 - 61.86 309.31

108 cCM 5.22 112.14 6.81 31.04 155.21

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 225: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 225 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 4.08 46.31 4.13 13.63 68.15

108 eCM 9.52 73.87 2.45 21.46 107.30

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.91 16.84 1.18 4.73 23.66

109 biSM 0.65 10.31 0.63 2.90 14.49

110 IMPROVED SUB-GRADE CM 6.51 75.50 54.33 34.09 170.43

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.55 9.38 0.64 2.64 13.21

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.83 9.92 0.74 2.87 14.36

201 GRANULAR SUB-BASE CM 5.29 106.91 500.39 153.15 765.74

202 AGGREGATE BASE CM 6.07 132.11 650.41 197.15 985.74

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 48.32 916.98 3,470.33 1,108.91 5,544.54

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 50.04 916.98 3,699.62 1,166.66 5,833.30

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 53.74 957.74 3,464.85 1,119.08 5,595.41

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 53.74 954.75 3,781.05 1,197.39 5,986.93

204 b CEMENT STABILIZED BASE CM 18.65 272.73 764.65 264.01 1,320.04

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 158.20 568.44 22,072.80 5,699.86 28,499.30

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 158.20 568.44 22,986.80 5,928.36 29,641.80

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 63.11 55.65 687.31 201.52 1,007.59

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 98.63 1,408.67 3,173.96 1,170.32 5,851.58

206 bCM 69.82 66.68 584.02 180.13 900.65

207 a DEEP PATCHING (0-15 cm) SM 1.13 30.14 1.02 8.07 40.36

207 b DEEP PATCHING (16-30 cm) SM 1.13 26.47 1.02 7.16 35.78

208 REINSTATEMENT OF ROAD SURFACE SM 1.18 37.00 0.45 9.66 48.29

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.34 70.82 0.55 18.18 90.89

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.27 14.16 0.11 3.64 18.18

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 22.08 5.74 28.68

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 226: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 226 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.19 0.67 22.08 5.74 28.68

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.72 2.51 12.55

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.08 0.24 9.19 2.38 11.89

304 a SINGLE SURFACE TREATMENT SM 0.50 4.16 44.05 12.18 60.89

304 b DOUBLE SURFACE TREATMENT SM 0.73 8.06 84.74 23.38 116.91

304 c TRIPLE SURFACE TREATMENT SM 1.23 11.08 101.53 28.46 142.30

304 d SEAL COAT SM 0.46 2.33 24.76 6.89 34.44

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 45.44 906.07 4,037.15 1,247.17 6,235.83

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 45.44 876.73 4,347.89 1,317.52 6,587.58

307 a DENSE GRADED HOT BIT-MAC CM 110.24 171.48 3,318.32 900.01 4,500.05

307 b OPEN GRADED HOT BIT-MAC CM 110.24 171.48 3,242.27 881.00 4,404.99

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.76 456.95 945.09 355.20 1,776.00

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 140.29 465.97 24,148.50 6,188.69 30,943.45

309 a COLD MILLING, 0 - 30 mm SM 0.61 16.87 7.54 6.26 31.28

309 b COLD MILLING, 0 - 50 mm SM 1.02 28.11 12.57 10.43 52.13

309 c COLD MILLING, 0 - 70 mm SM 1.54 42.16 18.85 15.64 78.19

401 ai CONCRETE CLASS "A3" (Underground) CM 355.69 643.62 3,266.03 1,066.34 5,331.68

401 aii CONCRETE CLASS "A3" (On ground) CM 355.69 643.62 3,474.93 1,118.56 5,592.80

401 aiii CONCRETE CLASS "A3" (Elevated) CM 355.69 643.62 3,892.73 1,223.01 6,115.05

401 b CONCRETE CLASS "B" CM 451.80 407.09 2,523.67 845.64 4,228.20

401 ci CONCRETE CLASS "C" (Underground) CM 349.63 258.76 2,967.08 893.87 4,469.34

401 cii CONCRETE CLASS "C" (On ground) CM 349.63 258.76 3,056.18 916.14 4,580.71

401 ciii CONCRETE CLASS "C" (Elevated) CM 349.63 258.76 3,234.37 960.69 4,803.45

401 d CONCRETE CLASS "D1" CM 557.86 810.64 4,124.66 1,373.29 6,866.45

401 e CONCRETE CLASS "Y" CM 783.77 258.76 3,539.80 1,145.58 5,727.91

401 f LEAN CONCRETE CM 293.16 252.12 2,065.93 652.80 3,264.01

Page 227: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 227 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,185.81 468.57 4,073.14 1,431.88 7,159.40

401 gii PRECAST CONCRETE CLASS "B" CM 1,185.81 468.57 3,696.50 1,337.72 6,688.60

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,077.00 - 42,567.98 10,911.25 54,556.23

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,077.00 - 44,667.98 11,436.25 57,181.23

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 880.76 2,335.68 37,345.45 10,140.47 50,702.36

405 aTON 1,963.83 6,882.66 80,762.49 22,402.25 112,011.23

405 b LAUNCHING OF GIRDER TON 46.52 403.69 - 112.55 562.76

406 aSM 78.30 - 185.62 65.98 329.90

406 b SM 78.30 - 194.33 68.16 340.79

406 c STEEL EXPANSION JOINTS KG 6.49 11.61 61.01 19.78 98.89

406 d WATER STOPS 6" SIZE M 64.47 - 309.53 93.50 467.50

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 28.48 - 1,411.59 360.02 1,800.09

406 g STEEL OR METAL BEARING DEVICES KG 13.67 30.66 81.36 31.42 157.11

407 d1M 249.61 847.08 555.25 412.99 2,064.93

407 d2M 374.41 1,270.62 832.87 619.48 3,097.38

407 d3M 374.41 1,270.62 637.51 570.64 2,853.18

407 d4M 624.02 2,117.70 787.52 882.31 4,411.55

407 d5M 534.88 1,815.17 733.94 771.00 3,854.99

407 d6M 936.03 3,176.55 1,026.59 1,284.79 6,423.96

407 h PILE LOAD TEST UP TO 120 TON EACH 14,181.84 19,990.40 69,433.80 25,901.51 129,507.55

407 i PILE LOAD TEST UP TO 240 TON EACH 28,537.92 19,990.40 138,867.60 46,848.98 234,244.90

407 j PILE LOAD TEST UP TO 360 TON EACH 42,528.24 19,990.40 208,301.40 67,705.01 338,525.05

407 k CONFIRMATORY BORING (NX SIZE) M 141.47 826.61 5.16 243.31 1,216.55

410 BRICK WORK CM 228.58 142.50 2,206.79 644.47 3,222.34

411 a STONE MASONRY RANDOM DRY CM 239.18 56.01 536.00 207.80 1,038.99

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 228: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 228 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 284.37 84.89 1,372.96 435.56 2,177.78

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 329.75 56.01 593.42 244.80 1,223.98

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 375.12 84.89 1,408.84 467.21 2,336.06

411 g ROLL POINTING SM 49.08 5.78 47.68 25.64 128.18

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 495.69 134.30 1,337.46 491.86 2,459.31

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 152.58 230.36 369.32 188.07 940.33

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 149.04 297.19 475.25 230.37 1,151.85

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 145.30 514.83 585.86 311.50 1,557.49

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 152.54 639.81 876.82 417.29 2,086.46

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 175.95 704.13 1,181.86 515.49 2,577.43

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 218.35 868.93 1,781.19 717.12 3,585.59

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 282.57 961.94 2,226.59 867.78 4,338.88

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 332.27 1,168.07 3,106.69 1,151.76 5,758.79

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 394.68 1,362.74 4,706.10 1,615.88 8,079.40

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 152.58 263.77 393.89 202.56 1,012.80

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 149.04 297.19 508.05 238.57 1,192.85

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 141.92 514.83 612.10 317.21 1,586.06

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 152.54 639.81 935.15 431.88 2,159.38

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 175.95 704.13 1,648.73 632.20 3,161.01

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 218.35 868.93 2,243.67 832.74 4,163.69

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 282.57 961.94 2,856.35 1,025.22 5,126.08

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 332.27 1,168.07 3,732.65 1,308.25 6,541.24

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 394.68 1,362.74 5,138.19 1,723.90 8,619.51

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 58.96 68.08 237.18 91.06 455.28

502 bCM 511.94 309.47 2,576.78 849.55 4,247.74

507 a STEEL WIRE MESH FOR GABIONS KG 3.63 - 77.80 20.36 101.79

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 229: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 229 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 64.23 - 436.72 125.24 626.19

508 a BRICK PAVING (SINGLE COURSE) SM 75.73 15.80 168.32 64.96 324.81

508 b BRICK PAVING (DOUBLE COURSE) SM 136.11 15.80 334.50 121.60 608.01

509 a RIP RAP CLASS "A" CM 328.60 - 464.63 198.31 991.54

509 b RIP RAP CLASS "B" CM 317.18 - 460.91 194.52 972.61

509 c RIP RAP CLASS "C" CM 319.70 - 464.63 196.08 980.41

509 d GROUTED RIP RAP CLASS "A" CM 366.12 35.09 1,565.32 491.63 2,458.16

509 e GROUTED RIP RAP CLASS "B" CM 353.65 28.07 1,447.62 457.34 2,286.68

509 f GROUTED RIP RAP CLASS "C" CM 349.39 23.39 1,474.19 461.74 2,308.71

509 gCM 536.72 181.56 2,934.51 913.20 4,565.99

509 h FILTER LAYER OF GRANULAR MATERIAL CM 32.48 115.89 297.79 111.54 557.70

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 74.18 194.57 - 67.19 335.94

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 102.67 35.01 75.50 53.30 266.48

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 131.42 44.81 96.64 68.22 341.09

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 167.72 91.01 264.28 130.75 653.76

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 209.65 113.77 330.35 163.44 817.21

603 BRICK EDGING M 5.94 - 26.88 8.21 41.03

605 a CONCRETE BEAM GUARDRAIL M 50.73 14.67 426.99 123.10 615.49

605 c CONCRETE POST FOR GUARDRAIL M 62.29 13.10 424.46 124.96 624.81

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 160.96 128.42 4,684.15 1,243.38 6,216.91

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 47.54 192.63 6,875.20 1,778.84 8,894.21

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 160.96 272.87 8,513.99 2,236.96 11,184.78

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 526.82 304.65 15,625.02 4,114.12 20,570.61

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 105.36 60.93 7,022.15 1,797.11 8,985.55

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,027.45 317.82 1,589.11

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,541.17 446.25 2,231.26

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 230: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 230 / 244

Rate Analysis Summary ( Construction)District (63) Sialkot

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.74 2.85 15.38 4.99 24.96

608 b2M 0.58 1.27 30.32 8.04 40.21

608 c1M 1.74 2.85 20.53 6.28 31.40

608 c2M 0.58 1.27 40.44 10.57 52.86

608 d1EACH 51.84 - 148.65 50.12 250.61

608 d2EACH 51.84 - 382.04 108.47 542.35

608 h1M 2.17 3.56 21.40 6.78 33.91

608 h2M 2.17 4.75 51.71 14.66 73.29

608 i1M 2.17 3.56 28.53 8.57 42.83

608 i2M 2.17 4.75 68.95 18.97 94.84

608 j1EACH 51.84 - 206.61 64.61 323.06

608 j2EACH 51.84 - 652.07 175.98 879.89

608 n1 EACH 42.73 - 99.10 35.46 177.29

608 n2 EACH 42.73 - 255.08 74.45 372.26

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 42.73 - 137.74 45.12 225.59

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 42.73 - 435.37 119.53 597.63

609 cEACH 6.33 46.68 167.72 55.18 275.91

609 dEACH 6.33 46.68 202.72 63.93 319.66

610 b RIGHT OF WAY MARKER EACH 69.98 60.88 216.30 86.79 433.95

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 434.77 476.40 1,462.48 593.41 2,967.06

610 d TEN KILOMETRE POST EACH 839.16 952.79 3,178.62 1,242.64 6,213.21

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 231: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 231 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.46 6.96 - 1.86 9.28

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.53 102.44 0.88 26.96 134.81

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 13.19 258.13 1.97 68.32 341.61

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 52.74 1,032.53 7.89 273.29 1,366.45

103 STRIPPING CM 1.53 59.42 - 15.24 76.19

104 COMPACTION OF NATURAL GROUND SM 0.22 5.92 0.62 1.69 8.45

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.54 86.79 - 22.33 111.66

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 76.72 193.76 46.20 79.17 395.85

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.87 214.84 - 56.43 282.14

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 7.13 167.12 - 43.56 217.81

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.08 78.63 - 20.18 100.89

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 76.72 193.76 46.20 79.17 395.85

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 12.22 199.88 - 53.03 265.13

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.47 167.24 - 43.18 215.89

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.26 89.04 0.31 23.40 117.01

107 bCM 38.79 165.86 53.31 64.49 322.45

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 67.88 258.51 30.80 89.30 446.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 57.80 193.04 - 62.71 313.55

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 34.91 160.37 - 48.82 244.10

107 d GRANULAR BACK FILL CM 21.41 83.07 320.73 106.30 531.51

107 e COMMON BACK FILL CM 16.26 37.31 4.13 14.43 72.13

108 aCM 4.24 106.71 4.13 28.77 143.85

108 biCM 12.52 302.97 48.81 91.08 455.38

108 biiCM 9.39 268.11 1.96 69.87 349.33

108 biiiCM 8.35 238.60 - 61.74 308.69

108 cCM 4.90 112.14 6.81 30.96 154.81

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 232: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 232 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.79 46.31 4.13 13.56 67.79

108 eCM 8.99 73.87 2.45 21.33 106.64

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.85 16.84 1.18 4.72 23.59

109 biSM 0.61 10.31 0.63 2.89 14.44

110 IMPROVED SUB-GRADE CM 6.16 75.50 50.73 33.10 165.49

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.52 9.38 0.64 2.64 13.18

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.77 9.92 0.74 2.86 14.29

201 GRANULAR SUB-BASE CM 4.96 106.91 443.36 138.81 694.04

202 AGGREGATE BASE CM 5.75 132.11 568.47 176.58 882.91

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 47.01 916.98 3,434.72 1,099.68 5,498.39

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 48.60 916.98 3,661.83 1,156.85 5,784.26

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 51.94 957.74 3,429.39 1,109.77 5,548.84

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 51.94 954.75 3,743.88 1,187.64 5,938.21

204 b CEMENT STABILIZED BASE CM 17.80 272.73 714.57 251.28 1,256.38

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 147.22 568.44 22,174.80 5,722.62 28,613.08

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 147.22 568.44 23,087.09 5,950.69 29,753.44

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 62.18 55.65 621.07 184.73 923.63

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 94.60 1,408.67 3,112.26 1,153.88 5,769.41

206 bCM 69.04 66.68 532.66 167.10 835.48

207 a DEEP PATCHING (0-15 cm) SM 1.05 30.14 1.02 8.05 40.26

207 b DEEP PATCHING (16-30 cm) SM 1.05 26.47 1.02 7.14 35.68

208 REINSTATEMENT OF ROAD SURFACE SM 1.12 37.00 0.45 9.64 48.21

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.21 70.82 0.55 18.15 90.73

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63 18.14

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.18 5.76 28.79

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 233: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 233 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.18 0.67 22.18 5.76 28.79

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.76 2.52 12.59

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.23 2.39 11.93

304 a SINGLE SURFACE TREATMENT SM 0.47 4.16 43.89 12.13 60.65

304 b DOUBLE SURFACE TREATMENT SM 0.69 8.06 83.99 23.19 115.93

304 c TRIPLE SURFACE TREATMENT SM 1.15 11.08 100.39 28.16 140.78

304 d SEAL COAT SM 0.44 2.33 24.81 6.90 34.48

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 43.90 906.07 4,008.88 1,239.71 6,198.56

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 43.90 876.73 4,321.89 1,310.63 6,553.15

307 a DENSE GRADED HOT BIT-MAC CM 107.62 171.48 3,302.16 895.32 4,476.58

307 b OPEN GRADED HOT BIT-MAC CM 107.62 171.48 3,211.77 872.72 4,363.59

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 18.24 456.95 935.45 352.66 1,763.30

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 130.59 465.97 24,250.50 6,211.77 31,058.83

309 a COLD MILLING, 0 - 30 mm SM 0.59 16.87 7.54 6.25 31.25

309 b COLD MILLING, 0 - 50 mm SM 0.98 28.11 12.57 10.42 52.08

309 c COLD MILLING, 0 - 70 mm SM 1.47 42.16 18.85 15.62 78.10

401 ai CONCRETE CLASS "A3" (Underground) CM 316.28 643.62 3,251.09 1,052.75 5,263.74

401 aii CONCRETE CLASS "A3" (On ground) CM 316.28 643.62 3,459.99 1,104.97 5,524.86

401 aiii CONCRETE CLASS "A3" (Elevated) CM 316.28 643.62 3,877.79 1,209.42 6,047.11

401 b CONCRETE CLASS "B" CM 414.70 407.09 2,470.28 823.02 4,115.09

401 ci CONCRETE CLASS "C" (Underground) CM 313.89 258.76 2,926.64 874.82 4,374.11

401 cii CONCRETE CLASS "C" (On ground) CM 313.89 258.76 3,015.73 897.10 4,485.48

401 ciii CONCRETE CLASS "C" (Elevated) CM 313.89 258.76 3,193.93 941.65 4,708.23

401 d CONCRETE CLASS "D1" CM 488.52 810.64 4,134.63 1,358.45 6,792.24

401 e CONCRETE CLASS "Y" CM 685.24 258.76 3,543.96 1,121.99 5,609.95

401 f LEAN CONCRETE CM 276.78 252.12 2,002.23 632.78 3,163.91

Page 234: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 234 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,075.73 468.57 4,054.52 1,399.71 6,998.53

401 gii PRECAST CONCRETE CLASS "B" CM 1,075.73 468.57 3,639.34 1,295.91 6,479.55

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 941.33 - 42,566.31 10,876.91 54,384.55

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 941.33 - 44,666.31 11,401.91 57,009.55

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 781.65 2,335.68 37,173.38 10,072.68 50,363.39

405 aTON 1,727.23 6,882.66 80,776.33 22,346.56 111,732.78

405 b LAUNCHING OF GIRDER TON 40.66 403.69 - 111.09 555.44

406 aSM 70.63 - 188.94 64.89 324.46

406 b SM 70.63 - 197.66 67.07 335.36

406 c STEEL EXPANSION JOINTS KG 5.84 11.61 60.75 19.55 97.75

406 d WATER STOPS 6" SIZE M 57.89 - 308.65 91.64 458.18

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 25.03 - 1,412.64 359.42 1,797.09

406 g STEEL OR METAL BEARING DEVICES KG 13.00 30.66 81.13 31.20 155.99

407 d1M 217.62 847.08 559.70 406.10 2,030.50

407 d2M 326.43 1,270.62 839.55 609.15 3,045.75

407 d3M 326.43 1,270.62 644.19 560.31 2,801.55

407 d4M 544.06 2,117.70 798.64 865.10 4,325.50

407 d5M 466.33 1,815.17 743.48 756.25 3,781.23

407 d6M 816.09 3,176.55 1,043.28 1,258.98 6,294.90

407 h PILE LOAD TEST UP TO 120 TON EACH 14,037.18 19,990.40 72,541.08 26,642.17 133,210.83

407 i PILE LOAD TEST UP TO 240 TON EACH 28,342.38 19,990.40 145,082.16 48,353.74 241,768.68

407 j PILE LOAD TEST UP TO 360 TON EACH 42,383.58 19,990.40 217,623.24 69,999.31 349,996.53

407 k CONFIRMATORY BORING (NX SIZE) M 130.03 826.61 5.16 240.45 1,202.25

410 BRICK WORK CM 202.88 142.50 2,093.94 609.83 3,049.15

411 a STONE MASONRY RANDOM DRY CM 213.88 56.01 434.38 176.07 880.34

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 235: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 235 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 256.04 84.89 1,252.82 398.44 1,992.19

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 295.34 56.01 483.67 208.76 1,043.78

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 334.64 84.89 1,288.35 426.97 2,134.85

411 g ROLL POINTING SM 42.96 5.78 47.51 24.06 120.31

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 446.10 134.30 1,216.97 449.34 2,246.71

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 147.52 230.36 369.03 186.73 933.64

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 144.23 297.19 474.89 229.08 1,145.39

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 138.90 514.83 585.37 309.78 1,548.88

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 146.73 639.81 876.29 415.71 2,078.54

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 169.44 704.13 1,181.33 513.73 2,568.63

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 209.39 868.93 1,780.49 714.70 3,573.51

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 270.97 961.94 2,226.05 864.74 4,323.70

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 320.35 1,168.07 3,106.04 1,148.62 5,743.08

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 378.25 1,362.74 4,705.34 1,611.58 8,057.91

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 147.52 263.77 392.49 200.95 1,004.73

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 144.23 297.19 507.69 237.28 1,186.39

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 135.53 514.83 611.61 315.49 1,577.46

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 146.73 639.81 934.70 430.31 2,151.55

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 169.44 704.13 1,648.31 630.47 3,152.35

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 209.39 868.93 2,242.97 830.32 4,151.61

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 270.97 961.94 2,855.81 1,022.18 5,110.90

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 320.35 1,168.07 3,732.00 1,305.11 6,525.53

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 378.25 1,362.74 5,137.43 1,719.61 8,598.03

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 57.44 68.08 279.55 101.27 506.34

502 bCM 465.47 309.47 2,524.95 824.97 4,124.86

507 a STEEL WIRE MESH FOR GABIONS KG 3.30 - 75.81 19.78 98.89

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 236: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 236 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 63.05 - 452.28 128.83 644.16

508 a BRICK PAVING (SINGLE COURSE) SM 69.00 15.80 158.79 60.90 304.49

508 b BRICK PAVING (DOUBLE COURSE) SM 123.30 15.80 315.08 113.55 567.73

509 a RIP RAP CLASS "A" CM 296.09 - 363.00 164.77 823.86

509 b RIP RAP CLASS "B" CM 286.31 - 360.10 161.60 808.01

509 c RIP RAP CLASS "C" CM 287.90 - 363.00 162.73 813.63

509 d GROUTED RIP RAP CLASS "A" CM 309.75 35.09 1,440.09 446.23 2,231.16

509 e GROUTED RIP RAP CLASS "B" CM 298.56 28.07 1,325.56 413.05 2,065.24

509 f GROUTED RIP RAP CLASS "C" CM 294.71 23.39 1,352.86 417.74 2,088.70

509 gCM 494.23 181.56 2,901.46 894.31 4,471.56

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.63 115.89 320.82 117.09 585.43

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 68.16 194.57 - 65.68 328.41

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 93.50 35.01 58.99 46.88 234.38

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 119.68 44.81 75.50 60.00 299.99

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 151.12 91.01 249.36 122.87 614.36

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 188.90 113.77 311.70 153.59 767.96

603 BRICK EDGING M 5.51 - 24.96 7.62 38.09

605 a CONCRETE BEAM GUARDRAIL M 47.70 14.67 426.62 122.25 611.24

605 c CONCRETE POST FOR GUARDRAIL M 58.57 13.10 424.04 123.93 619.64

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 149.65 128.42 4,689.00 1,241.77 6,208.84

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 42.98 192.63 6,874.68 1,777.57 8,887.86

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 149.65 272.87 8,514.67 2,234.30 11,171.49

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 503.78 304.65 15,630.44 4,109.72 20,548.59

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 100.76 60.93 7,028.54 1,797.56 8,987.79

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.04 318.22 1,591.10

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,543.56 446.85 2,234.25

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 237: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 237 / 244

Rate Analysis Summary ( Construction)District (69) Toba Tek Singh

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.51 2.85 15.40 4.94 24.70

608 b2M 0.50 1.27 30.41 8.05 40.23

608 c1M 1.51 2.85 20.54 6.23 31.13

608 c2M 0.50 1.27 40.55 10.58 52.90

608 d1EACH 42.45 - 148.76 47.80 239.01

608 d2EACH 42.45 - 383.17 106.41 532.03

608 h1M 1.89 3.56 21.41 6.72 33.58

608 h2M 1.89 4.75 51.71 14.59 72.94

608 i1M 1.89 3.56 28.55 8.50 42.50

608 i2M 1.89 4.75 68.95 18.90 94.49

608 j1EACH 42.45 - 206.72 62.29 311.46

608 j2EACH 42.45 - 652.07 173.63 868.15

608 n1 EACH 35.15 - 99.17 33.58 167.90

608 n2 EACH 35.15 - 255.83 72.75 363.73

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 35.15 - 137.81 43.24 216.20

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 35.15 - 435.37 117.63 588.15

609 cEACH 5.57 46.68 188.79 60.26 301.30

609 dEACH 5.57 46.68 224.79 69.26 346.30

610 b RIGHT OF WAY MARKER EACH 67.50 60.88 215.88 86.07 430.33

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 397.83 476.40 1,451.69 581.48 2,907.40

610 d TEN KILOMETRE POST EACH 771.35 952.79 3,171.50 1,223.91 6,119.55

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

Page 238: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 238 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

101 CLEARING AND GRUBBING SM 0.45 6.96 - 1.85 9.26

102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 4.41 102.44 0.88 26.93 134.66

102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 12.92 258.13 1.97 68.26 341.28

102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 51.66 1,032.53 7.89 273.02 1,365.10

103 STRIPPING CM 1.51 59.42 - 15.23 76.16

104 COMPACTION OF NATURAL GROUND SM 0.21 5.92 0.62 1.69 8.44

106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 2.36 86.79 - 22.29 111.44

106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 73.50 193.76 46.20 78.37 391.83

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 10.59 214.84 - 56.36 281.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 6.97 167.12 - 43.52 217.61

106 c EXCAVATE SURPLUS COMMON MATERIAL CM 1.93 78.63 - 20.14 100.70

106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 73.50 193.76 46.20 78.37 391.83

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 11.67 199.88 - 52.89 264.44

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 5.34 167.24 - 43.15 215.73

107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 4.09 89.04 0.31 23.36 116.80

107 bCM 40.21 165.86 53.31 64.85 324.23

107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 64.86 258.51 30.80 88.54 442.71

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 55.33 193.04 - 62.09 310.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 33.35 160.37 - 48.43 242.15

107 d GRANULAR BACK FILL CM 20.69 83.07 318.22 105.50 527.48

107 e COMMON BACK FILL CM 16.03 37.31 4.13 14.37 71.84

108 aCM 4.11 106.71 4.13 28.74 143.69

108 biCM 12.20 302.97 48.81 91.00 454.98

108 biiCM 9.15 268.11 1.96 69.81 349.03

108 biiiCM 8.13 238.60 - 61.68 308.41

108 cCM 4.78 112.14 6.81 30.93 154.66

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK MATERIAL

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK MATERIAL

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

Page 239: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 239 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

108 dCM 3.70 46.31 4.13 13.54 67.68

108 eCM 8.82 73.87 2.45 21.29 106.43

109 a SUB GRADE PREPARATION IN EARTH CUT SM 0.82 16.84 1.18 4.71 23.55

109 biSM 0.59 10.31 0.63 2.88 14.41

110 IMPROVED SUB-GRADE CM 5.98 75.50 51.11 33.15 165.74

114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.51 9.38 0.64 2.63 13.16

114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.76 9.92 0.74 2.86 14.28

201 GRANULAR SUB-BASE CM 4.81 106.91 534.38 161.53 807.63

202 AGGREGATE BASE CM 5.44 132.11 650.41 196.99 984.95

203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 46.10 916.98 3,532.31 1,123.85 5,619.24

203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 47.57 916.98 3,755.33 1,179.97 5,899.85

203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 51.00 957.74 3,527.04 1,133.95 5,669.73

203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 51.00 954.75 3,837.45 1,210.80 6,054.00

204 b CEMENT STABILIZED BASE CM 16.95 272.73 808.96 274.66 1,373.30

204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 143.55 568.44 22,378.80 5,772.70 28,863.49

204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 143.55 568.44 23,294.10 6,001.52 30,007.61

205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 61.87 55.65 687.30 201.21 1,006.03

205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 92.32 1,408.67 3,204.18 1,176.29 5,881.46

206 bCM 68.61 66.68 620.49 188.95 944.73

207 a DEEP PATCHING (0-15 cm) SM 1.03 30.14 1.02 8.05 40.24

207 b DEEP PATCHING (16-30 cm) SM 1.03 26.47 1.02 7.13 35.65

208 REINSTATEMENT OF ROAD SURFACE SM 1.06 37.00 0.45 9.63 48.14

209 a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.19 70.82 0.55 18.14 90.70

209 b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.24 14.16 0.11 3.63 18.14

302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.39 5.81 29.04

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON MATERIAL

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF ROCK MATERIAL

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

Page 240: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 240 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.17 0.67 22.39 5.81 29.04

303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.84 2.54 12.69

303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.07 0.24 9.32 2.41 12.04

304 a SINGLE SURFACE TREATMENT SM 0.45 4.16 44.75 12.34 61.70

304 b DOUBLE SURFACE TREATMENT SM 0.65 8.06 86.01 23.68 118.40

304 c TRIPLE SURFACE TREATMENT SM 1.10 11.08 103.07 28.81 144.06

304 d SEAL COAT SM 0.41 2.33 25.21 6.99 34.94

305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 42.83 906.07 4,109.24 1,264.54 6,322.68

305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 42.83 876.73 4,429.00 1,337.14 6,685.70

307 a DENSE GRADED HOT BIT-MAC CM 104.99 171.48 3,396.43 918.23 4,591.13

307 b OPEN GRADED HOT BIT-MAC CM 104.99 171.48 3,301.67 894.54 4,472.68

308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 17.72 456.95 952.29 356.74 1,783.70

308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 128.19 465.97 24,454.50 6,262.17 31,310.83

309 a COLD MILLING, 0 - 30 mm SM 0.56 16.87 7.54 6.24 31.21

309 b COLD MILLING, 0 - 50 mm SM 0.93 28.11 12.57 10.40 52.01

309 c COLD MILLING, 0 - 70 mm SM 1.39 42.16 18.85 15.60 78.00

401 ai CONCRETE CLASS "A3" (Underground) CM 341.16 643.62 3,235.26 1,055.01 5,275.05

401 aii CONCRETE CLASS "A3" (On ground) CM 341.16 643.62 3,444.16 1,107.24 5,536.18

401 aiii CONCRETE CLASS "A3" (Elevated) CM 341.16 643.62 3,861.96 1,211.69 6,058.43

401 b CONCRETE CLASS "B" CM 428.21 407.09 2,453.66 822.24 4,111.20

401 ci CONCRETE CLASS "C" (Underground) CM 339.41 258.76 2,920.02 879.55 4,397.74

401 cii CONCRETE CLASS "C" (On ground) CM 339.41 258.76 3,009.11 901.82 4,509.10

401 ciii CONCRETE CLASS "C" (Elevated) CM 339.41 258.76 3,187.31 946.37 4,731.85

401 d CONCRETE CLASS "D1" CM 542.31 810.64 4,105.08 1,364.51 6,822.54

401 e CONCRETE CLASS "Y" CM 768.10 258.76 3,525.59 1,138.11 5,690.56

401 f LEAN CONCRETE CM 285.72 252.12 1,991.32 632.29 3,161.45

Page 241: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 241 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

401 gi PRECAST CONCRETE CLASS "A" CM 1,161.76 468.57 4,040.32 1,417.66 7,088.31

401 gii PRECAST CONCRETE CLASS "B" CM 1,161.76 468.57 3,627.36 1,314.42 6,572.11

404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,041.01 - 42,565.73 10,901.69 54,508.43

404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,041.01 - 44,665.73 11,426.69 57,133.43

404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 849.22 2,335.68 37,113.46 10,074.59 50,372.95

405 aTON 1,659.16 6,882.66 80,762.90 22,326.18 111,630.90

405 b LAUNCHING OF GIRDER TON 39.24 403.69 - 110.73 553.66

406 aSM 76.04 - 189.97 66.50 332.51

406 b SM 76.04 - 198.69 68.68 343.41

406 c STEEL EXPANSION JOINTS KG 6.32 11.61 60.61 19.64 98.18

406 d WATER STOPS 6" SIZE M 63.08 - 308.57 92.91 464.56

406 eccm 0.01 - 1.22 0.31 1.54

406 f ASPHALT FELT (3 PLY) SM 27.47 - 1,413.07 360.14 1,800.68

406 g STEEL OR METAL BEARING DEVICES KG 12.97 30.66 81.01 31.16 155.80

407 d1M 211.68 847.08 552.71 402.87 2,014.34

407 d2M 317.52 1,270.62 829.07 604.30 3,021.51

407 d3M 317.52 1,270.62 633.71 555.46 2,777.31

407 d4M 529.21 2,117.70 781.18 857.02 4,285.11

407 d5M 453.61 1,815.17 728.51 749.32 3,746.61

407 d6M 793.81 3,176.55 1,017.09 1,246.86 6,234.31

407 h PILE LOAD TEST UP TO 120 TON EACH 13,892.04 19,990.40 67,879.72 25,440.54 127,202.70

407 i PILE LOAD TEST UP TO 240 TON EACH 28,296.84 19,990.40 135,759.44 46,011.67 230,058.35

407 j PILE LOAD TEST UP TO 360 TON EACH 42,238.44 19,990.40 203,639.16 66,467.00 332,335.00

407 k CONFIRMATORY BORING (NX SIZE) M 127.95 826.61 5.16 239.93 1,199.65

410 BRICK WORK CM 225.12 142.50 1,856.90 556.13 2,780.65

411 a STONE MASONRY RANDOM DRY CM 234.16 56.01 634.45 231.16 1,155.78

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

Page 242: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 242 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

411 b STONE MASONRY RANDOM WITH MORTAR CM 279.16 84.89 1,407.99 443.01 2,215.05

411 c STONE MASONRY DRESSED UNCOURSED DRY CM 324.16 56.01 699.75 269.98 1,349.90

411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 369.16 84.89 1,468.95 480.75 2,403.75

411 g ROLL POINTING SM 48.61 5.78 46.68 25.27 126.34

412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 489.16 134.30 1,397.57 505.26 2,526.29

501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 149.44 230.36 367.46 186.82 934.08

501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 146.40 297.19 473.01 229.15 1,145.75

501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 140.58 514.83 583.22 309.66 1,548.29

501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 148.26 639.81 873.76 415.46 2,077.29

501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 170.27 704.13 1,178.80 513.30 2,566.50

501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 210.43 868.93 1,776.79 714.04 3,570.19

501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 272.33 961.94 2,222.28 864.14 4,320.69

501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 319.97 1,168.07 3,101.45 1,147.37 5,736.86

501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 380.17 1,362.74 4,700.00 1,610.73 8,053.64

501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 149.44 263.77 389.82 200.76 1,003.79

501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 146.40 297.19 505.81 237.35 1,186.75

501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 137.21 514.83 609.46 315.38 1,576.88

501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 148.26 639.81 932.75 430.21 2,151.03

501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 170.27 704.13 1,645.40 629.95 3,149.75

501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 210.43 868.93 2,239.27 829.66 4,148.29

501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 272.33 961.94 2,852.04 1,021.58 5,107.89

501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 319.97 1,168.07 3,727.42 1,303.87 6,519.33

501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 380.17 1,362.74 5,132.08 1,718.75 8,593.74

502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 56.65 68.08 215.99 85.18 425.90

502 bCM 489.23 309.47 2,507.44 826.54 4,132.68

507 a STEEL WIRE MESH FOR GABIONS KG 3.46 - 77.80 20.32 101.58

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

Page 243: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 243 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

507 b ROCK FILL IN GABIONS CM 62.60 - 445.94 127.14 635.68

508 a BRICK PAVING (SINGLE COURSE) SM 74.47 15.80 133.54 55.95 279.76

508 b BRICK PAVING (DOUBLE COURSE) SM 134.47 15.80 265.11 103.85 519.23

509 a RIP RAP CLASS "A" CM 323.51 - 563.08 221.65 1,108.24

509 b RIP RAP CLASS "B" CM 312.81 - 558.57 217.85 1,089.23

509 c RIP RAP CLASS "C" CM 315.67 - 563.08 219.69 1,098.44

509 d GROUTED RIP RAP CLASS "A" CM 341.50 35.09 1,569.52 486.53 2,432.64

509 e GROUTED RIP RAP CLASS "B" CM 329.90 28.07 1,460.77 454.69 2,273.43

509 f GROUTED RIP RAP CLASS "C" CM 326.22 23.39 1,485.98 458.90 2,294.49

509 gCM 526.08 181.56 2,875.87 895.88 4,479.39

509 h FILTER LAYER OF GRANULAR MATERIAL CM 31.45 115.89 317.92 116.32 581.58

510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 67.15 194.57 - 65.43 327.15

511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 100.41 35.01 91.50 56.73 283.65

511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 128.52 44.81 117.12 72.61 363.06

511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 164.52 91.01 269.05 131.15 655.73

511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 205.65 113.77 336.32 163.94 819.68

603 BRICK EDGING M 5.78 - 21.12 6.73 33.63

605 a CONCRETE BEAM GUARDRAIL M 50.14 14.67 426.18 122.75 613.74

605 c CONCRETE POST FOR GUARDRAIL M 61.56 13.10 423.48 124.54 622.68

607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 155.48 128.42 4,692.23 1,244.03 6,220.16

607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 46.50 192.63 6,871.94 1,777.77 8,888.84

607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 155.48 272.87 8,507.58 2,233.98 11,169.91

607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 518.22 304.65 15,620.93 4,110.95 20,554.75

607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 103.64 60.93 7,027.98 1,798.14 8,990.69

607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,029.44 318.32 1,591.60

607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,544.16 447.00 2,235.00

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

Page 244: Nha Csr Punjab - 2005

General Revision- IVCSR - 2005

Page 244 / 244

Rate Analysis Summary ( Construction)District (71) Vehari

CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE

National Highway Authority Islamabad

Quantity Surveying &Estimation Specialist, NHA

608 b1M 1.60 2.85 15.40 4.96 24.81

608 b2M 0.53 1.27 30.43 8.06 40.29

608 c1M 1.60 2.85 20.55 6.25 31.25

608 c2M 0.53 1.27 40.58 10.60 52.98

608 d1EACH 46.49 - 148.79 48.82 244.10

608 d2EACH 46.49 - 383.43 107.48 537.40

608 h1M 1.99 3.56 21.41 6.74 33.70

608 h2M 1.99 4.75 51.71 14.61 73.06

608 i1M 1.99 3.56 28.55 8.53 42.63

608 i2M 1.99 4.75 68.95 18.92 94.61

608 j1EACH 46.49 - 206.75 63.31 316.55

608 j2EACH 46.49 - 652.07 174.64 873.20

608 n1 EACH 38.39 - 99.19 34.40 171.98

608 n2 EACH 38.39 - 256.01 73.60 368.00

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 38.39 - 137.83 44.06 220.28

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 38.39 - 435.37 118.44 592.20

609 cEACH 6.09 46.68 167.66 55.11 275.54

609 dEACH 6.09 46.68 202.66 63.86 319.29

610 b RIGHT OF WAY MARKER EACH 69.11 60.88 215.38 86.34 431.71

610 c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 427.81 476.40 1,450.16 588.59 2,942.96

610 d TEN KILOMETRE POST EACH 825.61 952.79 3,163.34 1,235.44 6,177.18

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)