_________________________________________________________________________ NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT ADVERTISING SCHEDULE FEDERAL FISCAL YEARS 2020-2021 May 2020 _________________________________________________________________________

Transcript of NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal...

Page 1: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

_________________________________________________________________________

NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT

ADVERTISING SCHEDULE

FEDERAL FISCAL YEARS

2020-2021

May 2020

_________________________________________________________________________

Page 2: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

Project Previous Ad Date Revised Ad Date Explanation

Conway 25103 April 7, 2020 April 14, 2020More time for Project Development (Bridge Design) to

obtain environmental permits.

Derry-Londonderry 13065 April 23, 2020 May 12, 2020More time for Project Development (Highway Design)

for preparation of the Design-Build Final RFP.

Milford-Amherst 43031 September 22, 2020New project added by Project Development (Highway

Design) from Pave T-2 Resurfacing Program.

Central Turnpike Paving 41821 February 4, 2020 October 27, 2020 Project re-advertised by Turnpikes due to no prior bids.

Eastern Turnpike Paving 41822 February 4, 2020 October 27, 2020 Project re-scoped and advertised by Turnpikes.

Hillsborough-Henniker-Hopkinton

42864April 8, 2020 November 3, 2020

More time for Project Development (Highway Design)

to realign with federal funding constraints.

Bethlehem-Carroll/Wentworth 42780 November 17, 2020Project advanced by Project Development (Highway

Design) within Pave T-2 Resurfacing Program.

Conway (BWC) 42845 November 17, 2020Project advanced by Project Development (Highway

Design) within Pave T-2 Resurfacing Program.

Gorham/Cambridge/Errol 42778 November 17, 2020Project advanced by Project Development (Highway

Design) within Pave T-2 Resurfacing Program.

Advertisement Schedule Changes for NHDOT Managed Projects

from April 2020 to March 2021

Page 3: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 1 of 11

Fiscal Year

2020

I-93 Exit 1 to Exit 5 - Construct 4th lane northbound and southbound[NON-PAR (other), Other Fed Aid, TIFIA]

US3 & NH26 Resurfacing of various Tier 2 roadways in the Northern region for Maintenance & Preservation

[Pave-T2-Resurf]

US 202 & NH101 & NH12 Resurfacing of various Tier 2 roadways in the Southwest region for Maintenance & Preservation.

[Pave-T2-Resurf]

NH 16 Reconstruct railway-highway crossing, roadway approaches & protective devices (Wakefield054-237Y)[RR-RCS *]

Various Replace cable guardrail in Districts 1 &3 (East).[HSIP *]

NH28 Bridge Preservation efforts for NH28 over NHRR in Ossipee (Br. No. 194/146).[BET-BMT-BD, NON-PAR (dot)]

Various Replace cable guardrail and F terminal units on Tier 2 and 3 roads in Districts 4 & 5.[HSIP *]

Various Tier 2 South Resurfacing of various Tier 2 roadways in the Southwest region for Maintenance & Preservation

[NON-PAR (other), Pave-T2-Resurf]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

SALEM TO MANCHESTER 14633J A004(438)

STATEWIDE TIER 2 (N) RESURFACING 42291 X-A004(806)

STATEWIDE TIER 2 (SW) RESURFACING 42289 X-A004(804)

WAKEFIELD 42240 X-A004(793)

STATEWIDE 41909 X-A004(776)

OSSIPEE 41916

STATEWIDE 41899 X-A004(769)

STATEWIDE TIER 2 (S) RESURFACING 42293 X-A004(808)

Project Name / Number

October Monthly Total

$6,839,200

$1,807,700

$2,831,800

$939,800

$1,040,900

$539,800

$839,200

$5,362,500

$4,103,500

$1,807,700

$2,831,800

$939,800

$1,040,900

$0

$839,200

$5,362,500

01-Oct-19

01-Oct-19

01-Oct-19

08-Oct-19

22-Oct-19

29-Oct-19

29-Oct-19

05-Nov-19

$14,838,400 $11,562,900

NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT

ADVERTISING SCHEDULE

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

October 2019

November 2019

Contact Person: Wendy Johnson

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Melodie Esterberg

Contact Person: Kirk Mudgett

Contact Person: David Scott

Contact Person: Kirk Mudgett

Contact Person: Ronald Grandmaison

Page 4: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 2 of 11

Fiscal Year

2020

Various Tier 2 Southeast Resurfacing of various Tier 2 roadways in the Southeast region for Maintenance & Preservation.[NON-PAR (other), Pave-T2-Resurf]

US302,NH 10 Preservation efforts on 5-span bridge carrying US302,NH 10 over I-93 (Littleton 187/065). [Bridg-T1-2-Main-Pres]

US4/NH10/NH12A Resurfacing various Tier 2 roadways in District 2.

[NON-PAR (other), Pave-T2-Resurf]

US Route 4 and Tremont Street Bridge Pres for US4 over River Rd,NHRR(ABD)(139/040) & for Tremont St over Contoocook Riv (131/035)[BET-BMT-BD, NON-PAR (dot)]

I-93, I-89, and I-393 Resurfacing I-93 MM 38.5 to 44.0; I-89 MM 8.2 to MM 13.6, and crack sealing along I393 & I93

[Pave-T1-Resurf, Pave-T2-Resurf]

US 3 & I-93 Preservation work on Plymouth 142/145, & Campton 105/058 and 104/059.[Bridg-T1-2-Main-Pres]

I-93 Repair of a 48" CMP culvert at MM 35.2 under I-93/I-89 CD road[TRR *]

NH Route 101 Pavement preservation from MM 115.2 to MM 124.6 including ramps from Exit 6 through Exit 9 [GRR *, Pave-T1-Resurf]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

STATEWIDE TIER 2 (SE) RESURFACING 42292 X-A004(807)

LITTLETON 42376 X-A004(831)

STATEWIDE TIER 2 (W) RESURFACING 42272 X-A004(829)

BOSCAWEN 42440

CONCORD / HOPKINTON 41906 X-A004(775)

PLYMOUTH-CAMPTON 42364 X-A004(824)

BOW 42300

EPPING-EXETER 41790 X-A004(851)

Project Name / Number

First Quarter Total

November Monthly Total

December Monthly Total

$3,785,700

$1,267,700

$2,123,500

$1,647,600

$7,791,200

$1,729,100

$289,700

$6,981,500

$3,785,700

$1,267,700

$2,123,500

$0

$7,791,200

$1,729,100

$0

$6,981,500

12-Nov-19

19-Nov-19

19-Nov-19

26-Nov-19

26-Nov-19

26-Nov-19

07-Jan-20

07-Jan-20

$23,707,300

$0

$22,059,700

$0

$38,545,700 $33,622,600

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

November 2019

December 2019

January 2020

Contact Person: Ronald Grandmaison

Contact Person: Joseph Adams

Contact Person: Ronald Grandmaison

Contact Person: David Scott

Contact Person: Ronald Grandmaison

Contact Person: Joseph Adams

Contact Person: Kirk Mudgett

Contact Person: Ronald Grandmaison

Page 5: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 3 of 11

Fiscal Year

2020

NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107, 1/2 mi north of US 4.[BET-DRG-HQ, NON-PAR (dot)]

I-89 NB & SB Superstructure Replace & Widening, I-89 NB & SB over Connecticut River (Br No 044/103 & 044/104)[Bridg-HIB-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]

Statewide Statewide Striping (Turnpikes)[TRR *]

Various Replace cable guardrail and F terminal units on Tier 2 and 3 roads[HSIP *]

Various Resurfacing various tier 2, 3, and 4 roadways in District 1.

[BET-RL-1, BET-RL-HQ, NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Rehab, Pave-T3-4-Resurf]

Various Resurfacing various Tier 2, 3, and 4 roadways in District 1.

[BET-RL-1, BET-RL-HQ, NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 2.

[NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various Tier 2, 3, and 4 roadways in District 2.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 3.

[BET-RL-3, BET-RL-HQ, Pave-T2-Resurf, Pave-T3-4-Resurf]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

NORTHWOOD 42363

LEBANON, NH - HARTFORD, VT 16148 A001(154)

STATEWIDE STRIPING (TURNPIKES) 41823

STATEWIDE 41897 X-A004(767)

DISTRICT 1 16161I

DISTRICT 1 42318

DISTRICT 2 16162I

DISTRICT 2 2020 42319

DISTRICT 3 16163I

Project Name / Number

January Monthly Total

$441,000

$43,166,900

$908,900

$1,298,200

$2,931,400

$2,202,800

$2,082,200

$2,914,100

$2,278,900

$0

$26,637,000

$0

$1,298,200

$0

$0

$0

$0

$0

14-Jan-20

21-Jan-20

21-Jan-20

28-Jan-20

04-Feb-20

04-Feb-20

04-Feb-20

04-Feb-20

04-Feb-20

$53,086,200 $34,916,700

low-bid

low-bid

low-bid

low-bid

low-bid

low-bid

January 2020

February 2020

Contact Person: Kirk Mudgett

Contact Person: Joseph Adams

Contact Person: Nancy Spaulding

Contact Person: Kirk Mudgett

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Page 6: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 4 of 11

Fiscal Year

2020

Various Resurfacing various tier 2, 3, and 4 roadways in District 4.

[BET-RL-4, BET-RL-HQ, NON-PAR (dot), Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 5.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 6.

[BET-RL-6, BET-RL-HQ, Pave-T2-Resurf, Pave-T3-4-Resurf]

Statewide Statewide Bridge Washing Contract - Tier 1 Roads[NON-PAR (dot)]

NH Route 112 Replacement of corten guardrail on NH Route 112 in Woodstock.[GRR *]

Statewide - North Northern State Bridge Washing Contract - Tier 1 roads[NON-PAR (dot)]

NH 16 Repair failed roadway slope along NH 16 abutting the Magalloway River[BET-DRG-HQ, FLAP, NON-PAR (dot)]

NH 102 Redrill Child salted well[WELLS]

NH 127 Replace Frye salted well[WELLS]

NH 77 Replace salted Lacroix well.[WELLS]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

DISTRICT 4 16164I

DISTRICT 5 16165I

DISTRICT 6 16166I

BRIDGE WASHING 42939

WOODSTOCK 42576 X-A004(917)

BRIDGE WASHING 42997

ERROL 41069 X-A004(565)

CHESTER 42597B

HOPKINTON 42597D

WEARE 42597C

Project Name / Number

February Monthly Total

$3,964,700

$2,582,300

$5,117,100

$465,000

$1,015,700

$744,000

$883,500

$25,400

$19,800

$20,700

$0

$0

$0

$0

$1,015,700

$0

$0

$0

$0

$0

04-Feb-20

04-Feb-20

04-Feb-20

18-Feb-20

18-Feb-20

25-Feb-20

25-Feb-20

03-Mar-20

03-Mar-20

03-Mar-20

$27,181,700 $1,015,700

low-bid

low-bid

February 2020

March 2020

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Steve Johnson (Br Maint)

Contact Person: Kirk Mudgett

Contact Person: Steve Johnson (Br Maint)

Contact Person: Tobey Reynolds

Contact Person: Victoria Chase

Contact Person: Victoria Chase

Contact Person: Victoria Chase

Page 7: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 5 of 11

Fiscal Year

2020

Rehab Queen City Bridge over I-293, BMRR & Merrimack River BRIDGE REHABILITATION-QUEEN CITY BR. OVER I-293, BMRR & MERRIMACK RIVER-BR. #151/065 (MOBRR)[SAB *]

Various Roadway preservation (Chip Seal) on Various roadways.[Pave-T3-4-Resurf]

NH 175, NH 49, & Tripoli Rd PMRAP and resurfacing on NH 175 and resurfacing of NH 49 and Tripoli Rd.[BET-RL-3, BET-RL-HQ, Pave-T3-4-Rehab, Pave-T3-4-Resurf]

NH 11 NH 11 corridor safety improvements andresurfacing[HSIP *, Pave-T2-Resurf]

Dover Community Trail Const multi-use path to connect 2 portions of the Dover Community Trail, which are gaps (14-27TAP)[NON-PAR (other), TA *]

I-95, I-93, I-293, FEET and NH 16 Replacement and repair of guardrail systems along the Turnpike facilities[TRR *]

Pavement Markings Pavement Marking Maintenance via Contractor. Limited to Stenciled and Transverse Markings[BET-STAL-HQ]

Blue Star, FEET & Spaulding Turnpike, I-93, Rt 101 Central, Eastern Turnpikes, I-93 and Rt. 101 guardail repair on as needed basis.[BET-STAL-HQ, NON-PAR (dot), NON-PAR (other)]

NH Rte 106 NH Rte 106 Roadway Widening (3.6 mi, Phase II) from Soucook Road, Loudon to Ames Road, Canterbury [None-Highway]

US Route 2 Rehab or replacement of a 50 ft long, 72" cmp/60" cmp/5'x8' box culvert carrying Kidder Brook.[CRDR *]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

MANCHESTER 28336 X-A003(718)(LPA)

DISTRICT 5 CHIP SEAL 2020 42438

HOLDERNESS-WATERVILLE VALLEY PMRAP 42786

ROCHESTER-FARMINGTON 42243 X-A004(795)

DOVER 40437 X-A004(407)(LPA)

STATEWIDE GUARDRAIL 41939

STATEWIDE PAVEMENT MARKINGS 42963

GUARDRAIL REPAIR SOUTH 42444

LOUDON - CANTERBURY 29613A X-A004(458)

SHELBURNE 42426 X-A004(842)

Project Name / Number

$7,760,200

$1,141,700

$2,569,600

$1,304,200

$410,800

$622,000

$212,600

$762,100

$7,830,000

$669,700

$0

$0

$0

$1,304,200

$286,300

$0

$0

$0

$7,830,000

$669,700

06-Mar-20

10-Mar-20

10-Mar-20

10-Mar-20

17-Mar-20

17-Mar-20

17-Mar-20

31-Mar-20

31-Mar-20

31-Mar-20

March 2020 Contact Person: Ron Kleiner

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Mike Dugas

Contact Person: Tom Jameson

Contact Person: Nancy Spaulding

Contact Person: Lee Baronas

Contact Person: John Corcoran

Contact Person: Matthew Lampron

Contact Person: Kirk Mudgett

Page 8: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 6 of 11

Fiscal Year

2020

I-93 (Exit 14 to VT Border) Guardail Repair North - I-93 Exit 20 to VT border[BET-STAL-HQ, NON-PAR (dot)]

I-93, I-89 & I-393 Guardrail Repair on the Turnpike System, I-93 (Exit 14 to 20) & I-89[BET-STAL-HQ, NON-PAR (dot)]

I-293/NH101 & NH 111 HBP inlays along I-293/NH101 and BWC along NH 111[Pave-T1-Resurf, Pave-T2-Resurf]

East Side Road Saco River Covered Bridge Scour Protection effort [BRPPI *, Bridg-T3-4-Main-Pres, NHCBP*]

NH 28 Phase 1 roadway and building demo for Salem #12334 Depot Project at intersection of NH28 & NH97 [Other Fed Aid]

BRADFORD CENTER ROAD Bridge Rehab-Bradford Center Rd over West Branch of Warner River-Br. #140/144-Bement Covered Br[NHCBP*, SAB *]

NH 28 RECONSTRUCT DEPOT INTERSECTION NH28 (BROADWAY) AND NH 97 (MAIN STREET) ADD TURN LANES ON NH28 MUPCA[Ear-NH072, MUPCA*, Other Fed Aid]

I-93 I-93 EXIT 4A - Prelim., Final Design, ROW &Construction of NEW INTERCHANGE and connecting roadway[NON-PAR (other), Other Fed Aid]

Charlotte Avenue Elementary School Constructnew sidewalk, reconstruct crosswalk to meet ADA standards.[NON-PAR (other), SRTS]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

GUARDRAIL REPAIR NORTH 43005

GUARDRAIL REPAIR WEST 42994

MANCHESTER 42635A X-A005(001)

CONWAY 25103 X-A003(039)

SALEM 12334A X-A005(004)(LPA)

BRADFORD 23819 X-A002(772)(LPA)

SALEM 12334 X-STP-X-5399(011)(LPA)

DERRY - LONDONDERRY 13065 IM-0931(201)Design-Build

NASHUA 28739 X-A003(786)(LPA)

Project Name / Number

Second Quarter Total

March Monthly Total

April Monthly Total

$231,600

$399,500

$1,457,000

$563,800

$539,400

$1,155,800

$4,212,900

$57,878,100

$237,500

$0

$0

$1,457,000

$563,800

$431,500

$449,700

$3,370,300

$57,205,000

$93,000

07-Apr-20

07-Apr-20

07-Apr-20

14-Apr-20

28-Apr-20

29-Apr-20

06-May-20

12-May-20

19-May-20

$23,348,800

$4,347,100

$10,090,200

$2,902,000

$103,616,700 $46,022,600

March 2020

April 2020

May 2020

Contact Person: Sam Newsom

Contact Person: Sam Newsom

Contact Person: Ronald Grandmaison

Contact Person: Joseph Adams

Contact Person: C.R. Willeke

Contact Person: Kevin Russell

Contact Person: C.R. Willeke

Contact Person: Keith Cota

Contact Person: C.R. Willeke

Page 9: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 7 of 11

Fiscal Year

2020

Main Street Construct sidewalks, crosswalks, lighting and landscaping along Main Street in Durham on UNH Campu[TA *]

I 95 Turnpikes R&R Program Bridge Painting[TRR *]

Various To install Road and Weather systems around the State. [None-Highway, TPK *]

NUDD ROAD Bridge Rehabilitation-Nudd Rd over Bearcamp River-Bridge #108/333-Phase II-Whittier Covered Bridge[NHCBP*, SAB *]

NH 27, NH 111A, Winter St, Spring St Constructsidewalks on Epping Road, Brentwood Road, Winter Street, and Spring Street[TA *]

NH 38, NH 9 Intersection safety improvements -install Intersection Conflict Warning Systems in two locations[HSIP *]

NH 101 NH 123 intersection safety improvements[HSIP *]

Various Replacement and upgrade of signs and supports due to condition and improved compliance[USSS *]

South Main St. , Mason Road Const. Sidewalks on Rte 130, Const 60 foot Ped bridge over Nissitissit River and sidewalk to beach [TA *]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

DURHAM (UNH) 41369 X-A004(608)(LPA)

NORTH HAMPTON BRIDGE PAINTING 42917

STATEWIDE-RWIS 25198 A003(059)

OSSIPEE 23818 X-A002(771)(LPA)

EXETER 41372 X-A004(611)(LPA)

PELHAM-CHESTERFIELD 29338 X-A004(016)One Contract With 15698

PETERBOROUGH 15698 X-A000(890)One Contract With 29338

STATEWIDE SIGNS 42921 X-A004(994)

BROOKLINE 41364 X-A004(607)(LPA)

Project Name / Number

Third Quarter Total

May Monthly Total

June Monthly Total

$438,000

$2,069,100

$729,100

$1,001,900

$486,500

$139,500

$111,600

$228,500

$590,600

$350,400

$0

$364,600

$640,800

$389,200

$139,500

$111,600

$228,500

$472,400

26-May-20

26-May-20

26-May-20

15-Jun-20

16-Jun-20

16-Jun-20

16-Jun-20

23-Jun-20

30-Jun-20

$65,564,700

$2,558,600

$61,383,300

$1,982,000

$72,470,400 $66,267,300

May 2020

June 2020

Contact Person: Tom Jameson

Contact Person: Nancy Spaulding

Contact Person: Charles Blackman

Contact Person: Kevin Russell

Contact Person: Bob Hudson

Contact Person: Mike Dugas

Contact Person: Mike Dugas

Contact Person: Lee Baronas

Contact Person: Tom Jameson

Page 10: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 8 of 11

Fiscal Year

2020

Main Street, NH Routes 3 / 25 Reconstruct sidewalks to ADA compliance and construct new sidewalks on Main Street US Rte 3/25[NON-PAR (dot), NON-PAR (other), TA *]

US 3 & NH 26 Bridge Preservation on Columbia 108/167 and Colebrook 051/098.[Bridg-T1-2-Main-Pres]

NH 16 Reconstruct NH 16 from Olympic Lane east to NH 153 (Four Corners)[NON-PAR (other), Other Fed Aid, PRRCS *]

US302, NH 10 & US302 Bridge Preservation on Carroll 173/141 and Bethlehem 125/177.[Bridg-T1-2-Main-Pres]

Ami Brown Road Construct 11,695' of shared lane and bike lane markings. (14-42TAP) Ped crossing Improve at Rte 9[NON-PAR (other), TA *]

WINCHESTER STREET Reconst. of Winchester (NH 101 to Pearl & Island including Key Rd intersection) and Br. No. 125/069[Ear-NH049, MOBRR *, MUPCA*, NON-PAR (other), Other Fed Aid]

Cornish Toll Bridge Road Cornish Windsor Covered Bridge Scour Mitigation[BRPPI *, Bridg-T3-4-Main-Pres, NHCBP*, NON-PAR (Vermont)]

NH 119 Reconstruction of the new bridge over the Connecticut River[NON-PAR (Vermont), None-Bridge, Other Fed Aid, SB367-4-CENTS, TIGER]

Various Curve warning sign improvements on State highways[HSIP *]

Church Street Bridge Preservation efforts on the Church St over Conn River between Walpole, NH to Rockingham, Vt[Bridg-HIB-Main-Pres, NON-PAR (Vermont)]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

ASHLAND 41370 X-A004(610)(LPA)

COLUMBIA-COLEBROOK 42313 X-A004(814)

CONWAY 40018 X-A004(327)(LPA)

BETHLEHEM-CARROLL 42501 X-A004(878)

KEENE 40439 X-A004(408)(LPA)

KEENE 10309B X-STP-0111(007)(LPA)

CORNISH, NH - WINDSOR, VT 25067 A003(035)

HINSDALE, NH - BRATTLEBORO, VT 12210C A004(152)

STATEWIDE 42953 X-A005(002)

WALPOLE, NH - ROCKINGHAM, VT 42277 X-A004(799)

Project Name / Number

July Monthly Total

$522,900

$720,800

$3,460,800

$2,650,500

$332,300

$6,693,200

$2,325,000

$52,340,300

$465,000

$1,720,500

$302,200

$720,800

$2,549,400

$2,650,500

$265,800

$5,057,000

$2,048,800

$32,230,700

$465,000

$1,273,200

09-Jul-20

14-Jul-20

15-Jul-20

21-Jul-20

26-Jul-20

27-Jul-20

18-Aug-20

18-Aug-20

18-Aug-20

18-Aug-20

$14,380,500 $11,545,700

July 2020

August 2020

Contact Person: Bob Hudson

Contact Person: David Scott

Contact Person: Kevin Russell

Contact Person: Joseph Adams

Contact Person: Tom Jameson

Contact Person: Jennifer Reczek

Contact Person: Joseph Adams

Contact Person: Don Lyford

Contact Person: Mike Dugas

Contact Person: David Scott

Page 11: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 9 of 11

Fiscal Year

2020

Fiscal Year 2020 Total

US 4 / NH 108 Signalize intersection of US 4 westbound off ramp with NH 108[Other Fed Aid]

I-93 Full Width 1-1/2" inlay from MP 105.9 to 111.5 including exits 34B and 34C.[Pave-T1-Preserve, Pave-T1-Resurf, Pave-T3-4-Resurf]

I-93 SB Address Preservation needs on 5 bridges in Hooksett & Manchester on and over I-93 SB.[Bridg-HIB-Main-Pres, Bridg-T1-2-Main-Pres]

Various Installation of rumble strips along Stateroadways.

[HSIP *]

NH 175 Scour repairs at Woodstock 195/093 (NH175 over Pemi).[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]

NH 101 Reclaiming and resurfacing NH 101.[Pave-T2-Resurf]

Various Preservation response to stabilize various bridges from scour.[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]

NH Route 9 Rehab./Replacement of twin 72" x 44" corrugated metal arch pipes under Route 9.[BET-DRG-HQ, NON-PAR (dot)]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

DURHAM 16254 X-A001(211)

LINCOLN-FRANCONIA 41052 X-A004(544)

MANCHESTER - HOOKSETT 41475 X-A004(648)

STATEWIDE 40842 X-A004(501)

WOODSTOCK 42534 X-A004(896)

MILFORD-AMHERST 43031 X-A005(016)

STATEWIDE 41915 X-A004(779)

STODDARD 42708

Project Name / Number

Fourth Quarter Total

August Monthly Total

September Monthly Total

$568,100

$3,052,300

$6,975,000

$446,400

$465,000

$4,961,400

$1,574,500

$441,800

$568,100

$2,994,400

$6,975,000

$446,400

$465,000

$4,961,400

$1,574,500

$0

25-Aug-20

01-Sep-20

01-Sep-20

01-Sep-20

08-Sep-20

22-Sep-20

22-Sep-20

29-Sep-20

$57,418,900

$17,916,400

$36,585,800

$17,416,700

$89,715,800

$304,348,600

$65,548,200

$211,460,700

August 2020

September 2020

Contact Person: Loretta Doughty

Contact Person: Ronald Grandmaison

Contact Person: David Scott

Contact Person: Mike Dugas

Contact Person: David Scott

Contact Person: Ronald Grandmaison

Contact Person: David Scott

Contact Person: Kirk Mudgett

Page 12: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 10 of 11

MANCHESTER 41361 X-A004(604)(LPA)

HINSDALE 41365 X-A004(615)(LPA)

CONCORD-HOPKINTON 41703 X-A004(716)

HILLSBOROUGH-HENNIKER-HOPKINTON 42864 X-A005(033)

BEDFORD 42268 X-A004(797)

CONCORD-ASHLAND-CAMPTON 41706 X-A004(719)

BETHLEHEM-CARROLL/WENTWORTH 42780 X-A005(012)

CONWAY (BWC) 42845 X-A005(013)

GORHAM/CAMBRIDGE/ERROL 42778 X-A005(011)

LYME-ORFORD-PIERMONT-HAVERHILL 41913 X-A004(777)

MANCHESTER 42635 X-A004(997)

Project Name / Number

Rail Trail Const. Rail Trail along abandoned railroad bed from Mammoth Road to Lake ShoreAvenue[TA *]

Brattleboro Road Construct Sidewalks along Brattleboro Road.[NON-PAR (dot), TA *]

I-89 Painting I-89 bridges between Concord and Hopkinton[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]

US 202 Resurfacing US 202 in Hillsborough and Henniker including the ramps at NH 114.[Pave-T2-Resurf]

NH 101/Boynton St Rehabilitate 90" structural plate pipe under NH 101 & Boynton St in Bedford.[CRDR *]

I-93 Painting I-93 bridges in Concord, Ashland, and Campton[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]

US 302/NH 25 Resurfacing of US 302 and NH 25

[Pave-T2-Resurf]

US 302 Resurfacing of US Route 302.

[Pave-T2-Resurf]

US 2 and NH 16 Resurfacing of US 2 and NH 16

[Pave-T2-Resurf]

Various Upgrade cable guardrail and "F" terminals on Tier 2 & 3 highways.[HSIP *]

I-293/NH101 & NH28 Bypass Resurfacing of I293/NH101 in Manchester & 28 Bypass from Derry to Manchester[Pave-T1-Resurf, Pave-T2-Resurf]

Project Description

09-Jun-20

15-Jun-20

11-Aug-20

11-Aug-20

18-Aug-20

01-Sep-20

22-Sep-20

22-Sep-20

22-Sep-20

22-Sep-20

22-Sep-20

Target Ad Date

$818,600

$443,000

$2,371,500

$2,510,200

$1,204,400

$2,334,300

$3,607,700

$1,140,500

$1,404,400

$1,116,000

$5,409,200

Approx. Contract Amt.

$654,900

$354,400

$2,371,500

$0

$1,204,400

$2,334,300

$3,607,700

$1,140,500

$1,404,400

$1,116,000

$5,409,200

Federal Dollars

ON-SHELF PROJECTS

Fiscal Year 2020

Contact Person: Tom Jameson

Contact Person: Bob Hudson

Contact Person: David Scott

Contact Person: Ronald Grandmaison

Contact Person: Kirk Mudgett

Contact Person: David Scott

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Kirk Mudgett

Contact Person: Ronald Grandmaison

On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.

Page 13: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2020 Page 11 of 11

STATEWIDE SW TIER 2 42716 X-A004(996)

STRATFORD-COLUMBIA (BWC) 42703 X-A004(995)

NEWPORT - CROYDON - GRANTHAM 41914 X-A004(778)

Project Name / Number

NH 12A/NH 101/NH 10 Resurfacing of NH 12A, NH 101, and NH 10[Pave-T2-Resurf]

US Route 3 Resurfacing of US 3.[Pave-T2-Resurf]

Route 10 Cable guardrail and "F" unit replacement[HSIP *]

Project Description

22-Sep-20

22-Sep-20

29-Sep-20

Target Ad Date

$2,549,700

$2,488,200

$1,116,000

Approx. Contract Amt.

$2,549,700

$2,488,200

$1,116,000

Federal Dollars

ON-SHELF PROJECTS

Fiscal Year 2020

On-Shelf Projects 2020 Total $28,513,700 $25,751,200

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Kirk Mudgett

On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.

Page 14: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 1 of 9

Fiscal Year

2021

NA Construct 2.8mile pathway parallel to the North-South Road[CMAQ *]

NH 101/Boynton St Rehabilitate 90" structural plate pipe under NH 101 & Boynton St in Bedford.[CRDR *]

Various Upgrade cable guardrail and "F" terminals on Tier 2 & 3 highways.[HSIP *]

I-293/NH101 & NH28 Bypass Resurfacing of I293/NH101 in Manchester & 28 Bypass from Derry to Manchester[Pave-T1-Resurf, Pave-T2-Resurf]

Route 10 Cable guardrail and "F" unit replacement[HSIP *]

US Route 3 Resurfacing of US 3.[Pave-T2-Resurf]

FEET FEET[TRR *]

NH 12 NH 12 Bridge Preservation efforts for NH12 over NECRR in Charlestown (Br. No. 181/058).[BET-BMT-BD]

I-95 & NH 16 I-95 & NH 16[TRR *]

NH 12A/NH 101/NH 10 Resurfacing of NH 12A, NH 101, and NH 10[Pave-T2-Resurf]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

CONWAY 41755 X-A004(743)(LPA)

BEDFORD 42268 X-A004(797)

LYME-ORFORD-PIERMONT-HAVERHILL 41913 X-A004(777)

MANCHESTER 42635 X-A004(997)

NEWPORT - CROYDON - GRANTHAM 41914 X-A004(778)

STRATFORD-COLUMBIA (BWC) 42703 X-A004(995)

CENTRAL TURNPIKE PAVING 41821

CHARLESTOWN 42484

EASTERN TURNPIKE PAVING 41822

STATEWIDE SW TIER 2 42716 X-A004(996)

Project Name / Number

$1,860,000

$1,204,400

$1,116,000

$5,409,200

$1,116,000

$2,488,200

$4,103,200

$744,000

$2,964,100

$2,549,700

$1,488,000

$1,204,400

$1,116,000

$5,409,200

$1,116,000

$2,488,200

$0

$0

$0

$2,549,700

06-Oct-20

13-Oct-20

13-Oct-20

20-Oct-20

20-Oct-20

20-Oct-20

27-Oct-20

27-Oct-20

27-Oct-20

27-Oct-20

NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT

ADVERTISING SCHEDULE

October 2020 Contact Person: Tom Jameson

Contact Person: Kirk Mudgett

Contact Person: Kirk Mudgett

Contact Person: Ronald Grandmaison

Contact Person: Kirk Mudgett

Contact Person: Ronald Grandmaison

Contact Person: Nancy Spaulding

Contact Person: David Scott

Contact Person: Nancy Spaulding

Contact Person: Ronald Grandmaison

Page 15: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 2 of 9

Fiscal Year

2021

Hogback Road Slope failure repair and possibleroadway changes.[BET-STAL-HQ, NON-PAR (dot)]

Main Street and Riverside Drive Const. multi-use path along Androscoggin River from Service Credit Union Heritage Park to 12th St. [NON-PAR (other), TA *]

Rail Trail Const. Rail Trail along abandoned railroad bed from Mammoth Road to Lake ShoreAvenue[TA *]

US 302 & NH 16 Bridge Preservation efforts forNH16 over Ellis Rvr in Jackson & US302 over Stony Brk in Bartlett.[BET-BMT-BD]

US 202 Resurfacing US 202 in Hillsborough and Henniker including the ramps at NH 114.[Pave-T2-Resurf]

South Manchester Rail Trail Construct Multi-usepath along the abandoned rail corridor from Gold St. to Perimeter Road[CMAQ *, Ear-NH022]

Brattleboro Road Construct Sidewalks along Brattleboro Road.[NON-PAR (dot), TA *]

NH Route 28 Address Red List Bridge carrying NH 28 over Suncook River (Br No 107/098)[Bridg-T1-2-Rehab-Rcn]

US 302/NH 25 Resurfacing of US 302 and NH 25

[Pave-T2-Resurf]

US 302 Resurfacing of US Route 302.

[Pave-T2-Resurf]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

STRATFORD 42555

BERLIN 41367 X-A004(616)(LPA)

MANCHESTER 41361 X-A004(604)(LPA)

BARTLETT-JACKSON 41989

HILLSBOROUGH-HENNIKER-HOPKINTON 42864 X-A005(033)

MANCHESTER 29811 X-A004(311)(LPA)

HINSDALE 41365 X-A004(615)(LPA)

ALLENSTOWN-PEMBROKE 40362 X-A004(369)

BETHLEHEM-CARROLL/WENTWORTH 42780 X-A005(012)

CONWAY (BWC) 42845 X-A005(013)

Project Name / Number

October Monthly Total

$446,400

$1,298,500

$818,600

$395,300

$2,510,200

$1,427,400

$443,000

$2,483,100

$3,607,700

$1,140,500

$0

$634,600

$654,900

$0

$0

$1,141,900

$354,400

$0

$3,607,700

$1,140,500

27-Oct-20

31-Oct-20

01-Nov-20

03-Nov-20

03-Nov-20

03-Nov-20

15-Nov-20

17-Nov-20

17-Nov-20

17-Nov-20

$25,299,700 $16,006,100

October 2020

November 2020

Contact Person: Tobey Reynolds

Contact Person: Bob Hudson

Contact Person: Tom Jameson

Contact Person: Joseph Adams

Contact Person: Ronald Grandmaison

Contact Person: Tom Jameson

Contact Person: Bob Hudson

Contact Person: David Scott

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Page 16: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 3 of 9

Fiscal Year

2021

US 2 and NH 16 Resurfacing of US 2 and NH 16

[Pave-T2-Resurf]

I-95 ITS Improvements to I-95 from Portsmouth, NH to York, ME[TRR *]

NH 202A (WALNUT STREET) INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD SQ, NORTH MAIN, & WASHINGTON ST[MUPCA*, NON-PAR (other)]

RTE 108 Traffic signal improvements and installation of a camera system to monitor traffic flow.[CMAQ *]

US Route 3 Br Preservation on US 3 (Meredith 184/138), NH 11 (Gilford 102/099), & NH 11A (Gilford 138/137)

[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]

NH 1B Bridge replace, Single Leaf Bascule Bridge, NH 1B over Little Harbor (Red List) Br No 066/071[Bridg-HIB-Rehab-Rcn, CBI *, None-Bridge]

US 202 / NH 101 Bridge Replacement and Widening for TCP, US 202 & NH 101 over Contoocook River (Red List)[Bridg-T1-2-Rehab-Rcn, NON-PAR (dot), NON-PAR (other), None-Bridge]

Waukewan Road Rehabilitation of Red List Bridge carrying Waukewan Road over Snake River (Br No 080/040)[Bridg-T3-4-Rehab-Rcn, None-Bridge]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

GORHAM/CAMBRIDGE/ERROL 42778 X-A005(011)

PORTSMOUTH, NH - YORK, ME 16189B

ROCHESTER 14350 X-A000(320)(LPA)

DOVER 41746 X-A004(734)(LPA)

MEREDITH-GILFORD 41483 X-A004(652)

NEW CASTLE - RYE 16127 X-A001(146)

PETERBOROUGH 15879 X-A001(007)

CENTER HARBOR - NEW HAMPTON 24579 X-A002(923)

Project Name / Number

First Quarter Total

November Monthly Total

December Monthly Total

$1,404,400

$4,863,900

$4,174,000

$120,900

$1,069,500

$7,532,500

$8,934,300

$737,600

$1,404,400

$0

$1,264,800

$96,700

$1,069,500

$7,532,500

$8,724,200

$737,600

17-Nov-20

08-Dec-20

15-Dec-20

31-Dec-20

05-Jan-21

05-Jan-21

05-Jan-21

12-Jan-21

$14,230,200

$9,158,800

$8,303,800

$1,361,500

$48,688,700 $25,671,400

November 2020

December 2020

January 2021

Contact Person: Ronald Grandmaison

Contact Person: Charles Blackman

Contact Person: Bob Hudson

Contact Person: Tom Jameson

Contact Person: Joseph Adams

Contact Person: Jennifer Reczek

Contact Person: Joseph Adams

Contact Person: David Scott

Page 17: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 4 of 9

Fiscal Year

2021

NH 3A Constructing a third southbound right turn lane on Lowell Rd/NH 3A [CMAQ *]

East Thetford Road Bridge Rehab, for Red List Bridge carrying East Thetford Road over the Conn. River (Br No 053/112)[Bridg-T3-4-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]

NH 16 Pavement Rehab and drainage upgradesincluding improvements at Mt. Shaw Rd.[Pave-T2-Rehab]

Lang Road/Longmeadow Road/US Route 1 Realign Lang Road to connect to Longmeadow Road[HSIP *, NON-PAR (other)]

US 4 REHABILITATE OR REPLACE RED LIST BRIDGE CARRYING US 4 OVER NHRR - 156/104[Bridg-T1-2-Rehab-Rcn, None-Bridge]

Various Resurfacing various tier 2, 3, and 4 roadways in District 1.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 1.[Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 2.[Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 2.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 3.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

HUDSON 41754 X-A004(742)(LPA)

LYME, NH - THETFORD, VT 14460 A000(394)

OSSIPEE 41251 X-A004(573)

PORTSMOUTH 42350 X-A004(818)(LPA)

DANBURY 16303 X-A001(230)

DISTRICT 1 N 16161J

DISTRICT 1 S 42460

DISTRICT 2 E 42461

DISTRICT 2 W 16162J

DISTRICT 3 N 16163J

Project Name / Number

January Monthly Total

$1,162,500

$8,191,400

$2,325,000

$898,800

$2,046,000

$2,054,200

$2,197,400

$240,700

$2,613,600

$2,739,400

$930,000

$0

$2,325,000

$809,000

$2,046,000

$0

$0

$0

$0

$0

12-Jan-21

12-Jan-21

12-Jan-21

19-Jan-21

26-Jan-21

02-Feb-21

02-Feb-21

02-Feb-21

02-Feb-21

02-Feb-21

$32,897,600 $24,173,800

January 2021

February 2021

Contact Person: Tom Jameson

Contact Person: Joseph Adams

Contact Person: Tobey Reynolds

Contact Person: Bob Hudson

Contact Person: David Scott

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Page 18: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 5 of 9

Fiscal Year

2021

Varies Resurfacing various tier 2, 3, and 4 roadways in southern District 3.[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 4.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 5.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Various Resurfacing various tier 2, 3, and 4 roadways in District 6.

[Pave-T2-Resurf, Pave-T3-4-Resurf]

Pedestrian Trail from DW Highway to existing trail Construct pedestrian trail in the town of Merrimack for approximatly 700LF. (14-15TAP)[TA *]

Manchester & Lawrence Rail Line 0.3 miles of Bike-Ped trail along abandoned M&L rail line from Cluff Crossing to Rockingham Pk Blvd[CMAQ *]

Spaulding Turnpike Construct All Electronic Tolling at Dover and Rochester Toll Plazas.[TPK *]

Peverly Hill Rd. Const. new sidewalk and striped bicycle shoulders and associated drainage along Peverly Hill Road.[CMAQ *, NON-PAR (other)]

FE Everett Turnpike FE Everett Turnpike widening of a 2-lane section from north of Exit 13 to north of I-293 diverge.[TPK *]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

DISTRICT 3 S 43026

DISTRICT 4 16164J

DISTRICT 5 16165J

DISTRICT 6 16166J

MERRIMACK 40300 X-A004(357)(LPA)

SALEM 41750 X-A004(738)(LPA)

DOVER - ROCHESTER 29440

PORTSMOUTH 20258 X-A002(061)(LPA)

NASHUA-MERRIMACK-BEDFORD 13761D

Project Name / Number

Second Quarter Total

February Monthly Total

March Monthly Total

$4,225,700

$2,741,000

$1,311,400

$2,816,900

$835,900

$609,200

$16,275,000

$1,063,700

$16,388,300

$0

$0

$0

$0

$668,700

$487,300

$0

$340,400

$0

02-Feb-21

02-Feb-21

02-Feb-21

02-Feb-21

15-Feb-21

15-Feb-21

23-Feb-21

09-Mar-21

23-Mar-21

$38,660,400

$17,452,000

$1,156,000

$340,400

$89,010,000 $25,670,200

February 2021

March 2021

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Ronald Grandmaison

Contact Person: Bob Hudson

Contact Person: Tom Jameson

Contact Person: Nancy Spaulding

Contact Person: Tom Jameson

Contact Person: Wendy Johnson

Page 19: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 6 of 9

Fiscal Year

2021

NH 101 Bridge Rehab or Replacement of br no 090/065 carrying NH 101 over Pulpit Brook[Bridg-T1-2-Rehab-Rcn, Other Fed Aid]

Various Installation of rumble strips along Stateroadways.

[HSIP *]

Portions on High Street, Memorial Drive, Cemetery Rd. Const sidewalks on High St, Memorial Dr, Cemetery Rd, upgrade crosswalk across High St, const Path[TA *]

Herritage Rail Trail East Construct the Heritage Rail Trail East[CMAQ *]

Hampton Branch Rail Corridor Acquire 9.7 milesRR Corridor Hampton-Portsmouth & improve existing corridor surface for bike/ped[CMAQ *]

Elwyn Road Add a multi-use path for bike/pedalong Elwyn Rd extending from Rt1 to Harding Rd.[CMAQ *]

US 4 Bridge Pres on 3 brs in Canaan carrying US 4 over Indian Riv, Mascoma Riv, & Crystal Lake Brook.[Bridg-T1-2-Main-Pres]

NH Route 25A Bridge Replacement is anticpated for the bridge carrying NH Route 25A over Brackett Brook (217/112)[Bridg-T3-4-Rehab-Rcn]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

BEDFORD 13692C X-A004(254)

STATEWIDE 40843 X-A004(502)

SOMERSWORTH 41363 X-A004(606)(LPA)

NASHUA 41742 X-A004(730)(LPA)

HAMPTON - PORTSMOUTH 26485 X-A003(355)

PORTSMOUTH 41752 X-A004(740)(LPA)

CANAAN 42938 X-A004(998)

ORFORD 40366 X-A004(371)

Project Name / Number

Third Quarter Total

April Monthly Total

May Monthly Total

June Monthly Total

$3,977,100

$446,400

$810,500

$901,400

$1,906,500

$790,500

$1,325,300

$1,860,000

$3,977,100

$446,400

$648,400

$721,200

$1,906,500

$632,400

$1,325,300

$1,860,000

13-Apr-21

04-May-21

12-May-21

18-May-21

25-May-21

01-Jun-21

15-Jun-21

29-Jun-21

$3,977,100

$4,064,800

$3,975,800

$3,977,100

$3,722,500

$3,817,700

$12,017,700 $11,517,300

April 2021

May 2021

June 2021

Contact Person: Jennifer Reczek

Contact Person: Mike Dugas

Contact Person: Tom Jameson

Contact Person: Tom Jameson

Contact Person: Mike Dugas

Contact Person: Bob Hudson

Contact Person: David Scott

Contact Person: Joseph Adams

Page 20: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 7 of 9

Fiscal Year

2021

SPAULDING TURNPIKE / LITTLE BAY BRIDGES Remove the superstructure General Sullivan Br& provide the most cost effective bike/ped connection[TPK *]

NH 101A Safety impr. at NH 101A / Cont. Blvd & at Craftsman Lane / Boston Post Rd[Other Fed Aid]

I-89 Rehabilitate from MM 24.2 to MM 28.7 including the ramps for exit 10[GARVEE-21, Pave-T1-Rehab]

I-89 Rehabilitation of pavement structure and drainage improvements. MM 28.7 to MM 31.2-NB/31.6-SB[GARVEE-21, Pave-T1-Rehab]

NH Route 104 Rehabilitation of a 90" dia. multi-plate pipe under Route 104 at intersection of Corliss Hill Rd.[CRDR *]

US 4 Replacement of bridge carrying US 4 overBlackwater River (143/077)[Bridg-T1-2-Rehab-Rcn]

S BENNINGTON ROAD South Bennington Road over Russell Brook Bridge Rehab or Replacement[Bridg-T3-4-Rehab-Rcn]

Huse Road Address Red List bridge carrying Huse Road over I-293 and NH Route 101 (176/106)[Bridg-T3-4-Rehab-Rcn]

NH Route 122 Address Red List bridge carrying NH 122 (Main St) over NH 101 in the Town of Amherst (135/109)[Bridg-T3-4-Rehab-Rcn]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

NEWINGTON - DOVER 11238S

MERRIMACK 10136D X-A001(265)

SUTTON 42419 X-A004(839)One Contract With 40511

SUTTON - NEW LONDON 40511 X-A004(421)One Contract With 42419

MEREDITH 42912 X-A004(991)

ANDOVER 40392 X-A004(384)

BENNINGTON 29486 X-A004(156)

MANCHESTER 41414 X-A004(624)

AMHERST 41413 X-A004(623)

Project Name / Number

July Monthly Total

August Monthly Total

$28,132,500

$4,019,700

$12,834,000

$5,868,200

$320,900

$3,255,000

$558,000

$2,325,000

$1,860,000

$0

$4,019,700

$372,000

$232,500

$320,900

$3,255,000

$558,000

$2,325,000

$1,860,000

20-Jul-21

27-Jul-21

10-Aug-21

10-Aug-21

17-Aug-21

31-Aug-21

07-Sep-21

07-Sep-21

14-Sep-21

$32,152,200

$22,278,100

$4,019,700

$4,180,400

July 2021

August 2021

September 2021

Contact Person: Keith Cota

Contact Person: Jennifer Reczek

Contact Person: Tobey Reynolds

Contact Person: Tobey Reynolds

Contact Person: Kirk Mudgett

Contact Person: Joseph Adams

Contact Person: David Scott

Contact Person: Joseph Adams

Contact Person: Joseph Adams

Page 21: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 8 of 9

Fiscal Year

2021

Fiscal Year 2021 Total

US Route 1 Superstructure replacement of bridge carrying US 1 over Boston & Maine RR (Red List Br No 148/132)[Bridg-T1-2-Rehab-Rcn, None-Bridge]

Project DescriptionTarget Ad Date

Approx. Contract Amt.

Federal Dollars

NORTH HAMPTON 24457 A002(909)

Project Name / Number

Fourth Quarter Total

September Monthly Total

$4,185,000 $4,185,00014-Sep-21

$8,928,000 $8,928,000

$63,358,300

$213,074,700

$17,128,100

$79,987,000

September 2021 Contact Person: Matthew Lampron

Page 22: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 05/05/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,

05/05/20Print Date: 2021 Page 9 of 9

HANOVER, NH - NORWICH, VT 42278 X-A004(800)

BOW 42704 X-A004(950)

SWANZEY 27692 X-A003(591)

Project Name / Number

NH 10A Bridge Preservation effort on the bridge carrying NH 10A over Conn River (Ledyard Bridge)[Bridg-HIB-Main-Pres, NON-PAR (Vermont)]

I-89 Rehabilitation of a 48" cmp & 18" cmp under I-89 near intersection of I-93, Bow.[CRDR *]

NH Route 32 Address Red List Bridge (149/072) carrying NH Route 32 over Martin Brook in the Town of Swanzey[Bridg-T3-4-Rehab-Rcn]

Project Description

24-Aug-21

14-Sep-21

14-Sep-21

Target Ad Date

$1,767,000

$488,300

$1,209,000

Approx. Contract Amt.

$1,219,200

$488,300

$0

Federal Dollars

ON-SHELF PROJECTS

Fiscal Year 2021

On-Shelf Projects 2021 Total $3,464,300 $1,707,500

Contact Person: David Scott

Contact Person: Kirk Mudgett

Contact Person: Joseph Adams

On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.