NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT
ADVERTISING SCHEDULE
FEDERAL FISCAL YEARS
2020-2021
May 2020
_________________________________________________________________________
Project Previous Ad Date Revised Ad Date Explanation
Conway 25103 April 7, 2020 April 14, 2020More time for Project Development (Bridge Design) to
obtain environmental permits.
Derry-Londonderry 13065 April 23, 2020 May 12, 2020More time for Project Development (Highway Design)
for preparation of the Design-Build Final RFP.
Milford-Amherst 43031 September 22, 2020New project added by Project Development (Highway
Design) from Pave T-2 Resurfacing Program.
Central Turnpike Paving 41821 February 4, 2020 October 27, 2020 Project re-advertised by Turnpikes due to no prior bids.
Eastern Turnpike Paving 41822 February 4, 2020 October 27, 2020 Project re-scoped and advertised by Turnpikes.
Hillsborough-Henniker-Hopkinton
42864April 8, 2020 November 3, 2020
More time for Project Development (Highway Design)
to realign with federal funding constraints.
Bethlehem-Carroll/Wentworth 42780 November 17, 2020Project advanced by Project Development (Highway
Design) within Pave T-2 Resurfacing Program.
Conway (BWC) 42845 November 17, 2020Project advanced by Project Development (Highway
Design) within Pave T-2 Resurfacing Program.
Gorham/Cambridge/Errol 42778 November 17, 2020Project advanced by Project Development (Highway
Design) within Pave T-2 Resurfacing Program.
Advertisement Schedule Changes for NHDOT Managed Projects
from April 2020 to March 2021
05/05/20Print Date: 2020 Page 1 of 11
Fiscal Year
2020
I-93 Exit 1 to Exit 5 - Construct 4th lane northbound and southbound[NON-PAR (other), Other Fed Aid, TIFIA]
US3 & NH26 Resurfacing of various Tier 2 roadways in the Northern region for Maintenance & Preservation
[Pave-T2-Resurf]
US 202 & NH101 & NH12 Resurfacing of various Tier 2 roadways in the Southwest region for Maintenance & Preservation.
[Pave-T2-Resurf]
NH 16 Reconstruct railway-highway crossing, roadway approaches & protective devices (Wakefield054-237Y)[RR-RCS *]
Various Replace cable guardrail in Districts 1 &3 (East).[HSIP *]
NH28 Bridge Preservation efforts for NH28 over NHRR in Ossipee (Br. No. 194/146).[BET-BMT-BD, NON-PAR (dot)]
Various Replace cable guardrail and F terminal units on Tier 2 and 3 roads in Districts 4 & 5.[HSIP *]
Various Tier 2 South Resurfacing of various Tier 2 roadways in the Southwest region for Maintenance & Preservation
[NON-PAR (other), Pave-T2-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
SALEM TO MANCHESTER 14633J A004(438)
STATEWIDE TIER 2 (N) RESURFACING 42291 X-A004(806)
STATEWIDE TIER 2 (SW) RESURFACING 42289 X-A004(804)
WAKEFIELD 42240 X-A004(793)
STATEWIDE 41909 X-A004(776)
OSSIPEE 41916
STATEWIDE 41899 X-A004(769)
STATEWIDE TIER 2 (S) RESURFACING 42293 X-A004(808)
Project Name / Number
October Monthly Total
$6,839,200
$1,807,700
$2,831,800
$939,800
$1,040,900
$539,800
$839,200
$5,362,500
$4,103,500
$1,807,700
$2,831,800
$939,800
$1,040,900
$0
$839,200
$5,362,500
01-Oct-19
01-Oct-19
01-Oct-19
08-Oct-19
22-Oct-19
29-Oct-19
29-Oct-19
05-Nov-19
$14,838,400 $11,562,900
NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT
ADVERTISING SCHEDULE
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
October 2019
November 2019
Contact Person: Wendy Johnson
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Melodie Esterberg
Contact Person: Kirk Mudgett
Contact Person: David Scott
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
05/05/20Print Date: 2020 Page 2 of 11
Fiscal Year
2020
Various Tier 2 Southeast Resurfacing of various Tier 2 roadways in the Southeast region for Maintenance & Preservation.[NON-PAR (other), Pave-T2-Resurf]
US302,NH 10 Preservation efforts on 5-span bridge carrying US302,NH 10 over I-93 (Littleton 187/065). [Bridg-T1-2-Main-Pres]
US4/NH10/NH12A Resurfacing various Tier 2 roadways in District 2.
[NON-PAR (other), Pave-T2-Resurf]
US Route 4 and Tremont Street Bridge Pres for US4 over River Rd,NHRR(ABD)(139/040) & for Tremont St over Contoocook Riv (131/035)[BET-BMT-BD, NON-PAR (dot)]
I-93, I-89, and I-393 Resurfacing I-93 MM 38.5 to 44.0; I-89 MM 8.2 to MM 13.6, and crack sealing along I393 & I93
[Pave-T1-Resurf, Pave-T2-Resurf]
US 3 & I-93 Preservation work on Plymouth 142/145, & Campton 105/058 and 104/059.[Bridg-T1-2-Main-Pres]
I-93 Repair of a 48" CMP culvert at MM 35.2 under I-93/I-89 CD road[TRR *]
NH Route 101 Pavement preservation from MM 115.2 to MM 124.6 including ramps from Exit 6 through Exit 9 [GRR *, Pave-T1-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
STATEWIDE TIER 2 (SE) RESURFACING 42292 X-A004(807)
LITTLETON 42376 X-A004(831)
STATEWIDE TIER 2 (W) RESURFACING 42272 X-A004(829)
BOSCAWEN 42440
CONCORD / HOPKINTON 41906 X-A004(775)
PLYMOUTH-CAMPTON 42364 X-A004(824)
BOW 42300
EPPING-EXETER 41790 X-A004(851)
Project Name / Number
First Quarter Total
November Monthly Total
December Monthly Total
$3,785,700
$1,267,700
$2,123,500
$1,647,600
$7,791,200
$1,729,100
$289,700
$6,981,500
$3,785,700
$1,267,700
$2,123,500
$0
$7,791,200
$1,729,100
$0
$6,981,500
12-Nov-19
19-Nov-19
19-Nov-19
26-Nov-19
26-Nov-19
26-Nov-19
07-Jan-20
07-Jan-20
$23,707,300
$0
$22,059,700
$0
$38,545,700 $33,622,600
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
November 2019
December 2019
January 2020
Contact Person: Ronald Grandmaison
Contact Person: Joseph Adams
Contact Person: Ronald Grandmaison
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Joseph Adams
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
05/05/20Print Date: 2020 Page 3 of 11
Fiscal Year
2020
NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107, 1/2 mi north of US 4.[BET-DRG-HQ, NON-PAR (dot)]
I-89 NB & SB Superstructure Replace & Widening, I-89 NB & SB over Connecticut River (Br No 044/103 & 044/104)[Bridg-HIB-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]
Statewide Statewide Striping (Turnpikes)[TRR *]
Various Replace cable guardrail and F terminal units on Tier 2 and 3 roads[HSIP *]
Various Resurfacing various tier 2, 3, and 4 roadways in District 1.
[BET-RL-1, BET-RL-HQ, NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Rehab, Pave-T3-4-Resurf]
Various Resurfacing various Tier 2, 3, and 4 roadways in District 1.
[BET-RL-1, BET-RL-HQ, NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 2.
[NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various Tier 2, 3, and 4 roadways in District 2.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 3.
[BET-RL-3, BET-RL-HQ, Pave-T2-Resurf, Pave-T3-4-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
NORTHWOOD 42363
LEBANON, NH - HARTFORD, VT 16148 A001(154)
STATEWIDE STRIPING (TURNPIKES) 41823
STATEWIDE 41897 X-A004(767)
DISTRICT 1 16161I
DISTRICT 1 42318
DISTRICT 2 16162I
DISTRICT 2 2020 42319
DISTRICT 3 16163I
Project Name / Number
January Monthly Total
$441,000
$43,166,900
$908,900
$1,298,200
$2,931,400
$2,202,800
$2,082,200
$2,914,100
$2,278,900
$0
$26,637,000
$0
$1,298,200
$0
$0
$0
$0
$0
14-Jan-20
21-Jan-20
21-Jan-20
28-Jan-20
04-Feb-20
04-Feb-20
04-Feb-20
04-Feb-20
04-Feb-20
$53,086,200 $34,916,700
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
January 2020
February 2020
Contact Person: Kirk Mudgett
Contact Person: Joseph Adams
Contact Person: Nancy Spaulding
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
05/05/20Print Date: 2020 Page 4 of 11
Fiscal Year
2020
Various Resurfacing various tier 2, 3, and 4 roadways in District 4.
[BET-RL-4, BET-RL-HQ, NON-PAR (dot), Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 5.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 6.
[BET-RL-6, BET-RL-HQ, Pave-T2-Resurf, Pave-T3-4-Resurf]
Statewide Statewide Bridge Washing Contract - Tier 1 Roads[NON-PAR (dot)]
NH Route 112 Replacement of corten guardrail on NH Route 112 in Woodstock.[GRR *]
Statewide - North Northern State Bridge Washing Contract - Tier 1 roads[NON-PAR (dot)]
NH 16 Repair failed roadway slope along NH 16 abutting the Magalloway River[BET-DRG-HQ, FLAP, NON-PAR (dot)]
NH 102 Redrill Child salted well[WELLS]
NH 127 Replace Frye salted well[WELLS]
NH 77 Replace salted Lacroix well.[WELLS]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DISTRICT 4 16164I
DISTRICT 5 16165I
DISTRICT 6 16166I
BRIDGE WASHING 42939
WOODSTOCK 42576 X-A004(917)
BRIDGE WASHING 42997
ERROL 41069 X-A004(565)
CHESTER 42597B
HOPKINTON 42597D
WEARE 42597C
Project Name / Number
February Monthly Total
$3,964,700
$2,582,300
$5,117,100
$465,000
$1,015,700
$744,000
$883,500
$25,400
$19,800
$20,700
$0
$0
$0
$0
$1,015,700
$0
$0
$0
$0
$0
04-Feb-20
04-Feb-20
04-Feb-20
18-Feb-20
18-Feb-20
25-Feb-20
25-Feb-20
03-Mar-20
03-Mar-20
03-Mar-20
$27,181,700 $1,015,700
low-bid
low-bid
February 2020
March 2020
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Steve Johnson (Br Maint)
Contact Person: Kirk Mudgett
Contact Person: Steve Johnson (Br Maint)
Contact Person: Tobey Reynolds
Contact Person: Victoria Chase
Contact Person: Victoria Chase
Contact Person: Victoria Chase
05/05/20Print Date: 2020 Page 5 of 11
Fiscal Year
2020
Rehab Queen City Bridge over I-293, BMRR & Merrimack River BRIDGE REHABILITATION-QUEEN CITY BR. OVER I-293, BMRR & MERRIMACK RIVER-BR. #151/065 (MOBRR)[SAB *]
Various Roadway preservation (Chip Seal) on Various roadways.[Pave-T3-4-Resurf]
NH 175, NH 49, & Tripoli Rd PMRAP and resurfacing on NH 175 and resurfacing of NH 49 and Tripoli Rd.[BET-RL-3, BET-RL-HQ, Pave-T3-4-Rehab, Pave-T3-4-Resurf]
NH 11 NH 11 corridor safety improvements andresurfacing[HSIP *, Pave-T2-Resurf]
Dover Community Trail Const multi-use path to connect 2 portions of the Dover Community Trail, which are gaps (14-27TAP)[NON-PAR (other), TA *]
I-95, I-93, I-293, FEET and NH 16 Replacement and repair of guardrail systems along the Turnpike facilities[TRR *]
Pavement Markings Pavement Marking Maintenance via Contractor. Limited to Stenciled and Transverse Markings[BET-STAL-HQ]
Blue Star, FEET & Spaulding Turnpike, I-93, Rt 101 Central, Eastern Turnpikes, I-93 and Rt. 101 guardail repair on as needed basis.[BET-STAL-HQ, NON-PAR (dot), NON-PAR (other)]
NH Rte 106 NH Rte 106 Roadway Widening (3.6 mi, Phase II) from Soucook Road, Loudon to Ames Road, Canterbury [None-Highway]
US Route 2 Rehab or replacement of a 50 ft long, 72" cmp/60" cmp/5'x8' box culvert carrying Kidder Brook.[CRDR *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
MANCHESTER 28336 X-A003(718)(LPA)
DISTRICT 5 CHIP SEAL 2020 42438
HOLDERNESS-WATERVILLE VALLEY PMRAP 42786
ROCHESTER-FARMINGTON 42243 X-A004(795)
DOVER 40437 X-A004(407)(LPA)
STATEWIDE GUARDRAIL 41939
STATEWIDE PAVEMENT MARKINGS 42963
GUARDRAIL REPAIR SOUTH 42444
LOUDON - CANTERBURY 29613A X-A004(458)
SHELBURNE 42426 X-A004(842)
Project Name / Number
$7,760,200
$1,141,700
$2,569,600
$1,304,200
$410,800
$622,000
$212,600
$762,100
$7,830,000
$669,700
$0
$0
$0
$1,304,200
$286,300
$0
$0
$0
$7,830,000
$669,700
06-Mar-20
10-Mar-20
10-Mar-20
10-Mar-20
17-Mar-20
17-Mar-20
17-Mar-20
31-Mar-20
31-Mar-20
31-Mar-20
March 2020 Contact Person: Ron Kleiner
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Mike Dugas
Contact Person: Tom Jameson
Contact Person: Nancy Spaulding
Contact Person: Lee Baronas
Contact Person: John Corcoran
Contact Person: Matthew Lampron
Contact Person: Kirk Mudgett
05/05/20Print Date: 2020 Page 6 of 11
Fiscal Year
2020
I-93 (Exit 14 to VT Border) Guardail Repair North - I-93 Exit 20 to VT border[BET-STAL-HQ, NON-PAR (dot)]
I-93, I-89 & I-393 Guardrail Repair on the Turnpike System, I-93 (Exit 14 to 20) & I-89[BET-STAL-HQ, NON-PAR (dot)]
I-293/NH101 & NH 111 HBP inlays along I-293/NH101 and BWC along NH 111[Pave-T1-Resurf, Pave-T2-Resurf]
East Side Road Saco River Covered Bridge Scour Protection effort [BRPPI *, Bridg-T3-4-Main-Pres, NHCBP*]
NH 28 Phase 1 roadway and building demo for Salem #12334 Depot Project at intersection of NH28 & NH97 [Other Fed Aid]
BRADFORD CENTER ROAD Bridge Rehab-Bradford Center Rd over West Branch of Warner River-Br. #140/144-Bement Covered Br[NHCBP*, SAB *]
NH 28 RECONSTRUCT DEPOT INTERSECTION NH28 (BROADWAY) AND NH 97 (MAIN STREET) ADD TURN LANES ON NH28 MUPCA[Ear-NH072, MUPCA*, Other Fed Aid]
I-93 I-93 EXIT 4A - Prelim., Final Design, ROW &Construction of NEW INTERCHANGE and connecting roadway[NON-PAR (other), Other Fed Aid]
Charlotte Avenue Elementary School Constructnew sidewalk, reconstruct crosswalk to meet ADA standards.[NON-PAR (other), SRTS]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
GUARDRAIL REPAIR NORTH 43005
GUARDRAIL REPAIR WEST 42994
MANCHESTER 42635A X-A005(001)
CONWAY 25103 X-A003(039)
SALEM 12334A X-A005(004)(LPA)
BRADFORD 23819 X-A002(772)(LPA)
SALEM 12334 X-STP-X-5399(011)(LPA)
DERRY - LONDONDERRY 13065 IM-0931(201)Design-Build
NASHUA 28739 X-A003(786)(LPA)
Project Name / Number
Second Quarter Total
March Monthly Total
April Monthly Total
$231,600
$399,500
$1,457,000
$563,800
$539,400
$1,155,800
$4,212,900
$57,878,100
$237,500
$0
$0
$1,457,000
$563,800
$431,500
$449,700
$3,370,300
$57,205,000
$93,000
07-Apr-20
07-Apr-20
07-Apr-20
14-Apr-20
28-Apr-20
29-Apr-20
06-May-20
12-May-20
19-May-20
$23,348,800
$4,347,100
$10,090,200
$2,902,000
$103,616,700 $46,022,600
March 2020
April 2020
May 2020
Contact Person: Sam Newsom
Contact Person: Sam Newsom
Contact Person: Ronald Grandmaison
Contact Person: Joseph Adams
Contact Person: C.R. Willeke
Contact Person: Kevin Russell
Contact Person: C.R. Willeke
Contact Person: Keith Cota
Contact Person: C.R. Willeke
05/05/20Print Date: 2020 Page 7 of 11
Fiscal Year
2020
Main Street Construct sidewalks, crosswalks, lighting and landscaping along Main Street in Durham on UNH Campu[TA *]
I 95 Turnpikes R&R Program Bridge Painting[TRR *]
Various To install Road and Weather systems around the State. [None-Highway, TPK *]
NUDD ROAD Bridge Rehabilitation-Nudd Rd over Bearcamp River-Bridge #108/333-Phase II-Whittier Covered Bridge[NHCBP*, SAB *]
NH 27, NH 111A, Winter St, Spring St Constructsidewalks on Epping Road, Brentwood Road, Winter Street, and Spring Street[TA *]
NH 38, NH 9 Intersection safety improvements -install Intersection Conflict Warning Systems in two locations[HSIP *]
NH 101 NH 123 intersection safety improvements[HSIP *]
Various Replacement and upgrade of signs and supports due to condition and improved compliance[USSS *]
South Main St. , Mason Road Const. Sidewalks on Rte 130, Const 60 foot Ped bridge over Nissitissit River and sidewalk to beach [TA *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DURHAM (UNH) 41369 X-A004(608)(LPA)
NORTH HAMPTON BRIDGE PAINTING 42917
STATEWIDE-RWIS 25198 A003(059)
OSSIPEE 23818 X-A002(771)(LPA)
EXETER 41372 X-A004(611)(LPA)
PELHAM-CHESTERFIELD 29338 X-A004(016)One Contract With 15698
PETERBOROUGH 15698 X-A000(890)One Contract With 29338
STATEWIDE SIGNS 42921 X-A004(994)
BROOKLINE 41364 X-A004(607)(LPA)
Project Name / Number
Third Quarter Total
May Monthly Total
June Monthly Total
$438,000
$2,069,100
$729,100
$1,001,900
$486,500
$139,500
$111,600
$228,500
$590,600
$350,400
$0
$364,600
$640,800
$389,200
$139,500
$111,600
$228,500
$472,400
26-May-20
26-May-20
26-May-20
15-Jun-20
16-Jun-20
16-Jun-20
16-Jun-20
23-Jun-20
30-Jun-20
$65,564,700
$2,558,600
$61,383,300
$1,982,000
$72,470,400 $66,267,300
May 2020
June 2020
Contact Person: Tom Jameson
Contact Person: Nancy Spaulding
Contact Person: Charles Blackman
Contact Person: Kevin Russell
Contact Person: Bob Hudson
Contact Person: Mike Dugas
Contact Person: Mike Dugas
Contact Person: Lee Baronas
Contact Person: Tom Jameson
05/05/20Print Date: 2020 Page 8 of 11
Fiscal Year
2020
Main Street, NH Routes 3 / 25 Reconstruct sidewalks to ADA compliance and construct new sidewalks on Main Street US Rte 3/25[NON-PAR (dot), NON-PAR (other), TA *]
US 3 & NH 26 Bridge Preservation on Columbia 108/167 and Colebrook 051/098.[Bridg-T1-2-Main-Pres]
NH 16 Reconstruct NH 16 from Olympic Lane east to NH 153 (Four Corners)[NON-PAR (other), Other Fed Aid, PRRCS *]
US302, NH 10 & US302 Bridge Preservation on Carroll 173/141 and Bethlehem 125/177.[Bridg-T1-2-Main-Pres]
Ami Brown Road Construct 11,695' of shared lane and bike lane markings. (14-42TAP) Ped crossing Improve at Rte 9[NON-PAR (other), TA *]
WINCHESTER STREET Reconst. of Winchester (NH 101 to Pearl & Island including Key Rd intersection) and Br. No. 125/069[Ear-NH049, MOBRR *, MUPCA*, NON-PAR (other), Other Fed Aid]
Cornish Toll Bridge Road Cornish Windsor Covered Bridge Scour Mitigation[BRPPI *, Bridg-T3-4-Main-Pres, NHCBP*, NON-PAR (Vermont)]
NH 119 Reconstruction of the new bridge over the Connecticut River[NON-PAR (Vermont), None-Bridge, Other Fed Aid, SB367-4-CENTS, TIGER]
Various Curve warning sign improvements on State highways[HSIP *]
Church Street Bridge Preservation efforts on the Church St over Conn River between Walpole, NH to Rockingham, Vt[Bridg-HIB-Main-Pres, NON-PAR (Vermont)]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
ASHLAND 41370 X-A004(610)(LPA)
COLUMBIA-COLEBROOK 42313 X-A004(814)
CONWAY 40018 X-A004(327)(LPA)
BETHLEHEM-CARROLL 42501 X-A004(878)
KEENE 40439 X-A004(408)(LPA)
KEENE 10309B X-STP-0111(007)(LPA)
CORNISH, NH - WINDSOR, VT 25067 A003(035)
HINSDALE, NH - BRATTLEBORO, VT 12210C A004(152)
STATEWIDE 42953 X-A005(002)
WALPOLE, NH - ROCKINGHAM, VT 42277 X-A004(799)
Project Name / Number
July Monthly Total
$522,900
$720,800
$3,460,800
$2,650,500
$332,300
$6,693,200
$2,325,000
$52,340,300
$465,000
$1,720,500
$302,200
$720,800
$2,549,400
$2,650,500
$265,800
$5,057,000
$2,048,800
$32,230,700
$465,000
$1,273,200
09-Jul-20
14-Jul-20
15-Jul-20
21-Jul-20
26-Jul-20
27-Jul-20
18-Aug-20
18-Aug-20
18-Aug-20
18-Aug-20
$14,380,500 $11,545,700
July 2020
August 2020
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Kevin Russell
Contact Person: Joseph Adams
Contact Person: Tom Jameson
Contact Person: Jennifer Reczek
Contact Person: Joseph Adams
Contact Person: Don Lyford
Contact Person: Mike Dugas
Contact Person: David Scott
05/05/20Print Date: 2020 Page 9 of 11
Fiscal Year
2020
Fiscal Year 2020 Total
US 4 / NH 108 Signalize intersection of US 4 westbound off ramp with NH 108[Other Fed Aid]
I-93 Full Width 1-1/2" inlay from MP 105.9 to 111.5 including exits 34B and 34C.[Pave-T1-Preserve, Pave-T1-Resurf, Pave-T3-4-Resurf]
I-93 SB Address Preservation needs on 5 bridges in Hooksett & Manchester on and over I-93 SB.[Bridg-HIB-Main-Pres, Bridg-T1-2-Main-Pres]
Various Installation of rumble strips along Stateroadways.
[HSIP *]
NH 175 Scour repairs at Woodstock 195/093 (NH175 over Pemi).[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
NH 101 Reclaiming and resurfacing NH 101.[Pave-T2-Resurf]
Various Preservation response to stabilize various bridges from scour.[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
NH Route 9 Rehab./Replacement of twin 72" x 44" corrugated metal arch pipes under Route 9.[BET-DRG-HQ, NON-PAR (dot)]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DURHAM 16254 X-A001(211)
LINCOLN-FRANCONIA 41052 X-A004(544)
MANCHESTER - HOOKSETT 41475 X-A004(648)
STATEWIDE 40842 X-A004(501)
WOODSTOCK 42534 X-A004(896)
MILFORD-AMHERST 43031 X-A005(016)
STATEWIDE 41915 X-A004(779)
STODDARD 42708
Project Name / Number
Fourth Quarter Total
August Monthly Total
September Monthly Total
$568,100
$3,052,300
$6,975,000
$446,400
$465,000
$4,961,400
$1,574,500
$441,800
$568,100
$2,994,400
$6,975,000
$446,400
$465,000
$4,961,400
$1,574,500
$0
25-Aug-20
01-Sep-20
01-Sep-20
01-Sep-20
08-Sep-20
22-Sep-20
22-Sep-20
29-Sep-20
$57,418,900
$17,916,400
$36,585,800
$17,416,700
$89,715,800
$304,348,600
$65,548,200
$211,460,700
August 2020
September 2020
Contact Person: Loretta Doughty
Contact Person: Ronald Grandmaison
Contact Person: David Scott
Contact Person: Mike Dugas
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: David Scott
Contact Person: Kirk Mudgett
05/05/20Print Date: 2020 Page 10 of 11
MANCHESTER 41361 X-A004(604)(LPA)
HINSDALE 41365 X-A004(615)(LPA)
CONCORD-HOPKINTON 41703 X-A004(716)
HILLSBOROUGH-HENNIKER-HOPKINTON 42864 X-A005(033)
BEDFORD 42268 X-A004(797)
CONCORD-ASHLAND-CAMPTON 41706 X-A004(719)
BETHLEHEM-CARROLL/WENTWORTH 42780 X-A005(012)
CONWAY (BWC) 42845 X-A005(013)
GORHAM/CAMBRIDGE/ERROL 42778 X-A005(011)
LYME-ORFORD-PIERMONT-HAVERHILL 41913 X-A004(777)
MANCHESTER 42635 X-A004(997)
Project Name / Number
Rail Trail Const. Rail Trail along abandoned railroad bed from Mammoth Road to Lake ShoreAvenue[TA *]
Brattleboro Road Construct Sidewalks along Brattleboro Road.[NON-PAR (dot), TA *]
I-89 Painting I-89 bridges between Concord and Hopkinton[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
US 202 Resurfacing US 202 in Hillsborough and Henniker including the ramps at NH 114.[Pave-T2-Resurf]
NH 101/Boynton St Rehabilitate 90" structural plate pipe under NH 101 & Boynton St in Bedford.[CRDR *]
I-93 Painting I-93 bridges in Concord, Ashland, and Campton[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
US 302/NH 25 Resurfacing of US 302 and NH 25
[Pave-T2-Resurf]
US 302 Resurfacing of US Route 302.
[Pave-T2-Resurf]
US 2 and NH 16 Resurfacing of US 2 and NH 16
[Pave-T2-Resurf]
Various Upgrade cable guardrail and "F" terminals on Tier 2 & 3 highways.[HSIP *]
I-293/NH101 & NH28 Bypass Resurfacing of I293/NH101 in Manchester & 28 Bypass from Derry to Manchester[Pave-T1-Resurf, Pave-T2-Resurf]
Project Description
09-Jun-20
15-Jun-20
11-Aug-20
11-Aug-20
18-Aug-20
01-Sep-20
22-Sep-20
22-Sep-20
22-Sep-20
22-Sep-20
22-Sep-20
Target Ad Date
$818,600
$443,000
$2,371,500
$2,510,200
$1,204,400
$2,334,300
$3,607,700
$1,140,500
$1,404,400
$1,116,000
$5,409,200
Approx. Contract Amt.
$654,900
$354,400
$2,371,500
$0
$1,204,400
$2,334,300
$3,607,700
$1,140,500
$1,404,400
$1,116,000
$5,409,200
Federal Dollars
ON-SHELF PROJECTS
Fiscal Year 2020
Contact Person: Tom Jameson
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Kirk Mudgett
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.
05/05/20Print Date: 2020 Page 11 of 11
STATEWIDE SW TIER 2 42716 X-A004(996)
STRATFORD-COLUMBIA (BWC) 42703 X-A004(995)
NEWPORT - CROYDON - GRANTHAM 41914 X-A004(778)
Project Name / Number
NH 12A/NH 101/NH 10 Resurfacing of NH 12A, NH 101, and NH 10[Pave-T2-Resurf]
US Route 3 Resurfacing of US 3.[Pave-T2-Resurf]
Route 10 Cable guardrail and "F" unit replacement[HSIP *]
Project Description
22-Sep-20
22-Sep-20
29-Sep-20
Target Ad Date
$2,549,700
$2,488,200
$1,116,000
Approx. Contract Amt.
$2,549,700
$2,488,200
$1,116,000
Federal Dollars
ON-SHELF PROJECTS
Fiscal Year 2020
On-Shelf Projects 2020 Total $28,513,700 $25,751,200
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Kirk Mudgett
On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.
05/05/20Print Date: 2021 Page 1 of 9
Fiscal Year
2021
NA Construct 2.8mile pathway parallel to the North-South Road[CMAQ *]
NH 101/Boynton St Rehabilitate 90" structural plate pipe under NH 101 & Boynton St in Bedford.[CRDR *]
Various Upgrade cable guardrail and "F" terminals on Tier 2 & 3 highways.[HSIP *]
I-293/NH101 & NH28 Bypass Resurfacing of I293/NH101 in Manchester & 28 Bypass from Derry to Manchester[Pave-T1-Resurf, Pave-T2-Resurf]
Route 10 Cable guardrail and "F" unit replacement[HSIP *]
US Route 3 Resurfacing of US 3.[Pave-T2-Resurf]
FEET FEET[TRR *]
NH 12 NH 12 Bridge Preservation efforts for NH12 over NECRR in Charlestown (Br. No. 181/058).[BET-BMT-BD]
I-95 & NH 16 I-95 & NH 16[TRR *]
NH 12A/NH 101/NH 10 Resurfacing of NH 12A, NH 101, and NH 10[Pave-T2-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
CONWAY 41755 X-A004(743)(LPA)
BEDFORD 42268 X-A004(797)
LYME-ORFORD-PIERMONT-HAVERHILL 41913 X-A004(777)
MANCHESTER 42635 X-A004(997)
NEWPORT - CROYDON - GRANTHAM 41914 X-A004(778)
STRATFORD-COLUMBIA (BWC) 42703 X-A004(995)
CENTRAL TURNPIKE PAVING 41821
CHARLESTOWN 42484
EASTERN TURNPIKE PAVING 41822
STATEWIDE SW TIER 2 42716 X-A004(996)
Project Name / Number
$1,860,000
$1,204,400
$1,116,000
$5,409,200
$1,116,000
$2,488,200
$4,103,200
$744,000
$2,964,100
$2,549,700
$1,488,000
$1,204,400
$1,116,000
$5,409,200
$1,116,000
$2,488,200
$0
$0
$0
$2,549,700
06-Oct-20
13-Oct-20
13-Oct-20
20-Oct-20
20-Oct-20
20-Oct-20
27-Oct-20
27-Oct-20
27-Oct-20
27-Oct-20
NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT
ADVERTISING SCHEDULE
October 2020 Contact Person: Tom Jameson
Contact Person: Kirk Mudgett
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
Contact Person: Nancy Spaulding
Contact Person: David Scott
Contact Person: Nancy Spaulding
Contact Person: Ronald Grandmaison
05/05/20Print Date: 2021 Page 2 of 9
Fiscal Year
2021
Hogback Road Slope failure repair and possibleroadway changes.[BET-STAL-HQ, NON-PAR (dot)]
Main Street and Riverside Drive Const. multi-use path along Androscoggin River from Service Credit Union Heritage Park to 12th St. [NON-PAR (other), TA *]
Rail Trail Const. Rail Trail along abandoned railroad bed from Mammoth Road to Lake ShoreAvenue[TA *]
US 302 & NH 16 Bridge Preservation efforts forNH16 over Ellis Rvr in Jackson & US302 over Stony Brk in Bartlett.[BET-BMT-BD]
US 202 Resurfacing US 202 in Hillsborough and Henniker including the ramps at NH 114.[Pave-T2-Resurf]
South Manchester Rail Trail Construct Multi-usepath along the abandoned rail corridor from Gold St. to Perimeter Road[CMAQ *, Ear-NH022]
Brattleboro Road Construct Sidewalks along Brattleboro Road.[NON-PAR (dot), TA *]
NH Route 28 Address Red List Bridge carrying NH 28 over Suncook River (Br No 107/098)[Bridg-T1-2-Rehab-Rcn]
US 302/NH 25 Resurfacing of US 302 and NH 25
[Pave-T2-Resurf]
US 302 Resurfacing of US Route 302.
[Pave-T2-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
STRATFORD 42555
BERLIN 41367 X-A004(616)(LPA)
MANCHESTER 41361 X-A004(604)(LPA)
BARTLETT-JACKSON 41989
HILLSBOROUGH-HENNIKER-HOPKINTON 42864 X-A005(033)
MANCHESTER 29811 X-A004(311)(LPA)
HINSDALE 41365 X-A004(615)(LPA)
ALLENSTOWN-PEMBROKE 40362 X-A004(369)
BETHLEHEM-CARROLL/WENTWORTH 42780 X-A005(012)
CONWAY (BWC) 42845 X-A005(013)
Project Name / Number
October Monthly Total
$446,400
$1,298,500
$818,600
$395,300
$2,510,200
$1,427,400
$443,000
$2,483,100
$3,607,700
$1,140,500
$0
$634,600
$654,900
$0
$0
$1,141,900
$354,400
$0
$3,607,700
$1,140,500
27-Oct-20
31-Oct-20
01-Nov-20
03-Nov-20
03-Nov-20
03-Nov-20
15-Nov-20
17-Nov-20
17-Nov-20
17-Nov-20
$25,299,700 $16,006,100
October 2020
November 2020
Contact Person: Tobey Reynolds
Contact Person: Bob Hudson
Contact Person: Tom Jameson
Contact Person: Joseph Adams
Contact Person: Ronald Grandmaison
Contact Person: Tom Jameson
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
05/05/20Print Date: 2021 Page 3 of 9
Fiscal Year
2021
US 2 and NH 16 Resurfacing of US 2 and NH 16
[Pave-T2-Resurf]
I-95 ITS Improvements to I-95 from Portsmouth, NH to York, ME[TRR *]
NH 202A (WALNUT STREET) INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD SQ, NORTH MAIN, & WASHINGTON ST[MUPCA*, NON-PAR (other)]
RTE 108 Traffic signal improvements and installation of a camera system to monitor traffic flow.[CMAQ *]
US Route 3 Br Preservation on US 3 (Meredith 184/138), NH 11 (Gilford 102/099), & NH 11A (Gilford 138/137)
[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
NH 1B Bridge replace, Single Leaf Bascule Bridge, NH 1B over Little Harbor (Red List) Br No 066/071[Bridg-HIB-Rehab-Rcn, CBI *, None-Bridge]
US 202 / NH 101 Bridge Replacement and Widening for TCP, US 202 & NH 101 over Contoocook River (Red List)[Bridg-T1-2-Rehab-Rcn, NON-PAR (dot), NON-PAR (other), None-Bridge]
Waukewan Road Rehabilitation of Red List Bridge carrying Waukewan Road over Snake River (Br No 080/040)[Bridg-T3-4-Rehab-Rcn, None-Bridge]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
GORHAM/CAMBRIDGE/ERROL 42778 X-A005(011)
PORTSMOUTH, NH - YORK, ME 16189B
ROCHESTER 14350 X-A000(320)(LPA)
DOVER 41746 X-A004(734)(LPA)
MEREDITH-GILFORD 41483 X-A004(652)
NEW CASTLE - RYE 16127 X-A001(146)
PETERBOROUGH 15879 X-A001(007)
CENTER HARBOR - NEW HAMPTON 24579 X-A002(923)
Project Name / Number
First Quarter Total
November Monthly Total
December Monthly Total
$1,404,400
$4,863,900
$4,174,000
$120,900
$1,069,500
$7,532,500
$8,934,300
$737,600
$1,404,400
$0
$1,264,800
$96,700
$1,069,500
$7,532,500
$8,724,200
$737,600
17-Nov-20
08-Dec-20
15-Dec-20
31-Dec-20
05-Jan-21
05-Jan-21
05-Jan-21
12-Jan-21
$14,230,200
$9,158,800
$8,303,800
$1,361,500
$48,688,700 $25,671,400
November 2020
December 2020
January 2021
Contact Person: Ronald Grandmaison
Contact Person: Charles Blackman
Contact Person: Bob Hudson
Contact Person: Tom Jameson
Contact Person: Joseph Adams
Contact Person: Jennifer Reczek
Contact Person: Joseph Adams
Contact Person: David Scott
05/05/20Print Date: 2021 Page 4 of 9
Fiscal Year
2021
NH 3A Constructing a third southbound right turn lane on Lowell Rd/NH 3A [CMAQ *]
East Thetford Road Bridge Rehab, for Red List Bridge carrying East Thetford Road over the Conn. River (Br No 053/112)[Bridg-T3-4-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]
NH 16 Pavement Rehab and drainage upgradesincluding improvements at Mt. Shaw Rd.[Pave-T2-Rehab]
Lang Road/Longmeadow Road/US Route 1 Realign Lang Road to connect to Longmeadow Road[HSIP *, NON-PAR (other)]
US 4 REHABILITATE OR REPLACE RED LIST BRIDGE CARRYING US 4 OVER NHRR - 156/104[Bridg-T1-2-Rehab-Rcn, None-Bridge]
Various Resurfacing various tier 2, 3, and 4 roadways in District 1.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 1.[Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 2.[Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 2.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 3.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
HUDSON 41754 X-A004(742)(LPA)
LYME, NH - THETFORD, VT 14460 A000(394)
OSSIPEE 41251 X-A004(573)
PORTSMOUTH 42350 X-A004(818)(LPA)
DANBURY 16303 X-A001(230)
DISTRICT 1 N 16161J
DISTRICT 1 S 42460
DISTRICT 2 E 42461
DISTRICT 2 W 16162J
DISTRICT 3 N 16163J
Project Name / Number
January Monthly Total
$1,162,500
$8,191,400
$2,325,000
$898,800
$2,046,000
$2,054,200
$2,197,400
$240,700
$2,613,600
$2,739,400
$930,000
$0
$2,325,000
$809,000
$2,046,000
$0
$0
$0
$0
$0
12-Jan-21
12-Jan-21
12-Jan-21
19-Jan-21
26-Jan-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
$32,897,600 $24,173,800
January 2021
February 2021
Contact Person: Tom Jameson
Contact Person: Joseph Adams
Contact Person: Tobey Reynolds
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
05/05/20Print Date: 2021 Page 5 of 9
Fiscal Year
2021
Varies Resurfacing various tier 2, 3, and 4 roadways in southern District 3.[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 4.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 5.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 6.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Pedestrian Trail from DW Highway to existing trail Construct pedestrian trail in the town of Merrimack for approximatly 700LF. (14-15TAP)[TA *]
Manchester & Lawrence Rail Line 0.3 miles of Bike-Ped trail along abandoned M&L rail line from Cluff Crossing to Rockingham Pk Blvd[CMAQ *]
Spaulding Turnpike Construct All Electronic Tolling at Dover and Rochester Toll Plazas.[TPK *]
Peverly Hill Rd. Const. new sidewalk and striped bicycle shoulders and associated drainage along Peverly Hill Road.[CMAQ *, NON-PAR (other)]
FE Everett Turnpike FE Everett Turnpike widening of a 2-lane section from north of Exit 13 to north of I-293 diverge.[TPK *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DISTRICT 3 S 43026
DISTRICT 4 16164J
DISTRICT 5 16165J
DISTRICT 6 16166J
MERRIMACK 40300 X-A004(357)(LPA)
SALEM 41750 X-A004(738)(LPA)
DOVER - ROCHESTER 29440
PORTSMOUTH 20258 X-A002(061)(LPA)
NASHUA-MERRIMACK-BEDFORD 13761D
Project Name / Number
Second Quarter Total
February Monthly Total
March Monthly Total
$4,225,700
$2,741,000
$1,311,400
$2,816,900
$835,900
$609,200
$16,275,000
$1,063,700
$16,388,300
$0
$0
$0
$0
$668,700
$487,300
$0
$340,400
$0
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
15-Feb-21
15-Feb-21
23-Feb-21
09-Mar-21
23-Mar-21
$38,660,400
$17,452,000
$1,156,000
$340,400
$89,010,000 $25,670,200
February 2021
March 2021
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Bob Hudson
Contact Person: Tom Jameson
Contact Person: Nancy Spaulding
Contact Person: Tom Jameson
Contact Person: Wendy Johnson
05/05/20Print Date: 2021 Page 6 of 9
Fiscal Year
2021
NH 101 Bridge Rehab or Replacement of br no 090/065 carrying NH 101 over Pulpit Brook[Bridg-T1-2-Rehab-Rcn, Other Fed Aid]
Various Installation of rumble strips along Stateroadways.
[HSIP *]
Portions on High Street, Memorial Drive, Cemetery Rd. Const sidewalks on High St, Memorial Dr, Cemetery Rd, upgrade crosswalk across High St, const Path[TA *]
Herritage Rail Trail East Construct the Heritage Rail Trail East[CMAQ *]
Hampton Branch Rail Corridor Acquire 9.7 milesRR Corridor Hampton-Portsmouth & improve existing corridor surface for bike/ped[CMAQ *]
Elwyn Road Add a multi-use path for bike/pedalong Elwyn Rd extending from Rt1 to Harding Rd.[CMAQ *]
US 4 Bridge Pres on 3 brs in Canaan carrying US 4 over Indian Riv, Mascoma Riv, & Crystal Lake Brook.[Bridg-T1-2-Main-Pres]
NH Route 25A Bridge Replacement is anticpated for the bridge carrying NH Route 25A over Brackett Brook (217/112)[Bridg-T3-4-Rehab-Rcn]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
BEDFORD 13692C X-A004(254)
STATEWIDE 40843 X-A004(502)
SOMERSWORTH 41363 X-A004(606)(LPA)
NASHUA 41742 X-A004(730)(LPA)
HAMPTON - PORTSMOUTH 26485 X-A003(355)
PORTSMOUTH 41752 X-A004(740)(LPA)
CANAAN 42938 X-A004(998)
ORFORD 40366 X-A004(371)
Project Name / Number
Third Quarter Total
April Monthly Total
May Monthly Total
June Monthly Total
$3,977,100
$446,400
$810,500
$901,400
$1,906,500
$790,500
$1,325,300
$1,860,000
$3,977,100
$446,400
$648,400
$721,200
$1,906,500
$632,400
$1,325,300
$1,860,000
13-Apr-21
04-May-21
12-May-21
18-May-21
25-May-21
01-Jun-21
15-Jun-21
29-Jun-21
$3,977,100
$4,064,800
$3,975,800
$3,977,100
$3,722,500
$3,817,700
$12,017,700 $11,517,300
April 2021
May 2021
June 2021
Contact Person: Jennifer Reczek
Contact Person: Mike Dugas
Contact Person: Tom Jameson
Contact Person: Tom Jameson
Contact Person: Mike Dugas
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Joseph Adams
05/05/20Print Date: 2021 Page 7 of 9
Fiscal Year
2021
SPAULDING TURNPIKE / LITTLE BAY BRIDGES Remove the superstructure General Sullivan Br& provide the most cost effective bike/ped connection[TPK *]
NH 101A Safety impr. at NH 101A / Cont. Blvd & at Craftsman Lane / Boston Post Rd[Other Fed Aid]
I-89 Rehabilitate from MM 24.2 to MM 28.7 including the ramps for exit 10[GARVEE-21, Pave-T1-Rehab]
I-89 Rehabilitation of pavement structure and drainage improvements. MM 28.7 to MM 31.2-NB/31.6-SB[GARVEE-21, Pave-T1-Rehab]
NH Route 104 Rehabilitation of a 90" dia. multi-plate pipe under Route 104 at intersection of Corliss Hill Rd.[CRDR *]
US 4 Replacement of bridge carrying US 4 overBlackwater River (143/077)[Bridg-T1-2-Rehab-Rcn]
S BENNINGTON ROAD South Bennington Road over Russell Brook Bridge Rehab or Replacement[Bridg-T3-4-Rehab-Rcn]
Huse Road Address Red List bridge carrying Huse Road over I-293 and NH Route 101 (176/106)[Bridg-T3-4-Rehab-Rcn]
NH Route 122 Address Red List bridge carrying NH 122 (Main St) over NH 101 in the Town of Amherst (135/109)[Bridg-T3-4-Rehab-Rcn]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
NEWINGTON - DOVER 11238S
MERRIMACK 10136D X-A001(265)
SUTTON 42419 X-A004(839)One Contract With 40511
SUTTON - NEW LONDON 40511 X-A004(421)One Contract With 42419
MEREDITH 42912 X-A004(991)
ANDOVER 40392 X-A004(384)
BENNINGTON 29486 X-A004(156)
MANCHESTER 41414 X-A004(624)
AMHERST 41413 X-A004(623)
Project Name / Number
July Monthly Total
August Monthly Total
$28,132,500
$4,019,700
$12,834,000
$5,868,200
$320,900
$3,255,000
$558,000
$2,325,000
$1,860,000
$0
$4,019,700
$372,000
$232,500
$320,900
$3,255,000
$558,000
$2,325,000
$1,860,000
20-Jul-21
27-Jul-21
10-Aug-21
10-Aug-21
17-Aug-21
31-Aug-21
07-Sep-21
07-Sep-21
14-Sep-21
$32,152,200
$22,278,100
$4,019,700
$4,180,400
July 2021
August 2021
September 2021
Contact Person: Keith Cota
Contact Person: Jennifer Reczek
Contact Person: Tobey Reynolds
Contact Person: Tobey Reynolds
Contact Person: Kirk Mudgett
Contact Person: Joseph Adams
Contact Person: David Scott
Contact Person: Joseph Adams
Contact Person: Joseph Adams
05/05/20Print Date: 2021 Page 8 of 9
Fiscal Year
2021
Fiscal Year 2021 Total
US Route 1 Superstructure replacement of bridge carrying US 1 over Boston & Maine RR (Red List Br No 148/132)[Bridg-T1-2-Rehab-Rcn, None-Bridge]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
NORTH HAMPTON 24457 A002(909)
Project Name / Number
Fourth Quarter Total
September Monthly Total
$4,185,000 $4,185,00014-Sep-21
$8,928,000 $8,928,000
$63,358,300
$213,074,700
$17,128,100
$79,987,000
September 2021 Contact Person: Matthew Lampron
05/05/20Print Date: 2021 Page 9 of 9
HANOVER, NH - NORWICH, VT 42278 X-A004(800)
BOW 42704 X-A004(950)
SWANZEY 27692 X-A003(591)
Project Name / Number
NH 10A Bridge Preservation effort on the bridge carrying NH 10A over Conn River (Ledyard Bridge)[Bridg-HIB-Main-Pres, NON-PAR (Vermont)]
I-89 Rehabilitation of a 48" cmp & 18" cmp under I-89 near intersection of I-93, Bow.[CRDR *]
NH Route 32 Address Red List Bridge (149/072) carrying NH Route 32 over Martin Brook in the Town of Swanzey[Bridg-T3-4-Rehab-Rcn]
Project Description
24-Aug-21
14-Sep-21
14-Sep-21
Target Ad Date
$1,767,000
$488,300
$1,209,000
Approx. Contract Amt.
$1,219,200
$488,300
$0
Federal Dollars
ON-SHELF PROJECTS
Fiscal Year 2021
On-Shelf Projects 2021 Total $3,464,300 $1,707,500
Contact Person: David Scott
Contact Person: Kirk Mudgett
Contact Person: Joseph Adams
On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.