7) Power to the Crane should be switched off when the Crane is left unattended.
![Page 2: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/2.jpg)
Mobile jib Cranes present extra hazards in use. Particular points requiring attention include:
8) The travelling height of the Crane with jib lowered and raised should be marked on the Crane.
![Page 3: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/3.jpg)
9) Overhead obstructions or hazards should be clearly identified and marked with the maximum clearance height.
10) Care should be taken to ensure that no one is trapped by counter-balance weight, etc., as the crane slews.
![Page 4: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/4.jpg)
11) The condition of the ground should be checked before lifting with a mobile crane and it should not approach close to excavations.
![Page 5: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/5.jpg)
12) Tandem lifts should be avoided if possible. If they must be undertaken, it must be by a fully trained gang under the a Strict Control of a Competent Person.
![Page 6: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/6.jpg)
![Page 7: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/7.jpg)
![Page 8: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/8.jpg)
Whilst work is in progress:Check that there is an up-to- to-date Test Certificate.
![Page 9: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/9.jpg)
Check that the daily/weekly inspections are being carried out.
![Page 10: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/10.jpg)
Ensure that the Crane is operating from planned / approved position
only.
![Page 11: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/11.jpg)
Ensure that the correct Lifting Gear is being used.
![Page 12: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/12.jpg)
Ensure that outriggers are being used,and are adequately supported.
![Page 13: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/13.jpg)
Check that the safe load / radius indicator
is in working order.
![Page 14: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/14.jpg)
Load
Indicator
Angle
Range of Capacity Boom
Length
Height
Radius
![Page 15: NGI-Cranes-Part 03](https://reader033.fdocuments.us/reader033/viewer/2022061104/54135d218d7f7284698b45a9/html5/thumbnails/15.jpg)
Radius
Overload indicators