NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015...

15
Page 1 NG-EPON Industry Connections (IC) Marek Hajduczenia, Acting Chair Bright House Networks Louisville, CO, USA, 02/02/2015

Transcript of NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015...

Page 1: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 1

NG-EPON

Industry Connections (IC)

Marek Hajduczenia, Acting Chair

Bright House Networks Louisville, CO, USA, 02/02/2015

Page 2: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 2 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC Structure

IEEE-SA

Standards Board

Standards Process

Approval Process

NG-EPON IC Activity

IC Process

IEEE-SA

Standards Association

ICCom

Industry

Connections

Committee

IEEE 802

Sponsor Group

IEEE 802.3

Working Group

NG-EPON IC

Page 3: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 3 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON ICAID

• NG-EPON IC Activity Initiation Document

(ICAID) can be found at: NGEPON ICAID

• Expected completion of NG-EPON IC

activities in December’15

• Deliverables of NG-EPON IC: report to be

published as 802.3 WG communication,

following a liaison approval process

• Participation open to all individuals

Page 4: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 4 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC project goals • Create a venue for interested individuals to

discuss the requirements and technical options for the next generation of Ethernet Passive Optical Networks

• Operate under and report to the IEEE 802.3 Ethernet Working Group

• Explore operators’ requirements

• Explore market potential

• Explore technological and economic tradeoffs.

• Explore the state of the art of optical technology for subscriber access networks

• Produce a report of the group’s findings

Page 5: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 5 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC status

• 9 meetings of NG-EPON IC held so far

• NG-EPON report D1.0 (draft) published in January’15. NG-EPON draft D2.0 expected mid February’15.

• Main focus on completion of the NG-EPON IC report to seek 802.3 WG approval in March’15 plenary

• Call For Internet (CFI) expected within the next few months. Details to be distributed on NG-EPON reflector.

Page 6: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (1)

• Draft report D1.0 is available for preview

within the private area of the NG-EPON IC

ad-hoc (private area)

• Draft focuses on project goals, exploring

operators’ requirements, market potential,

technological and economic tradeoffs, as

well as the state of the art of optical

technology for subscriber access networks

• Outline is presented on the next slide

Page 7: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 7 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (2)

• NG-EPON IC report outline

Page 8: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 8 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (3)

• Different architectures are possible

MSD-WDM-PON

Scheduling Domain #1

Scheduling Domain #2

Scheduling Domain #3

Scheduling Domain #4

ONU1 ONU2 ONU3

ONU6 ONU7 ONU6

ONU8 ONU9 ONU10

ONU12 ONU11

1

2

3

4

SSD-WDM-PON

Scheduling Domain

ONU1 ONU2 ONU3

1

2

3

4

ONU1 ONU2 ONU3

ONU1 ONU2 ONU3

ONU1 ONU2 ONU3

WA-PON

Scheduling Domain #1

Scheduling Domain #2

Scheduling Domain #3

ONU1 ONU2 ONU3

ONU6 ONU7 ONU6

ONU8 ONU9 ONU10

1

2

3

4

ONU6 ONU7 ONU6

Page 9: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 9 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (4)

• Examples of bandwidth consumption trends

0%

100%

200%

300%

400%

500%

600%

700%A

ug-

10

Oct

-10

Dec

-10

Feb

-11

Ap

r-1

1

Jun

-11

Au

g-1

1

Oct

-11

Dec

-11

Feb

-12

Ap

r-1

2

Jun

-12

Au

g-1

2

Oct

-12

Dec

-12

Feb

-13

Ap

r-1

3

Jun

-13

Au

g-1

3

Oct

-13

Dec

-13

Feb

-14

Ap

r-1

4

Jun

-14

Au

g-1

4

Oct

-14

Peak Usage

Peak Usage 6-mo Moving Avg

YoY Growth in Peak Usage

YoY Growth in Peak Usage Moving Avg

Page 10: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 10 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (5)

• Service examples

fiber

EPON OLT (L2/L3)

with IP router

PC

Printer

Laptop

EPON ONU (L2)

Firewall + NAT

HGW + WiFi AP

twisted

pair

LAN

Service Edge Router

PON

Converged

Transport

Networkfiberfiber

fiber

IP connection path

fiber

EPON OLT (L2)

no IP router

PC

Printer

EPON ONU (L2)

twisted

pair

LANPONfiber

fiber

LAN switch

MPLS tunnel across

Converged Transport Network

SERDAR

DIA circuit

Architecture of a Residential FTTH Services

Architecture of DIA service

Page 11: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 11 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (6)

• Service examples

fiber

EPON OLT (L2)

no IP router

PC

Printer

EPON ONU (L2)

twisted

pair

LANPONfiber

fiber

LAN switch

MEF circuit

fiber

EPON OLT (L2)

no IP router

PC

Printer

EPON ONU (L2)

twisted

pair

LANPONfiber

fiber

LAN switch

SITE 1

SITE 2

SER

MPLS tunnel access

Converged Transport Network

SER

MEF circuit

Architecture of MEF Services

Page 12: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 12 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

NG-EPON IC report (7)

• Service examples

fiber

EPON OLT (L2/L3)

with IP router

EPON ONU (L2)

public WiFi AP

link

Service Edge Router

PON

Converged Transport Network

& public Internetfiberfiber

fiber

WiFi Core controller

WiFi control traffic

WiFi user traffic

Architecture of Public WiFi Backhaul Service

Page 13: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 13 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

Next Steps

• Publish report draft D2.0 and send out for

comments to NG-EPON IC ad-hoc and

802.3 WG membership

• Resolution of received comments during

plenary meeting in March’15

• Seek 802.3 WG approval of report at the

closing plenary in March’15

• Report gets published after professional

preparation by IEEE-SA editors.

Page 14: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 14 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

Reflector and Web

• NG-EPON IC Ad-hoc home page URL: http://www.ieee802.org/3/ad_hoc/ngepon/

• NG-EPON IC email reflector subscription: http://www.ieee802.org/3/ad_hoc/ngepon/reflector.html

• NG-EPON IC Ad-hoc reflector archive: http://www.ieee802.org/3/ad_hoc/ngepon/email/thrd1.html

Page 15: NG-EPON Industry Connections (IC) - IEEE 1904 · Version 2.6 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Page 4 NG-EPON IC project goals •Create a venue for interested individuals

Page 15 NG-EPON IC Ad-Hoc – 02/02/2015 interim meeting Version 2.6

Thank You!