Newtown Mid Wales Drive-Thru Gastronomy Foods UK Ltd 17 th August 2012 APPROVAL.
-
Upload
alysha-pyburn -
Category
Documents
-
view
213 -
download
0
Transcript of Newtown Mid Wales Drive-Thru Gastronomy Foods UK Ltd 17 th August 2012 APPROVAL.
Newtown
Mid Wales
Drive-Thru
Gastronomy Foods UK Ltd
17th August 2012
APPROVAL
Expansion Criteria
Quarter 1
Quarter 2
Quarter 3
Quarter 4
84.3% 81.8% 74.7%
83% 84% 81%
Yes Yes Yes
Yes Yes Yes
CER Results
CMS Results
Royalty Payments/Fees Up To Date
Supplier Payments Up To Date
Franchise People SlideFranchise DC Summary and Management Update 2012
Franchise Name: Gastronomy Foods UK Ltd Total Number of Stores 11
Optimum Management Current Management Variance In Training
Variance to Optimum
Leavers in Q2 2012
Above Store Capability
Ops Manager 1 Ops Manager 1 Ops Manager 0 Ops Manager 0 0 Ops Manager 0
Area Coach 2 Area Coach 2 Area Coach 0 Area Coach 0 1 Area Coach 0
Trainers 1 Trainers 1 Trainers 0 Trainers 0 0 Trainers 0
Store level Capability
RGM 11 RGM 11 RGM 0 Internal RGM 1 1 RGM 0
ARGM 7 ARGM 8 ARGM 1 External RGM 0 ARGM 0
TL 25 TL 43 TL 18 TARGM 1 2 TL 10
TTL 12 30 TRGM 0
TARGM 0
TTL 3
Reason if Optimum RGM Number does not equal Number of Stores
Progress and Key Milestones in Q2 2012 Plans for Q3 2012
13 new DC candidates finished books and are running shifts shadowed by existing managers. All to be skilled assessed and signed off by end P7. LZ rolled out for all RGms, will be continuing when recertification comes back online. TPWY rolled out to RGMs. Training Manager qualified as first Aid Instructor. Cleaning and Accountability workshops held in 4 stores with opportunities identified by CER, providing better TL knowledge and capability, and enabling Performance management to be carried out for further issues.
TRGM to be confirmed RGM by end P8. New TRGM to be confirmed if successful by end Q3. RGMs to cascade LZ to ARGMs, TLs by end P7. Recertification of managers starts P7, starting with long term managers. TPWY will follw Recertification. First Aid courses will be held for all management, scheduled in, and will be completed by end P7. New DC Course to be initiated after the Roll out 19th June
Regional Context Map of Site Location
Potential Sites Existing FranchiseeExisting GFUK Rest.Proposed Site
Trade Zone Map/ Market Plan
Area Map of Site Location
Area Map of Site Location with Proposed By-Pass
Aerial Shot of Site Location
Scheme Layout Plan
Site Layout Plan
The Proposed Site
Proposed Development.KFC unit to sit where Co-
Op building is
The Proposed Site
Proposed Development.KFC unit to sit where Co-
Op building is
The Proposed SiteProposed Development.
KFC unit to sit where Co-Op building is
McDonalds Car Park
The Proposed SiteProposed Development.
KFC unit to sit where Co-Op building is
The Proposed SiteView from KFC Car Park
McDonalds
Overlaps
Drive Times
Traffic Flows
Target Acorn Groups
Site Assessment Form
Category
1 Demographics
2 Demographics
3 Demographics
4 Demographics
5 Overlaps
Variable Site Actual Average Variable Site Actual Average Variable Site Actual Average
Ethnicity 1% 8% Car Ownership 71% 65% Population 11,838 66,441
Muslim % 4% Students 335 3,319
Walk Population 1,607 1,329 Target Acorn 11-39 20% 39%
Traffic 16,268 24,936
Walk Workers 815 1,220
Workers 6,746 31,591
3 1 6
Store No Asset Type Overlap % Distance (miles)UC% (52 week
avg)CER (52 week
avg)
KFC Site Assessment - Newtown Pool Rd (page 1 of 1) CM / SG
OwnershipStore Name
20% ABOVE AVERAGE AVERAGE
MARKET PLANNING SUMMARY POINTS
No Overlaps
Target Acorn% is significantly below average
Traffic is below average
Population is significantly below average
4 out of 10 points above average or average
Comments
Core DTIdeal Asset:
Proposed Asset: Core DT (Non-London)KFC Site Assessment - Newtown Pool Rd
DEMOGRAPHICS (based on 8 minute drive time)
Issue Date: 22/08/2012
Site Name: Newtown Pool Rd
SAF Completed/Requested By:
20% BELOW AVERAGE
COUNT COUNT COUNT
This SAF is being provided to the Franchisee on the strict understanding that KFC (GB) is giving no representations or guarantees in respect of the performance of the proposed site, or the accuracy of any assumptions used, and on the condition that neither KFC (GB) nor any of its affiliated companies shall have any liability whatsoever for the contents of, or for any estimates, projections, errors or omissions contained in or produced pursuant to this SAF. If this information is used directly by the Franchisee to indicate possible performance of the proposed site, the Franchisee must recognise that it takes sole responsibility for such use of this information and should obtain independent verification thereof. This information will not be the sole factor relevant to the performance of the site and other issues, such as operational performance, a changing market place or competitor activity, will all have a significant effect on the performance of a site. Without limiting the foregoing, any approval from KFC (GB) of the development of the site by the Franchisee will not be deemed to be any endorsement or representation by KFC (GB) in relation to the performance of the site and neither KFC (GB) nor any of its affiliated companies shall have any liability in connection with any such approval.
OVERLAPS
52 week WPSA (latest 12 week)
Summary
Proposed unit Core DT (260)
Does proposed unit conform to Market Plan?
Yes
Main generators Traffic, Population from a 20min Drive Time. Through road to Mid & West Wales from the Midlands.
Competition •McDonalds
•Opposite Proposed KFC unit
•2012 PSA £33,000
Nearest KFC’s •KFC Shrewsbury
•No Overlap
•£17,000
Deal Summary
Rent per square foot and/ or total annual rent or freehold deal
£22 per sq. ft. Annual Rent of £57,772.
12 months rent free period.
Length of lease 20 Years. 5 yearly reviews with a 15 tenant only Break-Clause
Service charge TBD
Conditionality 6 months rent to be held as a deposit with Landlords for 3 years.
Forecast Breakeven £ £18,000 Breakeven.
Predicted PSA sales £ £22,000
Forecast opening date October 2013
Projected Timelines.
Dates
Site legally secured date October 2012
Planning submitted date November 2012
Construction start date June 2013
Store Opening Prediction October 2013
Any qualifying comments on above These are conservative timelines as the Developers have already had discussions with the planners and a positive response was received.
Notes - Newtown
• There is a By-Pass proposed which has been on the cards since 1970. Since the Tesco was built, a few years ago, the traffic is extremely congested and slow moving. The By-Pass has been listed as a priority now by the Welsh Assembly. They are hoping to get construction underway in 2014.
• I have looked at the detailed traffic movement predictions produced by the Welsh Assembly and they are available if anyone chooses to see them.
• In my view, this By-Pass will only help our Drive-Thru as it can take up to 1 hour just to get through the town during peak times.