    OFFICE MEMORANDUMNo.DGW/MAN/167A

    ISSUED BY AUTHORITY OF DIRECTOR GENERAL OF WORKS

    NIRMAN BHAVAN, NEW DELHI DATED: 18.02.2009_

    Subject: Amendment of section 32.8, 32.9 and 32.10 containing Clause 10C,

    10CA and 10CC of CPWD Wor ks Manual-2007

    Modifications done vide OM No. DGW/MAN/167 dt. 1.12.08 to para 32.8, 32.9

    and 32.10 of CPWD Works Manual 2007 are hereby withdrawn with immediate effect.

    The re-modified provisions of these paras shall be as under which shall be applicable

    only in respect of the new contracts and shall not be applicable to contracts already drawn

    or where tenders have already been received and not finalized

    Existing Provision Modified Provision32 .8 Claus e 10 (C) of Form s n o. CPWD 7 an d

    8

    1) Claus e 1 0(C) provides for re-im bu rsem en t

    to contractor due to increas e/ decrease caused

    as a direct result of coming into force of any

    fresh law or statutory rule or order (but not

    du e to any cha nges in sa les tax/ VAT), in th e

    price of material incorporated in the works

    (excluding the materials covered under clause

    10CA) an d/ or wages of labou r increased over

    prices/ wages prevailin g at the time of the las tstipulated date of receipt of tenders including

    extensions, of any, for the work during

    contract period including the justified period

    extended under the provisions of clause 5 of

    the contract without any act ion under clause

    2. The increase should not be at tr ibutable to

    delay in the execution of the contract within

    the control of the contra ctor.

    2) The operation of the clause includes the

    increase as well as decrease in price of

    ma terials an d/ or the wages of labour.

    3) To ensure uniformity in working out the

    rates so payable, following procedure shall befollowed:

    (i) Materials:

    The Increased / Decreased rates of ma terial(s)

    shall be approved by Zonal Chief Engineer.

    Payment/ Recovery shall be ma de by

    Engineer-in-Charge on the basis of theoretical

    consumption of material(s) multiplied with

    difference in cost of such material(s) as

    32 .8 Clause 1 0(C) of Form s n o. CPWD 7 an d

    8

    1) Clause 10(C) provides for re-imbursement

    to contractor due to increase/ decrease cau sed

    as a direct result of coming into force of any

    fresh law or statutory rule or order (but not

    du e to any cha nges in sa les ta x/ VAT), in th e

    price of material incorporated in the works

    (excluding the materials covered under clause

    10CA) an d/ or wages of labou r increased over

    prices/ wages prevailing at th e time of the laststipulated date of receipt of tenders including

    extensions, of any, for the work during

    contract period including the justified period

    extended under the provisions of clause 5 of

    the contract without any act ion under clause

    2. The increase should not be at tr ibutable to

    delay in the execution of the contract within

    the control of the contra ctor.

    2) The operation of the clause includes the

    increase as well as decrease in price of

    ma terials an d/ or the wages of labour .

    3) To ens u re u niformity in working out the

    rates so payable, following procedure shall befollowed:

    (i) Materials:

    The Increased/ Decreased rates of ma terial(s)

    shall be approved by Zonal Chief Engineer.

    Paymen t/ Recovery sh all be made by Engineer-

    in-Charge on the basis of theoretical

    consumption of material(s) multiplied with

    difference in cost of such material(s) as

  • 7/30/2019 newsitem_dgwman_MAN167A

    2/6

    prevailing at the time of receipt of tender and

    increased / decreased ra tes a s approved by

    Zonal Chief Engineer.

    (ii) La bou r:

    The increase/ Decrease sha ll be approved and

    Paid/ Recovered by Enginee r-in-Ch arge on the

    ba sis of Incre ase/ Decreas e of wages of labourcoming into force as per fresh law or sta tu tory

    ru le or order.

    4) Clause 10(C) forms .. in the

    na tu re of an equ itable reimbu rsemen t.

    5) The claim for increase increased over the

    prices/ wages prevailin g at the time of the las t

    stipulated date of receipt of tenders including

    extensions, if any, for the work duringcontract period including the justified period

    extended under the provisions of clause 5 of

    the contract without any act ion under clause

    2, shall be payable which shall be limited to

    the prices/ wages prevailing at the t ime of

    stipulated date of completion or as prevailing

    for the period under consideration, whichever

    is less .

    This clause shall not be applicable where

    claus e 10CC is app licable.

    32 .9 Claus e 1 0 (CA) of Form s n o. CPWD 7

    a n d 8

    (1) Clause 10 CA provides

    cons titu ting su bs tan tial

    pa rt of the work.

    The NIT approving authority may consider

    bringing materials like cement, steel,

    structural steel , b i tumen etc. under the ambit

    of this claus e. Su ch list of m aterials (otherthan Cement, Steel reinforcement bars and

    structural steel) shall be got approved from

    ADG concerned, who shall have full powers for

    su ch approval . The material , the est imated

    cost of which is less th an 5% of estima ted cost

    of work and the materials l ike sand, stone

    etc., the prices of which vary from place toplace, need not be considered. The items

    which are su pplied by the departmen t a t fixed

    price to the contractor shall also not be

    considered.

    (2) All India Whole Sale Price indices for

    various materials (except Cement, Steel

    reinforcement bars of structural steel) as

    published regularly by Economic Advisor to

    Government of India, Ministry of Commerce

    prevailing at the time of receipt of tender and

    increase d/ decreased rates as approved by

    Zona l Chief Engin eer.

    (ii) La bou r:

    a) The increas e/ Decrease sha ll be approved

    an d Paid/ Recovered by Engineer-in-Cha rge on

    the basis of Increase/ Decrease of wages oflabour coming into force as per fresh law or

    sta tu tory rule or order.

    b) The Inc r ease / D ec rease labour sh a l l be

    c o n s i d e r e d o n t h e m i n i m u m d a i l y w a g e s i n

    rupees i f any unsk i l l ed adu l t mazdoor ,

    f i xed unde r any l aw o r s t a t u t o ry ru l e o r

    o rde r .

    4) Clause 10(C) forms .. in the

    na tu re of an equ itable reimbu rsemen t.

    5) The claim for increase over and above the

    prices/ wages prevailing at th e time of the last

    stipulated date of receipt of tenders including

    extens ions , if an y, for the work du ring cont ractperiod including the justified period extended

    un der the provisions of clau se 5 of the contract

    without any act ion under clause 2, shal l be

    payable which shall be limited to the

    prices/ wages prevailing at th e time of

    stipulated date of completion or as prevailing

    for the period under consideration, whichever

    is less .

    This clause shall not be applicable where

    claus e 10CC is app licable.

    32 .9 Clause 10 (CA) of Form s n o. CPWD 7

    a n d 8

    (1) Clause 10 CA provides

    constituting substantial part

    of the work.

    The NIT approving authority may consider

    bringing materials like cement, steel,

    structural steel , b i tumen etc. under the ambit

    of th is claus e. Su ch list of m aterials (other

    than Cement, Steel reinforcement bars and

    structural steel) shall be got approved from

    ADG concerned, who shall have full powers for

    su ch approval . The material, the est imated

    cost of which is less than 5% of estimated cost

    of work and the ma terials l ike s an d, stone etc. ,

    the prices of which vary from place to place,need not be considered. The item s which are

    supplied by the department at fixed price to

    the con tractor sh al l also not be considered.

    (2) All India Whole Sale Price indices for

    various materials (except Cement, Steel

    reinforcement bars of structural steel) as

    published regularly by Economic Advisor to

    Government of India, Ministry of Commerce

    and Industry available at their website

  • 7/30/2019 newsitem_dgwman_MAN167A

    3/6

    and Industry available at their website

    http.eaindustry.nic.in and price indices forcement, steel reinforcement and structural

    steel as issu ed u nder the a uth ority of Director

    General (Works) CPWD consideration

    whichever is lesser. sh all be followed. In case,

    for a particular material, price indices is notbeing published by Ministry of Commerce and

    Industry, the price indices of nearest similar

    m ate rial sh all be followed. List of m ate rials

    for which this clause is a pplicable a nd nea rest

    similar ma terial sh al l be indicated in s chedule

    F of GCC while finalizing NIT of a work as

    illus tra ted below.

    Clau se 10 CA

    Material covered

    un der th is c laus e

    1. Cement

    2. Steel reinforcement

    bars

    3. Structu ral steel

    4 ..

    5 ..

    Nearest

    ma terial other

    then Cement

    reinforcement

    b ar s an dst ructura l s teel

    for wh ich All

    India Whole

    sa le Price

    Index is to be

    followed

    1 ..

    2 ..

    3 ..

    4 ..

    5 ..

    (3) The base price for Cement, Steel

    reinforcing bars and structural steel for Delhi

    including Noida, Gurgaon Faridabad and

    Gha zibad s ha ll be issued by Director General

    (Works) and for other places shall be issued

    by concerne d Zona l Chief Engineer. Base

    prices for other materials covered under

    clause 10CA shall be issued by concerned

    Zona l Chief Engineer. This clau se sha ll be

    ap plicab le for all the contra cts.

    32.10 Clause 10(CC) of Forms no. CPWD 7

    a n d 8

    1) This clause provides for variation in

    contract amount due to variat ions in price of

    ma terials, POL an d/ or wages of labou r

    required for execution of work (not for the

    materials supplied or services rendered at

    http.eaindustry.nic.in and price indices forcement, steel reinforcement and structural

    steel as issu ed u nder the a u thori ty of Director

    General (Works) CPWD consideration

    whichever is lesser. shall be followed. In case,

    for a particular material, price indices is not

    being published by Ministry of Commerce andIndustry, the price indices of nearest similar

    m at erial sh all be followed. List of m ate rials for

    which this clause is applicable and nearest

    similar material shall be indicated in schedule

    F of GCC while finalizing NIT of a work as

    illus tra ted below;

    Clau se 10 CA

    Material covered

    un der th is c laus e

    1. Cement

    2. Steel

    reinforcement

    bars

    3. Structu ral steel

    4..

    Nearest

    ma terial other

    then Cement

    reinforcement

    b ar s an ds t ru c tu ra l

    steel for

    which All

    India Whole

    sa le Price

    Index is to be

    followed

    1 ..

    2 ..

    3 ..

    4 ..

    Base

    Pr ice

    of all

    t h e

    m a t e rials

    cove r

    e d

    u n d e r

    c l ause

    10CA*

    * Base Pr ice of a l l the mater ia l s coveredu n d e r c l a u s e 1 0 C A i s t o b e m e n t i o n e d a t

    t h e t i me o f approva l o f NIT.

    (3) The base price for Cement, Steel reinforcing

    bars and structural steel for Delhi including

    Noida, Gu rgaon Fa ridab ad a nd Gh azibad s ha ll

    be issued by Director General (Works) and for

    other places shal l be issued by concerned

    Zona l Chief Engineer. Base prices for other

    materials covered under clause 10CA shall be

    issued by concerned Zonal Chief Engineer.

    This clause shall be applicable for all the

    contracts.

    32 .10 Claus e 1 0(CC) of Form s n o. CPWD 7

    a n d 8

    1) This claus e p rovides for variation in contra ct

    amount due to variations in price of materials,

    POL an d/ or wages of labour r equired for

    execution of work (not for the materials

    su pplied or s ervices ren dered at fixed price in

  • 7/30/2019 newsitem_dgwman_MAN167A

    4/6

    fixed price in accordance with clauses 10 and

    34 and excluding materials covered under

    claus e 10CA), su bject to certain conditions .

    2) Clause 10(CC) will be applicable in

    contracts where the stipulated period for

    complet ion is more than 1 8 month s.

    3) Payment under clause 10(CC). for t h e p eriod u n der

    cons idera tion whichever is less er.

    (4) Where provisions of clause 10CC are

    applicable, provisions of clause 10C will not

    be applicable but provisions of clause 10CA

    will be a pplicable.

    32 . 10 . 1 P re -de t e rmi na t i on o f a l l

    com ponen t s a ff ec t i ng c lause 1 0(C C)

    1) The components of materials, excludingmaterials covered under clause 10CA, labour

    and P.O.L. for every work have to be pre-

    determined and incorporated in the schedule

    E. For this pu rpose, the works, sha ll be

    classified broadly as under:

    (i) Building works including sanitary and

    water su pply.

    (ii) Road works and pavement works in

    airfields.

    (iii) Development works.

    (iv) Carriage works.

    (v) Internal electrical installations.

    (vi) Exter n al electrica l works.(vii) Supplying and installation of machinery,

    like li fts , su b-stat ions , pu mp sets etc.

    2) In t h e c a se of .. variou s

    cat egories of civil works :

    Cate gory of

    workCement

    + Steel +

    Material*

    Labou r P.O.L.

    Buildings

    75% 25% --

    Road Works

    &

    pavementsin airfields

    90% 5% 5%

    External

    sewerage 90% 10% -

    External

    water

    supply

    95% 5% -

    Bridgework/

    accordance wi th c lauses 10 and 34 and

    excluding materials covered under clause

    10CA), s u bject to certain conditions .

    2) Clause 10(CC) will be applicable in contracts

    where the stipulated period for completion is

    more than 18 months .

    3) Payment under clause 10(CC). for the period under

    cons idera tion whichever is less er.

    (4) a ) Where provisions of clause 10CC are

    applicable, provisions of clause 10C will not be

    applicable but provisions of clause 10CA will

    be ap plicable.

    b) Where provis ions of c lause 10CC are

    no t app l i cab le , p rov is i ons o f c l ause 10 C and

    10 CA wi ll becom e ap pl icable .

    32 . 10 . 1 P re -de t e rmi na t i on o f a l l

    com ponen t s a ff ec t i ng c lause 1 0(C C)

    1) The components of materials, excludingmaterials covered under clause 10CA, labour

    and P.O.L. for every work have to be pre-

    determined and incorporated in the schedule

    E. For th is purpose, the works, sha ll be

    classified broadly as under:

    (i) Building works inclu ding san itary an d wa ter

    supply.

    (ii) Road works and pavement works in

    airfields.

    (iii) Development works.

    (iv) Carriage works.

    (v) Internal electrical installations.

    (vi) Exter n al electrica l works.(vii) Supplying and installation of machinery,

    like li fts , su b-stat ions , pu mp sets etc.

    2) In the case of .. various

    ca tegories of civil works :

    Cate gory of

    workCement

    + Steel +

    Material*

    Labour P.O.L.

    Buildings

    75% 25% --

    Road Works

    &

    pavementsin airfields

    90% 5% 5%

    External

    sewerage 90% 10% -

    External

    water

    supply

    95% 5% -

    Bridgework/

  • 7/30/2019 newsitem_dgwman_MAN167A

    5/6

  • 7/30/2019 newsitem_dgwman_MAN167A

    6/6

    Base Pr ice of Cem en t : (M)

    n) Les s C os t o f r e i n fo r cemen t

    ba r s

    Q uan t i t y o f r e i n fo r cemen t ba r s b rough t

    a t s i t e f o r bona f i de use i n t he w ork

    dur i ng t he qua r t e r X B ase Pr i ce o f

    re inforce m en t bars : (N)o) Les s cos t o f s t r u c t u r a l s t ee l

    Q u a n t i t y o f S t r u c t u r a l S t e e l b ro u g h t a t

    s i t e f o r bona f i de use i n t he w ork dur i ng

    t h e q u a r t e r X B a s e P r i c e o f S t r u c t u r a l

    Steel: (O)

    p) Les s cos t o f o t he r ma t e r i a l cove red

    un de r c l ause 10 C A

    Q uan t i t y o f such Mat e r i a l/ Ma t e r i a ls

    b r o u gh t a t s i t e f o r b o n a fi d e u s e i n t h e

    w or k d u r i n g t h e q u a r t e r c o v e re d u n d e r

    c lause 10 CA X Base Pr ice of such

    Mater ia l / Mater ia l s : (P)

    Cost of work for which es calation/ de-esca lation is app licable :W = R (K + L) (M+N+O+P)

    4) All India Wholesale Price Index for civil

    Execu tive E n gineer s

    un der th eir ju risdict ion.

    5) Copies of all sanctions issued by

    . accepted by the Chief

    Engineer.

    m ) Cost of work for which esca lation/ de-es ca lation is a pp lica ble (M)

    W = M (K + L)

    4) All India Wholesale Price Index for civil

    Execu tive E n gine er s

    un der th eir ju risdict ion.

    5) Copies of all sanctions issued by

    . accepted by the Chief

    Engineer.

    - sd -

    Superintending Engineer (C&M)

    Issued from file No. CSQ/CM/M/16(1)/2008