New windows for the addition arrive in the dark. These go on the south wall.

22
New windows for the addition arrive in the dark

Transcript of New windows for the addition arrive in the dark. These go on the south wall.

Page 1: New windows for the addition arrive in the dark. These go on the south wall.

New windows for the addition arrive in the dark

Page 2: New windows for the addition arrive in the dark. These go on the south wall.

These go on the south wall

Page 3: New windows for the addition arrive in the dark. These go on the south wall.

These are for the east wall in the basement

Page 4: New windows for the addition arrive in the dark. These go on the south wall.

A conference on joining the two roofs

Page 5: New windows for the addition arrive in the dark. These go on the south wall.

Starting to snow – driving snow from the west

Page 6: New windows for the addition arrive in the dark. These go on the south wall.

The new ridge is in place, rafters next

Page 7: New windows for the addition arrive in the dark. These go on the south wall.

That’s me at Gulag Carlow, behind bars

Page 8: New windows for the addition arrive in the dark. These go on the south wall.

Look at the size of the snowflakes

Page 9: New windows for the addition arrive in the dark. These go on the south wall.

Filling in the valley, Dave is pondering

Page 10: New windows for the addition arrive in the dark. These go on the south wall.

The new entrance wall

Page 11: New windows for the addition arrive in the dark. These go on the south wall.

Time to go home, Ryan has to listen to Dave’s hunting stories while Dave looks for deer

Page 12: New windows for the addition arrive in the dark. These go on the south wall.

The door with 4 lites will be the new entrance door - 1895

Page 13: New windows for the addition arrive in the dark. These go on the south wall.

Insulating the porch floor over the old concrete step

Page 14: New windows for the addition arrive in the dark. These go on the south wall.

Roxul insulation bats on top of 2” SM sheathing

Page 15: New windows for the addition arrive in the dark. These go on the south wall.

Simon waiting to go to work with me

Page 16: New windows for the addition arrive in the dark. These go on the south wall.

Roofs are joined, entrance wall – door with sidelites

Page 17: New windows for the addition arrive in the dark. These go on the south wall.

Close up the west end for the weekend

Page 18: New windows for the addition arrive in the dark. These go on the south wall.

Mobile shop for all the bits and pieces of equipment

Page 19: New windows for the addition arrive in the dark. These go on the south wall.

From the road on my way home

Page 20: New windows for the addition arrive in the dark. These go on the south wall.

A little closer view – I’m pleased

Page 21: New windows for the addition arrive in the dark. These go on the south wall.

This old window will go in the wall next to the entrance

Page 22: New windows for the addition arrive in the dark. These go on the south wall.

It used to live here