• 9.11 AD&I biweekly• 16.11 SCRF ML meeting monthly• 23.11 AD&I biweekly• 30.11 (Free slot) monthly• 7.12 AD&I• 14.12 …
Two meetings per month for AD&I team.TDR related work:- design (& cost) work- documentation (EDMS)- TDR writing (coming soon!)
2
Today
• Review DESY BTR meeting summary– Sent to AD&I mailing list 01.11.11
• Action item list (for today)– status
• Agenda for next meeting (23.11)
20.04.2009
3
Baseline Decisions
• Retain a two-stage bunch compressor• Reduced field Flux Concentrator for e+ source • 500 MV s-band linac for auxiliary positron source • Include e+/e- production overhead (margin) in
specification for RF • HLRF system for 5 GeV Boosters RDR/DRFS • Adjustment of the damping ring transfer lines
(Central Region)• Physics related instrumentation accepted as
proposed.• BDS/FFS length fixed at current length
20.04.2009
4
Other issues discussed
• Global timing– Finalisation of path length for TDR– Understand construction tolerance (survey)– Location (and design) of adjustment chicane– Final path lengths not known until after KEK BTR
(Jan 2012).
• Operations and commissioning – Understand strategy and use of beam dumps
• desired rating etc.
– Understand scope of use of aux. positron source
20.04.2009
5
Action Items (4.11.11)
• Prepare detailed design change document for PLTR, PRTL, ELTR, PRTL – Palmer, Paterson– Friday 4.11
• Prepare central region cartoon indicating updated beamline and dump locations– Walker, List, Palmer– Friday 4.11
20.04.2009
Draft document complete (Report from Palmer/List)
6
Action Items (for today) #1
• Update top-level parameters– Make Dp/p consistent with two-stage compressor
and FC undulator parameters• Walker, List, Gai -> try for end of next week!
– Include shifted waist enhancement in luminosities• Walker [Meeting tomorrow with T. Hartin → next week].
20.04.2009
7
Action Items (for today) #2
• Update machine parameters– Consolidate/update compressor parameters for two-
stage system• Solyak
– Consolidate positron source parameters for 3.2 T Flux Concentrator
• Gai
– Update/confirm Damping Ring acceptance parameters• Guiducci, Palmer, Gai -> Review Wanming’s design
parameters
– Review and update source RF parameters (gradient etc.)
• Walker, Gai, Sheppard -> send proposal tomorrow
20.04.2009
8
Action Items (for today) #3
• Lattice design work– Propose remaining treaty points:
• e- ML to e+ source – End of MPS collimator section• e+ ML to e+ BDS – End of MPS collimator section
– Walker, List
• Conceptual layout of Aux. source (CFS requirements)– Gai, Kuriki
• CFS: Detector hall layout – finalise numbers of shafts and overall layout, support tunnel– mid December for CERN/FNAL like sites.
• Include installation in commissioning group?• Meeting to discuss service tunnel layout (soon)
20.04.2009
9
Next ADI meetings (tentative)
• 23.11.11– Review action item status– Review progress on lattice design work
• note: freeze due 30.11
– TDR writing assignments and schedule
• 7.12.11– Review action item status– CFS update to central region drawings, service
tunnel etc.– TeV upgrade status (parameters)