New Timing and Control Equipment At LSU Wildwood, NJ

Page 3: New Timing and Control Equipment At LSU Wildwood, NJ.

New Transmitter At LSU Wildwood, NJ

Page 4: New Timing and Control Equipment At LSU Wildwood, NJ.

Building Construction Begins At LORSTA George, WA

Page 5: New Timing and Control Equipment At LSU Wildwood, NJ.

New Transmitting Complex At LORSTA George, WA

(bottom – left)

Page 6: New Timing and Control Equipment At LSU Wildwood, NJ.

New Transmitting Complex At LORSTA George, WA

Page 7: New Timing and Control Equipment At LSU Wildwood, NJ.

New Transmitter Room At LORSTA George, WA

Page 8: New Timing and Control Equipment At LSU Wildwood, NJ.

New Operations Room At LORSTA George, WA

Page 9: New Timing and Control Equipment At LSU Wildwood, NJ.

Ready To Install New Equipment At LORSTA George, WA

Page 10: New Timing and Control Equipment At LSU Wildwood, NJ.

New Equipment At LORSTA George, WA

Page 11: New Timing and Control Equipment At LSU Wildwood, NJ.

New Timing and Control Equipment At LSU Wildwood, NJ

Page 12: New Timing and Control Equipment At LSU Wildwood, NJ.

New Transmitter At LORSTA George, WA

Page 13: New Timing and Control Equipment At LSU Wildwood, NJ.

New Transmitter At LSU Wildwood, NJ

Page 14: New Timing and Control Equipment At LSU Wildwood, NJ.

ET1 McKinney Changing Antenna Feed At George, WA

Page 15: New Timing and Control Equipment At LSU Wildwood, NJ.

Mr. Paulus Has The Honor At LORSTA George, WA

Page 16: New Timing and Control Equipment At LSU Wildwood, NJ.

Old Equipment Secured At LORSTA George, WA

Page 17: New Timing and Control Equipment At LSU Wildwood, NJ.

Old Tube Transmitter Silent At LORSTA George, WA

Page 18: New Timing and Control Equipment At LSU Wildwood, NJ.

Whidbey Island TD 5990Y

0

50

100

150

200

250

300

350

Time (hrs)

TD

(n

Sec

)

15-Oct 23-Oct

OCTOBER 15 OCTOBER 23

MEAN 28405.259 28405.264

MEDIAN 28405.261 28405.263

MAX 28405.286 28405.291

MIN 28405.218 28405.240

Page 19: New Timing and Control Equipment At LSU Wildwood, NJ.

Whidbey Island SNR 5990Y

0

5

10

15

20

25

30

35

40

17:06

18:06

19:06

20:06

21:06

22:06

23:06 1:

062:06

3:06

4:06

5:06

6:06

7:06

8:06

8:36

Time (hrs)

SN

R (

dB

)

15-Oct 23-Oct

Whidbey Island ECD 5990Y

0

0.5

1

1.5

2

2.5

3

17:06

18:06

19:06

20:06

21:06

22:06

23:06 1:

062:06

3:06

4:06

5:06

6:06

7:06

8:06

8:36

Time (Hrs)

EC

D (

uS

ec)

15-Oct 23-Oct

OCTOBER 15 OCTOBER 23

MEAN 35.00 31.77

MEDIAN 36.00 33.00

MAX 38.00 37.00

MIN 31.00 23.00

OCTOBER 15 OCTOBER 23

MEAN 2.37 1.65

MEDIAN 2.36 1.64

MAX 2.78 1.78

MIN 2.22 1.55

Page 20: New Timing and Control Equipment At LSU Wildwood, NJ.

Commissioning Crew At LORSTA George, WA

Page 21: New Timing and Control Equipment At LSU Wildwood, NJ.

Primary TOT(Secondary)

RF Gate

SecondaryPCI

PCI

SZC

SecondaryTransmits

SZC

LocusTINO

Alternate TOT(Secondary)

UTC(Secondary)

XMTRDelay

MasterPCI

MasterUTC

PCI

RF Gate

Master receivedat Secondary

RF Gate

Loran(Master)

RF Gate

Secondary received at Master

UTC

Baseline Length(in Usec)

UTC

MasterTransmitter

Delay

Alternate TOT(Master)

LocusTINO

(Master)SZC

SZC

Baseline Length(in uSEC)

(Secondary)(Secondary)

Loran(Secondary)

Primary TOT(Master 30 uSEC)

MasterTransmitsSZC

Timing Ladder Diagram