New test structures: Status report and technical documentation review

21
New test structures: Status report and technical documentation review Case structures : 11WNSDVG1.KS N2 (T18) PETS 11.4 GHz with damping material Extra: BAAN, ERP-package for inventory management Margarita Saifoulina & Maria Filippova BE/RF Input from: Andrey Olyunin Germana Riddone Serge Lebet

description

New test structures: Status report and technical documentation review Case structures : 11WNSDVG1.KS N2 (T18) PETS 11.4 GHz with damping material Extra: BAAN, ERP-package for inventory management. Margarita Saifoulina & Maria Filippova BE/RF Input from: Andrey Olyunin - PowerPoint PPT Presentation

Transcript of New test structures: Status report and technical documentation review

Page 1: New test structures: Status report and technical  documentation review

New test structures:Status report and technical documentation review

Case structures : 11WNSDVG1.KS N2 (T18)PETS 11.4 GHz with damping material

Extra: BAAN, ERP-package for inventory management

Margarita Saifoulina & Maria FilippovaBE/RF

Input from:Andrey OlyuninGermana RiddoneSerge Lebet

Page 2: New test structures: Status report and technical  documentation review

CATIA/Smarteam & EDMS/MTF

Page 3: New test structures: Status report and technical  documentation review

Design

Manufacturing

Installation

Commissioning

Maintenance

Dismantling

CERNEDMS

PLM = Product Lifecycle Management = EDMS/MTF at CERN

Page 4: New test structures: Status report and technical  documentation review

Import process

MTF

AxalantDesign data

Drawings & Documents

InforEAMPLM management

Manufacturing workflow

EDMS Web

Page 5: New test structures: Status report and technical  documentation review

Introduction to the EDMS/MTF

• Design side(EDMS)= Items – Structure of project– Drawings– 2D models– Parameters– Documentation (test/report)

• Physical manufacturing side(MTF) = Equipment– Structure of assembly– Made of– Equipment data– Manufacturing

• Workflow steps– Quality control– Documents(links to EDMS)– Component’s traceability of whole product lifecycle

Project data management

Product life cycle management

Page 6: New test structures: Status report and technical  documentation review

Manufacturing Workflow in MTF• Describes the manufacturing process

Easy to identify data when it appears along with the equipment being manufactured

Page 7: New test structures: Status report and technical  documentation review

How to access MTF?

1. Method

Page 8: New test structures: Status report and technical  documentation review
Page 9: New test structures: Status report and technical  documentation review

2. Method

Page 10: New test structures: Status report and technical  documentation review
Page 11: New test structures: Status report and technical  documentation review

11WNSDVG1.KS N2 (T18)

Now it’s ready for shipment

Page 12: New test structures: Status report and technical  documentation review

PETS 11.4 GHz with damping material material

Now it’s ready for final bake-out

Page 13: New test structures: Status report and technical  documentation review

Notification letter for MTF

Proposal of letter content:

Please find new attached report document in MTF,under the structure '11WNSDVG1.8 VB S- CLAAS110277-CR000002'. https://edms.cern.ch/asbuilt/plsql/mtf_equip.eqp_work_top?cooki=9270257&p_rec_id=CLAAS110277-CR000002&p_rec_typeEDMS id. of document 1065640 (ver.1) RF design and parameters of 11.424 GHz T24_vg1.8_disk.( or 11WNSDvg1.8; or CLIC_G undamped) created by Alexej GRUDIEVhttps://edms.cern.ch/document/1065640/1

Page 14: New test structures: Status report and technical  documentation review

Notification letter for MTF

• Notification letter should be sent when document is attached to MTF

• Notification system updates every hour• Who should receive notification letter?

- CLIC RF production: IS, WW, AG, JPD, SL, MF, MS, MT, MM, JShi, AS, G. Arnau, Ph. De Souza

Page 15: New test structures: Status report and technical  documentation review

PLM/ERP for BE/RF

CAD tools - CATIA

PDM - EDMS PLM - MTF ERP - BAAN

Enterprise Resource Planning – BAAN (Company name)

Page 16: New test structures: Status report and technical  documentation review

BAAN – Inventory Management

• ERP- package used by CERN since 1995

• It’s integrated to other applications such as EDH and Qualiac, which is another ERP package for purchasing and logistics export/import documentation

• Component’s traceability of whole product lifecycle in different levels of intra- and inter- organizational integration in one place

Page 17: New test structures: Status report and technical  documentation review

BAAN – Inventory Management

• User-friendly interface Training courses not compulsory

• Not yet web-based

• If needed AIS-support can create new functions of database for our personal needs

• Technical Specification in progress

• BAAN- package presentation availablehttps://espace.cern.ch/gs-dep-ais-fpf/ExternalProject/rf/default.aspx

Page 18: New test structures: Status report and technical  documentation review

BAAN – Example of standard layout

Page 19: New test structures: Status report and technical  documentation review

BAAN – Functions’ Screens

Page 20: New test structures: Status report and technical  documentation review

BAAN – Stock Management

Page 21: New test structures: Status report and technical  documentation review

Conclusion

• PLM/ERP eliminates: The lack of information Waste of time

Inefficiency of component’s whole lifecycle, not only in manufacturing

• If used properly PLM/ERP increase productivity

• Future actions: Inventory management is needed Standard information in reports for data management: what was done, who did, when, where