Case structures : 11WNSDVG1.KS N2 (T18)PETS 11.4 GHz with damping material
Extra: BAAN, ERP-package for inventory management
Margarita Saifoulina & Maria FilippovaBE/RF
Input from:Andrey OlyuninGermana RiddoneSerge Lebet
CATIA/Smarteam & EDMS/MTF
Design
Manufacturing
Installation
Commissioning
Maintenance
Dismantling
CERNEDMS
PLM = Product Lifecycle Management = EDMS/MTF at CERN
Import process
MTF
AxalantDesign data
Drawings & Documents
InforEAMPLM management
Manufacturing workflow
EDMS Web
Introduction to the EDMS/MTF
• Design side(EDMS)= Items – Structure of project– Drawings– 2D models– Parameters– Documentation (test/report)
• Physical manufacturing side(MTF) = Equipment– Structure of assembly– Made of– Equipment data– Manufacturing
• Workflow steps– Quality control– Documents(links to EDMS)– Component’s traceability of whole product lifecycle
Project data management
Product life cycle management
Manufacturing Workflow in MTF• Describes the manufacturing process
Easy to identify data when it appears along with the equipment being manufactured
How to access MTF?
1. Method
2. Method
11WNSDVG1.KS N2 (T18)
Now it’s ready for shipment
PETS 11.4 GHz with damping material material
Now it’s ready for final bake-out
Notification letter for MTF
Proposal of letter content:
Please find new attached report document in MTF,under the structure '11WNSDVG1.8 VB S- CLAAS110277-CR000002'. https://edms.cern.ch/asbuilt/plsql/mtf_equip.eqp_work_top?cooki=9270257&p_rec_id=CLAAS110277-CR000002&p_rec_typeEDMS id. of document 1065640 (ver.1) RF design and parameters of 11.424 GHz T24_vg1.8_disk.( or 11WNSDvg1.8; or CLIC_G undamped) created by Alexej GRUDIEVhttps://edms.cern.ch/document/1065640/1
Notification letter for MTF
• Notification letter should be sent when document is attached to MTF
• Notification system updates every hour• Who should receive notification letter?
- CLIC RF production: IS, WW, AG, JPD, SL, MF, MS, MT, MM, JShi, AS, G. Arnau, Ph. De Souza
PLM/ERP for BE/RF
CAD tools - CATIA
PDM - EDMS PLM - MTF ERP - BAAN
Enterprise Resource Planning – BAAN (Company name)
BAAN – Inventory Management
• ERP- package used by CERN since 1995
• It’s integrated to other applications such as EDH and Qualiac, which is another ERP package for purchasing and logistics export/import documentation
• Component’s traceability of whole product lifecycle in different levels of intra- and inter- organizational integration in one place
BAAN – Inventory Management
• User-friendly interface Training courses not compulsory
• Not yet web-based
• If needed AIS-support can create new functions of database for our personal needs
• Technical Specification in progress
• BAAN- package presentation availablehttps://espace.cern.ch/gs-dep-ais-fpf/ExternalProject/rf/default.aspx
BAAN – Example of standard layout
BAAN – Functions’ Screens
BAAN – Stock Management
Conclusion
• PLM/ERP eliminates: The lack of information Waste of time
Inefficiency of component’s whole lifecycle, not only in manufacturing
• If used properly PLM/ERP increase productivity
• Future actions: Inventory management is needed Standard information in reports for data management: what was done, who did, when, where