New tariffs system in France GTE 23 rd October 2003 Jacques Laurelut.
-
Upload
lionel-white -
Category
Documents
-
view
214 -
download
1
Transcript of New tariffs system in France GTE 23 rd October 2003 Jacques Laurelut.
New tariffs system in France
GTE23rd October 2003
Jacques Laurelut
22nd October 2003GTE 2
The French network
Gaz de France
CFM
GSO
22nd October 2003GTE 3
A multi-zonal Entry-Exit system
System in place in 2003 and 2004
Eight Entry-Exit zones:
• one for GSO• two for CFM• five for GDF (one for L-Gas, one for H-gas)
Average area covered by each zone: 70 000 km2 (Belgium: 30 000 km2 ; Netherlands: 35 000 km2 ; Ireland: 70 000 km2)
22nd October 2003GTE 4
How does it work ?
Interconnection pointUnderground storageRegasification plant
GSO
CFM
GDF
Montoir
Dunkerque TaisnièresObergailbach
Oltingue
Fos
22nd October 2003GTE 5
Advantages of this system (1/2)
No inter-TSO payment although there are 3 TSO’s
Favouring competition:
no capacity constraint within each zone
each GDF’s zone has a storage capacity
daily balancing in each zone
Transparency: physical capacity constraints are reflected by the inter-zone links
appropriate information is given to the network users by the TSOs regarding available capacities for the supply of their customers
appropriate information is given by the network users to the TSOs (capacity booking reflects the actual need for capacity)
minimisation of the risk of supply shortages for customers
22nd October 2003GTE 6
Advantages of this system (2/2)
Cost reflectivity: minimisation of cross-subsidiation
the cost of the inter-zone links is borne by the users of the corresponding capacity only
the price for the inter-zone links is very low for backhaul capacity
consistency with existing transit contracts
Consistency with physical balancing requirements:
the commercial balancing obligation on each zone for the shippers is consistent with the physical balancing requirements of the TSO
22nd October 2003GTE 7
New Transmission tariff (from January 1st 2004)
Regulator proposal dated July 24th, subject to French government approval
Same tariff structure Zonal Entry / Exit Five balancing zones for Gaz de France : NORD H, EST, OUEST,
SUD, NORD B
But a lot of changes have been introduced Inter-zone links prices have been reduced by 20% short-duration contracts (1 month) long-duration contracts (more than a year) have been introduced title transfer facility is proposed within each balancing zone (from
November 2003)
22nd October 2003GTE 8
Price Comparison (1000 MWh/d - 300 GWh/yr - NTAR=2)
0
0,5
1
1,5
2
2,5
3
Nord H
Gournay
H
Seine
Ouest
Seine
Est
Langre
s
Bourgogne
Lyonnai
s
Sud Est
EU
R/M
Wh
Tariff 2004 Tariff 2003 Tariff 2000
22nd October 2003GTE 9
Transparency : publication on the web site
Detailed TPA conditions
Entry, exit and link points Capacities Total firm capacity
Subscribed firm capacity
Subscribed interruptible capacity
Available firm capacity Flows Daily flow
Maintenance schedule Maintenance programme and impact on available capacities
22nd October 2003GTE 10
Third Party Access
2001 2002 2003
(estimated)
Gas delivered (TWh)
6,1 19,2 31
(on 180 TWh eligible)
Number of Sites concerned
6 11 23
Number of shippers (including Gaz de France)
4 7 8
22nd October 2003GTE 11
Multi-zonal Entry-Exit tariff system A model for Europe ?
Process of opening the French gas market On the way of success …