New Source Review : Monitoring Recordkeeping and Reporting
description
Transcript of New Source Review : Monitoring Recordkeeping and Reporting
![Page 1: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/1.jpg)
1
New Source Review:Monitoring Recordkeeping and
Reporting
Donald LawEPA Region 8
![Page 2: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/2.jpg)
2
OutlineMonitoring
Types of Monitoring methodsTypes of Monitoring limitsShort Term and Long Term Limits
RecordkeepingReportingPermit Conditions Review
![Page 3: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/3.jpg)
3
MonitoringFor each emissions unitFor each regulated pollutant emittedBased on an applicable requirement
derived from Prohibitory Rules Applicable BACT LimitsEngineering EvaluationNESHAP, MACT, NSPS RequirementsPotential To Emit Calculations
![Page 4: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/4.jpg)
4
Monitoring (cont.)Lists specific monitoring methodSource Test
Direct measurement of stack gas pollutant emissionsMeasured at the stack for a set period of time Source test methods describe apparatus
usedConducted at maximum operating capacityPerformed at start-up and usually annually
thereafter Witnessed by Permitting Authority
![Page 5: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/5.jpg)
5
Source Test MonitoringTitle 40 Code of Federal Regulations Part 60
Appendix AMethods prescribe how testing is to be done:
Method 1--Sample and velocity traverses for stationary sources
Method 1A--Sample and velocity traverses for stationary sources with small stacks or ducts
Method 3A--Determination of Oxygen and Carbon Dioxide Concentrations in Emissions From Stationary Sources (Instrumental Analyzer Procedure)
Method 4--Determination of moisture content in stack gases Method 5--Determination of particulate emissions from stationary sources
![Page 6: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/6.jpg)
6
Source Test Monitoring (cont.)
Method 7--Determination of nitrogen oxide emissions from stationary sources
Method 7A--Determination of nitrogen oxide emissions from stationary sources--Ion chromatographic method
Method 7B--Determination of nitrogen oxide emissions from stationary sources (Ultraviolet spectrophotometry)
Method 7C--Determination of nitrogen oxide emissions from stationary sources--Alkaline-permanganate /colorimetric method
Method 7D--Determination of nitrogen oxide emissions from stationary sources-
-Alkaline-permanganate/ion chromatographic method Method 7E--Determination of Nitrogen Oxides Emissions From
Stationary Sources (Instrumental Analyzer Procedure) Method 9--Visual determination of opacity of emissions from stationary
sources remotely by lidar
![Page 7: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/7.jpg)
7
Monitoring (cont.) Continuous Emission Monitoring (CEM)All of the equipment that may be required to meet the data acquisition and availability requirements to sample, condition (if applicable), analyze, and provide a record of emissions on a continuous basis.
Reference test methods provide detailed instruction for source sampling
Data immediately available and recordedSome CEM data linked directly to permitting
authority
![Page 8: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/8.jpg)
8
CEM Requirements Title 40 Code of Federal Regulations, Part 60, Appendix
B : Performance Specification 1 -- Specifications and test
procedures for opacity continuous emission monitoring systems in stationary sources.
Performance Specification 2 -- Specifications and test procedures for SO[2] and NO[x] continuous emission monitoring systems in stationary sources.
Performance Specification 3 -- Specifications and test procedures for O[2] and CO[2] continuous emission monitoring systems in stationary sources.
Performance Specification 6 -- Specifications and test procedures for continuous emission rate monitoring systems in stationary sources.
![Page 9: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/9.jpg)
9
CEM ApplicationsPollutants that CEMs are good for
NOxSOxCOCO2Particulates
Stack emission monitoringUncontrolledPost controls
![Page 10: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/10.jpg)
10
Monitoring (cont.)Predictive Emission Monitoring (PEM)
All the equipment necessary to monitor process and control device operational parameters (E.g. control device secondary voltages and electric currents) and other information (E.g. gas flow rate, O2 or CO2 concentrations), and calculate and record the mass emissions rate (E.g. lb/hr) on a continuous basis
![Page 11: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/11.jpg)
11
Monitoring (cont.)Continuous Parameter Monitoring System
(CPMS) All equipment necessary to meet data
acquisition and availability to monitor Process and control device operational
parameters (e.g. control device secondary voltages and electric currents)
Other information (e.g. gas flow rate, O2 or CO2 concentrations) and
Record average operational parameter value(s) on a continuous basis
![Page 12: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/12.jpg)
12
Monitoring (cont.)Continuous emissions rate monitoring system (CERMS)
The total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time).
Opacity and Visible Emissions MonitoringContinuous Opacity Monitor (COMs) Dependant on stack moisture conditions
Visible Emissions Evaluation (VEE)** Must be certified to read smoke
![Page 13: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/13.jpg)
13
Where do limits come from?
Limits can come from almost any documentNSPS (40 CFR Part 60)MACT (40 CFR Part 63)NESHAP (40 CFR Part 61)PSD permit (BACT)Non-NSR (LAER)State/Tribal Pre-construction permitState/Tribal Implementation Plan
Do NOT come from Title V permit
![Page 14: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/14.jpg)
14
Examples of Emission Limitations
Pounds per hour/Tons per yearGrains per dry standard footUsage rates (gallons per hour, gallons per square foot of surface areaNOx lbs/dscf; dscf/hr, hours per yearNOx PPMVD corrected to 15 % O2VOC Lbs/gallon, gallons per yearGrams per horsepower hourPounds/MMBtu20% Opacity
![Page 15: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/15.jpg)
15
Short-Term LimitsShort-term emissions usually
represent the worst case allowable emissions for equipment operating at maximum capacity.
These limits provide a way to verifyemission estimates are accurate control devices are operating as
designed air quality standards are being met
![Page 16: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/16.jpg)
16
Short-term Limits (cont.)Averaging periods (1-hour, 3-hour, 8-
hour, or 24-hour for pound-per-hour limits; usage rate limits such as gallons per hour or gallons per day) should be specified in setting short-term emission limits
Short-term limit should not exceed a 30-day averaging period, in keeping with EPA guidance on practical enforceability
![Page 17: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/17.jpg)
17
Long-Term limitsLong-term (usually annual) emission limits take
into account any restrictions on operating hours, throughput, or other parameters that reduce overall emissions
May be used to legally avoid applicability of a program (such as Major NSR or PSD)
In calculating annual emissions, important to include only those restrictions made enforceable through legally and practically enforceable permit conditions
![Page 18: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/18.jpg)
18
Considerations about Limits
Limits need some form of monitoring to be effective
If you have a limit, you need to have recordkeeping and reporting
Limits are seldom “instantaneous” and should be “rolling” averages30-day roll: Day 31 is added and Day 1 drops off24 hour roll: Hour 25 is added and Hour 1 drops
off
![Page 19: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/19.jpg)
19
ExampleThe Rutherford Rubber Baby Buggy Bumper Company is
seeking to place an operational limit on their rubber baby buggy bumber production line. At full 24hr per day operations, the rbb line uses 48,000 scf per day. They want to limit their yearly operations to 1/3 of that, but retain some operational flexibility to increase production during the 4 week time period when the new year’s model of rubber baby buggy bumpers are produced. During this time, they operate 12 hours a day.
What kind of operational limit could they receive.What kind of monitoring would be appropriate.
![Page 20: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/20.jpg)
20
Example SolutionYearly limit of 1/3 capacity = 48,000/3 = 16,000 scf per
year28 days of the year they need 12 hours of production per
day. 48,000 / 8760 = 5.5 scf/hr 5.5 * 12 = 66 scf/day 30 days * 66 = 1980 scf / 30 days
Limits = 16,000 scf per 365 day roll, 1980 scf per 30 day roll
A fuel flow monitor to the rbbb production line would monitor for both limits
![Page 21: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/21.jpg)
21
RecordkeepingCompliance with emission
limits, throughput limits, or other limits established in permit conditions needs to be verifiable through adequate record-keeping requirements
![Page 22: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/22.jpg)
22
Recordkeeping (cont.)Examples of specific records that
must be keptFuel useVOC contentThroughput/salesHours of operationMonitoring dataForms that must be used or approved
![Page 23: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/23.jpg)
23
Recordkeeping (cont.)Describes length of time records
must be maintainedTypically 2 yearsTitle V is minimum of 5 years
Describes where records may be keptOnsite, Offsite, available to inspection
personnel at all times, next to equipment being monitored
![Page 24: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/24.jpg)
24
ReportingTells the source what reports are
required to be generatedAnnual fuel useAnnual Source test report
When the reports are to be submittedAnnual fuel use to the district prior to
June 1Annual Source test report within 30
days after the source test was completed
![Page 25: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/25.jpg)
25
Reporting (cont.)Upset/Breakdown reporting
Reported within 4 hoursDescription of equipment, reason for
breakdown, how and when repaired, excess emissions estimate
Compliance Certification Signed by responsible official
![Page 26: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/26.jpg)
26
Reporting (cont.)Examples of reports that must be
filedStart date of constructionStart-up/First Fire dateStart date of productionStart and Finish dates for source testing Annual compliance certificationAnnual throughput reporting
![Page 27: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/27.jpg)
27
Permit ConditionsReviewing Permits
![Page 28: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/28.jpg)
28
Permit Conditions (cont.)A permit condition must be easily
understood by operator of facility, inspectors and general public May not have clear idea of proposal
Did not write Engineering Evaluation
Did not determine BACT
Did not determine offsets
Did not determine method of compliance with prohibitory rules
![Page 29: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/29.jpg)
29
Permit Conditions (cont.)Each decision or conclusion made
on the engineering evaluation should show up as a permit condition on the permitIt should be as near to 1:1 as possible!
![Page 30: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/30.jpg)
30
Permit Conditions (cont.)Clear idea of the proposal
Permit should clearly indicate the equipment installation/changes authorized
Ask: Is permit a stand-alone document?
![Page 31: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/31.jpg)
31
Permit Conditions (cont.)Example
Installation of a boilerWhat questions come to mind?
Equipment descriptionEmission limitsMonitoringRecordkeepingReporting
![Page 32: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/32.jpg)
32
Permit Unit DescriptionDetailed permit unit descriptions are essential to
matching equipment with appropriate regulations and permit conditions.
Example: 75 MMBtu/Hr Boiler with SCR
OR…
75.0 MMBTU/HR BIGELOW NATURAL GAS-FIRED BOILER, S/N 576, WITH A TODD MODEL V.485.FGX LOW NOX BURNER, FLUE GAS RECIRCULATION SYSTEM, 02 TRIM CONTROLLER, AND CO TRIM CONTROLLER SERVED BY A CRI COMPANY MODEL SHELL DNOX LFR SELECTIVE CATALYTIC REDUCTION (SCR) SYSTEM
![Page 33: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/33.jpg)
33
Emission limits Requirements
Boiler shall not exceed 7 ppmvd NOx at 3% O2 or more than 0.008 lb/MMBtu
Boiler shall not exceed 200 ppmvd CO@ 3% 02 or more than 0.148 lb/MMBtu
NOx emissions shall not exceed 15.9 lbs/day and 5,804 lbs per year
CO emissions shall not exceed 349.3 Lbs/Day and 127,484 lbs per year
![Page 34: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/34.jpg)
34
Monitoring (cont.)Source testing to measure NOx, CO. NH3
emissions from this unit shall be conducted at least once every twelve months. After demonstrating compliance on two consecutive annual source tests, unit shall be tested not less than once every 36 months. If result of 36-month source test demonstrates that unit does not meet applicable emission limits, source testing frequency shall revert to at least once every 12 months
![Page 35: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/35.jpg)
35
Monitoring (cont.)Permittee shall monitor and
record stack concentration of NOx, CO, NH3, and 02 at least once every month (in which a source test is not performed) using a portable emission monitor that meets District specifications
![Page 36: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/36.jpg)
36
Monitoring (cont.)• All NOx, CO, 02 and NH3 emission readings shall
be taken with the unit operating either at conditions representative of normal operations or conditions specified in the permit-to-operate. The NOx, CO and 02 analyzer as well as the NH3 emission monitoring equipment shall be calibrated, maintained, and operated in accordance with the manufacturer's specifications and recommendations or a protocol approved by the APCO. Emission readings taken shall be averaged over a 15 consecutive-minute period by either taking a cumulative 15 consecutive-minute sample reading or by taking at least five readings, evenly spaced out over the 15 consecutive-minute period.
![Page 37: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/37.jpg)
37
Recordkeeping (cont.)The permittee shall record the daily startup and shutdown
duration times of the boiler. The permittee shall maintain records of: (1) the date and time of
NOx, CO, NH3 and 02 measurements, (2) the 02 concentration in percent by volume and the measured NOx, CO and NH3 concentrations corrected to 3% 02, (3) make and model of exhaust gas analyzer, (4) exhaust gas analyzer calibration records, (5) the method of determining the NH3 emission concentration, and (6) a description of any corrective action taken to maintain the emissions at or below the acceptable levels.
All records shall be maintained and retained on-site for a minimum of five years, and shall be made available for District inspection upon request.
![Page 38: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/38.jpg)
38
Reviewing PermitsAmbiguous ConditionsRun-On ConditionsConfusing ConditionsEnforceabilityAveraging TimesMonitoring of ComplianceOff Permit ComplianceDepartment or Permittee Discretion
![Page 39: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/39.jpg)
39
Permit conditions should…Use simple declarative sentencesAvoid compound sentence structureAvoid complex sentence structureBe short, simple and to the point
![Page 40: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/40.jpg)
40
Ambiguous Conditions Material usage shall not exceed
32.2 gallons per day or 7,467 gallons in any
12-month period32.2 gallons/day x 365 days/year = 11,753
gallons11,753 gallons > 7,467 gallon annual limitCan both limits apply? Which one applies?
![Page 41: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/41.jpg)
41
Reduce AmbiguityDaily material usage shall not exceed 32.2 gallons. Usage during any consecutive 12-month period shall not exceed 7,467 gallons.No ambiguity here!
![Page 42: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/42.jpg)
42
Run-On ConditionsThe permittee shall ensure that the Phase I tank truck and trailer vapor recovery systems are utilized during each transfer of gasoline and that product and vapor (poppet) caps are securely replaced and remain in place following each transfer. The Phase I and Phase II vapor control systems shall be operated in accordance with District Rules 61.3, 61.4, and 61.7 and the ARB Executive Orders specified above.
![Page 43: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/43.jpg)
43
Run-On Conditions (cont.)Condition No. 1: The Phase I and Phase II vapor control systems shall be operated in accordance with District Rules 61.3, 61.4 and 61.7 and the ARB Executive Orders specified above.
Condition No. 2: The permittee shall ensure that the Phase I tank truck and trailer vapor recovery systems are utilized during each transfer of gasoline and that product and vapor (poppet) caps are securely replaced and remain in place following each transfer.
![Page 44: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/44.jpg)
44
Reducing Confusion
![Page 45: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/45.jpg)
45
Confusing Conditions Undefined abbreviations and acronyms
• The gasoline AST shall be PE&O’d with an OPD
(The gasoline aboveground storage tank shall be properly equipped and operated with an overfill protection device.)
Two different terms used for same thing• Condition 1: No more than 4 cars shall be
painted per day• Condition 2: No more than 12 vehicles shall be
painted per week
![Page 46: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/46.jpg)
46
Confusing Conditions (cont.)
• Pronouns that don't clearly refer to specific nouns
“Permittee shall keep it at a minimum of 3% moisture at all times.”
Wordy, hard to read language “Let us pontificate upon the ramifications
of their non-compliance…”
![Page 47: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/47.jpg)
47
Enforceability“The overall VOC destruction
efficiency of the control device shall be at least 95% by weight.”
With no other conditions for monitoring, this is unenforceable.
![Page 48: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/48.jpg)
48
Enforceability• The overall VOC destruction efficiency
of the control device shall be at least 95% by weight.
• The control device shall be source tested annually using CARB Method 100.
Or……• Permittee shall monitor the flame
temperature of the control device daily.
![Page 49: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/49.jpg)
49
Ambiguous ≠ Enforceable• “In accordance with the
manufacturer’s specifications…”• “Take reasonable precautions…”• “Use best engineering
practices…”How can these conditions be improved?
![Page 50: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/50.jpg)
50
Averaging TimesBoiler may not emit more than 10 Lbs of
NOx.Lacks averaging period
Boiler shall not exceed 7 PPMVD at 3% O2.Lacks averaging period
Boiler NOx emission rate shall not exceed 7 ppmvd at 3% O2 and not more than 10 lbs/hour in any 24-hour rolling average.
![Page 51: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/51.jpg)
51
Monitoring of ComplianceBoiler shall not emit more than 10
pounds/Hour.Lacks a compliance demonstration method
Boiler shall not emit more than 10 pounds/Hour. Compliance shall be determined by the use of a NOx continuous emissions monitor. Monitor shall be properly installed, certified and operated in accordance with U.S. EPA.
![Page 52: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/52.jpg)
52
Off PermitOpacity shall be met by following a
fugitive dust plan.If a plan is used to demonstrate compliance, it
should be in the permit.Compliance with the co emissions
limitation shall be demonstrated by following manufacturers recommendation.What are recommendations? How is
compliance demonstrated?
![Page 53: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/53.jpg)
53
Department or Permittee Discretion
The permittee shall measure opacity using method 9 for 15 minutes.Does not define when opacity test shall be run;
permittee can test during non operation or when unit is in compliance only.
The APCO shall determine the emission rate after one year of testing and maintenance.No actual emission rate until a year has passed.
No way for general public to know exact emission level.
![Page 54: New Source Review : Monitoring Recordkeeping and Reporting](https://reader035.fdocuments.us/reader035/viewer/2022070420/56815f63550346895dce546e/html5/thumbnails/54.jpg)
54
A Few RecommendationsPay particular attention to new or
modified equipment descriptions, conditions and requirements
Review BACT levels and ensure limits are reflected in permit conditions
Review daily, quarterly and annual emission limits and ensure conditions adequately limit emissions
Review MRR requirements