New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1...
Transcript of New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1...
![Page 1: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/1.jpg)
New Orleans East Levee
28
Bayou SauvageNational Wildlife
Refuge
![Page 2: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/2.jpg)
29
New Orleans East
Surge Barrier Tie-In Old
Floodwall
New Floodwall
![Page 3: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/3.jpg)
New Orleans EastTie-In Floodwall
30
![Page 4: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/4.jpg)
31
Conceptual
Seabrook Surge Barrier
![Page 5: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/5.jpg)
Seabrook Surge Barrier
32
![Page 6: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/6.jpg)
BUILDING STRONG®
Outfall Canal Pumps and Gates
33
• Pumping Capacity: 2,200 cfs
• 10 pumps fully installed and tested
• Pumping Capacity: 9,000 cfs
• 18 hydraulic pumps fully installed and tested
• 11 direct drive pumps fully installed and tested
• 14 portable pumps
17th St. Canal Orleans Ave. Canal London Ave. Canal
• Pumping Capacity: 5,000 cfs
• 12 hydraulic pumps fully installed and tested
• 8 direct drive pumps fully installed and tested
![Page 7: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/7.jpg)
West Closure Complex
![Page 8: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/8.jpg)
West Closure Complex
The WCC removed 26 miles of levees and floodwalls from the first line of defense
35
![Page 9: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/9.jpg)
36
WCC Sector Gate Delivery
![Page 10: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/10.jpg)
West Closure ComplexSector Gate Installation
37
![Page 11: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/11.jpg)
West Closure ComplexSector Gate Installation
38
![Page 12: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/12.jpg)
BUILDING STRONG®
West Closure ComplexPump Station
11 vertical pumps► 1,740 cfs per pump
11 diesel engines► 5,400 HP each
4 backup generators►Climber screens►Sector gates►Controls
39
![Page 13: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/13.jpg)
Repair $102.7 M Program
Repairs for all 61 pump stations are complete.
Motor at Orleans Drive Pump Station Vertical Drive Pump – Elaine Pump Station
Pump Station Repairs
40
![Page 14: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/14.jpg)
Pump Station Storm Proofing
41
Contract Status
Orleans Parish
JeffersonParish
TOTAL 18 16
In Design 1 2
Awarded 7 8
Complete 2 3
Pending 8 2
![Page 15: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/15.jpg)
42
Bayou Segnette Pump StationCompleted Safe House
![Page 16: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/16.jpg)
SELA Interior Drainage
43
Contract Status
Orleans Parish
JeffersonParish
TOTAL 11 24
In Design 9 14
Awarded 2 10
Complete 0 9
![Page 17: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/17.jpg)
BUILDING STRONG®
SELA Interior Drainage
44
![Page 18: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/18.jpg)
BUILDING STRONG®45
In 2007, you had a 1% chance every year of flooding this deep from Hurricanes
Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk
reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm
parameters of a suite of 152 storms and not a particular event
Assumes 50% Pumping Capacity
March 08
![Page 19: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/19.jpg)
BUILDING STRONG®46
With the 100-year level of protection, you have a 1% chance every year of flooding this deep from Hurricanes
Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk
reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm
parameters of a suite of 152 storms and not a particular event
Assumes 50% Pumping Capacity
March 08
![Page 20: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/20.jpg)
BUILDING STRONG®
With the 100-year level of protection, you have a 0.2% chance every year of flooding this deep from Hurricanes
Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk
reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm
parameters of a suite of 152 storms and not a particular event
Assumes 50% Pumping Capacity
March 08
![Page 21: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/21.jpg)
BUILDING STRONG®48
Buying Down Risk
Risk
Initial Risk
Zoning / Building Codes
Coastal Protection and Restoration
Outreach
Evacuation Plan
Insurance
Levees / Floodwalls / Structures
Residual Risk
![Page 22: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/22.jpg)
Doing Business with the Corps
14 Steps for Vendors:http://www.mvn.usace.army.mil/ebs/cont_doingbiz.asp
Federal Business Opportunitieshttps://www.fbo.gov/
49
![Page 23: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/23.jpg)
BUILDING STRONG®
Upcoming Contracts
50
Contract Description $$ Range Award Date
OSP-03 Orleans Storm Proofing – CWT & PP Water Perimeter Protection $5-25 M April 2011
OSP-05 Orleans Storm Proofing – PS #5 – Two Pumps with Generator $5-25 M April 2011
PCCP-01 Outfall Canal Closures and Permanent Pumps $500 M - $1 B April 2011
OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July 2011
SELA-09 Pump to the River Pump Station $25-50 M August 2011
![Page 24: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/24.jpg)
BUILDING STRONG®
Questions / Discussion
51
![Page 25: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/25.jpg)
EGSA Meeting of Members Agenda
1. 1. Opening Comments2. 2. Reports from the Chairmen of the Association’s Standing
Committees on Board Recommendations discussed during the preceding afternoon.
3. 3. Old Business4. 4. New Business5. 5. Adjourn
![Page 26: New Orleans East Levee - EGSA S11...PCCP-01 Outfall Canal Closures and Perm anent Pumps $500 M - $1 B April 2011 OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July](https://reader034.fdocuments.us/reader034/viewer/2022042408/5f23ab194ba78d6ecf682b48/html5/thumbnails/26.jpg)
Field Service Etiquette Panel
Moderated by Leo LeBlanc, Methane Power, Inc.
PanelistsBrad Bingert, Cummins Mid-South
Jim Cress, Ring Power CorporationJoe Hafich, Emergency Systems Service CompanyRick Morrison, Nixon Power Services Company
Jack Petro, ASCO Power TechnologiesBob Piske, Gen-Tech of Arizona