Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
NEMESISNew Method for Superior Integrated
Hydrogen Generation System(contract # 019827)12/2005 – 11/2008
Antje WörnerDLR – German Aerospace Center
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Project coordination
Proof-of-principle fuel processor prototype
Economic evaluation and scale-up strategy
FPM HGM
Pre-reformer
Desul-phurization
Reformer
System Modeling / Thermal Management
Off-gas burner
WGS
HCMMembrane Separation
PSA
Metal Hydrides
Definition phase – system specifications
Project coordination
Proof-of-principle fuel processor prototype
Economic evaluation and scale-up strategy
FPM HGM
Pre-reformer
Desul-phurization
Reformer
System Modeling / Thermal Management
Off-gas burner
WGS
HCMMembrane Separation
PSA
Metal Hydrides
Definition phase – system specifications
Project AchievementsProject and Partnership Description
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Project AchievementsProject Starting Point and Goal
NEMESISNEMESIS
FuelFuel ProcessorProcessor Technology Technology forfor NGNG
FPMFPMHGMHGM
HCMHCM
H210kg/day
Diesel
NG
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Project AchievementsApproach for R&D
NEMESISNEMESIS
System Modeling / Thermal Management
FPM HGM
Pre-reformer
Desul-phurization
Reformer
Off-gas burner
WGS
HCMMembrane Separation
PSA
Metal Hydrides
prereformercatalyst testing
test setup foradsorbents for
desulphurization
CFD simulation of burner and reformer
reformer testing
Heater
PT1
DA
H2container
H2tank
N2tank
PT2
PI3PI2
PCTC
TT
Vent
GC
MF
1
5
43
2
9
6 7
8
12
1110
13
electricity
H2 line
PI1
Heater
PT1
DA
H2container
H2tank
N2tank
PT2
PI3PI2
PCTC
TT
Vent
GC
MF
1
5
43
2
9
6 7
8
12
1110
13
electricity
H2 line
PI1
investigation ofmetal hydrides
testing ofadvanced PSA
membranedevelopment
system simulation
FPM HGM HCM
system specification
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Testing
Project AchievementsProgress towards overall project goal
Layout ofprototype unit
Manufacturingof
prototype unit
Project targetsand goals
L- and G-DesulphurizationPrereforming
CFD-SimulationReformer TestingSingle Bed PSA
Membrane SeparationMetal Hydrides
05/06 11/06 08/07 06/08 11/08
12/05
Systemsimulation
Decision forlead concept
Functionalrequirements
Processconcepts
AdsorbentsCatalysts
MembranesMaterial & Design
Operating Conditions
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Project AchievementsTechnical Achievements
fuel processor based on steam reformingimprovement in efficiency
liquid and gaseous fuelmulti-fuel aspectdesulphurization
based on existing technology upgraded by innovative materials and components
marketability
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Alignment to IPCorrelation with IDAs
IDA 1: Hydrogen and Refueling Stations
develop and install distribution chains for hydrogen vehicles
Phase I 2010: demonstration at 13 sites with 9 refueling stations onsite H2 production
R&D: refuelling technologiesreduce cost of technologyimprove system reliabilityregulation and safety issues
strengthen SMEs smaller production values and early markets
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Alignment to IPProject activities vs. IP document targets
NEMESISNEMESIS
Phase I 2010: demonstration with 9 refueling stations
2008: proof-of-principle prototype 10kg H2/dayupscaling by a factor of 10 to 50 for fueling20 to 100 vehicles/day
2020: cost of hydrogen at pump <2.5€/kg (centralized and decentralized, excl. taxes)
cost target can be reached with NEMESIS technology
strengthening of the position of SMEs
HyGear as manufacturer of small fuel processors
NEMESISNEMESIS
NEMESISNEMESIS
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Enhancing cooperation Technology transfer / Collaborations
Results from FURIM have been consideredas input for NEMESIS
Co-operation contract of Air Products with HyGear on the sales and marketing of steam reforming technology into various application areas including refueling stations
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
Project future perspectivesProposed future research approach
end of the project: proof-of-principle prototype unitwith 10kg H2/day, concept for upscaling and integrationinto the existing infrastructure
starting point for next steps towards demonstration and commercial product
NEMESIS II projectoptimization of innovative materialstesting of critical operating conditionsexpansion of fuel range (e.g. DME, biodiesel)system integration of fuel processorintegration into refueling stationupscaling to 100 to 500kg H2/day
NEMESISNEMESIS
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
cooperation on EU level
WP7 Economic Evaluationinput from CUTE and HYWAYS (experiences and cost figures from technical side)input from HyApproval (codes and standards)
contribution to future JTI Work Programme
demonstration of the technology developed within NEMESIS at refueling stations
Project future perspectivesFuture Collaborations
NEMESISNEMESIS
NEMESISNEMESIS
NEMESISNEMESIS
Hydrogen and Fuel Cell Review Days 2007, Brussels 10th-11th October
NEMESIS
Thank you for your attention!
Antje WörnerDLR – German Aerospace Center
NEMESISNEMESIS