New Meadowlands

21
New Meadowlands

Transcript of New Meadowlands

Page 1: New Meadowlands

New Meadowlands

Page 2: New Meadowlands

NEW MEADOWLANDS

PILOT AREA #1

Page 3: New Meadowlands

NEW MEADOWLANDSREBUILD BY DESIGN: 2 YEARS LATER

2

DAVID ROSENBLATTASSISTANT COMMISSIONER, ENGINEERING AND CONSTRUCTIONNJ DEPARTMENT OF ENVIRONMENTAL PROTECTION

CHRIS BENOSKY, PEVICE PRESIDENT, PROJECT DIRECTORAECOM

INTRODUCTIONS

TETERBORO AIRPORT

HACKENSACK RIVER

OVERPECK CREEK

METLIFE STADIUM

MEADOWLANDS RACETRACK

BERRY’S CREEK

TETERBORO

PILOT AREA #1

MOONACHIE

CARLSTADT

LITTLE FERRY

SOUTH HACKENSACK

I-80 EXPRESS

I-95

Page 4: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERPROTECT CONNECT GROWBUILDING FROM THE WINNING DESIGN

3

NEW MEADOWLANDS

Page 5: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING ALIGNMENTS

4

NEW MEADOWLANDS

• Winning design proposed 9 miles of flood protection features• FEMA-certifiable levees were estimated at $35M per mile• RBD alignment approximately $350M for Flood Protection

Component alone• Current funds allow for up to 3 miles of the 7 ot 9 miles proposed

Page 6: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING ALIGNMENTS

5

NEW MEADOWLANDS

Page 7: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING ALIGNMENTS

6

NEW MEADOWLANDS

Page 8: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING ALIGNMENTS

7

NEW MEADOWLANDS

Page 9: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING ALIGNMENTS

8

NEW MEADOWLANDS

Page 10: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING ALIGNMENTS

9

NEW MEADOWLANDS

Page 11: New Meadowlands

FLOOD PROTECTION & PUBLIC BENEFITCONSIDERATIONS ACROSS SCALES

• Of ecologies/green space

• To metro area

• Of adjacent communities

• From exterior flooding

• From interior flooding

• Full New Meadowlands study area

• Greater regional context

• Community redevelopment

• Local public amenities

• Experiential scale design

NETWORKS/ACCESS INTERFACES OPPORTUNITIES

NEW MEADOWLANDS

REGION

PARK

DEVELOPMENT

WILDLIFE HABITAT

BIODIVERSITY

WATERACTIVITIES

TOURISTATTRACTION

RECREATION

ENHANCED PUBLIC SPACES

PROTECTEDAREAS

ECOLOGICALHUBS

ACCESSROADS, TRANSIT

REBUILD BY DESIGN: 2 YEARS LATER

10

Page 12: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING OPTIONSA KIT OF PARTS

11

STREETSCAPEPUBLIC REALM

RAISED PIER/BOARDWALK

INTENSIVE BERM

SIMPLE BERM

SEA WALL

DEPLOYABLES

RESILIENTPARK

ACTIVERECREATION

TRANSPORTATIONINFRASTRUCTURE

STORMWATERBIORETENTION

NEW MEADOWLANDS

• Original MIT CAU proposal• Sloped condition at water• Raised Meadowband development• Raised vehicular lane

• Hard edge condition at water• Raised Meadowband development• Raised vehicular lane

• Less intensive berm condition at water• Meadowband development at-grade• Vehicular lane at-grade• Blocked views and access to water

• Open access to water• Temporary deployable flood protection• Meadowband development at-grade• Vehicular lane at-grade

Page 13: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTION IDEAS MATRIXFEASIBILITY CONSIDERATIONS

12

FLOOD STRATEGIES PUBLIC AMENITIES

INTENSIVEBERM

SEAWALL

RESILIENTPARK

STREETSCAPEPUBLIC REALM

RAISED PIER/BOARDWALK

TRANSPORTATIONINFRASTRUCTURE

• Winning concept elements

• New public input

• Engineered elements

• Green infrastructure solutions

NEW MEADOWLANDS

Page 14: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONEXPLORING WATERSHED BASED ALTERNATIVES

13

NEW MEADOWLANDS

• Less reliance on frontal berm for sole line of protection

• Investigate improved stormwater management

• Identify local drainage improvements

• Explore green infustructure solutions

Page 15: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONPERFORMATIVE OPEN SPACE INFRASTRUCTURE

NEW MEADOWLANDS

TYPICAL TREATMENTSNOT TO A SPECIFIC GEOGRAPHY 14

Page 16: New Meadowlands

REBUILD BY DESIGN: 2 YEARS LATERFLOOD PROTECTIONPERFORMATIVE RESIDENTIAL INFRASTRUCTURE

NEW MEADOWLANDS

TYPICAL TREATMENTSNOT TO A SPECIFIC GEOGRAPHY 15

Page 17: New Meadowlands

NEW MEADOWLANDSREBUILD BY DESIGN: 2 YEARS LATER

COMMUNITY OUTREACH CONTINUED INPUT

CITIZEN ADVISORY GROUP MEETINGAPRIL 26, 2016

16

Page 18: New Meadowlands

NEW MEADOWLANDSREBUILD BY DESIGN: 2 YEARS LATER

17

FLOOD PROTECTION & COMMUNITY BENEFITPROJECT GOALS & OBJECTIVES

• Contribute to community resiliency

• Reduce risk to public health

• Contribute to on-going community efforts to reduce FEMA flood insurance rates

• Deliver co-benefits by integrating the flood hazard risk reduction strategy with civic, cultural, and recreational values

• Activate public space and enhance the quality of life for the community

• Consider impacts from sea level rise

Page 19: New Meadowlands

NEW MEADOWLANDSREBUILD BY DESIGN: 2 YEARS LATER

18

CURRENT PROCESS

Page 20: New Meadowlands

NEW MEADOWLANDSREBUILD BY DESIGN: 2 YEARS LATER

19

A STORY OF NEW MEADOWLANDSCURRENT STATUS & NEXT STEPS

Page 21: New Meadowlands

TETERBORO AIRPORT

OVERPECK CREEK

METLIFE STADIUM

MEADOWLANDS RACETRACK

TETERBORO

MOONACHIE

LITTLE FERRY

I-80 EXPRESS

I-95

THANK YOU

HACKENSACK RIVERCARLSTADT

BERRY’S CREEK

SOUTH HACKENSACK

PILOT AREA #1