Presented by: Armindo Monteiro, P.E. Senior Associate October 29, 2008 New Meadowlands Stadium East Rutherford, New Jersey

Transcript of New Meadowlands Stadium - Amazon Web...

Page 1: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

Presented by: Armindo Monteiro, P.E. Senior Associate October 29, 2008 

New Meadowlands Stadium East Rutherford, New Jersey

Page 2: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

§  Project Description §  Foundations §  Superstructure §  Special Features

Page 3: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

§  Project Description §  Foundations §  Superstructure §  Special Features

Page 4: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Design and Construction team 

§  Owner :  Giants/Jets §  Architect:  360 Architecture/EwingCole §  Design­Build CM:  Skanska USA §  Structural Engineer:  Thornton Tomasetti §  MEP Engineer:  Ewing Cole

Page 5: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Away with the Old, in with the new 

Old  New Start  1972  2007 Opened  1976  2010 Owner  NJSEA  Giants/Jets Cost  $78 M  $1.3 B Capacity:  80,242  82,500 NFL Rank (cap.) 2 nd  2 nd Suites  119  217 Club seats  142  7200 Bldg footprint  450,000 700,000 SF Steel Tons  13,500  25,000

Page 6: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium §  2.1 Mill sq.ft. on 

Eight Levels §  Host NFL & college 

football, Intern’l soccer, concerts 

§  Four 40’x130’ LED scoreboards 

§  Louvered façade, illuminated by colors of team playing

Page 7: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Site Location § ~6 Mi from NYC § Meadowlands Complex § Bounded by I­95 and Route 3 § Overall project impacts 270 acres § Land Leased from NJSEA

Page 8: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium

Page 9: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Milestones §  Decision Jets/Giants – Sept. 2005 §  GMP awarded/Turned D­B – Dec. 2005 §  Foundation start – May 23, 2007 §  Steel erection began – Oct. 5, 2007 §  Expected topping out –Nov. 2008 (Currently 4+ months ahead of schedule)

Page 10: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Fast Track 

§  Multiple early bid packages §  4 Mill orders §  Fabricator on board in design assist phase §  Struct. Steel SIM created using Tekla

Page 11: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Steel Quantity Estimate §  Estimate = 23,769 Tons §  Final = ~25,000 Tons (including all changes & misc. framing) 

§  18,800 tons designed, detailed, submitted, and fabricated in approx. 17 months (up to May ’08) 

§  ~14,000 Tons erected in 7 months (up to May ’08)

Page 12: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

§  Project Description §  Foundations §  Superstructure §  Special Features

Page 13: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Driven Piles at Pilecaps §  Concrete filled, closed end piles, dia = 13 3/8” 

§  150 Ton allowable axial capacity 

§  10 Ton allowable uplift capacity 

§  3 Ton allowable lateral capacity

Page 14: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Pilecaps §  Top of pilecap typically 3 feet below top of slab 

§  Dowels provided to transfer lateral load into slab 

§  2 to 24 Pile Pilecaps Used

Page 15: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Tie Down Anchors §  Required when uplift load exceeds uplift capacity of driven piles 

§  175 kip uplift resistance §  $$$ at ~$150/LF

Page 16: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Pile Supported Framed Slab on Grade 

§  2’­0” thick individual pile caps/haunch slab 

§  150 ton and 75 ton slab support piles 

§  12 inch thick normal weight concrete slab 

§  10 inch thick normal weight field slab 

§  Continuous mat reinforcement 

Approx. 25’ 

~ 12’ o.c. 

Field Slab Part Plan Typ. Service Level  Slab Part Plan

Page 17: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Pile Supported Framed Slab on Grade

Page 18: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

§  Project Description §  Foundations §  Superstructure §  Special Features

Page 19: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

Structural System ­ Summary §  All steel super structure §  Code:  IBC 2000, New Jersey Edition §  GRAVITY SYSTEM §  4 ½” N.W. topping on 3” Composite  M.D. §  Typical span = 9’ to 10’ 

§  LATERAL SYSTEM §  Concentrically Braced frames ­both 

directions 

New Meadowlands Stadium

Page 20: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Lateral System §  Frames located symm. §  Diaphragm designed to span between frames §  #4@12” mat each way §  8­#7 add’l chord reinforcement along perimeter of slab 

�  Longitudinal Braced Frames 

Radial Braced Frames, Typ. 

Longitudinal 

Radial  Braced Frames 

Braced Frames

Page 21: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

Lower Bowl 

Braced Frame 

Mid Bowl 

Upper Bowl 

Suite Level A 

Suite Level B Suite Level C 

New Meadowlands Stadium Typ. Sideline Bent Elevation 

Precast Seating Units

Page 22: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

Lower Bowl 

Braced Frame 

Mid Bowl 

Upper Bowl 

Typ. Endzone Bent Elevation 

New Meadowlands Stadium 

Precast Seating Units

Page 23: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

Structural System­Summary §  STADIUM LATERAL LOAD SYSTEM §  WIND LOADS 

–  Exposure C –  V=100 mph –  I=1.15 

§  SEISMIC LOADS –  Seismic Design Category C –  R=3 (no special seismic detailing) –  I=1.25 

§  Seismic loads predominantly control design 

New Meadowlands Stadium

Page 24: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Seismic §  Code transition period from IBC2000 to IBC2006 in NJ 

§  Design for worst case §  IBC2006 reduced forces but still Cat. D, borderline 

§  TT suggested site specific study in hopes of achieving Cat. C 

S DS > 0.5 

S D1 > 0.2 } CAT. D

Page 25: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium §  Site Specific confirmed CAT. C 

Benefits of “C” vs. “D” §  R=3 permitted no special detailing provisions 

§  No special seismic requirements for MEP/ Arch systems 

§  $$$

Page 26: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

SITE SPECIFIC §  Sds:0.48g §  Sd 1 :0.175g §  SDC “C” §  R=3 

IBC 2000 §  Sds:0.555g §  Sd 1 :0.22g §  SDC “D” §  R>3 

SITE SPECIFIC VS. IBC §  Max. 20% reduction in Design Response coefficients for site specific per IBC 

§  Still significant uplift in columns at the foundation level 

§  Uplift anchor cost approx $150/LF, with depths ranging 45­90 ft. ($6,750­$13,500 ea)

Page 27: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium What can be done to reduce 

uplift? §  Dynamic analysis §  force distrib based on location of mass F=m*a 

§  Vb based on T = 1.2 *Ta*Cu…­15.4% reduction 

§  LLRS ‘R’ Factor reduced forces for increased system ductility

Page 28: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Dynamic Analysis vs Site Specific and IBC (R=3) 

§  Significant base shear reductions 

§  Significant overturning moment reductions 

§  Reduced uplift anchors proportionately

Page 29: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Seismic ‘R’ Value § Force inversely proportional to R value § Cs= S D1 *I/(T*R), & min Cs = 0.044 I*S DS § For R=3 and R=6, not 2:1 force ratio: min Cs = 0.044 I*S DS

Page 30: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Seismic ‘R’ Value § Structure of ~1.4 to 1.9 sec (Cs min controls for higher R) § Impacts Level of detailing of connx & member size criteria

Page 31: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium R6 Benefits § Main member tonnage reduction 350 Tons § No uplift anchors (100+ anchors) 

R6 Penalties § Full tension capacity conn. (Ry*Ag*Fy)…$$ § Brace beam L b <=L pd § Other detailing reqm’t Final Result:  R=3 selected 

� R=3 CONNX

� R=6 CONNX

Page 32: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

§  Project Description §  Foundations §  Superstructure §  Special Features

Page 33: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Expansion Joints §  No double columns and no slide bearings §  Cantilever floor system §  Aesthetically cleaner §  >Tonnage, but < detailing costs 

46’ 

27’ 

17’

Page 34: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Expansion Joint §  E.O.S. to E.O.S.  Dim = max EQ drift + temp + tolerance 

§  Sacrificial element between slab edge­ dimension based on install temp 

§  ‘X’ Dim accommodates temp & wind drift 

§  Same detail all floors §  Designed for forklift point load 

Exp. Jt. EOS  EOS 

Sacrificial Elements

Page 35: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 500 ft 

Stadium Four Expansion Joints at “corners” 

~910 ft 

~740 ft 

Max 670 Ft without exp. Jt. 

Max 630 Ft w

ithou

t exp. Jt.

Page 36: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Sideline Braced Frame Locations § Long. frames within 350 ft § Ductile connx detail 

EXP. JOINT

BRACED FRAME 

EXP. JOINT 

�  Longitudinal Braced Frames 

�  Radial Braced Frames, Typ. 

Typ. Longitudinal Braced Frame 

�  350 FT.

Page 37: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium Endzone Braced Frame Locations § Longitudinal frames centered § Sim. Ductile connx’s used 

BRACED FRAME 

EXP. JOINT 

�  Longitudinal Braced Frames 

�  Radial  Braced Frames

Page 38: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Typical Bays §  Spans up to 55’, typical modern stadium span approx. 40’­45’ 

§  Reduce number of pieces and erection time 

§  Nominal add’l tonnage §  Restricted live load deflection at façade components to 1 ¼” 

55’

Page 39: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

New Meadowlands Stadium 

Typical Bay Study §  Exist Giant’s stadium ~30 ft bays §  Reduce number of pieces of Steel, Precast, facade §  Reduces fireproofing quantity

Page 40: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

ANY QUESTIONS?

Page 41: New Meadowlands Stadium - Amazon Web Servicesthornton.s3.amazonaws.com/.../Meadowlands_Overview.pdf · New Meadowlands Stadium Away with the Old, in with the new Old New Start 1972

Thank you Armindo G. Monteiro, P.E. Thornton Tomasetti 24 Commerce St. Newark, NJ 07102 T 973.286.6100 F 973.286.6101