NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING …...death of koalas. PO 3: The development does...
Transcript of NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING …...death of koalas. PO 3: The development does...
Know How
NEW KOALAHABITATPROVISIONSUNDER THEPLANNINGREGULATION 2017
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
STEP 1
Do you meet the definition of exempted development
or Is the development to be carried out under a development permit given for an
application that was properly made before 7 February 2020
orIs the development consistent with a
development approval- in effect for the premises on which the development is carried out and
- given for an application that was properly made before 7 February 2020
If you meet any of the above criteria the new koala habitat provisions within the amended Planning Regulation 2017 do not apply
Note - For a current application that was properly made before 7 February 2020 the new statutory instrument is not applicable as per Section 73 of the Planning
Regulation 2017 which we interpret to mean it removes the ability for the Assessment Manager to give weight to the new provisions as per Chapter 3 Part 1
Section 45 of the Planning Act 2016
If you do not meet any of the above criteria proceed to STEP 2
STEP 2
Identify the Koala Conservation Plan values on your property and refer to the appropriate flow chart
Inside the Koala Priority Area
Outside the Koala Priority Area
Koala Habitat Area on premises
Koala Habitat Area on premises
Refer to Flow Chart 1(a)
Refer to Flow Chart 2(a)
Inside an Identified Koala Broad-Hectare Area
Koala Habitat Area off premises
Koala Habitat Area off premises
Refer to Flow Chart 1(b)
Refer to Flow Chart 2(b)
Refer to Flow Chart 3
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Koala Priority Area Koala Habitat AreaIdentified Koala
Broad-hectare Area
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(a)
Inside a Koala Priority Area and Koala Habitat Area on premises
Schedule 11 Part 2 Section 4 Assessment Benchmarks
1(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe movement of koalas ndash
(i) within a koala habitat area on the premises and(ii) between a koala habitat area on premises (the first area) and a koala habitat area or
ecological corridor within 200m of the first area
1(b) either ndash (i) each building structure or works associated with the development is at least 50m from a
koala habitat area or(ii) the development complies with each of the criteria stated in assessment benchmark 2 (a) ndash
(e)
2(a) any change to the condition of soil as a result of the development does not adversely affect a koala habitat area
2(b) any alteration of hydrological flows as a result of the development does not adversely affect a koala habitat area
2(c) any landscaping associated with the development that involves planting non-native vegetation does not adversely affect a koala habitat area
2(d) the development does not adversely affect a koala habitat area by resulting in the increased growth and spread of weeds in the koala habitat area
2(e) a building structure or works associated with the development is located to minimise the amount of vegetation required to be cleared for safety purposes
Proposing to interfere with the Koala Habitat Area on the premises
PROHIBITED DEVELOPMENT
Not proposing to interfere with the Koala Habitat Area on the premises
Local Authority to implement Schedule 11 Part 2 Section 4 (assessment benchmarks)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(b)
Inside a Koala Priority Area and no Koala Habitat Area on premises
Schedule 11 Part 2 is not applicable as the premises on which the development is
carried out does not meet the criteria of Schedule 11 Part 2 Section 3(c)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(a)
Outside a Koala Priority Area and Koala Habitat Area on premises
Not proposing to interfere with the Koala Habitat Area on the premises
No assessable development provisions applicable (ie SDAP Code 25)Referral toassessed by SARA for the
State Development Assessment Provisions Code 25 Development in South East Queensland
koala habitat areas
Proposing to interfere with the Koala Habitat Area on the premises
PO 6 Development1 avoids impacts on Category C areas of
vegetation and Category R areas of vegetation or
2 minimises and mitigates impacts on Category C areas of vegetation and Category R areas of vegetation after
demonstrating avoidances is not reasonably possible
PO 5 Development1 avoids impacts on MSES or
2 minimises and mitigates impacts on MSES after
demonstrating avoidance is not reasonably possible and3 provides an offset if after
demonstrating all reasonable avoidance minimisation
and mitigation measures are undertaken the development
results in an acceptable significant residual impact on MSES
PO 4 The construction of the development does not increase the risk of injury or
death of koalas
PO 3 The development does not restrict the
movement of koalas by providing for safe koala
movement between highly connected patches of
retained koala habitat area
PO 2 The design and siting of development avoids
fragmenting koala habitat areas within the site
PO 1 Demonstrate that the interfering with koala habitat
has 1 been reasonably avoided
or2 been reasonably
minimised where it cannot be reasonably avoided and3 mitigated the impacts of the interfering with koala
habitat values
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
STEP 1
Do you meet the definition of exempted development
or Is the development to be carried out under a development permit given for an
application that was properly made before 7 February 2020
orIs the development consistent with a
development approval- in effect for the premises on which the development is carried out and
- given for an application that was properly made before 7 February 2020
If you meet any of the above criteria the new koala habitat provisions within the amended Planning Regulation 2017 do not apply
Note - For a current application that was properly made before 7 February 2020 the new statutory instrument is not applicable as per Section 73 of the Planning
Regulation 2017 which we interpret to mean it removes the ability for the Assessment Manager to give weight to the new provisions as per Chapter 3 Part 1
Section 45 of the Planning Act 2016
If you do not meet any of the above criteria proceed to STEP 2
STEP 2
Identify the Koala Conservation Plan values on your property and refer to the appropriate flow chart
Inside the Koala Priority Area
Outside the Koala Priority Area
Koala Habitat Area on premises
Koala Habitat Area on premises
Refer to Flow Chart 1(a)
Refer to Flow Chart 2(a)
Inside an Identified Koala Broad-Hectare Area
Koala Habitat Area off premises
Koala Habitat Area off premises
Refer to Flow Chart 1(b)
Refer to Flow Chart 2(b)
Refer to Flow Chart 3
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Koala Priority Area Koala Habitat AreaIdentified Koala
Broad-hectare Area
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(a)
Inside a Koala Priority Area and Koala Habitat Area on premises
Schedule 11 Part 2 Section 4 Assessment Benchmarks
1(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe movement of koalas ndash
(i) within a koala habitat area on the premises and(ii) between a koala habitat area on premises (the first area) and a koala habitat area or
ecological corridor within 200m of the first area
1(b) either ndash (i) each building structure or works associated with the development is at least 50m from a
koala habitat area or(ii) the development complies with each of the criteria stated in assessment benchmark 2 (a) ndash
(e)
2(a) any change to the condition of soil as a result of the development does not adversely affect a koala habitat area
2(b) any alteration of hydrological flows as a result of the development does not adversely affect a koala habitat area
2(c) any landscaping associated with the development that involves planting non-native vegetation does not adversely affect a koala habitat area
2(d) the development does not adversely affect a koala habitat area by resulting in the increased growth and spread of weeds in the koala habitat area
2(e) a building structure or works associated with the development is located to minimise the amount of vegetation required to be cleared for safety purposes
Proposing to interfere with the Koala Habitat Area on the premises
PROHIBITED DEVELOPMENT
Not proposing to interfere with the Koala Habitat Area on the premises
Local Authority to implement Schedule 11 Part 2 Section 4 (assessment benchmarks)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(b)
Inside a Koala Priority Area and no Koala Habitat Area on premises
Schedule 11 Part 2 is not applicable as the premises on which the development is
carried out does not meet the criteria of Schedule 11 Part 2 Section 3(c)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(a)
Outside a Koala Priority Area and Koala Habitat Area on premises
Not proposing to interfere with the Koala Habitat Area on the premises
No assessable development provisions applicable (ie SDAP Code 25)Referral toassessed by SARA for the
State Development Assessment Provisions Code 25 Development in South East Queensland
koala habitat areas
Proposing to interfere with the Koala Habitat Area on the premises
PO 6 Development1 avoids impacts on Category C areas of
vegetation and Category R areas of vegetation or
2 minimises and mitigates impacts on Category C areas of vegetation and Category R areas of vegetation after
demonstrating avoidances is not reasonably possible
PO 5 Development1 avoids impacts on MSES or
2 minimises and mitigates impacts on MSES after
demonstrating avoidance is not reasonably possible and3 provides an offset if after
demonstrating all reasonable avoidance minimisation
and mitigation measures are undertaken the development
results in an acceptable significant residual impact on MSES
PO 4 The construction of the development does not increase the risk of injury or
death of koalas
PO 3 The development does not restrict the
movement of koalas by providing for safe koala
movement between highly connected patches of
retained koala habitat area
PO 2 The design and siting of development avoids
fragmenting koala habitat areas within the site
PO 1 Demonstrate that the interfering with koala habitat
has 1 been reasonably avoided
or2 been reasonably
minimised where it cannot be reasonably avoided and3 mitigated the impacts of the interfering with koala
habitat values
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
Inside the Koala Priority Area
Outside the Koala Priority Area
Koala Habitat Area on premises
Koala Habitat Area on premises
Refer to Flow Chart 1(a)
Refer to Flow Chart 2(a)
Inside an Identified Koala Broad-Hectare Area
Koala Habitat Area off premises
Koala Habitat Area off premises
Refer to Flow Chart 1(b)
Refer to Flow Chart 2(b)
Refer to Flow Chart 3
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Date 12022020
0 9300 18600 27900 37200
Metres
Department of StateDevelopment ManufacturingInfrastructure and Planning cent Disclaimer
This map has been generated from the information supplied to the Department of State Development Manufacturing Infrastructure and Planning for the purposes of the Development Assessment Mapping System Note that this is a print screen only The map generated has been prepared with due care based on the best available information at the time of publication The State of Queensland holds no responsibility for any errors inconsistencies or omissions within this document Any decisions made by other parties based on this document are solely the responsibility of those parties This information is supplied subject to the full terms and conditions available on the departmentrsquos website
DA Mapping System ndash Print Screen
copy The State of Queensland 2020
Koala Priority Area Koala Habitat AreaIdentified Koala
Broad-hectare Area
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(a)
Inside a Koala Priority Area and Koala Habitat Area on premises
Schedule 11 Part 2 Section 4 Assessment Benchmarks
1(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe movement of koalas ndash
(i) within a koala habitat area on the premises and(ii) between a koala habitat area on premises (the first area) and a koala habitat area or
ecological corridor within 200m of the first area
1(b) either ndash (i) each building structure or works associated with the development is at least 50m from a
koala habitat area or(ii) the development complies with each of the criteria stated in assessment benchmark 2 (a) ndash
(e)
2(a) any change to the condition of soil as a result of the development does not adversely affect a koala habitat area
2(b) any alteration of hydrological flows as a result of the development does not adversely affect a koala habitat area
2(c) any landscaping associated with the development that involves planting non-native vegetation does not adversely affect a koala habitat area
2(d) the development does not adversely affect a koala habitat area by resulting in the increased growth and spread of weeds in the koala habitat area
2(e) a building structure or works associated with the development is located to minimise the amount of vegetation required to be cleared for safety purposes
Proposing to interfere with the Koala Habitat Area on the premises
PROHIBITED DEVELOPMENT
Not proposing to interfere with the Koala Habitat Area on the premises
Local Authority to implement Schedule 11 Part 2 Section 4 (assessment benchmarks)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(b)
Inside a Koala Priority Area and no Koala Habitat Area on premises
Schedule 11 Part 2 is not applicable as the premises on which the development is
carried out does not meet the criteria of Schedule 11 Part 2 Section 3(c)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(a)
Outside a Koala Priority Area and Koala Habitat Area on premises
Not proposing to interfere with the Koala Habitat Area on the premises
No assessable development provisions applicable (ie SDAP Code 25)Referral toassessed by SARA for the
State Development Assessment Provisions Code 25 Development in South East Queensland
koala habitat areas
Proposing to interfere with the Koala Habitat Area on the premises
PO 6 Development1 avoids impacts on Category C areas of
vegetation and Category R areas of vegetation or
2 minimises and mitigates impacts on Category C areas of vegetation and Category R areas of vegetation after
demonstrating avoidances is not reasonably possible
PO 5 Development1 avoids impacts on MSES or
2 minimises and mitigates impacts on MSES after
demonstrating avoidance is not reasonably possible and3 provides an offset if after
demonstrating all reasonable avoidance minimisation
and mitigation measures are undertaken the development
results in an acceptable significant residual impact on MSES
PO 4 The construction of the development does not increase the risk of injury or
death of koalas
PO 3 The development does not restrict the
movement of koalas by providing for safe koala
movement between highly connected patches of
retained koala habitat area
PO 2 The design and siting of development avoids
fragmenting koala habitat areas within the site
PO 1 Demonstrate that the interfering with koala habitat
has 1 been reasonably avoided
or2 been reasonably
minimised where it cannot be reasonably avoided and3 mitigated the impacts of the interfering with koala
habitat values
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
FLOW CHART 1(a)
Inside a Koala Priority Area and Koala Habitat Area on premises
Schedule 11 Part 2 Section 4 Assessment Benchmarks
1(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe movement of koalas ndash
(i) within a koala habitat area on the premises and(ii) between a koala habitat area on premises (the first area) and a koala habitat area or
ecological corridor within 200m of the first area
1(b) either ndash (i) each building structure or works associated with the development is at least 50m from a
koala habitat area or(ii) the development complies with each of the criteria stated in assessment benchmark 2 (a) ndash
(e)
2(a) any change to the condition of soil as a result of the development does not adversely affect a koala habitat area
2(b) any alteration of hydrological flows as a result of the development does not adversely affect a koala habitat area
2(c) any landscaping associated with the development that involves planting non-native vegetation does not adversely affect a koala habitat area
2(d) the development does not adversely affect a koala habitat area by resulting in the increased growth and spread of weeds in the koala habitat area
2(e) a building structure or works associated with the development is located to minimise the amount of vegetation required to be cleared for safety purposes
Proposing to interfere with the Koala Habitat Area on the premises
PROHIBITED DEVELOPMENT
Not proposing to interfere with the Koala Habitat Area on the premises
Local Authority to implement Schedule 11 Part 2 Section 4 (assessment benchmarks)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 1(b)
Inside a Koala Priority Area and no Koala Habitat Area on premises
Schedule 11 Part 2 is not applicable as the premises on which the development is
carried out does not meet the criteria of Schedule 11 Part 2 Section 3(c)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(a)
Outside a Koala Priority Area and Koala Habitat Area on premises
Not proposing to interfere with the Koala Habitat Area on the premises
No assessable development provisions applicable (ie SDAP Code 25)Referral toassessed by SARA for the
State Development Assessment Provisions Code 25 Development in South East Queensland
koala habitat areas
Proposing to interfere with the Koala Habitat Area on the premises
PO 6 Development1 avoids impacts on Category C areas of
vegetation and Category R areas of vegetation or
2 minimises and mitigates impacts on Category C areas of vegetation and Category R areas of vegetation after
demonstrating avoidances is not reasonably possible
PO 5 Development1 avoids impacts on MSES or
2 minimises and mitigates impacts on MSES after
demonstrating avoidance is not reasonably possible and3 provides an offset if after
demonstrating all reasonable avoidance minimisation
and mitigation measures are undertaken the development
results in an acceptable significant residual impact on MSES
PO 4 The construction of the development does not increase the risk of injury or
death of koalas
PO 3 The development does not restrict the
movement of koalas by providing for safe koala
movement between highly connected patches of
retained koala habitat area
PO 2 The design and siting of development avoids
fragmenting koala habitat areas within the site
PO 1 Demonstrate that the interfering with koala habitat
has 1 been reasonably avoided
or2 been reasonably
minimised where it cannot be reasonably avoided and3 mitigated the impacts of the interfering with koala
habitat values
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
FLOW CHART 1(b)
Inside a Koala Priority Area and no Koala Habitat Area on premises
Schedule 11 Part 2 is not applicable as the premises on which the development is
carried out does not meet the criteria of Schedule 11 Part 2 Section 3(c)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(a)
Outside a Koala Priority Area and Koala Habitat Area on premises
Not proposing to interfere with the Koala Habitat Area on the premises
No assessable development provisions applicable (ie SDAP Code 25)Referral toassessed by SARA for the
State Development Assessment Provisions Code 25 Development in South East Queensland
koala habitat areas
Proposing to interfere with the Koala Habitat Area on the premises
PO 6 Development1 avoids impacts on Category C areas of
vegetation and Category R areas of vegetation or
2 minimises and mitigates impacts on Category C areas of vegetation and Category R areas of vegetation after
demonstrating avoidances is not reasonably possible
PO 5 Development1 avoids impacts on MSES or
2 minimises and mitigates impacts on MSES after
demonstrating avoidance is not reasonably possible and3 provides an offset if after
demonstrating all reasonable avoidance minimisation
and mitigation measures are undertaken the development
results in an acceptable significant residual impact on MSES
PO 4 The construction of the development does not increase the risk of injury or
death of koalas
PO 3 The development does not restrict the
movement of koalas by providing for safe koala
movement between highly connected patches of
retained koala habitat area
PO 2 The design and siting of development avoids
fragmenting koala habitat areas within the site
PO 1 Demonstrate that the interfering with koala habitat
has 1 been reasonably avoided
or2 been reasonably
minimised where it cannot be reasonably avoided and3 mitigated the impacts of the interfering with koala
habitat values
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
FLOW CHART 2(a)
Outside a Koala Priority Area and Koala Habitat Area on premises
Not proposing to interfere with the Koala Habitat Area on the premises
No assessable development provisions applicable (ie SDAP Code 25)Referral toassessed by SARA for the
State Development Assessment Provisions Code 25 Development in South East Queensland
koala habitat areas
Proposing to interfere with the Koala Habitat Area on the premises
PO 6 Development1 avoids impacts on Category C areas of
vegetation and Category R areas of vegetation or
2 minimises and mitigates impacts on Category C areas of vegetation and Category R areas of vegetation after
demonstrating avoidances is not reasonably possible
PO 5 Development1 avoids impacts on MSES or
2 minimises and mitigates impacts on MSES after
demonstrating avoidance is not reasonably possible and3 provides an offset if after
demonstrating all reasonable avoidance minimisation
and mitigation measures are undertaken the development
results in an acceptable significant residual impact on MSES
PO 4 The construction of the development does not increase the risk of injury or
death of koalas
PO 3 The development does not restrict the
movement of koalas by providing for safe koala
movement between highly connected patches of
retained koala habitat area
PO 2 The design and siting of development avoids
fragmenting koala habitat areas within the site
PO 1 Demonstrate that the interfering with koala habitat
has 1 been reasonably avoided
or2 been reasonably
minimised where it cannot be reasonably avoided and3 mitigated the impacts of the interfering with koala
habitat values
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
FLOW CHART 2(b)
Outside a Koala Priority Area and no Koala Habitat Area on premises
No assessable development provisions applicable (ie SDAP Code 25)
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
FLOW CHART 3
Inside an Identified Koala Broad-Hectare Area and is assessable development under a planning scheme or TLPI or
RALs under Schedule 10 Part 14 Division 1 Section 21
Local Authority to implementSchedule 11 Part 3 ndash Development in identified
koala broad-hectare areas including the assessment benchmarks under Schedule 11 Part 3 Section 6
Schedule 11 Part 3 Section 6 Assessment Benchmarks
(a) the development provides on the premises the safe koala movement measures necessary to maximise the safe koala movement of koalas
within and through the premises
(b) any clearing of native vegetation complies with the Nature Conservation (Koala) Conservation Plan 2017 sections 10 and 11
to the extent the sections apply to the clearing
(c) measures are implemented to ensure that a construction activity on the premises does not increase the risk of death or injury to koalas and
(d) any areas on the premises that is cleared of native vegetation as a result of a construction activity is progressively rehabilitated
NEW KOALA HABITAT PROVISIONS UNDER THE PLANNING REGULATION 2017
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4
Know How
Surverying
Town Planning
Urban Design
Mapping
Environmental Management
Landscape Architecture
More of us on
Saunders Havill Group9 Thompson Street
Bowen Hills Queensland 4006
T 1300 123 SHGE mailsaundershavillcom
- Button 2
- Button 3
- Button 4