Industrialized Construction Forum May 18, 2016

Transcript of New Industrialized Construction Forum · 2016. 5. 18.  · Today’sprogram • Sweden’s recipe...

  • IndustrializedConstruction Forum

    May 18, 2016

  • Jerker (Jerry) Lessing• Visiting lecturer at Stanford 2016• Director of R&D at BoKlok (Skanska + IKEA)• PhD from Lund University• Backgound: Advisor to building

    companies, Consultant and managingR&D projects

    • Worked with IC for 15 years

  • A need to change our industry

    • ”All projects are unique”• Unique technical solutions• Unique teams• Unique production methods• Unique supply chains

    • Low predictability• Low profitability• Low sustainability

  • Weather exposure

  • Production facility?

    Sustainability

  • Supply chain management

  • Production methods

  • Safety issuesEfficiency issues

  • Menlo Park, CAExclusive house-building?

  • A few miles away…-This is developed!

  • Potential for

    innovation!Jerker Lessing, April 2016

  • Industrialization

    Jerker Lessing, April 2016

  • Prefabrication

    Automation

    Factory production

    Assembly

    Standardized processes

    Materials handling

    Digitalization

    Building systems

    Standardized technology

  • Prefabrication

    Automation

    Factory production

    Assembly

    Standardized processes

    Materials handling

    Digitalization

    Building systems

    Standardized technology

    INTEGRATION

  • J. Lessing

    • The concept is complex

    • Several aspects need to be integrated

    • Continuity is the key!•Technology•Processes•Relations

    A model for industrialization

    Lessing (2006)

  • Platforms for increased continuityInspiration from other industriesProduct platforms enable a technological structureConfiguration instead of project-unique design!

  • Platforms for increased continuity

    DesignPlanning Manufacture Assembly

    Sitework

    Groundworks

    Specific building project

    Integration

    Lessing (2006)

    Knowledge flow

    Development of Technical platform

    Development of Process platform

    Jerker Lessing, April 2016

  • Development of Technical platform

    Development of Process platform

    Project X1

    Project X2

    Project Y1

    Project Y2

    The projects are part of a continuous process

    1.0 2.0

    Jerker Lessing, April 2016

  • Key word:

    Continuity• Technology and Systems

    • Process and methods• Team and relations

    Jerker Lessing, April 2016

  • Industrialized construction in Sweden• Sweden is leading globally in

    industrialized construction concepts

    • Single-family houses follow a long industrial history and 80 % are built with industrialized methods

    • 20% of the multi-family residential buildings are built with industrialized construction methods

  • Industrialized construction in Sweden• Industrialization is on the agenda

    in companies, in academia and at authorities

    • Production methods• Platform development• Business models

  • Industrialized Construction at Stanford• Industrialized Construction course

    (third time)• 24 students, 14 nationalities• Close collaboration with companies• Study trip to Sweden

  • Sweden

    International impact

  • Sweden

    China

    Lebanon

    Phillipines

    Mexico

    Venezuela

    India

    Indonesia

    ColombiaUSADom. Rep

    CanadaCosta Rica

  • Study trip to Sweden in 2014Planned also for 2016

  • Active knowledge transfer!Ideas grow when people meet!

    - That’s why we are here today!

  • Today’s program• Sweden’s recipe for industrialized construction Prof Lars Stehn,

    Luleå University of Technology

    • Further development of industrialized construction Ast Prof Niclas Andersson, Malmö University

    • IKEA’s and Skanska’s house-building company: BoKlok Lars Gath, VP BoKlok

    • BONE Structure: Innovative technology for high-quality house-building, Charles Bovet

    • Project Frog: Platforms for building schools, data centers and medical buildings, Mike Eggers

    • The CORE: Modular approach for sustanable and scalable house-building, Derek Ouyang

    • Reflections, Jerker Lessing

    • Panel discussion

    • Networking, wine and chesse

  • Reflections

    May 18, 2016

  • Platform, System, Product

    • Choice of platform strategyaffects process structure and organization

    • The business model changeswith the platform strategy

    • Difference in offer and company role

  • Opportunities• Product-orientation enables

    high design value (customer appreciation)

    • Specialization gives high efficiency through optimized production systems

    • Product offering companies are not contractors

    • New business models!

  • Opportunities• Scalability!

    • Sustainability!

    • Continuity!

    • Profitability

    • “Productability”

  • Thank you!