Format for Seeking In-Principle Approval for New Business [For credit limit (FB+NFB) more than Rs 10 Cr] Name of the Account Gama Infraprop Private Limited Branch Regional Office, Vadodara Region West Zone West 1. Basic Data 1 Name of the entity M/S Gama Infraprop Private Limited (GIPL) 2 Group (if any) RLG Group 3 Present Group Exposure with us Enclosed as Annexure-A. 3 Promoters / Directors Name Position Mr. Rahul Goyal Director Mr. Raman Goyal Director Mr. K. B. Dubey Director 4 Share Holding (Major share holders) Name of Shareholder No. of Shares Shareholding % Mr. Rahul Goyal 500 50.00 Mr. Raman Goyal 500 50.00 Total 1000 100.00 5 RBI caution listed (As per latest data with date) (yes / No) No 6 Nature of business Generation of Power 7 Place of business Kashipur, Uttarakhand 8 Present credit request Rupee W C loan (Rs Cr) Nil Rupee Term loan (Rs Cr) 200 FCNR B loan (Equi Rs cr) Nil LC (inland/foreign) and Bank Guarantee (Rs Cr) ( as sub limit of the Rupee Term Loan ) (150) 9 Brief Details of the company RLG Group of Industries was established in 1974 as a Plasticizer Manufacturing company by Mr. R. L. Goyal. Over the years, RLG Group has strengthened its foothold in the chemicals industry by setting up more than eight chemical plants successfully.

Transcript of New in-Principle Approval Format Bank of Baroda

Page 1: New in-Principle Approval Format Bank of Baroda

Format for Seeking In-Principle Approval for New Business[For credit limit (FB+NFB) more than Rs 10 Cr]

Name of the Account Gama Infraprop Private LimitedBranch Regional Office, VadodaraRegion WestZone West

1. Basic Data1 Name of the entity M/S Gama Infraprop Private Limited (GIPL)2 Group (if any) RLG Group3 Present Group Exposure with us Enclosed as Annexure-A. 3 Promoters / Directors Name Position

Mr. Rahul Goyal DirectorMr. Raman Goyal DirectorMr. K. B. Dubey Director

4 Share Holding (Major share holders)

Name of Shareholder

No. of Shares

Shareholding %

Mr. Rahul Goyal 500 50.00

Mr. Raman Goyal 500 50.00

Total 1000 100.00

5 RBI caution listed (As per latest data with date) (yes / No)

No

6 Nature of business Generation of Power 7 Place of business Kashipur, Uttarakhand8 Present credit request Rupee W C loan (Rs Cr) Nil

Rupee Term loan (Rs Cr) 200FCNR B loan (Equi Rs cr) NilLC (inland/foreign) and Bank Guarantee (Rs Cr) ( as sub limit of the Rupee Term Loan )

(150)

9 Brief Details of the company RLG Group of Industries was established in 1974 as a Plasticizer Manufacturing company by Mr. R. L. Goyal. Over the years, RLG Group has strengthened its foothold in the chemicals industry by setting up more than eight chemical plants successfully.

Besides, the group owns a fast moving consumer goods (FMCG) facility in Colombo, Sri Lanka and has an operating captive gas based power plant (2X1.1MW). The group is also developing a 1.1 MW Bio-gas based power plant and Alcohol (27000 kl/annum) plant which is expected to be commissioned by December 2010.

In view of huge potential in the energy space in India and experience in developing and operating captive gas based power plant, the RLG group has floated special purpose vehicle (SPV) by the name Gama Infraprop Private Limited (GIPL) to develop a 225 MW combined cycle gas based power project (Project) in Kashipur, Uttarakhand.

Page 2: New in-Principle Approval Format Bank of Baroda

Board of Directors of GIPL comprises following personnel.

Name Type Mr. Rahul Goyal Promoter DirectorMr. Raman Goyal Promoter DirectorMr. K.B.Dubey Professional Director

Key Management Personnel and their brief background are also described below.

Mr. Rahul Goyal is B.E.(Mechancial) from Delhi College of Engineering and MBA (Finance) from University of Illinois-Urbabna Champaing, USA. He has been engaged in the project development and implementation for the group since last one decade. Under his leadership the company has successfully developed six projects.

Mr. Raman Goyal is B.E.(Mechanical) from Delhi College of Engineering and has Certificate in International Business and Finance from Harvard Summer School. He has been engaged in business development and corporate strategy for the RLG group since last one decade. Under his leadership, the group has grown multifold and has developed business relationship with many reputed clients like Tata group, Clariant, Zydus etc.

Mr. K.B.Dubey is B.Tech (Mechanical) and Certified Project Director by International Project Management Association by qualification and has more than 35 years of professional experience in power sector. Mr. Dubey started his career with Bharat Heavy Electricals Limited (BHEL) and rose to the position of Executive Director of NHPC Ltd and Director (Projects) of NTPC Ltd . During his tenure with NTPC, projects worth capacity of 3500 MW were commissioned and projects aggregating to around 13000 MW were launched. He was also the operational head of 432 MW gas based power project at Faridabad and responsible for complete development of the project.

Mr. Viney Kumar is B.Tech. (Electrical) from IIT Roorkee by qualification and around 40 years of experience in power sector. He was actively associated with 135 MW Rajghat Power Plant, 270MW IP CCPP. 330MW Pragati CCPP, 1500 MW Bawana CCPP, 1500 MW Jhajjar project and proposed 750MW Bamnauli CCPP in Delhi. A 30 MW gas turbine was also installed and commissioned by him in Libya. He has held position of Director(Tech) of IPGCL, PPCL and Aravali Power Company Pvt. Ltd ( JV of NTPC, Delhi Govt. and Haryana Govt. for 1500 MW Jhajjar project).

Page 3: New in-Principle Approval Format Bank of Baroda

Mr. Satwant Singh is B.E. (Electrical) and Member of IEEE by qualification and has around 25 years of experience in power sector, especially in gas based power projects. Mr. Singh has worked with Pragati Power Corporation Ltd (PPCL) and Indraprastha Power Generation Company Limited (IPGCL) both owned by Government of Delhi. In PPCL and IPGCL, he was responsible for erection, commissioning, operations and maintenance of gas based power plants with operational capacity of 330 MW and 282 MW respectively. He was also deeply involved in the detailed engineering for 1500 MW gas based project in Bawana, Delhi.

10 Credit rating (internal) ……..

Credit rating (external ) The company has been incorporated recently ( May 17, 2010) and does not have any banking facility so far; hence, the external rating is not available. However credit rating of the group companies/firms like Luna Chemical Industries Private Limited, GD Dyestuff Industries Limited and Jayjee Enterprises on consolidate basis are available. The rating of each of these companies is BBB+ by CRISIL, which is an investment grade rating.

11 Security First charge by way of mortgage on all immovable fixed assets of the Project, both present and future,

First charge by way of hypothecation on all movable fixed assets of the Project, both present and future,

First charge on the escrow account opened for receiving all power sale realizations

Debt Service Reserve Account for two quarters of principal and interest payment

Pledge of equity shareholding of the GIPL up to 51%

12 Zone’s exposure to the industry ……13 Zone’s NPA in the industry ……14 Present banking arrangement

with details such as limitsThe Borrower does not have any banking facility so far. However, the banking relationships of the group companies is enclosed as Annexure-A

15 Proposed banking arrangement (take over of sole banking, entry into multiple/ consortium arrangement etc)

Consortium banking

2. Financials for last three years and projections

The company has been incorporated in May 17, 2010; hence, the financials are not available. However, the financial projections upto the debt repayment period are tabulated below.

Page 4: New in-Principle Approval Format Bank of Baroda

(Rs. crore)

Financial YearMar-

12Mar-

13Mar-

14Mar-

15Mar-

16Mar-

17Mar-

18Mar-

19Mar-

20Mar-21

Year 1 2 3 4 5 6 7 8 9 10

Total Income140.3

3 601.3

6 601.6

5 602.2

8 603.0

8 604.1

2 605.5

4 606.7

3 608.07 609.33

PBDITA 58.04 232.5

6 229.8

6 226.9

1 223.9

8 221.0

9 218.3

7 215.2

3 212.03 208.52

PBDITA (%)41.4

%38.7

%38.2

%37.7

%37.1

%36.6

%36.1

%35.5

% 34.9% 34.2%

PAT 22.82 91.41 94.54 97.90 101.9

2 106.9

9 114.1

7 118.7

6 123.62 126.93

Cash Accruals 34.07 136.5

2 139.6

5 143.0

0 147.0

3 151.0

8 155.2

0 159.7

9 164.65 167.95 Tangible Networth

273.21

364.62

459.16

557.06

658.98

765.97

880.14

998.90

1122.52

1249.45

Term Debt584.2

5 536.0

5 477.6

2 407.5

1 337.4

0 261.4

5 185.5

0 103.7

0 21.91 0.00 Debt:Equity Ratio 2.14 1.47 1.04 0.73 0.51 0.34 0.21 0.10 0.02 0.00

FACR 1.41 1.45 1.54 1.69 1.91 2.29 3.01 4.98 21.72 -

ICR 3.18 3.18 3.45 3.82 4.35 5.11 6.31 8.36 12.87 23.61

DSCR 3.03 1.77 1.69 1.60 1.68 1.67 1.77 1.78 1.92 1.89

Average DSCR 1.72                

3. For Project Finance Project appraised by Bank of BarodaCost of project (Rs. in crs) Rs 834.64 croreMeans of finance (Rs. in crs)

Equity Rs 250.39 croreTerm Loan Rs 584.25 crore

Average DSCR 1.72Project IRR 17.19%Scheduled commercial operation date

31 December 2011

Repayment period Moratorium: 2 quarters after commercial operation date (COD) Repayment : 32 quarters (starting from the end of 3rd

quarter after COD)Door to Door: 38 quarters (9.5 years)

Repayment schedule Financial Year

No. of installments

% of total debt

2013 3 8.25%2014 4 10.00%2015 4 12.00%2016 4 12.00%2017 4 13.00%2018 4 13.00%2019 4 14.00%2020 4 14.00%2021 1 3.75%Total 32 100.00%

Page 5: New in-Principle Approval Format Bank of Baroda

4. Concessions, if any recommended:

Category Applicable ProposedRate of interest ……… 11.50% p.a. ( fixed

upto the commercial operation date. First reset on the date of commercial operation and thereafter to be reset after every third year)

Upfront fee ……. 0.25% of the sanctioned amount

Other charges (please specify) NA NA

Page 6: New in-Principle Approval Format Bank of Baroda

5. SWOT Matrix

Strengths Opportunities

Page 7: New in-Principle Approval Format Bank of Baroda

a. Entire land required for the project has been acquired and possession has been taken.

b. Consents for arrangement of water required for operations in place

c. Terms of Agreement with Gail already signed for supply of 40% of the gas required for the project.

d. Evacuation of the power is proposed from the substation of PGCIL. The application has been made to PGCIL for the evacuation arrangement.

e. Orders for Gas Turbines, Heat Recovery Steam Generators and Steam Turbine Generator have been placed on General Electric, Thermax and Hangzhou Steam Turbine company (HTC) and the advance payment has been released to them. Toshiba’s Indian arm has been appointed as the Design and Engineering consultant for the Project.

f. Project envisages selling power on merchant basis (125 MW) which provides an excellent opportunity to encash the highly deficit power supply scenario in the country which is likely to prevail for a next couple of years.

g. The promoters have already infused around Rs. 30 crore in the project development

h. In the Base Case scenario, the Project has an Average DSCR of 1.72, Project IRR of 17.21%. At the time of sensitivity analysis with respect to various potential downside scenarios the Project demonstrates adequate financial strength.

a. Proposition of Merchant capacity gives an excellent opportunity to the developers to encash upon the huge power deficit scenario in the country.

b. In the current market regime, the merchant tariff is on a very high side. It is envisaged that the same tariff regime for merchant capacities will prevail over the next couple of years.

c. The project is envisaged to earn attractive profits in the short run and a fairly higher tariff in the long run in comparison to the cot plus tariff which are approved by the State/Central Electricity Regulatory Commission.

d. Gas based projects are ideal for merchant operation (meeting peak demand) because they can be ramped up and down very fast compared to coal based power plants.

Weaknesses Threats

Page 8: New in-Principle Approval Format Bank of Baroda

a. Power Purchase Agreement (PPA for around 50% of the capacity)y is yet to be signed;

Considering the current heavy power deficit scenario in India, especially in the Northern Region ( more than 17% in terms of peak load and more than 12% in terms of energy requirement), power generation required to sustain the economic growth rate of >10% ( at least 10% growth rate in power generation required to sustain the GDP growth of 10%),, and latent demand in the unelectricifed rural areas, the demand risk is non existent. Further, the cost of generation from the plant is Rs. 2.91/kWh, which is very competitive compared to current tariff in the merchant market ( ~Rs. 5/kWh) and the tariff at which the power has been tied-up by the utilities in the recent time ( ~Rs. 2.90-3.30/kWh) for long/medium term. Hence, tie-up of power on long term would not be an issue.

b. The company has to secure the remaining quantum of gas; however given the priority to Power sector and approach of MoP (as suggested in a recent criteria decided for allocation of gas to projects commissioning in 12th plan), getting gas allocation for such projects in advance stages of development is not perceived to be a cause of concern.

Mitigant: Reliance Industries Limited (RIL) is going to ramp up its production from its KG-D6 basin from current 60 mmscmd 80 mmscmd in next one year. Thus, additional 20 mmscmd of gas would be available for allocation to different sectors. Considering that: (i) criticality of the power sector for the economic development of the nation (ii) high priority to the plants getting commissioned in the XI

With high margins available in the short term market, many other players may be attracted to it and the merchant tariff can come down in future.

Mitigant: Considering that the coal based power plants take around five years from concept to commissioning, any significant capacity being planned today in private sector may not come up/may not come in time, it can be reasonable assumed that the opportunity for the attractive merchant operation of the proposed project would remain for at least next 5 years. With the attractive merchant operation, the project would be able to achieve payback in 3-4 years. Once the competition rises after 5 years, the project can enter into long term PPA can be entered into to generate long term annuity like cash flows.

Page 9: New in-Principle Approval Format Bank of Baroda

plan (iii) no substantial expansion in the sectors like fertilizer and LPG in near future (iv) allocation of more than 50% of the current production by RIL to the power sector, (v) securing 100% marks by the proposed project under the criteria devised by Central Electricity Authority (CEA) for gas allocation to the private sector power projects, (vi) and preference by the government for allocation of the gas to the project close to commissioning, it can be reasonably deduced that allocation of gas to the proposed project would not be an issue.

6. i) Date of visit to the Promoters: 11th October 2010 ii) Name of the official met : Mr. R.L.Goyal, Group chairman

7. Other Information

A. Details of the current project

GIPL is developing a 225 MW gas based combined cycle power project in Kashipur, Uttarakhand. Detailed Project Report (DPR) for the Project has been prepared by Tata Consulting Engineers Limited (TCE), a Tata group company with long standing experience in design and engineering of the power projects. The Project is in advanced stage of development. The company has acquired 25 acres of industrial land which suffices the requirement for setting up the Project. The clearance for boring of wells has also been secured from the Government of Uttarakhand on June 9, 2010.

The Terms of Reference (ToR) for the Environment clearance has been approved by Ministry of Environment & Forest, and the final clearance is expected shortly. Evacuation of the power is proposed from the substation of Power Grid Corporation of India Limited (PGCIL) located at around 6 KM from the Project site. The application has been made to PGCIL for the evacuation arrangement.

0.30 metric million standard cubic meter per day (mmscmd) of gas has been tied-up with GAIL (India) Limited (GAIL) on long term basis and balance gas would be tied-up from Reliance Industries Limited (RIL)/similar gas fields at the time commissioning in line with Government of India (GoI)’s Gas Utilization Policy. Transportation of the gas tied-up with GAIL would be from Oil & Natural Gas Corporation Limited (ONGC)’s Vasai gas fields in Maharasthra. The gas would be transported through ~3000 KM Hazira-Vijaipur-Jagdishpur (HVJ) gas pipeline upto Karanpur in Uttar Pradesh, which is operational since more than last two decades. From Karanpur the gas would be transported through Karanpur-Kashipur section (~ 100 KM) of the spur pipeline network, which is under construction by GAIL and would be commissioned in March 2011, much before the scheduled commissioning of the Project ( December 2011). RIL’s gas from KG-D6 basin would be transported upto Hazira through its already operational Kakinada-Hazira pipeline, and thereafter using GAIL’s network upto the Project site.

Page 10: New in-Principle Approval Format Bank of Baroda

Orders for Gas Turbines, Heat Recovery Steam Generators and Steam Turbine Generator have been placed on world renowned original equipment manufacturer (OEMs) like General Electric, Thermax and Hangzhou Steam Turbine company (HTC) and the advance payment has been released to them. Toshiba’s Indian arm has been appointed as the Design and Engineering consultant for the Project.

100 MW of the capacity would be tied-up on long term basis before commissioning of the Project and balance capacity would be sold in the merchant market (short term sale) to ensure higher revenue realization.

B. (Information about the previous project of the company, if any)

New company. Not Applicable

C. Information of the subsidiaries and other group concerns, their activity with their brief financials and present banking arrangement

RLG Group of Industries was established in 1974 as a Plasticizer Manufacturing company by Mr. R. L. Goyal. Over the years, RLG Group has strengthened its foothold in the chemicals industry by setting up several chemical manufacturing units.Presently, the Group’s total strength of Factory Staff is about 500 Nos. & Office Staff of around 60 personnel.In the last decade itself the group has successfully developed more than eight projects. Details of the projects commissioned by the group are tabulated below.

Project/Product

Capacity Location Company Current Status

Acetic Anhydride 5000 MT

Silvassa, Dadra & Nagar Haveli Jayjee

EnterprisesCommissioned in Jan 2010

Acetanilide10000 MT

Silvassa, Dadra & Nagar Haveli Commissioned in  January10

Acetic Anhydride

5000 MT Bharuch, Gujarat

Luna Chemical Industries

Private Limited

To be commissioned by December 2010

Acetanilide 25,000 MT

Silvassa, Dadra & Nagar Haveli Commissioned in  January10

Power Alcohol 27,000 kl

Surat, Gujarat Commissioned in  November 10

Aniline Oil 15,000 MT

Dahej, Gujarat Commissioned in October 2007

Nitro Benzene 18,000 MT

Dahej, Gujarat Commissioned in October 2007

 Alcohol 27000 kl Dahej, Gujarat 50%-commissioned in 2007 and balance by March 2011

Bio-gas based power plant 1 MW Surat, Gujarat

To be commissioned by March 2011

Captive gas based power plant 2.2 mw Dahej, Gujarat

 50% commissioned in May 2010 & balance by March 2011

Monochloro Acetic Acid

5,000 MT

Bharuch, Gujarat

Technology Partner is being finalized.

Vinyl Sulphone 2500 MT Baroda, Gujarat

GD Dye Stuff Industries Limited Already operational

Vinyl Sulphone 2500 MTBharuch, Gujarat

Shri Padmavati Chemicals Limited Already operational

Page 11: New in-Principle Approval Format Bank of Baroda

Provided below are the financials of the three flagship companies of the RLG Group:

(Rs. in crore)Luna Chemical Industries Private LimitedParticulars 2006-07

Audited2007-08Audited

2008-09Audited

2009-10Provisional

Capital 35.57 46.02 51.26 66.73Tangible Net Worth 37.02 48.39 54.98 71.91Sales 113.63 157.77 152.66 169.94Net Profit (after Tax) 3.94 4.55 5.24 6.27Current Ratio 1.87 2.08 1.70 2.10DER 0.79 0.90 0.86 0.85 (Rs. in crore)Jay Jee EnterprisesParticulars 2006-07

Audited2007-08Audited

2008-09Audited

2009-10Provisional

Capital 24.51 24.27 29.16 29.08Tangible Net Worth 24.51 24.27 29.16 29.08Sales 110.40 108.60 110.75 90.91Net Profit (after Tax) 5.14 5.29 3.45 4.25Current Ratio 28.67 16.71 4.63 3.51DER 0.23 0.72 0.35 0.26

(Rs. in crore)GD Dyestuff Industries LimitedParticulars 2006-07

Audited2007-08Audited

2008-09Audited

2009-10Provisional

Capital 11.41 11.98 12.19 12.36Tangible Net Worth 12.23 12.70 12.88 13.04Sales 43.29 44.71 35.40 20.96Net Profit (after Tax) 0.06 0.57 0.21 0.18Current Ratio 2.91 2.58 1.37 1.37DER 1.07 1.60 0.57 0.39

Page 12: New in-Principle Approval Format Bank of Baroda

8. Recommendations / comments of Zonal Office (please confirm that the proposal complies with applicable norms such as take over norm, real estate policy, prudential exposure cap etc)

Date Zonal Head

In-Principle approval is hereby granted subject to compliance with Bank’s policy guidelines, proper assessment/ appraisal of the facilities and consideration by Competent Authority on merits on receipt of comprehensive proposal. This approval is valid for one month and Bank reserves the right to modify terms and conditions at the time of actual sanction of facilities depending upon market conditions.

General Manager Executive Director(Wholesale Banking)

Page 13: New in-Principle Approval Format Bank of Baroda

Annexure-1: Banking Arrangement of RLG Group companies

A. BANK OF BARODA (BOB)

S.NO. Company’s name

Type of limit Rs. in croreSanctioned limit

Availed as on 31st

August 2010 1 GD

Industries Private Limited

PC/PCFC/CC 7.00 5.50

F.B.P. 12.50 -

L/C 2.00 -

BANK GUARANTEE 0.50 0.32

GOLD CARD 3.90 -

Total 25.90 5.82

2 Luna Chemical Industries Private Limited

C/C 19.35 17.14

TERM LOAN -I (PANOLI) 2.71 1.86

TERM LOAN -II (PANOLI) 10.50 8.48

TERM LOAN - (OLPAD) 10.14 9.48

TERM LOAN-ECB LOAN (OLPAD) 4.74 PAID

TERM LOAN - I (DAHEJ) 6.72 5.40

TERM LOAN - II (DAHEJ) 10.00 8.63

L/C 5.65 5.65

BANKN GUARANTEE 1.00 0.80

BILL DISCOUNTING 1.00 1.00

Sub Total 71.81 58.44

3 Jay Jee Enterprises

C/C 10.80 9.74

BILL DISCOUNTING 2.00 1.10

L/C 3.00 2.11

BANK GUARANTEE 1.00 0.25

Sub Total 16.80 13.20

TOTAL (BOB) 114.51 77.46

B. IDBI Bank1 LUNA C/C (SHORT TERM) 5.00 5.00

L/C 15.00 15.00

Sub Total 20.00 20.00

2 JAY JEE BILL DISCOUNTING 5.00 -

Sub Total 5.00 -

Total ( IDBI) 25.00 20.00

GROSS TOTAL 139.51 97.46