1
THEQUEENSFERRY
CROSSING
-
8/12/2019 New Forth Crossing cost analysis 2014
2/73
2
THIS TALK DEALS WITH ONLY
ONE ASPECT OF THE FRC
THE 1.5Bn COST
-
8/12/2019 New Forth Crossing cost analysis 2014
3/73
3
Firsta wee bit history
4thApril 2000
Holyrood Building Debate
A presentation was arranged prior to the debate
ONLY SIXTEEN MSPs TURNED UP
15thJanuary 2009- Forth Replacement Crossing Debate
Scotlands biggest ever project.
ONLY SEVENTEEN MSPs TURNED UP
So before we start lets deal with the politicians
-
8/12/2019 New Forth Crossing cost analysis 2014
4/73
4
SCOTLANDS RECENT
MAJOR PROJECTS RECORD
UK average motorway cost per
mile is 30m
M8 motorway missing link andother work to cost 415m
M8 was 70m per mile
-
8/12/2019 New Forth Crossing cost analysis 2014
5/73
5
EDINBURGH TRAMS
Now over
1,000 millionThe TIE Directors who made a mess of this resigned
They were awarded severance payment totalling
406,635.
Originally 2003 cost was 375 million
-
8/12/2019 New Forth Crossing cost analysis 2014
6/73
6
SKYE BRIDGEcost 25m
now 93m
BORDERS
RAILWAY
Was 155m now 295M
Edinburgh Infirmary
Cost 185mRepayment 1,000+
Stirling-Kincardine
Railway line-just finishedneeds to be rebui l t
Would you like to see some more
disasters for the taxpayer?
-
8/12/2019 New Forth Crossing cost analysis 2014
7/73
7
Wendy AlexanderSarah Boyack Iain Gray Nicol Stephen
Tavish Scott Jack McConnell Stewart Stevenson Keith Brown
Holyrood started business in 1999
How many Ministers of Transport
do you think have been appointed ?
Less than two years in office????
-
8/12/2019 New Forth Crossing cost analysis 2014
8/73
Alex S
870 of the 1,041 orders have gone to Scottish companies (84%)
Somethings missing Alex!!
118 Subcontracts awarded to Scottish firms from the total of 155 (76%)
First Ministers Questions 2 Feb 2012
-
8/12/2019 New Forth Crossing cost analysis 2014
9/73
Who is actually building the bridgeCONTRACT COMPANY NATIONALITY
CONSTRUCTIONCONSORTIUM
DRAGADOS SPANISH
HOCHTIEF GERMAN
AMERICAN BRIDGE USA
MORRISON CONSTRUCTION ENGLISH (Now)
9
CONTRACT COMPANY NATIONALITY
MAJOR
MANUFACTURERS
Zhenhua Heavy Industries CHINATecade-Megusa SPAIN
Crist-Gdansk POLAND
Cleveland Bridge ENGLAND
Scottish contractor awards = 143 million (1%)
870 of the 1,041 orders have gone to Scottish companies (84%)
118 Subcontracts awarded to Scottish firms from the total of 155 (76%)
-
8/12/2019 New Forth Crossing cost analysis 2014
10/73
BEFORE WE
START
10
3 TECHNICAL
ASPECTS
-
8/12/2019 New Forth Crossing cost analysis 2014
11/73
Cable Stayed Bridge
11
Before we begin you should be you should be
aware of the difference between these structures
A SUSPENSION BRIDGE
A CABLE STAYED BRIDGE
A MULTIMODAL BRIDGE
SUSPENSION BRIDGE STRUCTUREORIGINAL FORTH ROAD BRIDGE
-
8/12/2019 New Forth Crossing cost analysis 2014
12/73
12
Cable Stayed Bridge
The New Forth Bridge
-
8/12/2019 New Forth Crossing cost analysis 2014
13/73
13
PROPOSED FRC STRUCTUREWAS MULTIMODAL
-
8/12/2019 New Forth Crossing cost analysis 2014
14/73
14
LETS START WITH A LOOK AT THE
GOVERNMENTS COST OF THE 1965
FORTH ROAD BRIDGE
Their 1965 cost is 19.5m
Their 2005 inflation figure is 250
My 2016 inflation figure is 340m
Their data can be verified on their web
-
8/12/2019 New Forth Crossing cost analysis 2014
15/73
15
STRUCTURE COST COMPARISON
The old bridge is a
SUSPENSION BRIDGE
The new bridge is a CABLE
STAYED BRIDGE
Structural engineers will tell you that suspension bridges are
10% more expensive than cable stayed bridges
SO WHY IS THE NEW BRIDGE
5 TIMES MORE EXPENSIVE
Made in
UK
Made in
China
16 miles of road
24 other bridges8 miles of roadNo other bridges
-
8/12/2019 New Forth Crossing cost analysis 2014
16/73
16
NOWADAYSCana cable stayed bridge of
similar structure be built for around 340m
OF COURSE IT CAN - I T HAS BEEN DONE
ANDby one of the main contractors
involved with Scotlands FRC
-
8/12/2019 New Forth Crossing cost analysis 2014
17/73
Hong Kongs Stone Cutters Bridge
Examine the location
Over one of the worlds busies sea routes
Land prices 10 times the cost
Located over a built up area
Please examine the access roads...
And the cost??
245m
-
8/12/2019 New Forth Crossing cost analysis 2014
18/73
18
THE COST FLUCTUATION FARCE
THE COST REVISIONS ARE QUITE STAGGERING
DESIGN CHANGES ARE MINIMAL
ONE CHANGE ILLUSTRATES THE POINT
-
8/12/2019 New Forth Crossing cost analysis 2014
19/73
19
No Date Source Cost
2 Jan 05 Faber and Maunsell 500m
1 Jun 04 FETA 500m
3 Feb 07 Scottish Government 1,000+m
4 Dec 07 Scottish Government 2,790 to 3,630m
5 Jan 08 Scottish Government 3,250 to 4.220m
7 Mar 11 Scottish Government 1,470 to 1.620m
6 Sep 09 Scottish Government 1,700 to 2,300m
4,220m
-
8/12/2019 New Forth Crossing cost analysis 2014
20/73
20SKYSCRAPERCITY.COM
Scotland to build theWorld's most expensive bridge
This pretty average 2km bridge
has a budget of up to 4.2 billion
This is a larger amount than even the entire
Fehmarn Belt project.
Scottish Finance Secretary, John Swinney,
announced "Forth Replacement Crossing",
-
8/12/2019 New Forth Crossing cost analysis 2014
21/73
21
The FRC cost here are when the quoted price
was 4,220m
World Bridge Graphs
Lets compare.
-
8/12/2019 New Forth Crossing cost analysis 2014
22/73
22
COST of VARIOUS TYPES TYPES OF WORLD BRIDGES -M
The FRC was the worlds most
expensive bridge.
36
84
102
106
136
146
163
198
319
357
367
392
497
498
510
561
567
576
796
854
941
1,08
1
1,08
1
4,050
4,1094,220
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
-
8/12/2019 New Forth Crossing cost analysis 2014
23/73
23
36
84
102
106
146
163 3
19
367
392
497
561
5
67
5
76
796 9
41 1
,081
4,220
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
COST of ONLY CABLE STAYED BRIDGES -m
Again
the FRC wasby far the most costly
-
8/12/2019 New Forth Crossing cost analysis 2014
24/73
0240
5000
10000
15000
20000
25000
30000
35000
40000
45000
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94 97 100103106109112115118121124127
COMPARATIVE LENGTHof WORLD BRIDGES
The FRC is tiny: a mere 127thin world ranking..
-
8/12/2019 New Forth Crossing cost analysis 2014
25/73
25
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
WORLD AVERAGE COST PER METRE
200K
The FRC COST PER METRE WAS
1,500
LETS NOW EXAMINE THE COST PER METRE
WEVE SEEN TOTAL COST
LETS NOW CHECK THE COST PER LENGTH1,563
-
8/12/2019 New Forth Crossing cost analysis 2014
26/73
26
US CONSTRUCTION INDUSTRY DATA (Jan 2004)
Between $4k and $5K per square metre
The FRC cost- $60k per sq m.
COST OF (Cable Stayed) BRIDGES
PER SQUARE METRE
-
8/12/2019 New Forth Crossing cost analysis 2014
27/73
2009
THE WORLDS THREE
MOST EXPENSIVE BRIDGES
27
1st
- Scotlands Multimodal FRC2nd- Japans Pearl Bridge
3rd- Sweden/Denmarks -Oresund Crossing
Cost over 4,000m+ world crossings
-
8/12/2019 New Forth Crossing cost analysis 2014
28/73
028
2nd-The Pearl Bridge Japan Opened in 1998 for
$4,300m
The worlds longest suspension bridge -3,910m
Tornadoes (180mph)hinged-girder system
Fierce sea currents & deep water
Why is it so expensive
Earthquakes (8.5 Richter scale)TMD pendulumstuned mass damper
-
8/12/2019 New Forth Crossing cost analysis 2014
29/73
3rd - THE ORESUND CROSSING
29
WORLDS LARGEST
MULTIMODAL CROSSING
An Island
A Bridge
and
A Tunnel
-
8/12/2019 New Forth Crossing cost analysis 2014
30/73
30
Bridge
Tunnel
DENMARK SWEDEN
Island
SATELLITE VIEW
The Oresund Project
Lets build it in Fife!!!!!
-
8/12/2019 New Forth Crossing cost analysis 2014
31/73
31
A 4 km Artificial Island
-
8/12/2019 New Forth Crossing cost analysis 2014
32/73
32
A 4 km multimodal tunnel
Road &
Rail
Tunnel
4050 metres
-
8/12/2019 New Forth Crossing cost analysis 2014
33/73
33
A 8 km multimodal bridge
Road
& Rail Bridge 8km long
O d C i 4 100 *
-
8/12/2019 New Forth Crossing cost analysis 2014
34/73
34
Oresund Crossing cost 4,100m *
Oresund Project 8 times the size of the FRC
Built in 5 years; and the FRC???
5 years
* Transport Scotland data says 4,400m
Forth Crossing cost 4,220m
-
8/12/2019 New Forth Crossing cost analysis 2014
35/73
35
Professor John Kay.
Do you know this man?
Chosen Financial Adviser
to the
SCOTTISHGOVERNMENT.
Public lectureSept 2007 on
the FRC
Expressed astonishment
..more than 4 times the final cost of
the Oresund bridge
-
8/12/2019 New Forth Crossing cost analysis 2014
36/73
36
THE NEW
MERSEY GATEWAY BRIDGE
Englands MULTI-MODAL Comparison
COMPLETION 2016
STRUCTURE MULTI-MODAL
TYPE CABLE STAYED
LENGTH 2.3 Km
TOWERS 3
LANES 6
COST UNDER 600 million
-
8/12/2019 New Forth Crossing cost analysis 2014
37/73
37
The Occasion
Project Director
Steve NicholsonFeb. 27th, 2012
The Statement
Dropping the double deck and
other measures will save
..30m
-
8/12/2019 New Forth Crossing cost analysis 2014
38/73
38
The Occasion
Finance Secretary
John SwinneyScottish Parliament
Dec. 19th, 2007
The Statement
The tram section removed..
A revised saving will be
..580m
D 2009 t i 1 600
-
8/12/2019 New Forth Crossing cost analysis 2014
39/73
39
Dec 2009 cost is now 1,600m
Lets compare it with
another UK crossing
THE SEVERN BRIDGE
-
8/12/2019 New Forth Crossing cost analysis 2014
40/73
AN EXCELLENT COMPARISON
Both UK projects
Similar environments
Contemporary
Cable Stayed Structures
40
-
8/12/2019 New Forth Crossing cost analysis 2014
41/73
041
Second Severn Crossing FORTH REPLACEMENT CROSSING
MADE IN CHINAMADE IN UK
Six+hs Lanes Four+hs5,200 m Length 2,700
18.5 km Roads 4.5 km
4 years Build time 5.5 years810 m Cost 1,500
*Transport Scotland have it at 890m
HardShoulder
FRC IS HALF THE SIZE & TWICE THE PRICE
-
8/12/2019 New Forth Crossing cost analysis 2014
42/73
42
Three ICONIC world bridges.
Is the FRC really so expensive?
-
8/12/2019 New Forth Crossing cost analysis 2014
43/73
Greece -Rio Antirio Bridge
WORLDS MOST
DIFFICULT BRIDGE
TO BUILD
-
8/12/2019 New Forth Crossing cost analysis 2014
44/73
44
2,880 Metres Cable Stayed
No bedrock
64 metre deep Sea crossing Seismic & Tsunami
-
8/12/2019 New Forth Crossing cost analysis 2014
45/73
45
65 metres
SEA DEPTH
800 i 200 i 2 di 25/30 l
-
8/12/2019 New Forth Crossing cost analysis 2014
46/73
200 STEEL PIPES
2 METRE IN DIAMETER
30 METRE IN LENGTH
BURIED IN THE SEA BED
46
800 pipes200 per pier - 2m diameter25/30 m long
F i ti CAISSONS
-
8/12/2019 New Forth Crossing cost analysis 2014
47/73
47
Four gigantic CAISSONS
installed over the pipes
-
8/12/2019 New Forth Crossing cost analysis 2014
48/73
48
-
8/12/2019 New Forth Crossing cost analysis 2014
49/73
049
Length
m
Lanes Towers Build
Time
Cost
2016
Rio Antirio 2880 6 4 6.0 576m
Forth 2700 4 3 5.5 1,600m
Rio Antirio
Opened in 2004
at a cost of
630M
WORLDS MOSTDIFFICULT BRIDGE
MILLAU
-
8/12/2019 New Forth Crossing cost analysis 2014
50/73
WORLDSHIGHEST BRIDGE
MILLAU
VIADUCTFrance
Opened in 2004350m
Lengthm
Lanes Towers BuildTime
Cost2016
Millau 2460 4 7 3 400m
Forth 2700 4 3 5.5 1,600m
VASCO d
-
8/12/2019 New Forth Crossing cost analysis 2014
51/73
051
VASCO de
GAMA
Opened in 1998
at a cost of$1000m
Length
m
Lanes Towers Build
Time
Cost
2016Vasco de
Gama17200 6 2 1.5 941m
Forth 2700 4 3 5.5 1,600m
EUROPESLONGEST BRIDGE
-
8/12/2019 New Forth Crossing cost analysis 2014
52/73
-
8/12/2019 New Forth Crossing cost analysis 2014
53/73
COULD IT BE
SOMEONE DIDNTWANT A TUNNEL?
THEIR LIST IN FAVOUR OF A TUNNEL
-
8/12/2019 New Forth Crossing cost analysis 2014
54/73
THEIR LIST IN FAVOUR OF A TUNNEL
GOVERMENT LIST AGAINST A TUNNEL
-
8/12/2019 New Forth Crossing cost analysis 2014
55/73
1. 5km more roadway
3. 4 million tonnes of spoil
4. Multi-modal option needs another tunnel
5. Prohibited goods (like whisky)
8. More expensive
7. No pedestrians or cyclists
6. Would take 7.5 years
2. Special Protection Areas
GOVERMENT LIST AGAINST A TUNNEL
An underground tunnel has less environmental impact.
The bridge is 2.7km the tunnel is 8kmwhy more
The Eurotunnel used their spoil to prevent erosion.
The tram link was dropped simply not valid.
Londons M25 tunnel escort goods- we still have a bridge
How come - the 31 mile Channel Tunnel was built in 6 years
Tourists would prefer the bridge stupid
LETS EXAMINE THIS CLAIM IN DETAIL..
-
8/12/2019 New Forth Crossing cost analysis 2014
56/73
The best means available to assess this
cost is again by comparison
You are about to see why!!!!
Gotthard Base Tunnel
A single comparison here will suffice
Well use the worlds longest tunnel
ld' l l
-
8/12/2019 New Forth Crossing cost analysis 2014
57/73
World's longest tunnel
Its very deep too!!!
-
8/12/2019 New Forth Crossing cost analysis 2014
58/73
Its very deep too!!!
-
8/12/2019 New Forth Crossing cost analysis 2014
59/73
ROUTE LENGTH 58 km+
Additional shafts 152 km
Construction Time 17 Years
Construction Team 2,600
-
8/12/2019 New Forth Crossing cost analysis 2014
60/73
4 Giant borers used
simultaneously
T l li i
-
8/12/2019 New Forth Crossing cost analysis 2014
61/73
Tunnel lining
Cement cladding
-
8/12/2019 New Forth Crossing cost analysis 2014
62/73
Cement cladding
L t b ild it th
-
8/12/2019 New Forth Crossing cost analysis 2014
63/73
MAIN SHAFT58 kM
AUXILIARY SHAFTS152 kM
Lets build it across the
Forth for comparison
Oor wee tunnel
Now the Swiss one
-
8/12/2019 New Forth Crossing cost analysis 2014
64/73
TOTAL COST AS OF NOV 2010
6,300m
-
8/12/2019 New Forth Crossing cost analysis 2014
65/73
Now the ForthsBored Tunnel Option
FETA commissionedthis study in
JAN 2005
FORTH ESTUARY TRANSPORT AUTHORITYS d F th R d C i C lid t d t
-
8/12/2019 New Forth Crossing cost analysis 2014
66/73
66
This detailed 80 page report was commission to examine FRC options
Second Forth Road Crossing Consolidated report
Jan 2005 FABER MAUNSELL
-
8/12/2019 New Forth Crossing cost analysis 2014
67/73
Page 23
..Bored Tunnel cost..
-
8/12/2019 New Forth Crossing cost analysis 2014
68/73
598M
Why did FETA remove this document from
their web site???
-
8/12/2019 New Forth Crossing cost analysis 2014
69/73
SCALE MODELS
Forth
tunnel 8km
You wont believe it!!!
Cost 6,300m
-
8/12/2019 New Forth Crossing cost analysis 2014
70/73
70
The Occasion
Finance Secretary
John SwinneyScottish Parliament
Dec. 19th, 2007
The Statement
I have the cost estimates..
A bored tunnel would cost..
..6,600m
BACK TO HOLLYROOD
-
8/12/2019 New Forth Crossing cost analysis 2014
71/73
71
I'm still awaiting an answer to the following simple question
Quote to me .. Remember we are just laymen
Not one MSP has questioned these outrageous costs
Labour started this cost fiasco SNP continued
AUDIT SCOTLAND has never investigated these costs
Please provide a list of more
expensive comparable bridges
YOU
JUDGE
-
8/12/2019 New Forth Crossing cost analysis 2014
72/73
72
Facts do not cease to exist
because they are ignored.Aldous Huxley
-