New Data Center Update Brian Shannon & Anne Silvester.

7
New Data Center Update Brian Shannon & Anne Silvester

Transcript of New Data Center Update Brian Shannon & Anne Silvester.

Page 1: New Data Center Update Brian Shannon & Anne Silvester.

New Data Center Update

Brian Shannon & Anne Silvester

Page 2: New Data Center Update Brian Shannon & Anne Silvester.

Our New Data Center Located At One Summer St. Boston

Page 3: New Data Center Update Brian Shannon & Anne Silvester.

Our New Data CenterBuilding Characteristics

3,300 sq ft5 20 Ton A/C Units250KW UPSGeneratorN + 1 Infrastructure Redundancy Throughout Facility. Multiple Entry Fiber Paths. Multiple Power Grids for Redundant Power. 24 Hour Manned Security, Cameras & Digital Monitoring. Up to Twenty-Four (24) Day Fuel Supply On Site.

Page 4: New Data Center Update Brian Shannon & Anne Silvester.

“If You Build It They Will Come”

Our new Data Center at One Summer St. will be used for Enterprise Servers

The space and power regained in W91 will allow for the expansion of co-location services

Page 5: New Data Center Update Brian Shannon & Anne Silvester.

Our Lovely New Room

Page 6: New Data Center Update Brian Shannon & Anne Silvester.

Timeline

Working with the design & engineering firm Vanderweil on the room Fit Out

Target completion date for Fit Out construction & cabinets deployed – April 15 2008

Target completion for network Build Out – June 15 2008

Q1 FY09 Server Ops move 25% of servers

Q2-Q3 FY09 Server Ops move an additional 50%

Q4 FY09 Server Ops move last 25% of servers

Page 7: New Data Center Update Brian Shannon & Anne Silvester.

Relocation Strategies

Relocate “simpler” environments first

Take advantage of virtualization in advance, if eligible

Locate applications/services on hardware renewal schedules

Establish advance network requirements (F5s, network fabrics, SAN)