New CV (Medical )

9
SHAHULHAMEED KAMAL E-Mail: [email protected] /SUSTAIN 67 @yahoo.com Contact: 00971- 50 - 8506107/ 052 - 9437518 Address: P.O Box 1114 , Sharjah UAE SYNOPSIS A Versatile and accomplished Design, Construction and doing Project Management , offering over 24 years’ experience in the areas of Project Direction & Project Management, Project Planning & Scheduling, Project Budget & Time Management, Quality Assurance & Quality Control (QA / QC) and Client Relationship Management in the Construction industry A Planning and Scheduling with Knowledge, skill and competency in planning and scheduling projects to ensure that project objectives are achieved within time and budget. A LEED AP and Pearl Qualified Professional (PQP- Villa / Community/Buildings) with extensive leadership and management skills and knowledge base for designing and constructing high performance, healthful, durable, affordable and environmentally sound commercial, institutional, and high rise residential buildings. A successful construction management professional with an outstanding track record manifested in a string of successfully executed projects including 1 large residential housing projects( 2000 Villa – Durat Al Bahrain ) a large shopping center ( Yas Mall – AL DAAR ) , 2 prestigious Projects Like Global Village Pavilions and 64 Storey Hotel with Emaar Properties , 300 bed CCU ( Cardio Coronary Unit) hospital and rehabilitation center with HMC – Doha Qatar and a Bahrain World Trade Center with Wind Mill and LEED Platinum / Estidama Pearl 5 Certified Building named as Sheikh Zaid Desert Learning Center(SZDLC) energy efficient green building (currently under execution). I have successfully completed the ADEC Program and worked s Sustainability Manager in HILL INTERNATIONAL PMC with ADEC/MUSANADA Phase 3 Schools comprised 11 Schools Pursuing Estidama Pearl # 3 Certification. An excellent communicator and negotiator with the ability to work under pressure in fast-paced, time sensitive environments. Proven ability to interact effectively with people of diverse nationalities and comfortable working in a multi-cultural set-up CORE COMPETENCIES Design Expertise in mixed use projects comprising Hospitals , Skyscrapers , Shopping Centres , Hotels Industrial , Commercial Area buildings and residential villas Bachelor of Technology (B.Tech ) in Mechanical Engineering . LEED Accredited Professional (LEED AP) & LEED /ESTIDAMA Risk Analysis and preparation of Reports ESTIDAMA PQP , Pearl Qualified Professional ( Building /Community/Villa) Energy Simulation Expert with e Quest / TRANSYS (Thermal Modelling), AutoCAD Revit MEP BIM Coordination Expert

Transcript of New CV (Medical )

Page 1: New CV  (Medical )

SHAHULHAMEED KAMAL

E-Mail: [email protected] /SUSTAIN 67 @yahoo.com Contact: 00971- 50 - 8506107/ 052 -9437518

Address: P.O Box 1114 , Sharjah UAE

SYNOPSIS

A Versatile and accomplished Design, Construction and doing Project Management , offering over 24 years’ experience in the areas of Project Direction & Project Management, Project Planning & Scheduling, Project Budget & Time Management, Quality Assurance & Quality Control (QA / QC) and Client Relationship Management in the Construction industry

A Planning and Scheduling with Knowledge, skill and competency in planning and scheduling projects to ensure that project objectives are achieved within time and budget.

A LEED AP and Pearl Qualified Professional (PQP- Villa / Community/Buildings) with extensive leadership and management skills and knowledge base for designing and constructing high performance, healthful, durable, affordable and environmentally sound commercial, institutional, and high rise residential buildings. 

A successful construction management professional with an outstanding track record manifested in a string of successfully executed projects including 1 large residential housing projects( 2000 Villa – Durat Al Bahrain ) a large shopping center ( Yas Mall – AL DAAR ) , 2 prestigious Projects Like Global Village Pavilions and 64 Storey Hotel with Emaar Properties , 300 bed CCU ( Cardio Coronary Unit) hospital and rehabilitation center with HMC – Doha Qatar and a Bahrain World Trade Center with Wind Mill and LEED Platinum / Estidama Pearl 5 Certified Building named as Sheikh Zaid Desert Learning Center(SZDLC) energy efficient green building (currently under execution).

I have successfully completed the ADEC Program and worked s Sustainability Manager in HILL INTERNATIONAL PMC with ADEC/MUSANADA Phase 3 Schools comprised 11 Schools Pursuing Estidama Pearl # 3 Certification.

An excellent communicator and negotiator with the ability to work under pressure in fast-paced, time sensitive environments. Proven ability to interact effectively with people of diverse nationalities and comfortable working in a multi-cultural set-up

CORE COMPETENCIES

Design Expertise in mixed use projects comprising Hospitals , Skyscrapers , Shopping Centres , Hotels Industrial , Commercial Area buildings and residential villas

Bachelor of Technology (B.Tech ) in Mechanical Engineering . LEED Accredited Professional (LEED AP) & LEED /ESTIDAMA Risk Analysis and

preparation of Reports ESTIDAMA PQP , Pearl Qualified Professional ( Building /Community/Villa) Energy Simulation Expert with e Quest / TRANSYS (Thermal Modelling), AutoCAD Revit MEP BIM Coordination Expert Currently Doing MBA PROJECT MANAGEMENT

CORE FUNCTIONS

Self Starter, managing own work load, reporting to the team management to Complete the assigned tasks to agreed deadlines as directed and using appropriate /applicable project management tools Design management is purely based on Project Quality Plan (PQP) ’s and Project briefs (Including resource plans.) Creating the design from Concept , Preliminary Schematic and Proceed with Detailed Design with necessary project documentation as per the client requirement Agree and monitor scope of works, translate into schedule of deliverables and determine / agree design programme. Ensuring the information for project budget costing preparation in

Page 2: New CV  (Medical )

detail. Keep the QS informed regarding design progress through explanation of design decisions. Lead, complete and monitor design and encourage the rest of the team to deliver appropriate and cost effective solutions to the agreed programme. Coordinate as required. Managing the preparation of tender /contract documents, ensuring that information for tenders.Support project leader in review of tenders and investigate and comply with the company project quality process, including document control, archiving and QA processes technical reviews and value engineering workshop including sign off’s as applicable

BUSINESS AND TEAM FUNCTIONS

Represent the company as a Senior member of the project team , building relationship with Client and working closely with the project team, Involved in complete Design & Supervise the work of internal team members to ensure delegated work is completed to deadlines /standard and report to the project leader any issues risk or client changes. Flag up business development and additional fee opportunities to Project director/Manager. Develop positive professional relationship with Client/Project Manager about project progress.

Coordination of engineering disciplines and other departments for the project Liaison with /reporting to PM/PDManage Schedule and budget for project Approval of engineering document for project Prepare the engineering deliverables and monitor the whole project MEP Systems Manage &Prepare Project Engineering Quality Plan Technical assistance and support during Project Control and Manage The Procurement Process Control and Manage the Value Engineering Process Technical liaison with Clients , Subcontractors and Vendors

Engineering Progress Monitoring , Identification of shortfalls & Implementation of Recovery Plans Contribute to review and updating of departmental and project Procedures

Implementation of Management of Change Process

PROFESSIONAL HISTORY

Habtoor Leighton Specon : Engineering Manager/Design Manager P.O Box 87134 Dubai . UAE ( SINCE 2013 JUNE TO DECEMBER 2015)

Hill International : Sustainability Manager ( Musanada- ADEC Program ) P.O Box 5201 Abu Dhabi UAE ( Since 2012 June to 2013 June)

Shankland Cox Ltd - : Sustainability Manager /Design Manager P.O. Box 44936 Abu Dhabi U.A.E ( SINCE AUG 2010 – 2012 JUNE)

Shankland Cox Ltd - : Senior MEP Design Coordinator P.O. Box 44936 Abu Dhabi U.A.E ( Since Aug 2008 – 2010 June)

Cansult Maunsell AECOM : Lead Mechanical Engineer P.O. Box 27238, Sharjah U.A.E ( SINCE Jan2006 to – Aug2008)

W S Atkins & Partners Overseas : Senior Mechanical Engineer Kingdom of Bahrain P.O Box 5668 ( Sep 2004 to 2005 December)

Almana Design Consults. International : Lead Mechanical Engineer Doha, Qatar ,P.O BOX 3379 ( Sep2000 – Aug2004)

Rex Veth Consultancy : Building Service Design Engineer Abudhabi U AE ( Jan1999 – Aug2000)

Aster Thermeopianti Espa- Itally : Mechanical Project Engineer Abudhabi ,U.A.E : (May1996 – Dec1998)

Saudi Arabian Oil Company LG. Construction Arabia Ltd : Project Mechanical Engineer-

Page 3: New CV  (Medical )

KSA DAMMAM ( Apr1994 – Apr1996 ) Al Hallawani Bros : Mechanical Engineer (Projects) Cont. Group K.S.A Jeddah/Madina ( FEB1992 – MAR1994) Goa Shipyard Government of India : QA/QC Engineer

( DEC1988 – FEB1992)

DESIGNED PROJECTS

King Fahad Medical City Project ( KFMC - PPNNCC ) , comprised the combination of Neuro Tower / Cancer Tower / Cardiac Tower with Laboratory Building and Proton Particle

therapy Center - Kingdom of Saudi Arabia - RIYAD 750 bed Mafraq Hospital ( Combination Inpatient and Out Patient Building ) - Abudhabi 300 bed Cardio Coronary Unit for HAMAD MEDICAL CORPORATION - Doha Qatar Louver Abudhabi Project for TDIC ( Worked as Design Manager and implemented the design

changes ) Global Village Developments – Pavilions / Garden Restaurants / Lake Restaurants/ Back of

house buildings/ Maintenance and operation buildings and District Cooling Plant - SAMA DUBAI

Etihad Towers for Sheik Suroor (SSPD ) ( Group of Five Towers with combined Podium ) Etihad Tower T1 – 84 storey , T2- 80 Storey , T3 & T4 - 64 Storey and T5 – 101 storey Burj Dubai Island Park - EMAAR PROPERTIES Canada Business Centre (3B+G+3P +18 ) – BUSINESS BAY West Bay Tower (4BG+4P+26) - BUSINESS BAY H.H.Sheikha Azza Tower – Govt Of Sharjah Burj Dubai Lake Hotel - 63 storey building – EMAAR PROPERTIES Durrat al Bahrain Resort Project , 2000 – Villa Complex Diplomatic Tower (36 storey five star apartment) – Bahrain Bahrain World trade centre ( Twin Tower with wind mill ) Bahrain Sheraton refurbishment Scheme design review of Four Seasons hotel (five star status) and Arcapita Head Quarters Manama Bahrain . Training Centre Complex – QGPC (4 Story building for vocational training – Doha, Qatar Medical Extension Building – Hamad Medical Corporation – Doha, Qatar Commercial Development at Grand Hamad for Mr. Kamal Ali Saleh – Qatar Commercial and Office Building for Sheikh Jassim Bin Saud Al Thani – Qatar Palace for Shk Jassim Al Thani – Doha, Qatar Medical Facilities for Qatar Petroleum – Doha, Qatar Mainland R.A.A. Medical Center, proposed Dental Lab Extension for Qatar Petroleum Upgrading of Port at Al Ruwaise (B.E.D.) – Doha, Qatar Renovation of Main Kitchen and Staff Kitchen for Doha Marriott Gulf Hotel, Doha, Qatar New Fresh Water Tank for Qasco – Doha, Qatar Extension work for Qatar Gas Ras Laffan (SRU / LNG Plant) – Doha, Qatar Lab Extension for Hamad Medical Corporation (Pharmacy, Out Patient Department and C.S.S.D. and Lab), etc – Doha, Qatar Concept Design completed for Central Market (Salwa), Doha, Qatar MPH / HMC Dental Clinics Expansion project at Rayyan, Madinath, Khalifa and Munthaza Doha, Qatar Nurses Accommodation in Al Khor (supervision consultant) – Doha, Qatar Design Work completed for Garafa Clinic – Doha, Qatar Design Work for Medical Tower 300 Bed Cardiac Coronary Center – Doha, Qatar Design Works for Civil Engineering Department (Drainage) Building Design works for Marriott Tower Building Doha Qatar Design works for Sheraton Main Kitchens 4500Sq M area Design works for Qafco Extension of Main Workshop ( Industrial Project) 100 Nos Low cost building in Mussafa area for P.W.D Abu Dhabi Expansion of fish market in in al Watba area for Abu Dhabi Municipality. Contract No R –00-0237 .Water Works at H.H. the Presidential palace at Delma Island Abu

Dhabi Automatic Water filtering and pressure boosting system for palace compound Abu Dhabi

EXECUTED PROJECTS

Page 4: New CV  (Medical )

Car Park Projects ,Madinah, Saudi Arabia. A Two level under ground 2300 Parking Cars, a

project of a total built up area of 230000 m .sq. involving a car parking ventilation system that controls the concentration of carbon monoxide to an acceptable level, an emergency smoke exhaust system and a fire fighting system. The fire fighting system covers all Madinah car park Project areas with either water sprinkler for parking areas or automatic chemical fire extinguisher for mechanical equipment and switch gear rooms and automatic halon fire extinguisher for Plumbing system include central warm water heating system , Central chilled potable water System for Central irrigation system , Plumping services for 2300 water closet . 2300 shower , 6000 abolition point , 600 potable water drinking fountain and a decorative fountain. Madinah Hajj Terminal , Saudi Arabia Madina Central Area Reconstruction & Redevelopment Study, Saudi Arabia, detailed plans for the Area , surrounding Haram Mosque including infrastructure design and urban design guidelines, with Emphasis on preservation of neighbourhoods. Madina Hajj Station for a residential accommodation Compound for 180,000 Pilgrims with all related facilities on a 170 ha site.Total Air Conditioning load 10,000 Tr

Contains 4 nos Chillers Yard @ 2500 TR Each. ADNOC Housing Project for 320 Flats (Ruwise housing Project ) Project Value Shk Zaid Stadium in Al Ain (includes Cultural Centre, Cinema, Theatre, Mini Stadium, Shopping Center and Swimming Pool) – Abu Dhabi, UAE Vehicle Inspection Center– Abu Dhabi, Al Ain, Ruwais and Beda Zaid for ADNOC distribution – Abu Dhabi, UAE Surgery and X-Ray building and Veterinary Clinic in Al Wathba for Abu Dhabi Municipality . Residential Building for Mr. Abdullah Bin Sultan Bin Suleyem Abu Dhabi. Villa complex for Rashid Al-Suwaidy – Abu Dhabi H. H. Sheikh Fatima Bint Zayed Al Nahyan and H. H. Sheikh Samma Bint Zayed Al Nayyan

Buildings (2 Nos, 22 Story Buildings) – Abu Dhabi B + G + 5 Residential Complexes on Plot No. P 277 Abquip – Dammam, Saudi Arabia. Interpret Plants Design Specification and implimentation of ISO 9000– Goa, India

MAJOR PROJECT ACHIEVEMENTS

Global Village Pavilions , Complete B.O.H Buildings – SAMA DUBAI Burj Dubai Island Park, with co-ordination of 6 international consultants like , Spiers &Major,

Crystal Fountain, Khatib Cracknell, Hyder Consulting and Cansult with EMAAR properties. Etihad Towers for Sheikh Suroor (SSPD ) ( Group of Five Towers with combined Podium ) Etihad Tower T1 – 84 storey , T2- 80 Storey , T3 & T4 - 64 Storey and T5 – 101 storey Burj Dubai Lake Hotel - 63 Floor Tower Building , EMAAR Properties – Dubai Durrat al Bahrain Resort Project (Reclaimed land ) 2000 Villa complex project. Diplmatic Tower (36 storey five star apartment ) – Bahrain Bahrain World trade centre ( Twin Tower with wind mill ) Design of 300 –Bed (HVAC/Plumbing&Fire/Drainage/Medical Equipments&Gases For Cardio-Coronary Unit hospital , Qatar, under Hamad Medical Corporation Design changes of Grand mosque for late Shk Sultan al Nahyan Abudhabi Installed 10,000 ton of A/C plant in Madinah Hajj Terminal in Madinah K.S.A ADNOC Housing Project for 320 Flats (Ruwise Housing Project ) Value 74 million UAE

dirhams (Total MEP works ) Total A/C Load is 4500 Tons ) Emirates Tower - Dubai Shopping mall in Mecca (Saudi Arabia) al Diyafaa shopping mall 2800 of Refrigeration)

CAREER CONTOUR

Since 2013 June to December 2015 at HLS ( Habtoor Leighton Specon) worked as Engineering Manager/Design Manager and reporting to Project Director

1) LOUVER PROJECT -ABUDHABI WITH ASO ( MEP VALUE : AED 450 MILLION2) KING FAHAD MEDICAL CITY -PPNNCC - WITH HLG/LATIFIYA (MEP VALUE SR 700 MILLION)3) JEWEL OF CREEK PROJECTS IN DUBAI -( MEP VALUE AED 600 MILLION ) 4) SARAYA BINDAR JISSAH - SULTANATE OF OMAN -(MEP VALUE 150 MILLION)5) MAFRAQ HOSPITAL ABU DHABI 749 BED INPATIANT/OUTPATIANT HOSPITAL - MEP VALUE 750 MILLION

Page 5: New CV  (Medical )

Since 2012 June to 2013 June at Hill International Project Management Consultants (PMC) As Sustainability Manager and reporting to Program Director

MANAGING AND SUPERVISING THE ABUDHABI FUTUTE SCHOOL PROJECTS PROGRAM PHASE 3 (11 SCHOOLS) NOTE : CAREER CHANGED DUE THE COMPLETION OF THE PROJECTS Since 2010 Aug to 2012 June at Shankland Cox Limited, Al Ain As Sustainability Manager LEED AP /Estidama PQP (Building/Community/Villa) and reporting to MEP Director

Managing and Supervising the LEED Platinum /Estidama PEARL 5 project , the first Pearl 5 awarded project in UAE , that is Sheik Zayed Desert Learning Centre (SZDLC) project for AWPR (Al Ain Wild Life Park and resort)

Since 2009 Aug –to 2010 Aug at Shank land Cox Limited Abu Dhabi As Design Manager / Principal Mechanical Engineer and reporting to Head of Department

Managing the complete Mechanical design process such as HVAC , Plumbing , Drainage . Fire Fighting Systemsand LPG networks for the developments .

Key Projects Yas Island (ALDAR properties ) Jebal Hafeet Water Theme Park ( Tamouh Developers) – 150 Mio AED ADNEC (Abudhabi National Exhibition Center ) Nael Hotel (4 Star Facility ) DU Buildings Etc

Since Aug 2008 – 2009 Aug at Shankland Cox Limited Al Ain As Senior MEP Design Coordinator and reporting to Head of Department / Project Manager

Managing the complete MEP coordination in design process and responsible for the timely submission.

Key Highlights YAS Island Abu Dhabi Hotel , Retail Zone , Welcome pavilion & Car parks approx value 45 Mio US

dollars Responsible for all aspects MEP works, Preparation of permit documents, Design drawing

reviews. Coordinating design between trades, Specifications writing/editing & Cost estimates. Feasibility studies, QS, QA, LEED / Estidama.

Project Execution based on approved Project Quality Plan

Jan2006 to – Aug2008 at Cansult Maunsell AECOM Sharjah As Lead Mechanical Engineer and reporting to Head of Department

Key Highlights Effectively handled the design process, design review, design verification, design validation, non

conformance, resource allocation and design coordination. Ensured the basis of the design standards, codes of practice, statutory regulations, technical

papers or computer programmes used in the design work. Handled project costs, Global Village –175 Mio US $, Al Waab City Development- 1.2 Billion QR,

etc. Worked and Coordinated with international consultants like: Katib Cracknel, Spiers & Major, and

Hyder Consult Colab & Crystal Fountain for One of EMAAR Projects. Took initiatives to implement Cost saving action plan. Took initiatives to ensure successful execution of the projects with other consultant’s teams. Executed Project Quality Plan as per company aspiration Awards of recognition or appreciation letters received from top directors for the successful

design completion of the project in short time of the fast track project.

Page 6: New CV  (Medical )

Sep2004 – Dec2005 at W S Atkins & Partners Overseas, Manama Kingdom of Bahrain As Senior Mechanical Engineer and reporting Head of Department

Key Highlights Effectively handled the design process, design review, design verification, design validation, non

conformance, resource allocation and design coordination. Ensured the basis of the design standards, codes of practice, statutory regulations, technical

papers or computer programmes used in the design work. Bahrain World Trade centre Project MEP Value 12 Mio US $, Sheraton Refurbishment MEP Value

2.5 Mio US dollars Worked and Coordinated with international consultants. Initiatives taken to ensure successful execution of the projects with other consultants teams Executed Project Quality Plan as per company aspiration.

Sep2000 – Aug2004 at Al Mana Design Consultants International, Doha, Qatar As Lead Mechanical Engineer and reporting to Head of Department

Key Highlights Involved and lead the design activities, design review, design verification, design validation, non

conformance, and resources planning. Handled the design documents and the main lead of HVAC, Plumbing Drainage and Sewerage,

Fire Fighting. 300 bed Cardio Coronary Unit for Hamad Medical Corporation (HMC) , Project MEP Value 2.25

Mio US dollars Lot of other projects , Please see annexure Initiative taken to implement Cost saving action plan Initiatives taken to ensure successful execution of the projects with other consultants teams Executed Project Quality Plan as per company aspiration

Jan1999 – Aug2000 at Rex Veth Consultancy, Abu DhabiAs Building Service Design Engineer and reporting Project Manager

Key Highlights Effectively involved in complete Design of HVAC, Plumbing, Drainage, Sewerage, Fire Fighting &

Fire Alarm; prepared Design Drawing , Specifications, and Bill of Quantities. 100 low cost Buildings in Mussafah Area for PWD Project Value 7.5 Mio US dollars Lot of other

projects (please see annexure). Initiative taken to implement Cost saving action plan Initiatives taken to ensure successful execution of the projects with other consultants teams Executed Project Quality Plan as per company aspiration.

PREVIOUS ASSIGNMENTS

May1996 – Dec1998 at Aster Thermiopianty Spa-Italy, Abu Dhabi as Project Engineer

Apr1994 – Apr1996 at LG Construction Arabia Limited, Saudi Arabia as Project Design Engineer (Under the contract Saudi Arabian Oil Company (ARAMCO) - Kingdom of Saudi Arabia) MECHANICAL DESIGN ENGINEERING ( COLUMN HEAT EXCHANGERS, AIR COOLER ,PLATE HEAT EXCHANGER , PRESSURE VESSEL AND TANKS, WELL CONVERSED WITH HTRI/HTFS PV –ELITE COMPRESS B-JAC )

Feb1992 – Mar1994 at Al Hallawani Contracting Group of Company - Kingdom of Saudi Arabia as Mechanical Engineer

Page 7: New CV  (Medical )

Dec1988 – Feb1992 at Goa Shipyard, Goa as QA/QC Engineer

ACADEMIA

B.Tech. (Mechanical) from University of Kerala 1988

PROFESSIONAL AFFILIATIONS

LEED Accredited Professional Estidama PQP ( Building /Community/Villa) Pearl Qualified Professional . Member of American Society of Heating Refrigeration and Air-Conditioning Engineers (ASHRAE). Member, Council on Tall Buildings and Urban Habitat. Member, UAE Society of Engineers. Member, USGBC (U S Green Building Council).

I.T. SKILLS Elite Software, HAP (Hourly Analysis Programme), Hevacomp & Carrier E20 – II, for HVAC

Calculations. Fire Acad/FPS for Fire Fighting. Eagle Star for Storm Drainage Network.

PERSONAL DOSSIER

Date of Birth 31st May 1967Linguistic Abilities English, Arabic Nationality IndianPermanent Address Kunninpurathu Veedu, Cheruvakkal P.O. Ayoor via District: Kollam – PIN

691533, KeralaReligion MuslimDriving License Valid driving license from UAE, Bahrain, Doha and Saudi ArabiaVisa Status Residence Visa till 2017