1
RSU No. 24
Charles M. Sumner Learning Campus
January 21, 2020
CONSTRUCTION DOCUMENTS
Mariaville Waltham Eastbrook Franklin Sullivan Sorrento Gouldsboro Winter Harbor Steuben
2
PLAN DEVELOPMENTS – ADDITIONAL CORRIDOR
3
PLAN DEVELOPMENTS – ADDITIONAL SINGLE-USER WC
4
PLAN DEVELOPMENTS – LEARNING COMMONS EGRESS
5
OVERALL PLAN – LEVEL 1
6
SITE PHASING PLAN
7
COST ESTIMATE & BID ALTERNATES
Cost Estimate: x2
Bid Alternates: 1. Cost Control
a. Both state / local and local onlyb. Eg. Sinks in the middle school classrooms
2. Like to Haves or Local Only Costs not Part of the Original Projecta. Water holding tankb. Additional out buildingsc. Distribution of field irrigation
8
DARK SKY STRATEGIES
1. Full cut-off fixtures2. Dimming / Motion sensor
Parking Lot Poles Pedestrian / Sidewalk Wall Mounted at Exits
9
COMMISSIONING AGENT
SCOPE:Design ReviewInstallation ReviewStart-up
ReportsDeficiency LogsFinal Report
Sparhawk Group
RFS Engineering
Fitzemeyer & Tocci Associates, Inc.
Cx Associates
Turner Building Science & Design, LLC
CHA
10
COMMISSIONING AGENT
Sparhawk Group
RFS Engineering
Fitzemeyer & Tocci Associates, Inc.
Cx Associates
Turner Building Science & Design, LLC
CHA
Interview with DOE
11
NEXT STEPS
Clerk of the Works Advertisement
SBOE approvals
BID
Construction Testing Agent RFP
12
MONUMENT SIGN OPTIONS
OPTION #1OPTION #2 OPTION #3
• BOTH CAMPUS AND INDIVIDUAL SCHOOL NAMES.
• ELECTRONIC SCREEN LOCATED ABOVE SCHOOL SIGN
• CAMPUS NAME ONLY (OPTION CAN INCLUDE BOTH NAMES)
• LOCATION FOR LOGO/GRAPHIC
• CAMPUS NAME ONLY• SIMPLE AND LOW PROFILE