CLIENT:John Leahy & Sons Builders Ltd
LOCATION:Leicester Road, Barnet
COMPLETION DATE:November 2011
SECTOR:Residential/Private
ABOUT THE PROJECT
Pre stressed Concrete Flooring was required at First and Second Floor levels on this new build private dwelling. Supply and delivery to site was requested to be within 3 weeks of receipt of order for first floor level.
PROJECT CHALLENGES
Client required to fit pre stressed concrete flooring planks with an on site crane, lifting pins were incorporated in planks on manufacture to facilitate this and to ensure rapid installation. Lifting shackles were supplied also to marry with lifting pins used and to simplify craneage. A separate area at second floor level had to be accommodated to fit a specific design detail at the stairs. A bespoke solid slab was manufactured to as built measurements submitted from site.
SpanWright Case StudySupply Only - Barnet, Hertfordshire - SpanWright Pre stressed Heavy Duty Planks
SpanWri ght
Windmill Hill Business Park, Whitehill Way, Swindon SN5 6QR
Tel: 01793 441474Fax: 01793 441401Mob: 07543 180455Email: [email protected]
www.spanwright.co.uk
PRODUCTS & SERVICES
PRECAST CONCRETE FLOORING 150mm
PRECAST CONCRETE FLOORING 210mm
PRESTRESSED CONCRETE FLOORING 150mm
PRESTRESSED CONCRETE FLOORING 150 High Density
PRESTRESSED CONCRETE FLOORING 200mm
PRESTRESSED CONCRETE FLOORING 250mm
PLATE FLOORING
CONCRETE STAIRS
DESIGN
INSTALLATION
BESPOKE PRODUCT DESIGN
PRODUCT DETAIL PRESTRESSED product is finished to BS 8110 and is available in a range of depths and sizes and manufactured to comply with the recommendations of the PRECAST FLOORING FEDERATION.
SpanWri ght
Ciaran Leahy/Project Manager – John Leahy & Sons Builders Ltd……………………………… Thanks for both floors on time and a great fit. I have another job- a new house………………………………………………………... Thanks again
TESTIMONIAL