New 180 Megawatt Power Plant
Overview to
Guam Chamber of Commerce
September 27, 2017
John Benavente, PE General Manager
2
Why Build a New 180 MW Plant?
• Exis9ng Cabras 1&2 MW baseload plant is over 42 years old. Most of other genera9ng units are over 20 years old.
• GPA’s baseload units burn residual fuel oil and are non-‐compliant with recent USEPA regula9ons.
• GPA is currently subject to poten9ally over $150 million in penal9es should it not complete its compliance plan submiQed to USEPA.
• GPA lacks adequate baseload units to meet future demand. It is becoming more difficult to keep the 42 year old plant running un9l 2022.
• Exis9ng baseload units do not work well with intermiQent renewables such as solar PV and wind. GPA an9cipates contrac9ng for over 150 MW of renewables over the next five years as a hedge against increasing fuel cost.
3
New Power Plant Characteris9cs
• Future power plant to be constructed in compliance with both USEPA and GEPA Regula9ons.
• Plant will meet all air, water, noise and other regula9ons in order to be permiQed for opera9ons.
• Plant to operate on Ultra Low Sulfur Diesel or Natural Gas which are both considered by USEPA as “clean fuel”.
• New technology is much simpler than the exis9ng baseload ones which would result in higher reliability and safer opera9ons.
• Plant to be substan9ally more efficient than the exis9ng units resul9ng in reducing GPA’s annual fuel consump9on by over 11,000,000 gallons.
• Dual fuel capability would result in rela9vely stable rates because GPA would no longer be only 9ed in to the very unstable fuel oil market.
4
For Illustra9ve Purposes Only
5
For Illustra9ve Purposes Only
6
Why a New Plant in Ukudu? • Elevated from poten9al tsunami and storm surges; currently all baseload units
suscep9ble to these credible threats. • Close to the Northern District Waste Water Treatment Plant (NDWWTP)
allowing use of grey water for cooling purposes which would reduce demand on the aquifer by over 3 million gallons per day.
• Close to Major Substa9on and Load Centers thereby improving reliability and reducing line losses (about $3M/Year).
• Plant to directly 9e-‐in to major underground transmission lines providing for poten9al opera9ons through typhoons and for quick recoveries ager storms, especially in Tumon.
• Topography is generally flat without wetlands. • Most public right-‐of-‐ways available to result in expedient construc9on. • USEPA to assist in expedi9ng Air Permits because loca9on is acceptable. The
exis9ng Cabras Power Plant area is designated a non-‐ aQainment area and therefore a new plant there would require substan9ally more 9me to permit.
• Inadequate land area at Cabras to construct plant
7
Current Aerial View
NDWWTP
Harmon Substn
8 New 180MW Power Plant at Ukudu provides substan;al reliability improvements GPA has placed vital power transmission lines underground from the Harmon Substa;on to key load centers of
Guam’s economy including GMH, GIAA, Tumon Bay, Tamuning, Harmon, Dededo and AAFB).
9
GPA will not be able to meet Demand without New Power Plant by 2021 Summary of System Genera/ng Capacity With No New Baseload: With New
180MW Descrip/on FY 2015 FY2017 FY2021 FY2021 Baseload MW Capacity 299 208 208 268 Emergency/Standby Capacity 120 200 200 200 Total MW Capacity 419 408 408 468 Peak MW Demand 249 263 283 283 Reserve Margin 170 145 125 185 Total Two Largest Units 132 120 120 88 Reserve Less Two Largest Units 38 25 5 97 % Baseload Capacity 71.4% 51.0% 51.0% 57.3%
% Energy from Baseload 98.0% 80.0% 62.2% 72.6% % Energy from Renewables 0.0% 3.5% 26.4% 26.4% % Energy from Emergency/Peaker 2.0% 16.5% 11.4% 1.0%
10
Renewables can only provide 25% of Guam’s Energy needs by CY2021. Conven;onal Energy a Must!
0
50
100
150
200
250
300
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Megaw
aVs
130MW Solar PV; 65MWH ESS Conven9onal Supply Reduced by 15MW At Peak
ESS
Solar PV
Conven9onal
11
Renewable PorWolio Standards (RPS) Achieved by 2021
12
Projected Power Related Investments Thru 2021
Descrip/on: Amount Investor Agreement Type
Renewables, Phase II – HANWHA, KEPCO $350,000,000 Private En99es Power Purchase Agreement
Renewables, Phase III – Navy Land Lease $120,000,000 Private En99es Power Purchase Agreement
New 180 MW Power Plant $300,000,000 Private En99es Independent Power Producer
New 180 MW Power Plant Pipeline & Transmission $100,000,000 GPA Revenue/Other Funds
Natural Gas Infrastructure ( When Oil > $60/Bbl.) $200,000,000 Private En99es Independent Power Producer
Total: $1,070,000,000
13
Targeted CY 2022 Fuel Cost and Barrels Reduc;on for Various Scenarios
July 2017 Fuel Oil Prices: RFO = $55/Bbl.; ULSD = $75/Bbl.
Scenario: Annual Cost Cost Variance Avg. $/kWh Total BBLs. BBL. Variance
Exis9ng CY 2017 Units $168,819,330 $0.105 2,640,096 0
Addi/onal 150MW Renewables $157,383,401 -‐$11,435,929 $0.098 1,938,433 -‐701,663
USEPA Forced Compliance $197,519,886 $28,700,556 $0.123 2,034,689 -‐605,407
New 180MW (ULSD) $168,881,229 $61,899 $0.105 1,653,463 -‐986,633
New 180MW (Natural Gas) $141,495,393 -‐$27,323,937 $0.088 88,558 -‐2,551,538
14
Will the New Plant Affect Base Rates?
• GPA has indicated that base rates would stay at about current level despite the new power plant $400M investment.
• Poten9al Sources of Offsesng Funds: • Cabras 3&4 Insurance SeQlement Proceeds $80M Plus ??? • Cabras 1&2 Re9rement (Reduced Cost of $10M/Year) • MEC 8&9 Turnover to GPA (Reduced Cost of $15M/Year) • TEMES 7 Turnover to GPA (Reduced Cost $4M/Year) • Other Cost Saving Ini9a9ves (Company Right Sizing)
• Reduc9on of FTE (dropped about 35 FTE in past three years) • Over9me Reduc9on (dropped from $3.2 M to $1.4M in FY2017) • Refinancing of 2010 Bonds ($300K/year) • Demand Side Management Programs to reduce Peak Demand
15
Summary • GPA urgently needs the land to build the new power plant which
would make it compliant with USEPA, reduce consump9on of fuel oil, meet future demand, and work well with renewables in order to provide a sustainable future for the island.
• Failure to construct and commission the new 180MW power plant will hinder GPA from mee9ng future power demand resul9ng from new developments including military buildup.
• GPA’s plan of the new power plant burning ULSD and Natural Gas coupled with renewables will minimize upward price risks associated with unstable fuel oil markets which had resulted in Guam’s residen9al energy rate rising as high as $0.29/kWh. Plans underway would very likely bring rates to below $0.20/kWh as it was in January 2017
• GPA plans to not increase base rate to cover cost of new plant • Time is of the Essence for the new plant
Please help us achieve a sustainable energy future.
Si Yu’os Ma’åse’