CO 2 Capture by Cold Membrane Operation with actual power plant flue gas (DE-FE0013163) NETL CO 2 Capture Technology Meeting 2015 June 23 rd 2015 T. Chaubey, S. Kulkarni, A. Augustine, D. Hasse, J. Brumback, D. Kratzer, D. Calvetti, J. Ma| R&D

Transcript of NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382...

Page 1: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

CO2 Capture by Cold Membrane Operation with actual power plant flue gas

(DE-FE0013163)

NETL CO2 Capture Technology Meeting 2015

June 23 rd 2015T. Chaubey, S. Kulkarni, A. Augustine, D. Hasse, J. Brumback, D. Kratzer, D. Calvetti, J. Ma| R&D

Page 2: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Project Summary

Air Liquide Hybrid Cold membrane - Liquefaction Process plant for 550 MWe scale

CO2 for sequest. or EOR+

Flue Gas

Improved Performance at Cold Condition

2 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Cold membrane testing at 0.1 MWe with synthetic flue gas (TRL4) in 2012

CO2 Capture Cost estimated at 46-52$/tonne (DOE Target - $40/tonne)

Current project will test the cold membrane technology at 0.3 MWe scale (TRL5) at National Carbon Capture Center (NCCC)

POWER PLANT LIQUEFACTIONCOLD MEMBRANE

+

Page 3: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Project Team

AIR LIQUIDE (R&D, MEDAL, E&C)Membrane experts – Sudhir Kulkarni, David Hasse, Karl Beers (MEDAL), Jean-Marie Gauthier (MEDAL)

Process experts – Trapti Chaubey, Alex Augustine, Paul Terrien (E&C), Alfredo Velasco (MEDAL)

Modeling expert – Jiefu Ma

Senior Technicians – Jacob Brumback, Dean Kratzer, Judy Huss

Engineering Services – Dennis Calvetti, Robert Sokola, Hwanho Kim

3 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Engineering Services – Dennis Calvetti, Robert Sokola, Hwanho Kim

AL management – Robert Gagliano, David Edwards, Ed Sanders

External Partner - PARSONS GOVERNMENT SERVICES Brad Knutson

TEST SITE - NATIONAL CARBON CAPTURE CENTER Tony Wu, Eric Fleming, Barton Pate, Max Phillips, Bob Lambrecht, Mike England

Page 4: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Agenda

AL Motivation & Roadmap

Hybrid Cold Membrane Technology

Project Overview

Project Progress

Project Risks

4 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Project Risks

Next Steps

Page 5: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Air Liquide MotivationMARKET

CO2 as a Product - 12 CO2 plants in US

CO2 for EOR application – Huge potential market

SOLUTIONCO2 Separation technologies such as cold membrane hybrid process, liquefaction plants, adsorption and absorption

5 Research & Development2015 World leader in gases, technologies and services for Industry and Health

plants, adsorption and absorption

PROBLEMCO2 Generator – 22.9 MMt of CO2 emitted in 2014 worldwide • AL SMR plants, cogen plants, Electricity for

ASU and other applications

CO2 emission equivalent to 7 Commercial power plants

Page 6: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Air Liquide Roadmap for Post-Combustion Capture

FIE

LDT

ES

TS

LA

RG

E S

CA

LE

PLA

NT

S

COMMERCIAL PLANTS

PI-1 (Commercial Material)

NCCC (2x12’’ Bundles) 0.3 MWe

Large ScalePilot

12’’ Bundle (0.5 MWe)

6 Research & Development2015 World leader in gases, technologies and services for Industry and Health

2010 2014 201820162012 2020

CO

NC

EP

TU

AL/

BE

NC

H S

CA

LE

ST

UD

IES

PIL

OT

/ F

IELD

TE

ST

S

PI-2 (Novel Material)

DRTC (6’’ Bundle) Tested at 0.1 MWe

Current Project

Mini-permeator

1 ’’ Bundle (<0.01 MWe)

4 ’’ Bundle (0.04 MWe)

6’’ Bundle(0.12 MWe)

Different size bundle capacity shown at 90%

CO2 recovery based on the intrinsic fiber performance

Page 7: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Agenda

AL Motivation & Roadmap

Hybrid Cold Membrane Technology

Project Overview

Project Progress

Project Risks

7 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Project Risks

Next Steps

Page 8: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Cold Membrane Process Based on Hollow Fiber Membrane

CO2 N2

8 Research & Development2015 World leader in gases, technologies and services for Industry and Health

>5X Surface area/volume compared to spiral membrane s.

Cost effective solution at large scale application

Key Parameters for high membrane performance

High surface area/vol, Good intrinsic property, very low thickness

High productivity/bundle is critical meeting the permeate purity spec

Page 9: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Hybrid Membrane + Liquefaction Configuration

Power Plant

Pretreatment

BFW

To Stack

CO2 Product 2200 psig

Cold Expansion

Warm Expansion

Flue Gas

BFW

9 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Heat ExchangerCompressor

Liquefaction

Dryer

Membrane

-35 to -45°C100-200 psig

Recycle

N2 Rich

CO2 Rich

All technology bricks have been demonstrated with the exception of membrane with real flue gas

Page 10: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Agenda

AL Motivation & Roadmap

Hybrid Cold Membrane Technology

Project Overview

Project Progress

Project Risks

10 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Project Risks

Next Steps

Page 11: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Total Budget : $5.88MM, DOE Funding - $4.7MM ; Cost share - $1.17MM

Period of Performance: 10/01/2013 through 12/31/2016 over 2 Budget PeriodsNETL Project Manager: José FigueroaPrime Recipient: American Air Liquide DRTCProject Sub-awardees: MEDAL (Bundle Optimization support, Detailed engineering), E&C (Basic Engineering & TEA), Parsons (TEA Review)

Project Overview: DOE NETL Award No. DE-FE0013163

DOE Share AL Cost Share

Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842,382

Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334,741

11 Research & Development2015 World leader in gases, technologies and services for Industry and Health

engineering), E&C (Basic Engineering & TEA), Parsons (TEA Review)E&C - $489K, MEDAL - $361K, Parsons - $96K

Delaware Research & Technology CenterNewark, DE

MEDAL (Membrane Supplier)Newport, DE

Air Liquide EngineeringChampigny, France

Parsons Governmental ServicesPasadena, CA and Philadelphia, PA

Page 12: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Project Schedule & StatusMain Tasks Start End Milestones/

Success CriteriaStatus

BUDGET PERIOD 1 (BP1) Oct 2013 to June 2015PI-1 Optimization & Testing

Oct 2013 March 2014

>30% improvement in bundle productivity

COMPLETED

PI-2 Bundle Preparation & Testing

Oct 2013 June 2015

4-5X Projected Bundle Productivity compared to PI-1

COMPLETED

Design and fabrication Oct 2013 June Fabrication, COMPLETED

12 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Design and fabrication of 0.3 MWe field test unit

Oct 2013 June 2015

Fabrication, Installation, Acceptant Testing of FTU

COMPLETED

BUDGET PERIOD 2 (BP2) July 2015 to December 2016Field Test at NCCC July 2015 July 2016 500 hours of steady

state testingTarget 2016

TEA July 2015 Dec 2016 $40/tonne CO2 capture cost

Target 2016

Preliminary design next phase

July 2015 July 2016 Preliminary design and costing of next phase

Target 2016

Page 13: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Agenda

AL Motivation & Roadmap

Hybrid Cold Membrane Technology

Project Overview

Project Progress

Project Risks

13 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Project Risks

Next Steps

Page 14: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

PI-1 Bundle Testing Summary

PI-1 Commercial Bundles tested for >13,700 hours

Current Project - Six 12 inch bundles ~6500 hours • 4 Bundles Qualified for field

Previous Project - Two 6 inch bundles – 7200 hours

Completed Bundle Optimization and testing with synthetic flue gas

Process simulation used due to current bench scale skid (0.1 MWe) limitations:

14 Research & Development2015 World leader in gases, technologies and services for Industry and Health

limitations:

Feed flow rate 400 Nm3/hr

Permeate pressure 7-8 psig

Process Performance is scaled to NCCC conditions

Feed flow capacity at NCCC~1000 Nm3/hr (0.3 MWe)

Lower permeate pressure at NCCC test conditions (Target – 1.5 psig with single bundle)

Page 15: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

90% CO2 Capture Data & Performance scaled for NCCC

15 Research & Development2015 World leader in gases, technologies and services for Industry and Health >30% Improvement in Bundle Productivity has been ac hieved with the

combination of simulation and experiments

Page 16: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Membrane Bundle Configurations at NCCC

Single Stage Configuration

F( 18% CO2)R

(2.2% CO2)

P (61% purity)

90% Recovery Permeate is

further purified in a liquefier

Sweep>450 Nm3/hr

200 psig, -45°C

16 Research & Development2015 World leader in gases, technologies and services for Industry and Health

2 Stage Configuration in Series – Completed bench scale test (0.1 MWe) at different feed composition to validate the concept

2xFEED (18% CO2) Stage 2 (~70%

Recovery) Sweep

R1R2

(2.2% CO2)

P mix (61% purity)

Stage 1 (~70%

Recovery)

P2P1

>900 Nm3/hr200 psig, -45°C

Multiple Configurations will be tested at NCCC Single stage, 2 bundles in series or parallel

Page 17: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

2 Stage Configuration – CFD Analysis

Both stages will operate at 65-70% CO2 recovery for overall 90% recovery

Total number of bundles will be reduced for the final solution

Partial Pressure Difference High Low

Permeate70% Recovery

17 Research & Development2015 World leader in gases, technologies and services for Industry and Health

FEEDRetentate

90% Recovery

Retentate FEED

Permeate

Higher Driving force at 70% CO 2 Recovery

Page 18: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Ideal Counter Current

CFD 1psig Back Pressure

2 Stage Configuration – CFD Analysis

18 Research & Development2015 World leader in gases, technologies and services for Industry and Health

CFD 10 psig Back Pressure

Bundle Non-ideality is dominant at high CO 2 recovery and accentuated at higher permeate pressure

Page 19: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

PI-2 Membrane Development SummaryLaboratory trials to develop spinning techniques for PI-2 membranes

CO2 permeance is >5X compared to PI-1 material

Increase in membrane separation performance at lower temperature consistent to PI-1

Scale-up in the current project

Fiber Count Compared to

Mini-Permeator

Synthetic Flue gas test

Real Flue Gas Test (NCCC)

Mini-Permeator 1X Test Completed -

19 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Challenges with PI-2

Polymer qualification

Fabrication scale-up

Mini-Permeator 1X Test Completed -

1 inch Permeator 25X – 45X Test in progress (3 Permeators

qualified for NCCC)

BP2 (Campaign 1)

1 inch Bundle 250X – 350X BP2 BP2 (Campaign 2)

Page 20: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

1 inch PI-2 Permeator Testing

MEDAL commercial 1 inch bundle design is used to prepare PI-2 permeators

1 inch permeator testing is in progress

Long term testing is continuing for >500 hours

20 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Performance is stable after >500 hours long term te sting at cold temperature

Page 21: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

PI-2 Permeator Parametric Testing

21 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Fiber Performance target has been met.Projected 4-5X Bundle Productivity compared to PI-1

Page 22: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

FIELD TEST UNIT

22 Research & Development2015 World leader in gases, technologies and services for Industry and Health

FIELD TEST UNIT

Page 23: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

0.3 MWe Field Testing at NCCC

HP Dryer and filters

Skid 1

Skid 2

23 Research & Development2015 World leader in gases, technologies and services for Industry and Health

29’ 6”

30’Membrane

Skid 3

Page 24: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

0.3 MWe Field Test Unit Design and Construction

Pretreatment Skid Membrane Skid

24 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Process equipment installation and acceptance testi ng is complete

Page 25: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

0.3 MWe Field Test Unit Design and Construction

25 Research & Development2015 World leader in gases, technologies and services for Industry and Health Compressor Skid is ready and stored at NCCC

Page 26: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Agenda

AL Motivation & Roadmap

Hybrid Cold Membrane Technology

Project Overview

Project Progress

Project Risks

26 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Project Risks

Next Steps

Page 27: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Project RisksProject Risks Mitigation Strategy

PI-1 Risks• Lower performance of 12 inch bundle compared to 6 inch• Bench scale skid limitation

•Optimized bundle testing limited due to time

PI-1 Mitigation Strategy• Bundle Optimization

• Process simulation used. Validation by field testing• Selective testing & CFD modeling

27 Research & Development2015 World leader in gases, technologies and services for Industry and Health

PI-2 Risks • Bundle manufacturing and viability for test at low temperature is unknown• Polymer Qualification for membrane• Scale-up

PI-2 Mitigation Strategy• Laboratory Testing at low temperature• Close Collaboration with supplier• Different phases of development

Page 28: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Project RisksProject Risks Mitigation Strategy

Field Test Risks• Particulates can foul the compressor or blind the hollow fiber membrane• Compressor corrosion due to acid contaminants• Acid contaminants in the presence of moisture may lead to long term hydrolysis of membrane

Field Test Mitigation Strategy• Dust filtration to remove the particulates• Water knock-out and de-saturation before compressor• Dryer upstream of membrane

28 Research & Development2015 World leader in gases, technologies and services for Industry and Health

membrane• Design related safety issues• Uncertainty in field

• Detailed HAZOP review• Extensive acceptance testing, AL experience and close collaboration with NCCC

Page 29: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Agenda

AL Motivation & Roadmap

Hybrid Cold Membrane Technology

Project Overview

Project Progress

Project Risks

29 Research & Development2015 World leader in gases, technologies and services for Industry and Health

Project Risks

Next Steps

Page 30: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Next Steps - Budget Period 2 (July 2015 – Dec 2016)0.3 MWe Field testing at NCCC (October 2015 – July 2016)

PI-2 bundle fabrication

TEA and EH&S analysis for CO2 capture using cold

30 Research & Development2015 World leader in gases, technologies and services for Industry and Health

TEA and EH&S analysis for CO2 capture using cold membrane technology

Comparison between different membrane configurations

PI-1 versus PI-2 membrane material

Preliminary design of next phase

Page 31: NETL June 2015 Meeting Public · Budget Period 1 (Oct 2013 – June 2015) $3,369,528 $842 ,382 Budget Period 2 (July 2015 – Dec 2016) $1,338,964 $334 ,741 11 2015 Research & Development

Acknowledgements & DisclaimerUS DOE – José Figueroa, Lynn Brickett, Andrew O’Palko

Parsons Government Services and NCCC

Some material in this presentation is based on work supported by the Department of Energy National Energy Technology Laboratory under Award Number DE-FE0004278 (completed) and DE-FE0013163. The National Carbon Capture Center is support by Award DE-FE0022596.

“This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or

31 Research & Development2015 World leader in gases, technologies and services for Industry and Health

thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.”