![Page 1: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/1.jpg)
NetApp Data Center Design Presentation for
SVLG Data Center Efficiency Summit
November 5, 2014
Mark Skiff, PE, CEM, CFM
Director, IT Data Center Solutions
© 2014 NetApp, Inc. All rights reserved. – Limited Use
![Page 2: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/2.jpg)
Data Center Design Evolution
© 2014 NetApp, Inc. All rights reserved. – Limited Use 2
Capacity Build
Cost Configuration
Density
kW/rack PUE
mW $/kW year power & cooling >1
Generation 1
Multiple
Smaller
1-3
n/a
Hot / Cold Aisle Prior to 2006 <4 1.65
Generation 2 3 1.8 Cold Aisle
Containment 2006
8 1.55
Generation 3 25 2 / 8 Gen 2 w/
Economizer 2007 (Delivered 2009)
12 1.16
Generation 4 25
(scalable) 2.6
Gen 3 Plus
Refinement 2014
4 to 12 1.12
* Estimated annual
![Page 3: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/3.jpg)
Data Center Design Evolution
© 2014 NetApp, Inc. All rights reserved. – Limited Use 3
Capacity Build
Cost Configuration
Density
kW/rack PUE
mW $/kW year power & cooling >1
Generation 1
Multiple
Smaller
1-3
n/a
Hot / Cold Aisle Prior to 2006 <4 1.65
Generation 2 3 1.8 Cold Aisle
Containment 2006
8 1.55
Generation 3 25 2 / 8 Gen 2 w/
Economizer 2007 (Delivered 2009)
12 1.16
Generation 4 25
(scalable) 2.6
Gen 3 Plus
Refinement 2014
4 to 12 1.12
* Estimated annual
![Page 4: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/4.jpg)
Measuring Performance with PUE
© 2014 NetApp, Inc. All rights reserved. – Limited Use 4
0.0
0.5
1.0
1.5
2.0
Typical 2.0 PUE
Chiller Plant
AHU
UPS
Humidity Control
Transformer
Lights
IT
Power Usage Effectiveness (PUE) ratio cited as the data center infrastructure efficiency metric
Total power / IT equipment power
Infrastructure systems account for half of total energy in data centers
Typical data center PUE = 2.0
Lower the number the more efficient
![Page 5: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/5.jpg)
Opportunity + Innovation
© 2014 NetApp, Inc. All rights reserved. – Limited Use 5
![Page 6: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/6.jpg)
Typical Hot Aisle / Cold Aisle Configuration
© 2014 NetApp, Inc. All rights reserved. – Limited Use 6
Supply Air Supply Air
![Page 7: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/7.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 7
Hot/Cold Aisle w/ VAV at 4 kW/Rack (150 watts/Square Foot)
Control Damper
Temp.
Sensor
C
R
A
H
R
A
C
K
Return Air
![Page 8: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/8.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 8
Operational January 2007
– 360 racks @ 8kW / Rack (high
density; 770 watts/sf)
CRAHs Supply Constant Temp
Neutral Cold Room Pressure
– Modulating Dampers
Eliminates Air Mixing
Uniform temperatures
– Infrared shows warm areas blanking
gaps
Control Damper
Press.
Sensor C
R
A
H
R
A
C
K
Return Air
Contained Cold Aisle w/ Pressure Controlled Cooling
![Page 9: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/9.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 9
Plan View & Cross Section
Cold Room Hot Aisle
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
Co
ld R
oo
m
AHU AHU AHU AHU AHU AHU
AHU AHU AHU AHU AHU AHU
![Page 10: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/10.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 10
Air Handlers Main Aisle
End of Aisle Air Handling and Center Aisle
![Page 11: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/11.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 11
Contained Cold Aisle (Cold Room) and Hot Aisle
Cold Room Hot Aisle
![Page 12: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/12.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 12
NetApp Global Dynamic Lab (GDL) & IT Site 2
Opened March, 2009
2,166 racks, 12 kW per rack average load
Predicted PUE = 1.2 (annualized)
FIRST EVER ENERGY STAR RATED
![Page 13: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/13.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 13
Plan View – 36 Cold Rooms x 60 cabinets
Corporate IT
R&D
25 mW = 770 watts/sf
![Page 14: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/14.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 14
GDL1
Speed Control
Outside
Air
CRAH
RA
CK Cold
Room
Mixing Dampers
Cooling Coil
Hot Air
Return
Pressure
Sensor
Fan
Outside
Relief
Dampers
• 360 IT racks
– 6kW/rack
– Dual path UPS &
generators
• 1800 Engineering racks
– 12 kW/rack
– Utility power only
• 30 Engineering Network
racks
– 3 kW/rack
– Single path UPS &
generator
• Cold Room with Pressure
Controlled Cooling
• Airside economizer
• Elevated Air and CHW
Temps
![Page 15: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/15.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 15
Main Hall; 1st Floor
![Page 16: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/16.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 16
Cold Room; 1st Floor
![Page 17: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/17.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 17
Measuring Efficiency with PUE
0.0
0.5
1.0
1.5
2.0
Typical 2.0 PUE
Chiller Plant
AHU
UPS
Humidity Control
Transformer
Lights
IT
0.0
0.5
1.0
1.5
2.0
1.2 PUE (Annualized)
Chiller Plant
AHU
UPS
Humidity Control
Transformer
Lights
IT
Power Usage Effectiveness (PUE) ratio cited as the data center infrastructure efficiency metric
Total power / IT equipment power
Infrastructure systems account for half of total energy in data centers
Typical data center PUE = 2.0
Lower the number the more efficient
NetApp RTP Building 4, predicted PUE = 1.2
State-of-the-Art Data Center 2009 2010 2011
EPA assumed PUE ratio 1.67 1.56 1.45
![Page 18: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/18.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 18
Full FREE Cooling PUE = 1.07 Outside Air Temp = 73oF (23oC)
Cold Room 75oF (24oC) Return Air
91oF (33oC)
90%
10%
Speed Control
CRAH
Cold
Room
Mixing Dampers
Cooling Coil
Hot Air
Return
Pressure
Sensor
Fan
Outside
Relief
Dampers
90%
90%
10%
RA
CK
RA
CK
![Page 19: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/19.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 19
Full PAY Cooling PUE = 1.30 Outside Air Temp > 91OF (33oC)
Return Air
91o (33OC)
90%
10%
Speed Control
CRAH
Cold
Room
Mixing Dampers
Cooling Coil
Hot Air
Return
Pressure
Sensor
Fan
Outside
Relief
Dampers
90% 100%
Cold Room 75oF (24oC) RA
CK
![Page 20: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/20.jpg)
PARTIAL Free Cooling PUE = 1.07 – 1.30
20
Outside Air Temp >75oF (24oC) to <91oF (33oC)
90%
10%
Speed Control
CRAH
Cold
Room
Mixing Dampers
Cooling Coil
Hot Air
Return
Pressure
Sensor
Fan
Outside
Relief
Dampers
90% 100%
Return Air
91o (33OC) Cold Room 75oF (24oC) RA
CK
100%
20 © 2014 NetApp, Inc. All rights reserved. NetApp Confidential – Limited Use
![Page 21: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/21.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 21
TEMP (F) #HRS/YR % of YR
<75o (24oC) 5481 62%
75-80o 2043 23%
80-85o 585 7%
85-90o 426 5%
>90o (32oC) 225 3%
Raleigh Weather Data
“FREE”
“PAY”
![Page 22: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/22.jpg)
Actual Performance: 2013 Free Cooling
© 2014 NetApp, Inc. All rights reserved. NetApp Proprietary – Limited Use Only 22
![Page 23: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/23.jpg)
Actual Performance: 4Year Average Free Cooling
© 2014 NetApp, Inc. All rights reserved. NetApp Proprietary – Limited Use Only 23
![Page 24: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/24.jpg)
Actual Performance: 4Year Monthly Free Cooling
© 2014 NetApp, Inc. All rights reserved. NetApp Proprietary – Limited Use Only 24
![Page 25: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/25.jpg)
Actual Performance: PUE
© 2014 NetApp, Inc. All rights reserved. NetApp Proprietary – Limited Use Only 25
Current PUE = 1.16
![Page 26: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/26.jpg)
© 2014 NetApp, Inc. All rights reserved. NetApp Proprietary – Limited Use Only 26
Lessons Learned and a Few “Ah-Ha’s”
PUE Range = 1.07 – 1.30 (average annual 1.16)
4 kW / rack average after 5 years
Construction Costs 20-33% of Industry
60 Degree Chilled Water
Temp Rise 16 degrees
TCOE 1/3 Site 1, 1/5 HQ, 1/7 Colo
![Page 27: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/27.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 27
Global Dynamic Lab 2
Project Goals – Bigger, Better, Cheaper
Project Completion; May, 2014
Predicted PUE 1.12
![Page 28: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/28.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 28
Data Center Space
![Page 29: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/29.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 29
Center Aisle GDL2
![Page 30: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/30.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 30
Mechanical System Improvements
• Increased Air Handling Capacity
• Incorporated Washable Outside Air Pre-filters
• Improved Air Distribution
• Eliminated Cooling Systems for Electrical Distribution Rooms
• Eliminated Evaporative Humidification Systems
• Selected More Efficient Fan Wheel
• Changed to Operable Window System Vs. Louver/Damper System
![Page 31: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/31.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 31
Air Handling Capacity
![Page 32: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/32.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 32
Washable Pre-Filters
![Page 33: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/33.jpg)
Actual Performance: 2013 Free Cooling
© 2014 NetApp, Inc. All rights reserved. NetApp Proprietary – Limited Use Only 33
![Page 34: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/34.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 34
Improved Air Distribution
![Page 35: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/35.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 35
Air Flow Through End of Hot Aisles
![Page 36: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/36.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 36
Eliminated Electrical Room Air Conditioning
![Page 37: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/37.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 37
Operable Window System for Exhaust
![Page 38: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/38.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 38
Exterior View (open)
![Page 39: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/39.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 39 3
9
Interior View (closed)
![Page 40: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/40.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 40
Interior View (open)
![Page 41: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/41.jpg)
© 2014 NetApp, Inc. All rights reserved. – Limited Use 41
Summary and Recommendations
Containment w/ Pressure Control Allows for High Density
(and low construction cost)
Air Side Free Cooling Required for Low PUE
Sustainable Data Centers
• Low Energy Use
• Recycled Materials
• Non Potable for Cooling Tower Make-up
• Low Construction Costs
Supplier (A/E, GC) Selection is Critical Success Factor
Phased Construction Provides Flexibilty
(first cost and purchasing)
![Page 42: NetApp Data Center Design - SVLG...NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center](https://reader030.fdocuments.us/reader030/viewer/2022040213/5ea1562ec2d70964d402c4be/html5/thumbnails/42.jpg)
Thank you