Changes in Education The Elementary School would house grades K-8 on one campus, leaving students in grades 9-12 at the High School. Students in grades 6-8 will be housed in a proposed addion to the school. The 6-8th grade teachers would be located on one campus. Proposed Safety Projects A secured entry, replacement of door locks, installaon of video cameras, and all students housed in one building. Exisng modular classrooms (portables) would be removed. Proposed Management of Funds if the Bond Measure Passes If the bond passes a State matching grant would be requested. The district would iniate a Cizen’s Bond Oversight Commiee that would be involved during the process observing how monies would be allocated and spent. Website: E-mail: Phone: INFO Nestucca Valley School District Proposed Bond Information: At-A-Glance hp://www.nestucca.k12.or.us [email protected] (Quesons & General Informaon) [email protected] (Misty Wharton, Superintendent) (503) 392-3194 Ext. 302 Created: March 21, 2018 PROPOSED ADDITION FIRST FLOOR (SHOWN) PROPOSED ADDITION SECOND FLOOR (OUTLINE) REFERENCE FLOOR PLANS FOR LAYOUT COMMUNITY GARDEN ' \ EXISTING COVERED PLAY STRUCTURE ' - - - Draft of K-8 Campus Plan at Nestucca Valley Elementary PROPOSED SITE PLAN if the bond measure passes PROPOSED PROJECTS if the bond measure passes

Transcript of Nestucca Valley School District ... - nestucca.k12.or.us · door locks, installation of video...

Changes in EducationThe Elementary School would house grades K-8 on one campus, leaving students in grades 9-12 at the High School. Students in grades 6-8 will be housed in a proposed addition to the school. The 6-8th grade teachers would be located on one campus.

Proposed Safety Projects

A secured entry, replacement of door locks, installation of video cameras, and all students housed in one building. Existing modular classrooms (portables) would be removed.

Proposed Management of Funds if the Bond

Measure PassesIf the bond passes a State matching grant would be requested. The district would initiate a Citizen’s Bond Oversight Committee that would be involved during the process observing how monies would be allocated and spent.

Website: E-mail: Phone: IN

FONestucca Valley School District

Proposed Bond Information: At-A-Glance

http://[email protected] (Questions & General Information) [email protected] (Misty Wharton, Superintendent)(503) 392-3194 Ext. 302

Created: March 21, 2018

PROPOSED ADDITION FIRST FLOOR (SHOWN)

PROPOSED ADDITION SECOND FLOOR (OUTLINE)

REFERENCE FLOOR PLANS FOR LAYOUT

COMMUNITY GARDEN •

' \

EXISTING COVERED

PLAY STRUCTURE ' �----------

Draft of K-8 Campus Plan at Nestucca Valley Elementary

PR

OPO

SED

SIT

E PL

AN

if th

e bo

nd m

easu

re p

asse

s P

RO

POSE

D P

RO

JECT

S if

the

bond

mea

sure

pas

ses

PRO

POSE

D F

LOO

R P

LAN

Created: March 21, 2018

Nestucca Valley School DistrictProposed Bond Information: At-A-Glance

Voters will be asked to consider a bond measure for the May 15, 2018 ballot. If the bond measure passes Nestucca Valley School District will sell $25,700,000 in General Obligation Bonds. The District may also qualify for $4,000,000 of State-matching funds, but will only receive those funds if the bond passes.

The current tax rate is $0.71 per $1,000 of assessed home value. This is the County-assessed value and not your home’s market or appraised value. If the measure passes, the estimated tax to real property owners would increase by $0.99 per $1,000 of assessed home value. For the owner of a $250,000 (assessed value) home, taxes would increase from $14.79 per month to $35.42 per month if the measure passes. The increased levy would remain in place through 2038.

If the measure does not pass, the additional rate of $0.99 per $1,000 of assessed home value will not be assessed, the current tax rate of $0.71 per $1,000 of assessed home value will remain in place until 2028, and the projects described above will not be undertaken.

PRO

POSE

D F

INAN

CES

PR

OPO

SED

PR

OJE

CTS

if th

e bo

nd m

easu

re p

asse

s

Create a K-8 Campus• Build new classrooms, commons, a cafeteria,

media commons, and gymnasium.

• Grades 6-8 would be housed in a separate wing.

Building Modifications for Safety• On-site parking and circulation would be

expanded.• Doors and security systems would be

renovated.

Changes to Existing Infrastructure• Replacements to the existing plumbing,

electrical, windows, siding, and building finishes.

Changes to Community Use• The construction of a second gymnasium would

provide space for drama, music, sports, and other existing programs at district schools.

• The common space would be expanded, with the expectation that additional programs could be offered in the evenings and weekends.

High School Capacity• Nestucca Junior Senior High School would

receive space for existing students by shifting grades 7-8 to the K-8 campus.

• NJSR High would use vacated classroom space to offer additional CTE programs.