NERC Policies
Introduction
![Page 2: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/2.jpg)
2
![Page 3: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/3.jpg)
3
What is NERC?
• Northeast U.S. blackout of 1965
• Electric Power Reliability Act of 1967
• Ten regional councils
• Organizational objectives– Define and measure reliability– Influence and interpret legislation regarding
the power industry– Study interregional connections
![Page 4: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/4.jpg)
4
NERC Regions
WSCC
NPCC
MAAC
FRCC
SERC
ERCOT
MAPP
SPPMAIN
ECAR
![Page 5: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/5.jpg)
5
NERC Organization
• Board of Trustees
• Engineering Committee
• Operating Committee
![Page 6: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/6.jpg)
6
NERC Operating Committee
Mission
• To promote the reliability of the electricity supply for North America,
• To establish Policies,
• To monitor compliance,
• To provide a forum for dealing with issues.
![Page 7: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/7.jpg)
7
NERC Standards Development
Players
• Standards Committee– Operating Committee– Engineering Committee
• Subgroup
• Due Process Appeals Committee
• Technical Appeals Committee
![Page 8: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/8.jpg)
8
Standards Development Process 1. Request to revise or develop standard
2. Assignment to subgroup
3. Drafting phase and Internet announcement
4. Draft standard posted for comment
5. Subgroup deliberates on comments
6. Draft standard submitted to Standards Committee
7. Standards Committee votes on recommendation to Board
8. Appeals processes
9. Board approves
10. Standard implementation or further appeals
![Page 9: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/9.jpg)
9
Waivers to NERC Operating Policies
• Instances when an entity cannot comply with a NERC Operating Policy
• Requested from the Operating Committee
• Waiver request must include an alternative plan
• Temporary
![Page 10: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/10.jpg)
10
Waivers in Effect
1. Scheduling Agent• Alliance RTO• Midwest ISO• Southwest Power Pool• GridSouth
2. Financial Inadvertent Settlement• Alliance RTO• Midwest ISO• Southwest Power Pool
3. Control Performance Standard 2• ERCOT
![Page 11: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/11.jpg)
11
Personnel Subcommittee
• Responsible for support materials• Promotes sharing of knowledge• Periodically reviews NERC Operating Policies
pertaining to System Operator training and certification and recommends revisions
• Establishes policies and standards for NERC System Operator Certification
• Serves as the interim governance body for the NERC System Operator Certification Program
![Page 12: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/12.jpg)
12
Introduction to the Operating Policies
NERC Doctrine• Policies -- Place responsibility for operating
reliability on the Control Areas
• Standards -- Requirements that are measurable and may be audited with surveys
• Requirements -- Describe the obligations of a Control Area
• Guides -- Operating practices to be considered
![Page 13: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/13.jpg)
13
Interconnections
![Page 14: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/14.jpg)
14
![Page 15: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/15.jpg)
15
Control Area
• An electrical system bounded by interconnection (tie-line) metering and telemetry
• Two requirements:– Directly controls its generation to balance
its actual and scheduled interchange– Helps regulate and stabilize the
Interconnection’s alternating-current frequency
![Page 16: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/16.jpg)
16
Control Area Obligations
• Interchange balance
• Interconnection frequency
![Page 17: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/17.jpg)
17
Interchange Balance
![Page 18: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/18.jpg)
18
![Page 19: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/19.jpg)
19
Generation & Load Balancing
Control Area Atie line flow =
100 -150 + 100 - 50 =
0
100 MW 150 MW
50 MW
100 MW
Control Area D
Control Area C Control Area E
Control Area B
![Page 20: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/20.jpg)
20
Interconnection Frequency
• Automatic Generation Control (AGC)
• Generator governors
![Page 21: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/21.jpg)
21
Compliance
Control Areas are obligated to adhere to all NERC Operating Requirements and
Standards.
![Page 22: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/22.jpg)
22
Control Area Reporting
• Inadvertent Interchange Accounting• Control Performance Surveys• Area Interchange Error Surveys• Frequency Response Characteristic Surveys• Frequency Bias Settings• Allowable Limit of Average Deviation
Survey
![Page 23: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/23.jpg)
23
Security Coordinators
• Established in 1996
• Established the requirements for sharing of data and information about the “health” of the Interconnection
• Established the Interregional Security Network for each Interconnection
• Required every Region, subregion, or interregional coordinating group to establish a Security Coordinator
• Required that each Region develop a security plan
• Rely on common operating terminology, criteria and standards
![Page 24: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/24.jpg)
24
Operating Policy Layout
![Page 25: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/25.jpg)
25
NERC Operating Policy Terms
• Several pages of terms and definitions are located in the Operating Manual
![Page 26: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/26.jpg)
26
Confirmation as a Control Area
To be recognized as a NERC-Certified CONTROL AREA, the entity must be
reviewed by the REGIONAL COUNCIL in which the entity is a member and and
confirmed that it meets the requirements of the specified Criteria.
![Page 27: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/27.jpg)
27
Control Area Criteria
• Generation• Metering• Communications• Transmission
Arrangements• System Operators• E-tag Services
• Performance Surveys• Back-up Control Center• Coordination• System Restoration• Compliance with NERC
Operating Policies and Standards
![Page 28: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/28.jpg)
28
Security Coordinator
Standards of
Conduct
![Page 29: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/29.jpg)
29
Security Coordinator Standards of Conduct
• Independent of employees/persons who engage in retail or wholesale merchant functions
• Abide by rules governing employee conduct
• Written procedures publicly available and provided to all Security Coordinator employees
![Page 30: NERC Policies Introduction. 2 3 What is NERC? Northeast U.S. blackout of 1965 Electric Power Reliability Act of 1967 Ten regional councils Organizational.](https://reader035.fdocuments.us/reader035/viewer/2022062618/551447c3550346494e8b4c98/html5/thumbnails/30.jpg)
Questions?