SARF/IRF 2014 | 2-4 September, South Africa ADDRESSING AFRICA’S MAINTENANCE NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE By Andrew Otto, BSc(Hons), MSc, CEng, MCIHT Senior Research Engineer, Transport Research Laboratory, UK

Transcript of NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term...

Page 1: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

ADDRESSING AFRICA’S MAINTENANCE NEEDS: DOING MORE WITH LESS IN

MOZAMBIQUE

By

Andrew Otto, BSc(Hons), MSc, CEng, MCIHT Senior Research Engineer, Transport Research Laboratory, UK

Page 2: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

The Maintenance Burden

Maintenance Strategies

Mozambique Approach

Challenges Faced

Way Forward

1

2

3

4

5

Discussion Topics

Page 3: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

1. Introduction: – maintenance backlog

Page 4: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

1. Introduction: - The maintenance burden (Main Network)

Page 5: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

1. Introduction: - The maintenance burden (Rural Network)

Page 6: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

1. Introduction: - the importance of all roads

Agricultural produce and Rural communities

Trunk Road

Link Road

Collector/ Rural Road

Page 7: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

Enhancing the Value of each $ spent

for road maintenance

2. Maintenance Strategies

Improving bottlenecks on the network

Efficient utilisation of resources

Techniques that increase the life of the road

Research and development

Page 8: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach • Mozambique launched Rural Roads Improvement Programme (RRIP) 2007 • Department for International Development (DFID) launched African

Community Access Programme (AFCAP) 2008

Mozambique RRIP • Critical sections of

road maintained to Satisfactory level

DFID: AFCAP • Promote use of

proven low-cost solutions that maximise use of local resources

• Share research and innovation that has been tried and tested in other countries

• Access to areas cut off during the wet season

• Access to rural communities to reach to basic services and social and economic opportunities

Page 9: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Research and innovative solutions tried out on bottlenecks so as to apply successes on wider scale

Page 10: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Marracuene - Macaneta

Page 11: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Marracuene – Macaneta • Challenge:

• Material available in abundance was only fine non-plastic sand

• Solutions • For unpaved road, blended with clay to meet certain

engineering parameters • For paved roads, used in Emulsion Stabilised Sand Base and

Slurry Seal

• Short-term Performance • Very good no defects; only slight abrasion of slurry 0.5m2

• Cost: US$342,000/km

Page 12: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Cumbana - Chacane

Page 13: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Cumbana – Chacane • Challenge:

• Loose sand in dry season, boggy in wet season and impassable; moderate plastic calcrete gravels

• Solutions • Plastic calcrete blended with loose sand to meet certain

engineering parameters and used as base course or gravel wearing course

• Plastic calcrete screened carefully and used as an Otta Seal surfacing

Page 14: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Cumbana – Chacane • Short-term Performance

• For sealed sections: Very good; minor stone loss and potholing. Roughness remained constant 4.3IRI

• For gravel wearing : low gravel loss < 20mm/year. Roughness increases rapidly from 7 to 21IRI in two years, but light grading and compaction restores it to 7IRI

• Cost: US$140,000/km

Page 15: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Inhacufera - Machaze

Page 16: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Inhacufera – Machaze • Challenge:

• Very large and coarse gravels, very low vehicle speeds and impassable to cyclists

• Solutions • Large stones removed by dozer, replaced by old river bed

gravel, Otta Seal surfacing provided

• Short-term Performance • Stone loss on Single Otta Seals, however the application of

fine river sand as a “grouting” layer on Otta Seal – 5years no defects

• Cost: US$135,000/km

Page 17: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Beira - Savanne

Page 18: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Beira – Savanne • Challenge:

• Only beach-type fine sands available nearby – loose and unstable, easily eroded

• Solutions • Cement Stabilisation and Emulsion Stabilisation for base course;

followed by Sand Seal. In-situ mixing to increase productivity rate

• Short-term Performance • “Granulation” unintended occurred as a construction defect but

became advantage. Unexpected heavy trucks abraded Sand Seal but bases remained intact

• Cost: US$124,000/km

Page 19: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Zero - Mopeia

Page 20: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

3. Mozambique Approach: - Projects

Zero – Mopeia • Challenge:

• Flooding on low-lying sections; slippery sections

• Solutions • Raising road level by use of “free-draining” quartzitic gravels and

then surfacing with Otta Seal

• Short-term Performance • Road passable throughout the year, and very good riding

surface 2.4IRI. Minor potholing - corrected

• Cost: US$123,000/km

Page 21: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

4. Challenges Faced

• Small and medium scale contractors not equipped and not trained or experienced in bituminous works • No bids received • Unacceptable quality of work

• Interventions perceived as small and not given priority by big contractors. • Overpricing (US$140K/km as compared to

US$100K/km) • Delayed construction

• Equipment such as mobile jaw crushers would have made significant difference but not available

Page 22: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

5. Way Forward

• Training of small and medium scale contractors • Guaranteeing work to small and medium scale

contractors so that they build capacity • Government equipment pools should be considered

since small contractors do not have capacity to purchase

• Transfer of research results to wider scale maintenance of roads.

Page 23: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

Thank You

Andrew Otto; TRL;

[email protected]

Page 24: NEEDS: DOING MORE WITH LESS IN MOZAMBIQUE · gravel, Otta Seal surfacing provided • Short-term Performance • Stone loss on Single Otta Seals, however the application of fine river

SARF/IRF 2014 | 2-4 September, South Africa

Questions and Discussions