NDG-Westmount Neighbourhood Committee January 25, 2016

Transcript of NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of...

Page 1: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

NDG-Westmount

Neighbourhood Committee

January 25, 2016

Page 2: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

2

Work update

Requests from members of the Neighbourhood Committee

Feedback on previous questions

Strengthening and diverting of the collector

Redeveloping rues Pullman, Saint-Rémi and Saint-Jacques

Mobility Maintenance Annual Plan 2016

Page 3: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

3

Feedback on previous questions

1. When the MTQ will carry out the closure of autoroute 15 ?

(Raising of parapets by the borough)

2. Is it possible to ensure the snow removal of the bicycle paths in

direction of downtown in NDG ?

3. As the escarpment is an ecoterritory, what does it mean in terms

of protection?

4. Update on bus lines 90 and 420

Page 4: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

4

Haut Saint-Pierre collector

Work in the existing collector

Existing collector to be abandoned

Diverting the collector

Page 6: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

6

Haut Saint-Pierre collector

Schedule

Diverting the collector : March 2015 to spring 2016

Dismantling and reconstruction of the Saint-Jacques overpass :

summer 2016 to end of 2017

Page 7: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

7

Saint-Rémi / Saint-Jacques / Pullman

Exit no 2 – rue Saint-Jacques reopened since December 2

7

OPEN

Page 8: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

Mobility Maintenance Annual Plan

2016

Page 9: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

9

Presentation outline

Highlights – Central sector

Access ramps A-15 South / A-720 East

and A-720 West / A-15 Nord

Access ramp A-15 North towards A-720

East

Rue Saint-Rémi

Preliminary schedule

Highlights – West sector

Dismantling of railway tunnel

Reconfiguration of Pullman Street /

Sainte-Anne-de-Bellevue Blvd.

Railway retaining wall

Preliminary schedule

Highlights – East sector

Temporary deviation of A-720

Closure of Guy and Atwater exits

Dismantling of A-720

Preliminary schedule

Highlights – South sector

Lachine Canal bridge

Work in De La Vérendrye sector

Rue Saint-Rémi

Preliminary schedule

Page 10: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

10

Highlights – Central sector

Construction of access ramp A-15 South towards R-136 East

A-15 fill near Centre sportif Gadbois

Continuing construction of 4 structures of A-20

Dismantling of ramp A-15 North towards A-720 East

Access ramp A-15 South

towards R-136 East

Page 11: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

11

Access ramps A-15 / A-720

Reduced to 1 lane on

ramp A-15 South / A-

720 East and ramp A-

720 West / A-15 North

Construction of new A-

15 South towards R-

136 ramps

Page 12: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

12

Ramps A-15 North towards A-720 East

Closure of ramp A-15

North towards A-720

East

Dismantling of existing

ramp to begin

construction of the new

ramps and realignment

of Turcot Holding

railway

Page 13: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

13

Rue Saint-Rémi

Closure …

Local traffic

Work area

Construction of the

new R-136 eastbound

Complete closure of

rue Saint-Rémi

between rues Saint-

Jacques et Cazelais

Page 14: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

14

Preliminary Schedule

Work / Closures Preliminary dates

1 lane reduction:

• A-15 South towards A-720 East

• A-720 West towards A-15 North

Spring 2016 to 2019

Closure of ramp A-15 North towards A-720 East Spring 2016 Opening of new ramp: end of 2017

Closure of rue Saint-Rémi End of february 2016 à to summer

of 2016

Page 15: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

15

Highlights – East sector

Construction of first two lanes of R-136

Construction of exit reserved for public transit - Rose-de-Lima

Route 136

Eastbound

Page 16: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

16

Temporary deviation of A-720

Necessary for the construction of the first lanes of R-136

Two-lane deviation

Duration: a little over a year (450 days)

Temporary deviation Traffic flow

Existing structure to dismantled and rebuild

Page 17: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

17

Temporary deviation of A-720

Page 18: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

18

Closure of exit no 3 – Montréal (downtown) / rue Guy

Planning underway – preliminary detour

Duration of closure: 2 to 3 months

Closed …

Exit no 4 -

De La Montagne

Closure …

Detour

Exit no 3 -

Rue Guy

Page 19: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

19

Closure of exit no 2 – rue Atwater

Planning underway – preliminary detour

Duration of closure: 2 to 3 months

Closure …

Detour

Exit no 3 -

Rue Guy

Exit no 2 -

Rue Atwater

Page 20: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

20

Important change for 2016 – West to east traffic

Use of existing structures, new structures and temporary structures to

implement a new traffic flow during the construction of the Turcot

project.

1 lane reduction

2 lanes reduction

New permanent road

Temporary road

Dismantling

Page 21: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

21

Dismantling A-720

Construction of R-136 Eastbound

Dismantling

Page 22: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

22

Preliminary Schedule

Work / Closures Preliminary dates

Construction of temporary deviation of A-720 Fall 2015 to Fall 2016

Closure of exit no 3 – rue Guy Spring 2016 / Fall 2016

(2 to 3 months)

Closure of exit no 2 – rue Atwater Fall 2016 / End of 2016

(2 to 3 months)

New west to east traffic flow Fall 2016 to 2018

Page 23: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

23

Highlights – West sector

Construction of A-20

Construction of service road

Construction of retaining walls

Start of CN work

Page 24: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

24

Reconfiguration of rue Pullman / boul. Ste-

Anne-de-Bellevue Commissioning of

service road

Change to

contraflow lane

on Sainte-Anne-

de-Bellevue: 1 lane in each

direction

Nouvelle structure

1 voie direction ouest

1 voie direction est

New structure

1 lane westbound

1 lane eastbound

Page 25: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

25

Preliminary Schedule

Work / Closures Preliminary dates

Closure of Montreal-West interchange December 2015 to 2019

Dismantling railway tunnel Winter 2016

Reconfiguration of rue Pullman / boul. Ste-Anne-

de-Bellevue

Spring 2016 to 2019

Page 26: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

26

Highlights – South sector

Lachine Canal Bridge Foundations

Deck

Work in De La Vérendrye sector

Page 27: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

27

Rue Saint-Patrick and Chemin de la Côte

Saint-Paul Detours:

Rue Saint-Patrick

Chemin de la Côte Saint-Paul

Bike path

Approximate work areas

Street detours

Bike path

Closed

Page 28: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

28

Temporary arrangement - De la Vérendrye

Connexion of new

De La Vérendrye

exit

Construction of

temporary structures

(2)

Detour

Temporary arrangements

Extension of boul. De La Vérendrye

Page 29: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

29

Deviation

Current bike path

Closure

Deviation of bike path

Use of bike path

on the extension

of boul. De La

Vérendrye

Extension of boul. De La Vérendrye

Page 30: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

30

Rue Saint-Rémi

Construction of A-15

Work between Cabot

and de l’Église

1 lane remains open in

each direction

Sidewalk on North side

closed, South side

deviated

1 lane in each direction

Sidewalk closed

Page 31: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

31

Preliminary Schedule

Work / Closures Preliminary dates

Lachine Canal Bridge

• Deviation of rue Saint-Patrick

• Deviation of chemin de la Côte-Saint-Paul

Winter 2016 to 2019

Opening Temporary arrangement of De la

Vérendrye

Spring 2016 to 2018

Deviation of boul. De La Vérendrye bike path Spring 2016 to 2018

Rue Saint-Rémi

• Drainage work

• Structure of A-15

• Spring 2016 to summer of 2016

• Summer/Fall 2016 to 2017

Page 32: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

32

Photos of 2015

A-20 structures

November 17, 2015

Page 33: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

33

November 17, 2015

Photos of 2015

A-20 structures

Page 34: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

34

November 17, 2015

Photos of 2015

End of dismantling 780, rue Saint-Rémi

Page 35: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

35

November 26, 2015

Photos of 2015

A-20 structures

Page 36: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

36

December 4, 2015

Photos of 2015

Temporary exit – West Sector

Page 37: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

37

December 4, 2015

Photos of 2015

Columns of boul. de Sainte-Anne-de-

Bellevue bridge

Page 38: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

38

December 11, 2015

Photos of 2015

Retaining wall – South of rue Pullman

Page 39: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

39

November 17, 2015

Photos of 2015

Boul. Angrignon deviation

Page 40: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

40

NDG-Westmount neighbourhood committee

March 21, 2016

Sud-Ouest neighbourhood committee

February 9, 2016

Website dedicated to the project: www.turcot.gouv.qc.ca

Twitter @MTQ_Turcot

Monthly electronic bulletins (subscribe via the Turcot website)

Dedicated telephone line: 514 873-1372

Turcot email: [email protected]

For More Information

Page 41: NDG-Westmount Neighbourhood Committee...2016/01/25  · • Summer/Fall 2016 to 2017 32 Photos of 2015 A-20 structures November 17, 2015 33 November 17, 2015 Photos of 2015 A-20 structures

41

www.turcot.gouv.qc.ca