NCSX Helium Bakeout System M. Kalish 3/25/02

9
NCSX Helium Bakeout System M. Kalish 3/25/02 Outline NCSX Helium System Requirements System Description P&ID Operational Parameters Calculations Cost and Schedule

description

NCSX Helium Bakeout System M. Kalish 3/25/02. Outline NCSX Helium System Requirements System Description P&ID Operational Parameters Calculations Cost and Schedule. NCSX Helium System Requirements. System will provide heating to hold vessel at 150C - PowerPoint PPT Presentation

Transcript of NCSX Helium Bakeout System M. Kalish 3/25/02

Page 1: NCSX  Helium Bakeout System M. Kalish 3/25/02

NCSX Helium Bakeout System M. Kalish 3/25/02

Outline

NCSX Helium System RequirementsSystem DescriptionP&IDOperational ParametersCalculationsCost and Schedule

Page 2: NCSX  Helium Bakeout System M. Kalish 3/25/02

NCSX Helium System Requirements

System will provide heating to hold vessel at 150C Inlet Helium gas temperature will be at 165C and outlet

gas temperature will be 150C12 kW nominally required to make up vessel losses

Per “non conservative inputs” provided by Paul GoransonNo heating provided at this time for PFCsVessel will accommodate use of ½” tubing to carry helium

30 parallel paths Each path approximately 13 meters long encompassing

two complete revolutions around the vessel Design will require iterations with ORNL

Job scope includes skid and supply and return piping up to vessel. Does NOT include manifolds or tubing on vessel.

Page 3: NCSX  Helium Bakeout System M. Kalish 3/25/02

System Description

Compressed Helium Inert Gas provides heating with low consequence from leaks High Cp (high pressure makes up for low density)

Blower used in lieu of compressorRecuperative Heat Exchanger makes energy balance feasibleControl

Temperature control via heater controller Pressure control via gas regulator More elaborate PLC and VFD control of NSTX system

eliminated as cost savingsInstrumentation

Temperature and Pressure measurement provide safety interlocks via simple mechanical relays

Costs reflect installation in NCSX Test Cell.

Page 4: NCSX  Helium Bakeout System M. Kalish 3/25/02

12 KW required to make up vessel losses24 KW available to allow for an acceptable ramp rate165 C to 150 C drop across NSTX270 psig helium at 207 icfm (at blower)313 cfm through vessel172 ft/sec in vessel

Operational Parameters

Page 5: NCSX  Helium Bakeout System M. Kalish 3/25/02

NCSX30 parallel paths

CoolingWater

Hea

ter

HE #1

HE #2

PressureRegulatingValve

Orifice

RV

Blower Assy.

BypassValve

Helium HeatingP&ID

32 C

155 kW

19 C

127 C

165 C 150 C

56 C

62 kW

60 kW

24 kW

21 kW

250 psi

270 psi

Kalish 3/25/02

Page 6: NCSX  Helium Bakeout System M. Kalish 3/25/02

Blower With Casing Assembly Retracted

Placing the blower in a pressure vessel allows the helium system to be operated at an elevated pressure without the expense of a sophisticated helium compressor. The elevated pressure is necessary to achieve the mass flow rate required to impart enough heat to NCSX.

Page 7: NCSX  Helium Bakeout System M. Kalish 3/25/02
Page 8: NCSX  Helium Bakeout System M. Kalish 3/25/02

Blower and Motor with housing retracted (NSTX Skid)

Page 9: NCSX  Helium Bakeout System M. Kalish 3/25/02

Front View of Similar NSTX Helium Skid