NC HIGHWAY 421

1
FIG 1 (GEN GW FLOW) 2014-07-25 2014-07-25 H. FRANK S. ARLEDGE PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: KATHY WEBB DATE: DATE: FIGURE 1 GENERALIZED GROUNDWATER FLOW DIRECTIONS 1200 GRAPHIC SCALE (IN FEET) 0 600 300 600 www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 WASTE BOUNDARY 500 ft COMPLIANCE BOUNDARY L.V. SUTTON ENERGY COMPLEX 801 SUTTON POWER PLANT RD WILMINGTON, NORTH CAROLINA LEGEND MONITORING WELL NEW HANOVER CO. PARCEL LINE (APPROXIMATE) MW 21C 197773.53 2306913.73 31.47 29.0 COMPLIANCE BOUNDARY WELL MW 22C 198349.48 2307023.29 20.40 18.0 COMPLIANCE BOUNDARY WELL MW 23C 198972.10 2306903.52 17.94 15.5 COMPLIANCE BOUNDARY WELL MW 24B 200712.12 2306251.09 16.67 13.9 COMPLIANCE BOUNDARY WELL MW 24C 200716.55 2306263.90 16.32 13.7 COMPLIANCE BOUNDARY WELL MW 27B 202585.27 2304679.45 15.59 12.7 COMPLIANCE BOUNDARY WELL MW 28C 197356.57 2307354.09 32.23 29.8 MW 31C 201046.82 2306858.17 18.87 16.2 WELL BEYOND COMPLIANCE BOUNDARY WELL BEYOND COMPLIANCE BOUNDARY MW 22B 198349.05 2307016.96 20.34 17.8 COMPLIANCE BOUNDARY WELL MW 23B 198967.44 2306901.76 17.50 15.3 COMPLIANCE BOUNDARY WELL MW 28B 197368.43 2307359.97 33.07 30.2 WELL BEYOND COMPLIANCE BOUNDARY MW 19 197833.5782 2307041.3442 31.38 28.39 COMPLIANCE BOUNDARY WELL MW 11 MW 12 202542.0838 199646.3130 2306295.0502 2307508.2217 25.37 20.83 22.19 18.47 WELL BEYOND COMPLIANCE BOUNDARY WELL BEYOND COMPLIANCE BOUNDARY MW 5C 205903.1285 2303858.9505 14.35 14.19 BACKGROUND WELL MW 7C 196600.8144 2307567.4378 16.98 16.77 WELL BEYOND COMPLIANCE BOUNDARY MW 4B 194233.8941 2308898.6525 18.09 16.90 BACKGROUND WELL NORTHING EASTING WELL ID MEASURING PT FEET (msl.) GROUND SURFACE FEET (msl.) MONITORING WELLS WELL STATUS MW 32C 197686.22 2307879.04 35.57 33.48 WELL BEYOND COMPLIANCE BOUNDARY MW 33C 197598.34 2308275.70 25.45 22.28 WELL BEYOND COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT MW-11 MW 5C 9.95 MW-12 MW-19 MW-7C MW-23C MW-24B MW-24C MW-27B MW-22C MW-21C MW-28C MW-23B MW-22B MW-28B MW-32C MW-33C MW-4B NC WILDLIFE LAKE ACCESS SUTTON LAKE RD NC HIGHWAY 421 OLD ASH POND AREA NEW ASH POND AREA FORMER ASH DISPOSAL AREA FORMER ASH DISPOSAL AREA CANAL CANAL SOLAR FARM AST CONCRETE PAD CAPE FEAR RIVER SUTTON STEAM PLANT RD SUTTON LAKE RD RAILROAD COOLING POND WATER LEVEL = 9.60 ft PROVIDED BY DUKE ENERGY 06-02-2014 FREDRICKSON RD METRO CIRCLE COOLING POND COOLING POND NC HIGHWAY 421 INTERSTATE 140 (US HIGHWAY 17) TRANSCOM CT BEVEL RD ROYMAC DR FREDRICKSON RD CANAL EZZELL TRUCKING LCH HOLDINGS S. T. WOOTEN CORPORATION INVISTA NEW HANOVER COUNTY SAUNDERS & SAUNDERS, LLC ROYMAC BUSINESS PARK ROYMAC PARTNERSHIP ABSOLUTE PROPERTIES HURRICANE PROPERTIES MAOLA MILK & ICE CREAM CO. MW-11 MW-31C NOTE: 1. CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES. SOURCES: 1. 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2. 2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg 4. NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29. 5. THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 6. PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 7. THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". GENERALIZED GROUNDWATER FLOW DIRECTION (HIGH CONFIDENCE) x SUPPORTED BY GROUNDWATER ELEVATION AND TOPOGRAPHIC DATA

Transcript of NC HIGHWAY 421

Page 1: NC HIGHWAY 421

FIG 1 (GEN GW FLOW)

2014-07-252014-07-25H. FRANK

S. ARLEDGE

PROJECT MANAGER:LAYOUT NAME:

DRAWN BY:CHECKED BY:

KATHY WEBB

DATE:DATE:

FIGURE 1GENERALIZED GROUNDWATER

FLOW DIRECTIONS

1200GRAPHIC SCALE

(IN FEET)

0 600300600

www.synterracorp.com

148 River Street, Suite 220Greenville, South Carolina 29601

864-421-9999

WASTE BOUNDARY500 ft COMPLIANCE BOUNDARY

L.V. SUTTON ENERGY COMPLEX801 SUTTON POWER PLANT RDWILMINGTON, NORTH CAROLINA

LEGENDMONITORING WELL

NEW HANOVER CO. PARCEL LINE (APPROXIMATE)

MW 21C 197773.53 2306913.73 31.47 29.0COMPLIANCE BOUNDARY WELL

MW 22C 198349.48 2307023.29 20.40 18.0COMPLIANCE BOUNDARY WELL

MW 23C 198972.10 2306903.52 17.94 15.5COMPLIANCE BOUNDARY WELLMW 24B 200712.12 2306251.09 16.67 13.9COMPLIANCE BOUNDARY WELLMW 24C 200716.55 2306263.90 16.32 13.7COMPLIANCE BOUNDARY WELLMW 27B 202585.27 2304679.45 15.59 12.7COMPLIANCE BOUNDARY WELL

MW 28C 197356.57 2307354.09 32.23 29.8MW 31C 201046.82 2306858.17 18.87 16.2

WELL BEYOND COMPLIANCE BOUNDARYWELL BEYOND COMPLIANCE BOUNDARY

MW 22B 198349.05 2307016.96 20.34 17.8COMPLIANCE BOUNDARY WELL

MW 23B 198967.44 2306901.76 17.50 15.3COMPLIANCE BOUNDARY WELL

MW 28B 197368.43 2307359.97 33.07 30.2WELL BEYOND COMPLIANCE BOUNDARY

MW 19 197833.5782 2307041.3442 31.38 28.39COMPLIANCE BOUNDARY WELL

MW 11MW 12

202542.0838199646.3130

2306295.05022307508.2217

25.3720.83

22.1918.47

WELL BEYOND COMPLIANCE BOUNDARYWELL BEYOND COMPLIANCE BOUNDARY

MW 5C 205903.1285 2303858.9505 14.35 14.19BACKGROUND WELLMW 7C 196600.8144 2307567.4378 16.98 16.77WELL BEYOND COMPLIANCE BOUNDARY

MW 4B 194233.8941 2308898.6525 18.09 16.90BACKGROUND WELL

NORTHING EASTINGWELL ID MEASURING PTFEET (msl.)

GROUND SURFACEFEET (msl.)

MONITORING WELLS

WELL STATUS

MW 32C 197686.22 2307879.04 35.57 33.48WELL BEYOND COMPLIANCE BOUNDARYMW 33C 197598.34 2308275.70 25.45 22.28WELL BEYOND COMPLIANCE BOUNDARY

DUKE ENERGY PROGRESS SUTTON PLANT

MW-11

MW 5C9.95

MW-12

MW-19

MW-7C

MW-23C

MW-24BMW-24C

MW-27B

MW-22C

MW-21C

MW-28C

MW-23B

MW-22B

MW-28B

MW-32C

MW-33C

MW-4B

NC WILDLIFELAKE ACCESS

SUTTON LAKE RD

NC HIGHWAY 421

OLD ASH POND AREA

NEW ASH POND AREA

FORMER ASH DISPOSAL AREA

FORMER ASHDISPOSAL AREA

CANAL

CANAL

SOLAR FARM

ASTCONCRETEPAD

CAPE FEAR RIVER

SUTTON STEAM PLANT RD

SUTTON LAKE RD

RAILROAD

COOLING POND WATER LEVEL = 9.60 ftPROVIDED BY DUKE ENERGY 06-02-2014

FREDRICKSON RD

METRO CIRCLE

COOLING POND

COOLING POND

NC HIGHWAY 421

INTE

RSTAT

E 14

0 (U

S HIG

HWAY

17)

TRANSCOM CT

BEVEL RD

ROYMAC DR

FREDRICKSON RD

CANAL

EZZELL TRUCKING

LCHHOLDINGS

S. T. WOOTEN CORPORATION

INVISTA

NEW HANOVER COUNTY

SAUNDERS &SAUNDERS, LLC

ROYMACBUSINESSPARK

ROYMAC

PARTNERSHIP

ABSOLUTEPROPERTIES

HURRICANE

PROPERTIES

MAOLA MILK &ICE CREAM CO.

MW-11

MW-31C

NOTE:1. CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE

USED FOR DESIGN OR CONSTRUCTION PURPOSES.

SOURCES:1. 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014

2. 2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATAGATEWAY AT http://datagateway.nrcs.usda.gov/

3. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L.HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING ISTITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELLINSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg

4. NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BYPARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BYPROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICALDATUM IS NGVD29.

5. THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WASBASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC.THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004.FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICALDATUM IS NGV 29.

6. PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AThttp://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY.

7. THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTALEXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA".

GENERALIZED GROUNDWATER FLOW DIRECTION(HIGH CONFIDENCE) SUPPORTED BY GROUNDWATER ELEVATION AND

TOPOGRAPHIC DATA