NBT Presentation - schd.wsschd.ws/hosted_files/internationalrailwaysummit2016/d9/Caroline... ·...
-
Upload
truongkhuong -
Category
Documents
-
view
221 -
download
3
Transcript of NBT Presentation - schd.wsschd.ws/hosted_files/internationalrailwaysummit2016/d9/Caroline... ·...
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 2
Agenda
1. Introduction / HSL Tracks context
2. NBT system presentation
3. Mock-up lab test
4. Construction process
5. Monitoring
6. Test section in Russia
7. Maintenance
8. A thorough qualification process
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 3
1. Introduction / HSL Tracks context
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 4
HSL Context
Concrete tracksBallasted tracks
Construction pace (>1000 meters per day)
Easy alignment modifications
Low CAPEX
Structure life-span below 25 years
High maintenance:
Track geometry corrections (tamping)
Damages caused by flying ballast
Low availability
Low maintenance
Long life duration
High availability
Low construction rate (lower than 200 meters
per day)
High CAPEX
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 5
HSL Context – Customer needs
IMPROVEMENTS ON CONSTRUCTION PHASE
• Higher construction rate
• Smaller footprint
• More flexible schedule
IMPROVEMENTS ON OPEX
• Long life
• Less maintenance
• Less need for renewals
• High availability
• Mixed traffic
• Compatiblity with extreme climatic conditions
Increasing worldwide demand for ballastless tracks (esp. in China)
French consortium to develop a competitive slab-track solution: NBT
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 6
2. NBT system presentation
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 7
Requirements for NBT
Design
• Life-span of the structure: 100 years
• Mixed traffic:
High-speed (up to 360km/h)
Freight (25T/axle)
• Compatibility with any track alignment and S&Cs
• Reduced ground footprint
High construction rate
• Automatised track laying: from 500 m/day/front
Reduced maintenance
• Maintenance of track components is similar to ballasted track
• No corrective maintenance of the structure
• Easy repairs in case of localised structural damages in the structure
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 8
NBT Design – Main components
Structure design based on road experience
2 slipping concrete slabs
Slab track:
• C35/45 reinforced concrete (2.5 m x 0.24 m)• Direct insertion of fastening system with
spacing of 0.6 m
Foundation layer:
• C25/30 concrete (2.8 m x 0.3 m)• Non erodible
Localized transversal joints• 4.8 m • Staggered between slabs• Avoid cracks near fastening system
Consolidated earthwork structure • 120 MPa“Shear key” to ensure
stability in curves
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 9
3. Mock-up lab test
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 10
Real scale mock-up test in lab
1-scale mock-up, 10m long
Both slabs fully instrumented (strain gauges, thermocouples, displacement sensors)
Elastomer mast to simulate the sub-base (~100MPa)
8 cylinder jacks (100 kN each, 5 Hz) to apply static and cyclic loads
Objective: to validate the calculation model and the track’s behavior
2.7 m
2.7 m 4.2 m 2.7 m
Jacks Group V5-
V8
(Upper sight)
2.1
m
0.3
mP=200 KN
Foundation
slab
Slab track
Rail
(Cross
section)
Jacks Group V1-
V4
Elastomer mast: Sylomer (5cm)
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 11
Mock-up loading
10 million cycles of loading were applied during 3 months
Mechanical loading only Mechanical loading combined with thermal cycling
100kN
150kN
175kN
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 12
4. Construction process
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 13
Test section in France – Video
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 14
Construction process
Consolidation of the ground sub-base
to reach a 120MPa bearing capacity
Underground drainage
Foundation slab (unreinforced
concrete) casting with the slipform
machine
Rebars installation
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 15
Construction process
Slab track construction with APPITRACK process:
• Slab casting with slipform machine
• Automatic rail fasteners insertion
Rail installation, then automated final adjustment
High performance construction process from 500m/day
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 16
Construction process
Single turnout installation
• Vossloh-Cogifer TG0.085
• Manual installation: “top-down”
• Locked in direct track position
Compatibility to any track
configuration
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 17
Transition zone with ballast
Characteristics:
• 25m long
• Ballast is contained between walls
• Ballast lies on concrete
• Rigidity rails 30m long
• Under-sleeper pads
• Progressive evolution of the rail
pads stiffness
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 18
5. Monitoring
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 19
Monitoring and results
Operated since Dec. 2013
• Passenger traffic (14T/axle)
• Maximum 110km/h
One-year monitoring
• 150 sensors and optic fiber
• Internal: Accelerations, stresses, thermal
gradients, displacements
• External: Wheel/rail contact force (kN),
weather conditions
Train detection
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 20
Monitoring and results
Deformation
• Good correlation between measures
and calculation
Structure’s behaviour as predicted
• Slabs are independent (no connection)
• No damage observed
Slipping interface is confirmed
Thermal gradients
• Measures: -0,3 à 0,7°C/cm
• Hypothesis: -0,6 à 0,8°C/cm
• Coherent with slabs deformations:
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 21
6. Test section in Russia
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 22
Scherbinka test section (Moscow)
125m test section into VNIIZHT
test ring
Opening on 15th November
2014
2 years testing with heavy load
(600MlnT)
4 solutions tested :
• NBT (Alstom);
• Bögl (prefab);
• LVT (single blocks);
• Tines (Edilon embedded block
system)
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 23
Scherbinka test section (Moscow)
VNIIZHT Certification reports after 100MT, 200MT and 300MT
circulated
No structural damage observed
Test section construction process and service proven
(300MlnT circulated)
23
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 24
7. Maintenance
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 25
Maintenance
Usual track maintenance
• Cracks and joints repairs are possible without impact on traffic
• Maintenance of components (rail and fasteners) is similar to ballast
Structural maintenance• In case of heavy structural
damages, slab replacement is possible: Easy removal of slabs (joints, no
continuous reinforcement) Replacement by precast slabs
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 26
Maintenance
Direct insertion
One level of resilience under
the rail
Friction grip anchorage
Vertical adjustment
• up to 30 mm
• with shims
Lateral adjustment
• Typically +/- 10 to 20 mm
• No additional component needed
High range adjustable direct fastening system
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 27
NBT Competitiveness
CAPEX results
Construction costs:
NBT : + 30% compared to ballasted track
NBT : - 10% compared to Rheda 2000 solution
Possible advantages:
Increased gains on CW thanks to a reduced footprint and track weight
Reduced bridges and tunnels thanks to greater admissible cant
OPEX results:
Maintenance scope restricted to rail and fasteners
Overall cost for NBT < overall cost for ballasted track after around 15 years
of operation
Increase revenue thanks to higher availability of the track
LCC analysis based on a typical HSL project in France
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project.This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
NBT Presentation – IRITS – 25/02/2016 – P 28
8. A thorough qualification process
Achievements:
VNIIZHT Certification (Russia) reports after 100MT
and 200MT circulated on Shcherbinka test section
HSL TSI requirements compliance by CERTIFER
Preliminary certification from SNCF UIC3 @ V160
In progress:
EMC interface, dynamic study
Design improvement of the rail fastening system with
Railtech
German bodies recognition (TÜV, EBA, DB)
Permanent certification from SNCF UIC3 @ V160