Innovation… Leadership… Performance 2007 JSEM Josh Fortenberry (805) 982-4990 Naval Facilities Engineering Command Engineering Service Center aval aval nstallation nstallation estoration estoration nformation nformation olution olution N N I I R R I I S S Navy's Solution for Navy's Solution for Environmental Restoration Environmental Restoration Data Management Data Management

Transcript of Navy's Solution for Environmental Restoration Innovation ...

Innovation…Leadership…

Performance 2007 JSEMJosh Fortenberry (805) 982-4990

Naval Facilities Engineering CommandEngineering Service Center

avalavalnstallationnstallationestorationestorationnformationnformationolutionolution

NNIIRRI I SSNavy's Solution for Navy's Solution for Environmental Restoration Environmental Restoration Data ManagementData Management

2

Acknowledgments

NEDD/NIRIS WorkgroupNAVFAC Information Technology Center

(NITC)

Tetra Tech EMITetra Tech NUS

URSMIJARA

3

Outline

Naval Installation Restoration Information Solution (NIRIS)

•Naval Environmental Restoration (ER) Program•Components of NIRIS•Deployment Schedule•Interoperability / SDS•End User Tools

4

NIRIS

5

NIRIS

•NIRIS:–Naval Facilities Engineering Command

(NAVFAC) enterprise wide solution–Manage Environmental Restoration Program

(ERP) Data•Installation Restoration (Cleanup)•Munitions Response•For Navy, Marine Corps •Supports Base Realignment and Closure (BRAC)

–Provides easy access to quality data

6

NIRIS Vision

• Manage all Navy and Marine Corps ER data

– Environmental sample data– Munitions Response/ Unexploded

Ordnance Data– Administrative Record / Site File

Documents– GIS Facility Maps and IR Site Boundaries– Land Use Control Data

7

Environmental Restoration Program- Need for NIRIS

•Part of DoD ERP (DERP)–About 4500 active sites in Navy–About $300 million per year

•Terra Bytes of data, 100s of users!!–6 regional NAVFAC offices with multiple

contractors working on multipleinstallations that have multiple ER sites with multiplesample locations that can be sampled multiple times, and analyzed various ways with hundreds of analytes reported, and validated...

•How can we manage this???Solution: NIRIS

8

NIRIS Concept

•Central, web based database

•Tools to ensure only quality data gets loaded

•Tools to visualize and analyze data, including GIS

•Interoprable with other enterprise systems

CONTR C

CONTR A

NIRIS

8 regional offices

CONTR B

CONTR D

NAVFAC

Tools

9

NIRIS Vision• Non-proprietary• Navy Marine Corps Intranet (NMCI)

–compliant with DoD Information Technology Security Certification (DITSCAP)

–web-based (Citrix)–no desktop install–Some restrictions on server side

10

NIRIS Database

NIRIS Database

11

5 Components of NIRIS

1)NIRIS database structure• Database for tabular data

–e.g., sample location and type (x, y, z, matrix type )

• Spatial data–e.g., site boundary, survey grid –Automatically updated based on triggers

• Environmental Data Management System for Admin Record, Post Decision, and Site File documents–e.g., PA/SI report, SOW

NIRIS Overview and Update

12

Components continued

2) NIRIS Electronic Data Deliverable (NEDD) tables- 50 Standard data submittal forms e.g., analytical,

pump test, lithology. 3) Administrative tools, instructions and training

- SOPs- RPM Handbook,- NEDD Data Checker/Data Loader

4) End user data analysis and GIS-based visualization tools

- ArcIMS- ArcGIS via Citrix (runs on server, no desktop

installation)

13

Spatial

•Spatial data is managed using:– Oracle 10G Enterprise (10.1.2)

Geodatabase– ESRI ArcSDE (Spatial Database

Engine) V9.1 – Separate schema for each regional

State Plane Coordinate System– All schema use NAD 83

•Identified standard layers for ER

14

15

Components of NIRIS

Tabular SpatialNIRIS Spatial DBNIRIS Database

Audit SchemaX – Y CoordinatesProjectionM&A Schema RefLocation Type

Location_CoordinatesLocation_Alias

NIRIS

Changes Database Link

NW Schema- ER Points

SW Schema- ER Points

NE Schema- ER Points

South Schema- ER Points

LANT Schema- ER Points

PAC Schema- ER Points

Admin Schema SDE SchemaJava & PL/SQL

Procedure: Update, Insert, Delete ER

PointsInfrastructure

Job Scheduler

Doc. Mgmt EDMS

16

Schedule

• Deployment in process•Training planned•Most FECs have legacy data staged•Historic data loading ongoing•Continue to add end user tools

17

Since Last JSEMS

•Migrated Servers to NMCI–Made changes to meet DoD IT security rules

•Central servers tested and ready•Just cleaned out beta test data

•Set up Geospatial components•Geodatabases

•Started work on Environmental Document Management System

18

Interoperability

19

Interoperability

•Key ID fields from other enterprise databases

•Centralized, Uniform database•SDS compliance

–Federal CADD/GIS Center’s Spatial Data Standard

–Not an easy decision: Big commitment, big investment!

• SDS is not normalized (duplication)• Legacy database mapping issues

20

SDS

•SDS compliant at “Experienced” level•Added fields to SDS structures (to make legacy data fit)

•Maximized database query efficiency by minimizing table ‘joins’

•Was partnering with CADD/GIS Center and provided data model to them, continue to work with DISDI

21

Interoperability

Interoperability allows:• Sharing, leveraging of data

– Regional Shore Installation Management System (RSIMS)

– NIRIS provides ER data e.g., IR site boundaries, Land Use Controls

– RSIMS provides base boundaries, buildings– NIRIS does not duplicate data in RSIMS

•Roll up of ER program data– GeoReadiness Repository

•DISDI Portal– Environmental Liabilities reporting

22

End User Tools

End User Tools

23

End User Tools

– Web based e.g., •ArcIMS web based GIS •Citrix

– ArcGIS (customized)– Spatial Analysis and Decision Assistance

(SADA) ver 4– Groundwater Modeling System (GMS)– Surfer

– Formatted data export for desktop based•Excel •EVS•3-d virtual globe viewer (Google Earth, Terraserver)

24

ArcIMS

Last JSEMS demo’d ArcIMS query w/ export to Google Earth

25

Sample

Well

Borehole

Ground Surface

X-SectionX-Section

26

•ArcIMS is primary tool visualize data–Goal is to have it meet 80% of Project Managers needs (ArcIMS for advanced)

•Various Query tools•Buffer•Cross section tool•Well Diagram tool•Map maker tool to create .pdf or .jpg maps

27

EVS

•Desktop application•Pilot demonstrated 3-d modeling to support Conceptual Site Model development for site and data visualization

28

Step 1 Solids Model - Bridgeport Site 4

29

Vadose and Saturated Zone for Site 4

30

TPH as Gasoline in Soil and Groundwater from 1998 through 2005

31

EVS demo

–Successfully used NIRIS and EVS to visualize data

–Did have lessons learned…• required vs. optional data fields i.e., need z/ vertical component of survey data

• Need to know intended use of data when doing the historic data load, can’t just load the easy to load, electronically available data.

32

Questions???

[email protected] IR GIS/Data Management

Workgroup