D espite tough safety issues, McKenney’s successfully installed roof top units along with a chilled water supply and return pipe system at a medical center kitchen. THE CHALLENGE Piping had to be carefully installed through the boiler plant, into a crawl space with asbestos warning labels, up through the floor and across the ceiling of the main switchboard room into the kitchen. New roof top units (RTUs) were very large and heavy. During the RTU installation lift, extreme precision was needed as there was only 18 inches of rigging space clearance. THE SOLUTION The McKenney’s team conducted pre-work hazard analysis and training to keep the job moving and installers safe. McKenney’s, the general contractor and the engineer developed a crane lift plan for the RTUs. Supplemental structural supports were added and equipment was relocated to facilitate a safe installation. THE RESULTS The project was completed safely with mini- mal schedule adjustment or additional costs, giving the medical center owner confidence they had selected the right provider. Navigating Safety Obstacles PROJECT NAME Medical Center Kitchen PROJECT LOCATION Gainesville, Georgia PROJECT TEAM Owner: Medical Center General Contractor: Brasfield & Gorrie Architect: CDH Partners, Inc. Engineer: HPD Engineers, LLC SPECIALIZATIONS Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS Healthcare Hospitality The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Transcript of Navigating Safety Obstacles - Installation of Roof top Units

Page 1: Navigating Safety Obstacles - Installation of Roof top Units

Despite tough safety issues, McKenney’s successfully installed roof top units along with a chilled

water supply and return pipe system at a medical center kitchen.

THE CHALLENGEPiping had to be carefully installed through the boiler plant, into a crawl space with asbestos warning labels, up through the floor and across the ceiling of the main

switchboard room into the kitchen. New roof top units (RTUs) were very large and heavy. During the RTU installation lift, extreme precision was needed as there was only 18 inches of rigging space clearance.

THE SOLUTIONThe McKenney’s team conducted pre-work hazard analysis and training to keep the job moving and installers safe. McKenney’s, the general contractor and the engineer

developed a crane lift plan for the RTUs. Supplemental structural supports were added and equipment was relocated to facilitate a safe installation.

THE RESULTSThe project was completed safely with mini-mal schedule adjustment or additional costs, giving the medical center owner confidence they had selected the right provider.

Navigating Safety ObstaclesPROJECT NAME

� Medical Center Kitchen

PROJECT LOCATION

� Gainesville, Georgia

PROJECT TEAM

� Owner: Medical Center

� General Contractor: Brasfield & Gorrie

� Architect: CDH Partners, Inc.

� Engineer: HPD Engineers, LLC

SPECIALIZATIONS

Pipe Shop Prefab

Sheet Metal Shop Prefab

MARKETS

� Healthcare

� Hospitality

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214