Navigating Project 2010 (OMT II)

48
Navigating Project 2010 By: Jalal Uddin Akbar Shayan Wazir Usman Zafar BBA(HONS) – D , 4 th Semester, OMT II

Transcript of Navigating Project 2010 (OMT II)

Page 1: Navigating Project 2010 (OMT II)

Navigating Project 2010By:Jalal Uddin AkbarShayan WazirUsman Zafar BBA(HONS) – D , 4th Semester, OMT II

Page 2: Navigating Project 2010 (OMT II)

Using the Ribbon• made up of several tabs

• Each tab contains several groups of buttons, separated by vertical gray lines and labeled in gray text at the bottom of the tab.

Page 3: Navigating Project 2010 (OMT II)

Using the Timeline• displayed between the ribbon and the main viewing area

• helpful in communicating your project data with others.

• The timeline can be turned on or off at any time.

• click the View tab and then select or clear the Timeline box in the Split View group to turn the timeline on or off.

Page 4: Navigating Project 2010 (OMT II)

Share the Timeline with Others1. On the Format tab, in the Copy group, click Copy Timeline.

2. Choose whether you want to copy the Timeline For E-mail, For Presentation, or Full Size. The timeline is copied to your clipboard.

3. Paste the Timeline in another application, such as Outlook, Word, or PowerPoint, for sharing with others.

Page 5: Navigating Project 2010 (OMT II)

Views Available in Project 2010Project 2010 provides several different default views, each designed for a unique purpose. The following sections go over each default view:

• Bar Rollup

• Calendar

• Descriptive Network Diagram

Page 6: Navigating Project 2010 (OMT II)

Bar Rollup• The Bar Rollup view is used to display subtasks overlapping summary

tasks on the Gantt Chart.

1. In the Bar Rollup view, double-click a subtask to display the Task Information dialog box.

2. On the General tab, select the Rollup check box

3. Click OK. The subtask bar now appears overlapped on its summary task bar on the Gantt chart.

Page 7: Navigating Project 2010 (OMT II)
Page 8: Navigating Project 2010 (OMT II)
Page 9: Navigating Project 2010 (OMT II)

Calendar• displays your project’s tasks as overlays in a standard calendar

format.

• enables you to jump between viewing a month, a week, or a custom span of weeks or dates.

• Click Month, Week, or Custom, above the calendar, to change what dates the Calendar view displays.

Set a Custom Calendar Period:1. In the Calendar view, click Custom, above the calendar.

2. On the Zoom dialog box, choose whether you want to display a certain number of weeks, or a specific date range, using the options.

3. Click OK. The calendar is updated to display the period you specified.

Page 10: Navigating Project 2010 (OMT II)
Page 11: Navigating Project 2010 (OMT II)
Page 12: Navigating Project 2010 (OMT II)

Descriptive Network Diagram• Descriptive Network Diagram view displays boxes for each task in

your project

• boxes are connected using arrows

• arrows show dependencies between the tasks

• Tasks on the critical path are highlighted in red

Page 13: Navigating Project 2010 (OMT II)
Page 14: Navigating Project 2010 (OMT II)

Detail Gantt• helps to highlight how much a task can be delayed before other task

dates are impacted

• shows the critical path using red bars on the Gantt chart.

Page 15: Navigating Project 2010 (OMT II)
Page 16: Navigating Project 2010 (OMT II)

Gantt Chart• probably the most-used view in Project 2010

• It lists the project’s tasks on the left portion of the view

• Displays coordinating bars across a timeline on the right portion of the view

Page 17: Navigating Project 2010 (OMT II)
Page 18: Navigating Project 2010 (OMT II)

Gantt with Timeline• The Gantt with Timeline view is a split view

• displays the Timeline view in the top pane and the Gantt Chart view in the bottom pane

Page 19: Navigating Project 2010 (OMT II)
Page 20: Navigating Project 2010 (OMT II)

Leveling Gantt• shows how the tasks in your project will be affected if you use the

resource-leveling feature in Project 2010

Page 21: Navigating Project 2010 (OMT II)

Milestone Data Rollup• to view your project’s summary tasks on the Gantt chart, with labels

for milestones and dates.

• will only display milestones and dates on the summary task Gantt bar if the subtasks are set to roll up to the summary task

• Refer to the section, “Roll Up a Subtask,” for information on how to roll subtasks up to the summary task level

Page 22: Navigating Project 2010 (OMT II)
Page 23: Navigating Project 2010 (OMT II)

Milestone Rollup• to view your project’s summary tasks on the Gantt chart, with labels

for milestones.

• The Milestone Rollup view will only display milestones on the summary task Gantt bar if the subtasks are set to roll up to the summary task

• Refer to the section, “Roll Up a Subtask,” for information on how to roll subtasks up to the summary task level

Page 24: Navigating Project 2010 (OMT II)
Page 25: Navigating Project 2010 (OMT II)

Multiple Baselines Gantt• displays the dates saved as Baseline, Baseline 1, and Baseline 2,

using different colored Gantt bars on the right portion of the view.

Page 26: Navigating Project 2010 (OMT II)

Network Diagram• displays boxes for each task in your project

• the boxes are connected using arrows that show dependencies between the tasks

• Tasks on the critical path are highlighted in red

• This view may come in handy when you need an illustrated look at how tasks in your project are connected

Page 27: Navigating Project 2010 (OMT II)
Page 28: Navigating Project 2010 (OMT II)

Resource Allocation• displaying the Resource Usage view in the top pane and the Leveling

Gantt view in the bottom pane.

Page 29: Navigating Project 2010 (OMT II)

Resource Form• enables you to view or enter detailed information about each of your

project’s resources individually.

Page 30: Navigating Project 2010 (OMT II)

Resource Graph• displays a bar graph for each resource assigned to at least one task in

your project

• The bar graph illustrates allocation, availability, cost, and work details throughout the project’s life cycle.

Page 31: Navigating Project 2010 (OMT II)
Page 32: Navigating Project 2010 (OMT II)

Resource Name Form• enables you to view or enter basic information about each of your

project’s resources individually

Page 33: Navigating Project 2010 (OMT II)

Resource Usage• displays task assignments for each resource on the left portion of the

view

• the work or cost information about the task assignments over time in the right portion of the view

Page 34: Navigating Project 2010 (OMT II)
Page 35: Navigating Project 2010 (OMT II)

Task Details Form• enables you to view or enter detailed information about each of your

project’s tasks individually

Page 36: Navigating Project 2010 (OMT II)

Task Entry• displaying the Gantt Chart view in the top pane and the Task Form

view in the bottom pane

Page 37: Navigating Project 2010 (OMT II)

Task Form• enables you to view or enter basic information about each of your

project’s tasks individually.

Page 38: Navigating Project 2010 (OMT II)

Task Name Form• to view or enter a single task’s assigned resources, predecessors, and

successors.

Page 39: Navigating Project 2010 (OMT II)

Task Sheet• enables you to view or enter task information without simultaneously

viewing the Gantt chart.

Page 40: Navigating Project 2010 (OMT II)

Task Usage• displays assigned resources for each task on the left portion of the

view

• the work or cost information about the resource assignments over time in the right portion of the view

Page 41: Navigating Project 2010 (OMT II)
Page 42: Navigating Project 2010 (OMT II)

Team Planner• provides a visual representation of what the resources in your project

are working on, throughout your project’s life cycle

• You can drag task assignments between resources to adjust for over allocation or free up some of a resource’s time to make room for other work

Page 43: Navigating Project 2010 (OMT II)
Page 44: Navigating Project 2010 (OMT II)

Timeline• illustrates your project’s tasks and dates using a traditional timeline

format.

• It can be customized to display certain tasks as callouts on the timeline, and it can be printed or copied into other applications.

Page 45: Navigating Project 2010 (OMT II)
Page 46: Navigating Project 2010 (OMT II)

Tracking Gantt• displays Gantt bars for the baseline dates and the current schedule for

each of your project’s tasks.

• This enables you to quickly see how well your project is tracking to your baseline dates.

Page 47: Navigating Project 2010 (OMT II)
Page 48: Navigating Project 2010 (OMT II)