Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an...
-
Upload
bernadette-day -
Category
Documents
-
view
214 -
download
1
Transcript of Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an...
1
Naval Inventory Control Point
F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry partnerships, risk management and shared accountability.
Awarded May 01
Features:•Guaranteed response time•Teaming arrangement with three NADEPs•Reliability improvements-targeted at 10%•Streamlined configuration control and obsolescence mgmt•Industry support for E/F peculiar WRAs, lower assemblies and piece-
parts•Reduced cycle time•Reduced cost of ownership•Integrated funding streams
F/A-18 E/F FIRST
Awarded PBLs
2
Naval Inventory Control Point
Awarded PBLs
E-2 Mission Computer
• $16M obs over 5 years• Contractor will manage
piece part inventory• Guaranteed availability
2 days • reliability guarantee of
10,000 hours MTBF (15 year warranty, 5 years priced, 2 other 5 year periods are options
• loaner spares clause if reliability is not met
Aircraft Tires
• $266M obs over 15 years
• 23 types...17 platforms
• Inv mgmt / warehousing transportation
• Guaranteed availability 95% in 2 days CONUS / 4 days OCONUS
• First performance review… filled over 8000 reqn… 96.43% availability!
Aviation Successes
• $66M obs over 8 years
• Inv mgmt/warehousing
• Obsolescence mgmt
• Contractor manages wholesale (forward- positioned) ship stock
• Guaranteed availability 90% in 5 days…ipg1s in 2 days
F-14 Night Target System
3
Naval Inventory Control Point
Awarded PBLs
50 Person Life Raft
• $6.6M Obs over 5 years
• COTS replacement for MILSPEC item
• Vendor owned inventory
• Commercial technology
• Replacement for MK 6 25-Person Life Raft (2:1)
• Over 50% cost avoidance for CV/CVNs
•4-year base contract w/ one 4-year option; $33.5M for 4-year base
•1600 line items; Transitioned from a Mini Stock Point to Full PBL; minimum fill rate of 87% …
•Contractor Responsibilities: material requirements determination, requisition support, CONUS transportation and tracking, Class II ECP authority
AEGIS Spy 1 Radar ARC-210 Radio
• $35.9M Obs Over 5 Years
• Inv Mgmt/warehousing
• Config/Obsolescence Mgmt...MTBF Guarantees… Growth Incentivized
• Guaranteed Availability 85%/90% with Incentives… 2 Days Pri 1-3...5 Days Pri 4-15
4
Naval Inventory Control Point
PBLs on the HorizonFY03 Outlook - Aviation
Good to GoSE EWSE 11/02 F/A-18 Displays 12/02 H-60 Tip-to-Tail 6/03
CommonTCAS 11/02 Engines F404 12/02 H-46 APU 6/03EA-6b Tailpipes11/02 H-60 Dynamic 3/03 H-53 APU 6/03H-60 FLIR 12/02 Components
Promising – FY03
P-3 EDC EA-6B Jax Hydraulics Common APR-39A v2SE RSTS Engines T58/64 Fuel Ctrls EA-6B ASW-40/41H-46 Rotor Head Engines F404-400 Fuel Ctrl Engines F404-402 Fuel CtrlEngines T400 Fuel Ctrl P-3 APS-137B AV-8B HISSP-3 AIP F/A-18 Flight Surfaces F/A-18 LEF Wingfold
More to Do
Engines F414 GILS V-22 Tip-to-Tail EA-6B ICAPIII/TJSR Engines J52
5
Naval Inventory Control Point
• PBL Features – 116 NIINs ... –400 / -402 series – Availability / reliability incentives– 20% surge requirement– 5 year base
• J&A at ASN awaiting approval• Next Steps
– Finalize BCA– Complete PWS– Alpha contracting ... Targeting Dec '02 Award
F404 7R Components
Next step ...Consumables for
I-level / whole engine repair
PBLs on the Horizon
Driving towards Time On Wing (TOW) Metric
6
Naval Inventory Control Point
Avionics Dynamic Components Tip-to-Tail- Lockheed Martin - Sikorsky - MHSCo- 42 Avionics - 14 major dynamic - 1331 total
components components components- Awarded May 02 - Est. award Oct 02 - Est. award Dec 02- $5M contract - $150M contract - $1.3B contract- Guaranteed - Guaranteed - Guaranteed response time response time response time- Obsolescence - Obsolescence - Obsolescence
Management Management Management - Firm-fixed price per - Firm-fixed price per
flying hour flying hour - Guaranteed reliability
improvements
PBLs on the Horizon
H-60 PBL Evolution
7
Naval Inventory Control Point
PBL Lessons Learned
Target new systems– Reduce initial inventory investments
Make deals attractive to industry– Long term agreements w/ incentives
Streamline the negotiation process– Deals significantly more complex than traditional
contracts
Strike the right arrangement– Specific response time / reliability goals by system
Consider Title 10 upfront– Depot partnerships can be "Win-Win"
Tie profit to performance
Each deal is handcrafted
8
Naval Inventory Control Point
Take-Aways
• NAVICP is teaming with Industry, NAVICP is teaming with Industry, Systems Commands and Fleet Systems Commands and Fleet customers to develop innovative customers to develop innovative support alternatives.support alternatives.
• NAVICP is making significant NAVICP is making significant investments of NWCF and personnel investments of NWCF and personnel to accomplish this goal.to accomplish this goal.
• PBLs… Procuring the performance PBLs… Procuring the performance end state, not the how toend state, not the how to