Nauticus Project – Teamwork Counts
Management of Shipbuilding Projects
April 2012
Richard Tao Maritime Advisory / Norway
© Det Norske Veritas Ltda. Todos os direitos reservados.
Main Characteristics Developed in 2004 as Nauticus Construction, focused on shipbuilders.
Renamed in 2011 to Nauticus Project, reflecting broad coverage to shipowners, designers, etc.
Fully Internet based (software, database and document files stored in DNV/Norway servers). No need for IT homologation, no deployement.
Special version for shipyards (software and database in DNV/Norway, document files stored in the shipyard server). No need for renaming document files, renumbering of documents, etc.
Indepency from shipbuilder, classification society, shipdesigner, etc.
Can be fully downloaded for read-only at end of project.
Slide 2
The stroke of genius behind NP is not just its simplicity and flexibility but also its shift of focus towards deliverables. The project breakdown structure atomizes the project into manageable deliverables. A project based on such tangible deliverables is far easier to manage than one based on activities alone. It allows one to be precise about what has to be delivered and helps track progress in a concrete way.
© Det Norske Veritas Ltda. Todos os direitos reservados.
3
Newbuilding Dept.
Finance Charterers
Classification
Vendors
Shipyards
Site teams
Owners
The Newbuilding Departments’ Headache
Designer
© Det Norske Veritas Ltda. Todos os direitos reservados.
4
Describe how you will: - Standardise construction survey procedures - Support information pooling and analysis - Improve process efficiency - Simplify the plan, review and approval process - Handle Non-conformities - Control Change Orders - Track vendors - Ensure requirements compliance
Describe your Quality Control System - How will you implement a real-time process management and control system
using an extranet.
Charterer’s Requirements
© Det Norske Veritas Ltda. Todos os direitos reservados.
Shipbuilding is a Process !
Slide 5
© Det Norske Veritas Ltda. Todos os direitos reservados.
6
The Site Team’s Work is a Process
Request for inspection
Application form from QC Dept.
Ready for
inspection ?
owner’s inspection
Yes
Standards Rules
No
Corrective action taken by the Yard
Update owner’s files • Technical Documentation • Manufacturers’ manuals • Contract specification • Previous surveys comments • Inspection report
• Computer database
Inspection
result
Yes
No
• NDT reports • Survey status of subassembly • Tech, doc. • Measurement reports • Inspection plan
Change Item status to “accepted”
Owner’s inspection process
• INspection report + comments • Computer database
END
Check status
© Det Norske Veritas Ltda. Todos os direitos reservados.
7
Documenting and Supporting the Process
The vessel
Top level folder
Item (Blocks, Tanks, Zones, Components, document etc.)
Folder (Any number of sub-levels)
Activities
Comments/Observations
Attachments (Drawings , approval letters, photographs etc.)
Not started In Progress Accepted
Not Accepted
Not started In Progress Accepted
Not Accepted
© Det Norske Veritas Ltda. Todos os direitos reservados.
8
Fabrication Block
Item Activity Comments
Nauticus Project Fundamental Structure
File attachments File attachments
© Det Norske Veritas Ltda. Todos os direitos reservados.
11
Activity Status Detail
Project model
breakdown
Activity statistics
Activity list
Coment list
Attached documents
© Det Norske Veritas Ltda. Todos os direitos reservados.
12
The Site Team’s Work is a Process
Request for inspection
Application form from QC Dept.
Ready for
inspection ?
owner’s inspection
Yes
Standards Rules
No
Corrective action taken by the Yard
Update owner’s files • Technical Documentation • Manufacturers’ manuals • Contract specification • Previous surveys comments • Inspection report
• Computer database
Inspection
result
Yes
No
• NDT reports • Survey status of subassembly • Tech, doc. • Measurement reports • Inspection plan
Change Item status to “accepted”
Owner’s inspection process
• INspection report + comments • Computer database
END
Check status
© Det Norske Veritas Ltda. Todos os direitos reservados.
13
© Det Norske Veritas Ltda. Todos os direitos reservados.
14
Weekly Activity Chart
Weekly Statistics
© Det Norske Veritas Ltda. Todos os direitos reservados.
15
Progress Chart
© Det Norske Veritas Ltda. Todos os direitos reservados.
16
Activity Overview
© Det Norske Veritas Ltda. Todos os direitos reservados.
17
NP Gives Simple Product Life Cycle Support
Project definition
Design Approval
Building
Delivery
Operation
Vendor Prequalificatio
n
Make available approval comments in the building phase to assure vessel is built to correct design
Important Hull, Paint and Outfitting - comments can be made available to the guarantee and operational phase to facilitate experience feeback.
Define and track process; store results for future projects
Documents and status immediately available on completion of project
Experience Feedback to new projects, hull maintenance, conversions
Visualise the complete project in a tree structure
© Det Norske Veritas Ltda. Todos os direitos reservados.
18
A Completed Project – All Lights Are Green !
© Det Norske Veritas Ltda. Todos os direitos reservados.
19
Well Structured But Not Fully Checked Out
© Det Norske Veritas Ltda. Todos os direitos reservados.
20
Typical Progress Chart – Shows Lag
© Det Norske Veritas Ltda. Todos os direitos reservados.
21
Typical Activity Chart – Only Shows Completed Tasks
© Det Norske Veritas Ltda. Todos os direitos reservados.
22
Typical Overview Chart – Very Useful for Filtering
© Det Norske Veritas Ltda. Todos os direitos reservados.
A Typical Projects – Bulk Carrier
23
© Det Norske Veritas Ltda. Todos os direitos reservados.
Typical Project – SFI Coded
24
© Det Norske Veritas Ltda. Todos os direitos reservados.
Typical Project – Multi-Discipline Approval
25
© Det Norske Veritas Ltda. Todos os direitos reservados.
26
Typical Project – Simple Offshore Project
© Det Norske Veritas Ltda. Todos os direitos reservados.
27
Typical Project – FPSO Project
© Det Norske Veritas Ltda. Todos os direitos reservados.
Some Nauticus Project (or Construction) Customers
Slide 28
© Det Norske Veritas Ltda. Todos os direitos reservados.
Slide 29 Slide 29
João Henrique VOLPINI Mattos Engenheiro Naval DNV Software - Maritime & Offshore Solutions Regional Sales Manager – South America [email protected] +55 21 3722 7337 +55 21 8132 8927
Salvaguardando a vida, a propriedade e o meio ambiente
Dúvidas
www.dnv.com.br