National Town Hall Meeting on Demand Response and Smart Grid

8
© 2005 San Diego Gas and Electric. All copyright and trademark rights reserved. 9 National Town Hall Meeting on Demand Response and Smart Grid Mark Gaines Director Customer Programs

description

National Town Hall Meeting on Demand Response and Smart Grid. 9. Mark Gaines Director Customer Programs SDG&E and SoCalGas. Application Summary Smart Meters to be installed 1.2 million electric meters 900,000 gas meters Cost/Benefits Cost = $576 million Benefits = $724 million - PowerPoint PPT Presentation

Transcript of National Town Hall Meeting on Demand Response and Smart Grid

Page 1: National Town Hall Meeting on Demand Response and Smart Grid

© 2005 San Diego Gas and Electric. All copyright and trademark rights reserved.

9

National Town Hall Meeting

on Demand Response and Smart Grid

Mark Gaines

Director Customer Programs

SDG&E and SoCalGas

Page 2: National Town Hall Meeting on Demand Response and Smart Grid

2

California

Southern California Gas Company

San Diego Gas & Electric

Application Summary • Smart Meters to be installed

• 1.2 million electric meters

• 900,000 gas meters

• Cost/Benefits

• Cost = $576 million

• Benefits = $724 million

• 55% from operational improvements

• 45% from demand response benefits

• Demand Response Proposal

• C/I customers > 20 kW – CPP default rate

• C/I customers < 20 kW – Peak Time Rebate (PTR)

• 57,000 Thermostats for small C/I

• Res customers - PTR

SDG&E’s Smart Meter Program

Page 3: National Town Hall Meeting on Demand Response and Smart Grid

3

SDG&E’s Smart Meter Program

Implementation Status

• Meter installation:• 40,000 installed to date

• 200,000 expected by year end

• Full deployment by 5/1/2011

• DR Rates:• 1,750 C/I customers > 200 kW

• Defaulted to CPP in May 2008

• 75% chose to stay on CPP

• 20,000 C/I customers > 20 kW

• Will be defaulted to CPP in 2011

• 1.2 million PTR customers will be eligible in 2011

• $.75/kWh rebate w/o automated controls

• $1.25/kWh rebate w automated controls

World Famous

Sea World

Page 4: National Town Hall Meeting on Demand Response and Smart Grid

4

SDG&E Smart Meter Program

Challenges:• Rate Challenges:

• Communicating CPP for > 200 kW

• 1 year bill protection between CPP and TOU

• On-line rate comparison available

• Averaged 1 hour for Account Executives to explain rate to customers

• CPP for > 20 kW C/I customers (20,000 customers w/o Account Executives)

• Rate design will be simpler (lower CPP rate)

• 12 month data available before CPP rate offered

• 1 year bill protection between CPP and TOU

Time Rate (c/kWh)

Off-peak 6

Semi On-peak

8

On-peak 10

Critical Peak 107

World Famous

San Diego Wild Animal Park

Page 5: National Town Hall Meeting on Demand Response and Smart Grid

5

SDG&E Smart Meter Program

Challenges:• IT System Challenges:

• Highly complex “spider web” of new systems and system integrations

• Data collection

• Billing

• Data reporting

• Rate comparison

• Bill presentation

• Some implementation delayed

• Additional delays possible

Gaslamp District

Page 6: National Town Hall Meeting on Demand Response and Smart Grid

6

SDG&E Smart Meter Program

AMI Solution Architecture – Phase 0

Updated: 12/27/06Version: Draft 0.11

Data Warehouse

Mainframe Messaging

Interface (MMI)

LEGENDExisting SDG&E Systems

CIS

Meter/DR Data Comm.

Mobile Workforce Management

Outage Management

Meter Asset Management

GIS

Planning and Engineering Existing Integration or Planned outside of the AMI Project

Wave 1 – Meter Installation Support Application Development and Integration (March, 2007 – July, 2008)

Wave 2 – Billing & Remaining AMI Functionality Application Development and Integration (January, 2008 {estimate} – January, 2009)

Interface taken off the scope as the result of Phase 0 analysis.

Pending interface, needs verification from business process workshop and final business case decisions.

System System or Integration Removed at Full AMI Deployment

Customer Portals

Meter Data Management System

System

Meter Data Management System (MDMS)

Hand-HeldMeter Reads

MRMS

Customer Information System (CISCO)

ODS

MV90 (Itron)

Meter Reads

Meter Reads for Billing

Interval Data

Mobile Workforce Mgmt SORT (MDSI)

AMIData Collection /

Head-end System(s)

Meter Inventory Management

(SAP)

I22: As-Installed Meter/

Service Point Relationship

Outage Management

System (OMS)

I25: Outage Verification Request

I27: Restoration Verification RequestI26: Outage Verification Response

I28: Restoration Verification Response

Trouble Call & Outage

Info

OutageWork Orders

I21: Field Work Orders

I23: AMI Network - Field Order Request

I24: AMI Network - Field Order Information

I46: Meter Reads & Interval Data

I4: Meters for Daily Billing Response

AMI InstallationVendor

I41: Read Request, Meter Status Ping, etc.

I 30 : As- builtDi st ri buti on

Net work

I 31: AMI

Net wor k Dat a

I 3: Met er s f or Dail y Billi ng Request s

I6: Reads Edited for Billing

I 5: Off - Cy cl e Reads, Rebat es/ Re bill sRequest

I2: Data Synchronization (acct, meter, configuration,

service pt, svc agreement, transformer connectivity, bill date com

mencement)

Engineering Data (EDW)

I32: Virtual Meter

Points

I 33: Vi rt ual Met er

Load

I11: Customer

Enrollment in DR

I12: Customer

DR Activity

I8: Virtual Connect/DisconnectI9: Consum

ption Warnings

I10: Meter Energy Theft PW

Q

I51: Meter Reads for Billing

Meter Reads

I17: Bulk Meter Install Update

Data Warehouse

Meter Read Data Mart

I37:

Mete

r Rea

ds &

Int

erval

Data

I38: M

eter R

eads

&

Interva

l Data

I 39: Cust omer Ener gy Usa ge

& Hi st or y

Meter Reads & Interval

Data

I16: Meter Install Service Orders

I1:Meter Routes

I7: Manual Meter Reads & Consumptions

System Future Considerations

I50: Meter R

outes

I45: Meter Read RequestI44: Meter Reads & Interval Data

I43: Meter Routes

I13: Remote Connect/Disconnect

Demand Response

Control Applications

I40: See AMI Information System RFP

(DR/Demand Enabling System

Signaling and Response)

Portal(AMI Customer

Online Presentment & Bill Analysis)

I47: Customer Data

Meter Reads & Interval Data

kWickview

I42: Meter Read Request

I19: 3rd Party Sample Meter Test DataAMI Technology VendorI20: Manufacturer Meter Test Data

& ASN

AMITechnology

Vendor

LSGISGeo Facility

Mgmt System GFMS (Enghouse)

I29: AMI NetworkInstallation Details

DemandResponse

CRM (SAP)

I 54: Cust om

erDR Updat es

Networkmapping

ATDI

AMI InstallationVendor

I18: Meter Receipt Data

I49:

Mete

r Co

nfigu

rat io

n

I48: M

eter In

stalla

tion

Update

s

X

X

IN5: DR Events

IN4:DR Event Results

IN3:Meter Asset Events

GFMSmdt

I N9: Met e r t o be

i nst all ed

IN2: M

eter Status ResponseIN1: M

eter Status Request

MDMA

Meter Reads

IDS

Scheduler I5a: Off-Cycle Reads, Rebates/RebillsResponse

Scheduler

Weather Data Service

(Itron)

IN10: Weather Data

IN11: M

eter Order Status

XX

Customer Data (CDW)

IN7: AMI Network Asset

I40a

: DR

cont

r ol

and r

esult

s

X

?

?

?

X

?

X

?

MDMA

IN12

: Mete

r Rea

ds

XXI41a: Meter Reads,

Meter & Network Data & Alarms, etc.)

IN13: Virtual Meter

Point

IN14: Virtual Meter

Load

X

Geo Facility Mgmt System GFMS

(Enghouse)I31a: AMI Network

?

I 39a: Cust omer Energy Usage

Pr ofil e & Anal ysi s

I47a: Billing Data

IN12a

: Mete

r Rea

ds

IN6:

Outag

e Notif

ication

Outage Filter

IN6a: Outage Notification

AMI Head-End

IN15: Meter, Configuration

Challenges:• IT System Challenges:

Page 7: National Town Hall Meeting on Demand Response and Smart Grid

7

SDG&E Smart Meter Program

Lessons learned to date:• Need 1 person to develop optimal rate design

• Objective: Send proper price signals

• Need 2 people to develop optimal marketing campaign• Objective: Educate/communicate with res and non-res

customers

• Need 1000+ people to develop IT systems• Objective: Just make it work!

World Famous

Torrey Pines Golf Course

Page 8: National Town Hall Meeting on Demand Response and Smart Grid

8

Questions?