INSTALLED CAPACITY

NORTHERN :- 53.7 GW

EASTERN :- 26.3 GW

SOUTHERN :- 52.8 GW

WESTERN :- 64.4 GW

NORTH-EASTERN :- 2.45 GW

TOTAL 200 GW

REGIONAL

GRIDS

Total 3,287,263 sq. km area

More than 1 Billion people

SOUTHERN

REGION

WESTERN

REGION

EASTERN

REGION

NORTHERN

REGIONNORTH-

EASTERN

REGION

REGIONAL

GRIDS

Area : 1010,000 SQ KMS

Population : 330 Million

Peak Demand : 41 GW

Max energy Consumption:280 BU

Area : 951470 SQ KMS

Population : 244 Million

Peak Demand : 42.4 GW

Max energy consumption :288 BU

Area : 636280 SQ KMS

Population : 232 Million

Peak Demand : 37.2 GW

Max energy consumption :250BU

Area : 433680 SQ KMS

Population : 240 Million

Peak Demand : 17.2 GW

Max energy consumption:105BU

Area : 255,090 SQ KMS

Population : 40 Million

Peak Demand : 2.2GW

Max energy consumption : 11BU

Total 3,287,263 sq. km area

More than 1 Billion people

Peak Demand: 136 GW

Energy Requirement :

934BU

NLDC:

Ensure integrated operation of

National Grid

RLDC:

Ensure integrated operation of

Regional Grid

SLDC:

Ensure integrated operation of State

Grid31

5

Power System Hierarchy

NEW Grid

SouthGrid

South

West

North

East

Northeast

Five Regional Grids

Five Frequencies

October 1991

East and Northeast

synchronized

March 2003

West synchronized

With East & Northeast

August 2006

North synchronized

With Central Grid

Central Grid

Five Regional Grids

Two Frequencies

Renewable: 24.5 GW

Installed Capacity: 200 GW

SR Synch

By 2013-14

Inter – Regional

Capacity:

27.95 GW

• 765kV/400kV lines: about

1,11,000 ckm

• 220kV lines: about 135,000

ckm

• HVDC Bipole (±500kV): 8900

ckms – 4 nos.

• HVDC Back-to-back: 7 nos.

(3000MW)

Transmission Network - Present

National Grid – A Continuing Process

National Grid – Present

Inter-regional Capacity –

27,950MW

Need of new initiatives in Transmission

Projected Power Scenario

** Source- Planning commission report on IEP

Present Generation Capacity & Demand - 200 GW & 136 GW

# Considering 9% GDP growth rate

205GW

Coal – In Central India

‾ Chhattisgarh : 58000 MW

‾ Orissa : 30000 MW

‾ Jharkhand : 15000 MW

‾ Madhya Pradesh:16000 MW

Hydro – In North Eastern &

Northern Himalayan region

Coastal based

‾ Andhra Pradesh: 24000 MW

‾ Tamil Nadu : 10000 MW

‾ Gujarat : 11000 MW

Expected Installed Capacity (2025) : 6,00,000MW

Lara

Expected Generating Stations - 2025

Partabpur

Talcher/Ib Valley

Krishnapatnam

NEPAL

KorbaBhopalIndore

Tadri

Girye

Kaiga

Thiruvananthapuram

Pipavav

Kudankulam

SR

Bangalore

Kayamkulam

WR

Tarapur

Mumbai

Cuddalore

Ennore

Akaltara

Raipur

Hyderabad

RAPP

Gandhinagar

Mudra

Delhi

Ludhiana

NR

Jaipur

Jammu

Sasan

Vindhyachal

Lucknow

Load Centre Based Generation

Ultra-Mega Generation

Hydro Based Generation

Coastal Generation

Coal Based generation

Nuclear generation

BhubaneswarDarlipali

Vizag

Simhadri

LEGEND

Load-Centre

NERGuwahati

Koderma

SIKKIM

Kolkata

ER

PatnaNECK

CHICKEN

BHUTAN

DESHBANGLA

MY

AN

MM

AR

Mangalore

KozhikodeSouth MadrasChennai

Energy resources (coal, water etc.) unevenly distributed

Energy Resources Map

Need of new initiatives in Transmission

Increased role of ISTS power transfer

Need of long distance Transmission system

Minimum use of land and Right-of-Way

Optimal cost per MW transmission

Optimal Transmission Losses

Adequate margin – to cater trading, contingencies

Implementation – Equipment availability, manpower

Future Transmission Planning

- Consideration

Change in Generation Profile

Central Sector State Sector Private Sector Total

21222 (34%) 21355(34%) 19797(32%) 62374

28600 (28%) 14400(15%) 57000 (57%) 100000

XI

XII

Development Plan

Road Map for Indian Power System

• Creation of 11 no. High Capacity Trans. Corridors for 55

IPPs (55,000 MW)

• Ultra Trans. System for 6 UMPPs (24000MW)

• Transmission system for DVC generation projects

(5000MW)

• Transmission system for Evacuation of power from

NER & Bhutan

Few Major Transmission Projects

Proposed 11 nos. High Capacity Transmission Corridors for

IPP Projects

Sl. No. Cluster/Corridor No. of IPPs Installed Capacity

(MW)

LTOA Granted (MW)

1 Orissa 7 10090 6080

2. Jharkhand 5 4540 4084

3, Sikkim 9 2358 2358

4 Bilaspur+MP 6 4370 4160

5. Chattisagrh 13 15485 15185

6. Krishnapatnam 4 4600 3072

7. Tuticorin 2 2600 2045

8. Srikakulam 2 3960 3760

9. Cuddlore/Nagapattinam 3 3570 2987

10. Vemagiri 4 5400 5150

11. Common Transmission

system in WR and NR

Total 55 56973 48881

Transmission Corridors for IPPs

High Capacity Transmission Corridor

NEYVELI

RAICHUR

RAMAGUNDAM

VIJAYAWADA

CHANDRAPUR

KORADI

KORBAKORBA(W)

VINDHYACHAL

SATPURA

RIHAND

ANPARA OBRA

RENGALI

FARAKKA

KAHAL-

TALCHER

MUNIRABAD

N'SAGAR

URI

MAITHON

MADRAS

TEHRI

DHAULIGANGA

CHAMERA

N.JHAKRI

AURAIYA

KAIGA

MADURAI

UDUMALPET TRICHY

SALEM

BANGALORE

CUDDAPAH

GOOTY

HYDERABAD

GAZUWAKA

ASOJ

DHULE

BHILAI

ITARSI

JAIPUR

KANPUR

LUCKNOW

JEYPORE

J

JEERAT

DURGAPUR

NORTH TRICHUR

KISHENPUR

WAGOORA

MOGA

BHIWANI

BIHAR-

KHAMMAM

BAREILLY

HISSAR

NALLAGARH

PANIPAT

MALERKOTLA

DEHGAM

INDRAVATI

DADRI

JAMSHEDPUR

PROPOSED HIGH CAPACITY TRANSMISSION

LEGEND

BALLABGARH

BAWANA

MURADNAGAR

MANDAULAMEERUT

BASSI(RSEB)

PANKI

JALANDHAR

IIIII

GANDHAR

STPS

DULHASTI

PAMPORE

SALALI&II

JAMMU

SARNAHAMIRPUR

SIUL

PONG

RAPP-B

ANTA

DAUSA

CHITTORGARH

UDAIPUR

KOLAR

BAHOOR

KAYAMKULAM

PALLOM

EDAMON

KOLASIBAGARTALA

AGARTALA GPP

MALDA

KUMARGHAT

BADARPUR IMPHAL

JIRIBAM

AIZWAL

ZEMABAWK

HAFLONG

LOKTAK

KAMENG

RAMMAM

SILIGURI

PURNEA

KHLIEHRIAT

CHUKHA

BONGAIGAON BIRPARA

DALKHOLA

SAMAGURI

BALIPARA

TEZPUR

KOPILI DIMAPUR

DOYANG

MARIANI

ITANAGAR

KHANDONG

MISA

RANGANADI

GOHPUR

ZIRO

DEOMALI

KATHALGURI

KAKRAPAR

BHARUCH

KAWAS

NAVSARIVALTHAN

NAGDA

VAPI

HOSUR

SHARIF

MERAMUNDALI

BARIPADA

STPS

KOLAGHAT

ALLAHABAD

SINGRAULI

LUDHIANA PATIALA

KAITHAL

BUDHI-PADAR

NELLORE

KURNOOLNARENDRA

KOLHAPUR

MAPUSA

TRIVANDRUM

BHIWADI

SATNA

UNNAO

GORAKHPUR(PG)

MUZAFARPUR

TALAB H U T A N

SEONI

FATEHBAD

MAINPURI

SIPAT

KHANDWA

RAJGARH

SSAROVAR

BOISARTARAPUR

DAVANGERE HIRIYUR

GAON

SUBHASGRAM

AMRITSAR

BHATAPARA

WARANGAL

ALAMANTHI

MALEKOTTAYUR

PONDICHERRY

PUGALUR

MYSORE

KOZIKODE

DELHI

KUDANKULAM

TIRUNELVELI

MUVATTAPUZHA

BARHPATNA

MAU

(PG)

(UP)

(UP)

KOTA RAPP-C&DKANKROLI

PARBATI

KOLDAM

PALLATANAGBPP

RANCHI

AKOLA

URI-II

-II

BAHDURGARH

JODHPUR

KISHENGANGA

ARASUR

MAHBOOB NAGAR

SOLAPUR(PG)

PARLI(N)PUNE

LONIKHAND

KALWA

B'SPUR

DAMOH

KARAMSADLIMBDI

RANCHODPURA

ZERDA

KARAD

SOLAPUR

BHILWARA

MERTA

ALISTONG

WAMPOH

-III

GANGTOK

MELLI

TALGUPPA

HASSAN

KARAIKUDI

VEMAGIRI

PARLI

RAJKOT

NAVI MUMBAI

KHADOLI

SHUJALPUR

KHARADPADA

MAGARWADA

AMARGARH

CHANDAKA

TEESTA-V

RANGIT

NKSTPP

FATEHPUR

BISHWANATH

LOWERSUBANSIRI

BHINMAL

GURGAON

RAMPUR

SILCHARMAITHON RBSASAN

MUNDRA

JETPUR

AMRELI

MUMBAI LOC

BHADRAWATI

BYRNIHAT

SONIPAT

K'WANGTOO

BACHCHAU

GAYA

TUTICORIN JV

KRISHNAPATANAM UMPP

NORTH CHENNAI JV

SIKAR

RATANGARH

BASPA

PANCHKULAPOOLING STN

JATTI KALAN

LUCKNOW

BAREILLY

DASUYA

MAHRANIBAGHGNOIDA

KODERMA

BOKARO

MEJIA

FROM SIKKIMMELLI

BEHRAMPUR

PUNE

A'BAD

NEEMRANA

MANESAR

DEHRADUNBAGPAT

GAJWEL

TILAIYYA

ROORKEE

SAHARANPUR

ROORKEE

KASHIPUR

SASARAM

VARANASI

WR POOL

ANGUL

PADGHEAURANGABAD

RAIPUR

RAIGARH

WARDHA

INDORE

GWALIOR

BINA

JABALPUR POOL

JABALPUR DHARAMJAYGARH

JHARSUGUDA

CORRIDORS UNDER VARIOUS IPP'S

CHAMPA

KISHANGANJ

AGRA

Transmission Corridor for Chhattisgarh IPPs (Corridor - V)

BHOPAL

JAIPUR

JHARKHANDPOOL

CHARIALI

ALIPURDUAR

PUNATSANGCHU-I

Transmission Corridor for Orissa IPPs (Corridor - I)

Transmission Corridor for Jharkhand IPPs (Corridor - II)

Transmission Corridor for Tuticorin IPPs (Corridor - VII)

Transmission Corridor for Sikkim IPPs (Corridor - III)

NABINAGAR

SRIKAKULAM

NELLORE

BANGALORE

MADHUGIRI

CHEYYUR UMPP

Transmission Corridor for Krishnapatnam IPPs (Corridor - VI)

TIRUVALAM

NAGAPATTINAM

KURUKSHETRA

VADODRA

BALIA

B'SAHAR

ORAI

Transmission Corridor for Chhattisgarh & MP IPPs (Corridor - IV)

PIRANA

Transmission Corridor for Srikakulam IPPs (Corridor - VIII)

Transmission Corridor for Southern Region IPPs (Corridor - IX)

Transmission Corridor for Vemagiri IPPs (Corridor - X)

Transmission Corridor for Nagapattinam/Cuddalore IPPs

TUTICORIN

NARENDRA

VEMAGIRI

Integration of Supply & Consumption points through Power

Expressway

Tr. Lines, Voltage level End of 11th Plan

(Ckm)

Estimated additions

in 12th Plan

(Ckm)

765 KV 7,612 25000-30000

HVDC Bi-pole 11,078 4000 - 6000

400 KV 1,25,000 50000

220 KV 1,50,000 40000

Total Tr. Lines 2,93,852 119,000 –

126,000

Transmission Addition Programme

Sub-Stn. Voltage level End of 11th

Plan

(MVA/MW)

Estimated

addition in 12th

Plan

(MVA/MW)

765 KV 53,000 110,000

HVDC 14,700 16,000 -22,000

400 KV 145,000 80,000

220/230 KV 230,000 95,000

Inter Regional Transfer

Capacity

28,000 65,000

Transmission Addition Programme

Transmission Line : 50,000 ckm

• 765kV – 17120 ckm

• 400kV – 22000 ckm

• 220kV/132kV – 1230 ckm

• HVDC - 9630 ckm

Substations : about 109,400 MVA (60 nos.)

• 765kV – 88,000 MVA

• 400kV – 7560 MVA

• 220kV/132kV – 840 MVA

• HVDC - 13,000 MVA

Expansion Programme in next 6-7 Years

(POWERGRID)

Road Map for Indian Power System

• Creation of reliable repairing facilities & development

of indigenous manufacturing capacity

• Need to establish reliable testing facilities for EHV and

UHV

• Development of Smart Grid for real-time monitoring of

dynamic state and optimal utilisation of facilities

Issues & Challenges

Road Map for Indian Power System

• Issues concerning availability of RoW and land are

becoming critical –

– Resistance of people, terrains in areas of mountains and

forest

• Sector to grow from 173 GW to 600 GW in next 20

years – Even 765kV system may not be good enough.

New methods have to be found out

• Cable manufacturers need to Research & develop

cables which could be more cost effective

• With increasing magnitude of power transmission,

new challenges of proper O&M

Issues & Challenges

Thank You