NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated...
Transcript of NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated...
![Page 1: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/1.jpg)
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering
NATIONAL AUSTRALIAN PIPELINES
COMPANY PROFILE Water . Gas . Reticulation . Pipeline Construction . Civil Engineering
![Page 2: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/2.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 1
Introduction to National Australian Pipelines National Australian Pipelines is proud to be an Australian owned family pipe laying and civil construction company operating in Melbourne, Victoria and throughout Australia. We have in excess of 25 years experience in the construction of water, gas, and oil pipelines. Our work has taken us to many locations both within metropolitan Melbourne, Regional Victoria, New South Wales and the Northern Territory. We have an immense experience with a large range of both pipe sizes and pipe materials. Our aim at National Australian Pipelines is to achieve a professional working relationship with our principals, stakeholders and the general public and we excel at meeting and exceeding target objectives through sound planning, innovative construction techniques, and by working in a safe and cooperative manner.
National Australian Pipelines is committed to delivering quality pipeline and civil construction projects in a timely manner whilst meeting budget constraints and providing an environmentally sound and consumer friendly work environment.
National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business activities.
We invite you to find out more about us through the information provided in this company profile or feel free to call on (03) 9716 3277.
Regards,
Martin J Moran
Operations Manager.
Contact Details: Phone: (03) 9716 3277 Fax: (03) 9716 3244 Email: [email protected] Excavation at Essendon Airport
Version 1.21 15/11/18
![Page 3: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/3.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 2
Overview of Company Profile Section 1 (Construction Related Systems), outlines our key construction operational procedures, such as; Quality Assurance methodology, Occupational Health & Safety, and Environmental Management systems. The adoption of these processes ensures National Australian Pipelines will perform to the satisfaction of clients and achieve timely completion of works. All employees adhere to these systems and policies, and perform their work in a safe manner at all times, whilst providing the most productive service possible. Section 2 (References from clients), illustrates National Australian Pipelines proven track record and the trust we have built and maintained with large water and gas authorities. Our sample of references include; Yarra Valley Water, Melbourne Water, GasNet Australia, and Tullamarine-Calder Interchange Alliance. References from these companies indicate their satisfaction with the works completed by National Australian Pipelines and their willingness to continue working with us in the future. Section 3 (Pipeline Projects), demonstrates a variety of past projects completed by National Australian Pipelines. Our early works date back as far as 1986, listing the highlights of several significant projects ranging up to several million dollars, and indicates National Australian Pipelines capacity to complete a substantial number of projects ranging in size, value, and in a variety of construction environments. Section 4 (National Australian Pipelines personnel), identifies key Personnel and the Organisational Structure of National Australian Pipelines. The Curriculum Vitae of key company members demonstrate the level of experience and excellence, which is directly attributed to the success achieved by National Australian Pipelines. Section 5 (Equipment), outlines the critical Plant, Machines and Vehicles in use in the National Australian Pipelines operation. The Plant, Machinery, and Vehicles listed are maintained in excellent running order, with service logs and other critical information recorded and regularly updated on all equipment. Maintenance and Service works for key Plant and Machinery are undertaken in accordance with a strict service scheduling approach, and older machines are continually monitored and updated to retain consistent upkeep and productivity. Section 6 (Key Suppliers), exhibits key suppliers, and the products we source from each. The necessary supply items are sourced from the highest quality suppliers in the most cost-effective manner to further reinforce National Australian Pipelines reputation for quality in the civil construction industry. Section 7 (Key Subcontractors), lists key subcontractors, and their roles as part of the works for National Australian Pipelines. Subcontractors complete job specific tasks such as; traffic management, boring, pipe and fittings manufacture, reinstatement, surveying, and soil disposal. Our subcontractors are sourced at the highest quality whilst ensuring we achieve value for money for that quality work.
![Page 4: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/4.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 3
INTRODUCTION TO NATIONAL AUSTRALIAN PIPELINES ........................................................................................ 1
OVERVIEW OF COMPANY PROFILE ......................................................................................................................... 2
1.1 QUALITY ASSURANCE .................................................................................................................................. 6 1.2 OCCUPATIONAL HEALTH AND SAFETY ............................................................................................................. 7 1.3 ENVIRONMENTAL MANAGEMENT SYSTEMS ..................................................................................................... 9
SECTION 2 – WRITTEN REFERENCES FROM CLIENTS ............................................................................................ 10
2.1 WRITTEN REFERENCES .............................................................................................................................. 10 2.1.1 APA Group Reference .................................................................................................................... 10 2.1.2 GasNet Reference ........................................................................................................................... 11 2.1.3 Tullamarine-Calder Interchange Alliance Reference..................................................................... 12 2.1.4 APA Group – Kevin Galea, Reference. ......................................................................................... 13 2.1.5 APA Group – Peter Wheelwright, Reference ................................................................................. 14 2.1.6 YVW Reference ............................................................................................................................... 15 2.1.7 Melbourne Water Reference ........................................................................................................... 16
SECTION 3 – PIPELINE PROJECTS ........................................................................................................................... 17
3.1 Southern Rural Water – Southern Tinamba Modernisation Project Stage 2 ...................................... 17 3.2 APA Group – M80 Widening Project .................................................................................................. 19 3.3 APA Group – Melbourne Metro Rail (Parkville) ................................................................................ 20 3.4 Cobar Water Board – Nyngan-Cobar Pipeline Replacement ............................................................. 23 3.5 APA Group – Cranbourne East High Pressure Main ........................................................................ 25 3.6 Goulburn Valley Water – MGC Dedicated Main ................................................................................ 27 3.7 APA Group – TGP-VTS Interconnect ................................................................................................. 28 3.8 APA Group – Wadeye Lateral Pipeline Project & End of Line Station .............................................. 31 3.9 BP Australia – BP Largs North Wharf Line Project Construction Works ......................................... 33 3.10 APA/ DCE/ Evovle/ YVW – Donnybrook Rd Gas & Water Main (dual trench) ............................ 37 3.11 APA Group – Robinsons Road Envestra Augmentation Project (Langwarrin) .............................. 39 3.12 APA Group – Sunbury Looping Project Pipeline Construction (Rockbank) .................................. 41 3.13 APA Group – Pine Gap Pipeline Project (Alice Springs) .............................................................. 43 3.14 Barwon Water Alliance – Lake Road Branch Sewer ...................................................................... 45 3.15 Barwon Water Alliance – Boundary Road Feeder Main ................................................................ 46 3.17 Barwon Water Alliance – Charlemont Road Feeder Main ............................................................ 48 3.18 APA Group – Ballarto Road Envestra Augmentation Pipeline Project ......................................... 49 3.19 Origin Energy – Mortlake Pipeline Extension Project ................................................................... 51 3.20 Coliban Water – Eppalock to Sandhurst Pipeline Project (Stage 1, 2a and 2b) ............................ 53 3.21 Melbourne Water - St Albans to Werribee Main (Stage 1) ............................................................. 55 3.22 George Street Feeder Main ............................................................................................................ 57 3.23 M205 Distribution Main Replacement ........................................................................................... 59 3.24 Tyabb – Transmission Gas Duplication Main, Mornington-Tyabb Road. ..................................... 61 3.25 Rockbank Middle Road Watermain, Caroline Springs ................................................................... 63 3.26 Hurstbridge – Gas Supply Main and Reticulation System ............................................................. 64 3.27 Mitchell Water – Wimmera Mallee River Crossing ...................................................................... 65 3.28 Bellarine TM Duplication ............................................................................................................. 67 3.29 Werribee Recycled Water Scheme ................................................................................................. 69 3.30 St. Georges Road Water Main - Preston ....................................................................................... 71 3.31 Whoorel Syphon – Geelong/Barwon .............................................................................................. 73 3.32 Essendon Airport – MSCL Construction ....................................................................................... 75 3.33 Wimmera Mallee Pipeline – Initial Stage ...................................................................................... 76 3.34 Dromana Reservoir Bypass Main ................................................................................................. 77 3.35 Hazelwood Power Station pipeline ............................................................................................... 78 3.36 Tocumwal to Finley Gas Supply Main .......................................................................................... 79 3.37 Bundoora Water Main Replacement .............................................................................................. 80 3.37 National Australian Pipelines – Projects Summary ....................................................................... 82
![Page 5: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/5.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 4
SECTION 4 - NATIONAL AUSTRALIAN PIPELINES PERSONNEL .............................................................................. 92
4.1 ORGANISATION STRUCTURE ....................................................................................................................... 93 4.1.1 CV: Martin Moran.......................................................................................................................... 94 4.1.2 CV: Brad Keele .............................................................................................................................. 95 4.1.3 CV: Ajay Kesavan .......................................................................................................................... 96 4.1.4 CV: Leigh Smith ............................................................................................................................. 97 4.1.5 CV: Kieran Moran.......................................................................................................................... 98 4.1.6 CV: Colin Field .............................................................................................................................. 99 4.1.7 CV: Scott Bennett ......................................................................................................................... 100 4.1.8 CV: Daniel Murphy ...................................................................................................................... 101 4.1.9 CV: Eamish Moran ....................................................................................................................... 102 4.1.10 CV: Martin Moran Jr .............................................................................................................. 103 4.1.11 CV: Paul Bartels ...................................................................................................................... 104
SECTION 5 - NATIONAL AUSTRALIAN PIPELINES EQUIPMENT ..................................................... 105
5.1 NAP PLANT & EQUIPMENT.......................................................................................................................... 105
SECTION 6 – OUR KEY SUPPLIERS ........................................................................................................... 109
6.1 PIPE SUPPLY .......................................................................................................................................... 109 6.1.1 Viadux Water Network Solutions and Steel Mains ....................................................................... 109 6.1.2 Crevet or Iplex Pipelines .............................................................................................................. 109 6.1.3 Plastic Plumbing & Irrigation Supplies ....................................................................................... 109 6.1.4 Humes Pty. Ltd. ............................................................................................................................ 109
6.2 QUARRY & CONCRETE SUPPLIES ............................................................................................................... 110 6.3 PLANT AND EQUIPMENT .......................................................................................................................... 110
6.3.1 William Adams - Caterpillar ........................................................................................................ 110 6.4 MISCELLANEOUS .................................................................................................................................... 111
6.4.1 Onsite Rentals .............................................................................................................................. 111 6.4.2 Coates Hire .................................................................................................................................. 111 6.4.3 Statewide Traffic Control ............................................................................................................. 111 6.4.4 Petro Coating Systems Pty. Ltd. ................................................................................................... 111
SECTION 7 - OUR KEY SUBCONTRACTORS .......................................................................................................... 112
7.1 ROAD, RAILWAY AND RIVER CROSSINGS ..................................................................................................... 112 7.1.1 Pezzimenti Lazerbore ................................................................................................................... 112 7.1.2 Theiss (Oz Bore) ........................................................................................................................... 112
7.2 SPECIAL PIPES/FITTINGS .............................................................................................................................. 112 7.2.1 Australian Pipe Technology ......................................................................................................... 112 7.2.2 Viadux Water Network Solutions and Steel Mains ....................................................................... 112
7.3 TRUCK & TRAILER HIRE AND SOIL DISPOSAL ................................................................................................ 113 7.3.1 Lantrak ......................................................................................................................................... 113
7.4 CONCRETE WORKS/REINSTATEMENT ......................................................................................................... 113 7.4.1 Statewide Asphalt Services ........................................................................................................... 113 7.4.2 Asphalt Paving Services Pty Ltd ................................................................................................... 113
7.5 CORROSION PROTECTION ........................................................................................................................ 113 7.5.1 Pipecorr Pty Ltd ........................................................................................................................... 113
7.6 NON-DESTRUCTIVE TESTING .................................................................................................................... 114 7.6.1 ALS Industrial .............................................................................................................................. 114
7.7 COMPACTION TESTING ............................................................................................................................ 114 7.7.1 Civil Test Pty Ltd .......................................................................................................................... 114
7.8 SURVEY AND SET-OUT ............................................................................................................................. 114 7.8.1 Sadlier Survey .............................................................................................................................. 114
SECTION 8 – SUMMARY....................................................................................................................................... 115
![Page 6: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/6.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 5
8.1 COST ................................................................................................................................................... 115 8.2 TIME FRAMES ........................................................................................................................................ 115 8.3 PROJECT DELIVERY ................................................................................................................................. 115 8.4 STAKEHOLDER AND PUBLIC RELATIONS ....................................................................................................... 116 8.5 MANAGEMENT PHILOSOPHY ..................................................................................................................... 116 8.6 OCCUPATIONAL HEALTH & SAFETY ............................................................................................................ 117 8.7 NATIONAL AUSTRALIAN PIPELINES, POLICIES ............................................................................................... 117
![Page 7: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/7.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 6
Section 1 – Construction Related Systems 1.1 Quality Assurance
National Australian Pipelines boasts a comprehensive Quality Assurance System, certified to NS/NZS
ISO 9001-2016. Our approach to quality is built on extensive worksite documentation, developed and
maintained throughout the project in line with our organisational management philosophy. We pride
ourselves on our quality record, as evidenced in the clientele references attached. (Section 2)
![Page 8: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/8.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 7
1.2 Occupational Health and Safety
National Australian Pipelines believes that safety of our employees and the public is of utmost
importance. Our Occupational Health and Safety policies and procedures, certified to AS/NZS 4801-
2001, reflect our dedication to ensuring a safe workplace for all.
![Page 9: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/9.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 8
In addition to the above Occupational Health and Safety certification, National Australian Pipelines
has also met the requirements of the Australian Government building and construction WHS
Accreditation Scheme further validating the organisations dedication to employee and public safety.
![Page 10: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/10.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 9
1.3 Environmental Management systems National Australian Pipelines have a comprehensive Environment Management System, certified to
AS/NZS ISO 14001-2016. Our approach to environmental impact awareness and planning is reflected
in our environmental policy, as well as in the activities undertaken by employees and reinforced
through project management and overall management philosophy.
![Page 11: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/11.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 10
Section 2 – Written References from Clients 2.1 Written References 2.1.1 APA Group Reference
![Page 12: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/12.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 11
2.1.2 GasNet Reference
![Page 13: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/13.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 12
2.1.3 Tullamarine-Calder Interchange Alliance Reference
![Page 14: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/14.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 13
2.1.4 APA Group – Kevin Galea, Reference.
![Page 15: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/15.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 14
2.1.5 APA Group – Peter Wheelwright, Reference
![Page 16: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/16.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 15
2.1.6 YVW Reference
![Page 17: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/17.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 16
2.1.7 Melbourne Water Reference
![Page 18: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/18.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 17
Figure 1: Pipeline Stringing of the DN1600 GRP Trunk Main
Section 3 – Pipeline Projects
3.1 Southern Rural Water – Southern Tinamba Modernisation Project Stage 2 Completion Date: 2018 Pipe Length: 7.8Km Pipe Diameter & Type: 1600/1500/600mm GRP & 375/450mm PVC Client: Southern Rural Water Client’s Representative: Andrew Fullard National Australian Pipelines constructed a 1600mm GRP irrigation pipeline on behalf of Southern Rural Water through the winter shutdown period between May and August 2018. The pipeline project was to effectively replace the existing open water channel system in the Tinamba District. The 7.8km of pipeline installed was along a greenfield alignment through 15 different private properties and road reserves. The scope of Work also included the installation of 16x Above ground customer outlets, a Transition Structure and the installation of associated valves and control equipment. Construction involved using up to 25 different pieces of plant ranging from varying sized Excavators, Front end loaders and rollers/compactors. The project was in accordance with a AS4000 contract during the winter shut down period where water is shut off from being delivered to farmers via the open water channel system. A workforce in excess of 60 personnel were engaged where 4x separate crews worked concurrently to deliver the project. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of Traffic Management Plans.
Site setup and survey of pipeline alignment.
Land Liaison with property owners
![Page 19: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/19.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 18
Figure 2: Bell hole to facilitate tie in of the DN1600 GRP Trunk Main
Figure 3: Pipe Installation of the DN1600 GRP Trunk Main
Figure 4: Construction of the above ground transition structure
Figure 5: Construction of one of the customer outlets
Identification and potholing of existing assets and utilities using Non-Destructive Digging
(NDD).
Clearing and grading of a 20m wide construction corridor
Pipeline stringing of the DN1600 GRP pipe and smaller diameter pipe offtakes
Excavation of trench to ensure pipeline installation up to 3.5m in depth
Backfilling of pipeline using an bedding material to the superintendent’s approval
Construction using horizontal directional drilling for smaller diameter road crossings
Construction of 15x above ground customer outlets
Construction of an above ground transition structure to transfer water from the pipeline back
into the open water channel
![Page 20: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/20.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 19
Figure 1: HDD rig setup at the East excavation of the M80 Widening project.
3.2 APA Group – M80 Widening Project Completion Date: 2018 Pipe Length: 0.26Km Pipe Diameter & Type: 350mm Client: APA Group Client’s Representative: Mukesh Bhatia Relocation of 260m of the steel transmission Brooklyn – Corio pipeline located underneath the M80 Ring Road for APA Group. Works included design and construction of a 248m horizontal directional drill through basalt rock and significant excavation for both the launch and retrieval HDD pits either side of the freeway. Commissioning of the pipeline included double isolation of the Brooklyn – Corio pipeline with two DN200 bypasses operating to maintain supply whilst tie-ins were conducted. Following the successful tie-ins and commission of the new pipeline, the existing section of the Brooklyn – Corio pipeline was abandoned and both major excavations backfilled with approved APA backfill material. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety Plan, Site Environmental Management Plan, Quality Plan.
Site setup and survey of pipeline alignment.
Provision of HDD management plans and design for the rock bore underneath the M80 Ring
Road.
Bulk earthworks for both the East and West excavations to expose the existing Brooklyn –
Corio pipeline and enable setting up of the HDD rig.
Stringing, welding, testing and coating of the pipeline string to AS2885 standard as required
for transmission pipelines.
Drilling, reaming, cleaning and installation of
248m horizontal directional drill in basalt rock
underneath the M80 Ring Road (works
conducted during day and night shifts).
![Page 21: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/21.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 20
Figure 2: Pullback of DN350 pipeline with string supported using machine and roller cradles.
Figure 3: Final tie-in with existing Brooklyn – Corio pipeline with DN200 bypass in place.
Live welding of 4 sets of stopple, bypass, baghole and TOR fittings on the existing Brooklyn –
Corio pipeline in preparation for tapping, isolation and cutting.
Tapping by TD Williamson of 16 fittings in preparation for isolation of main.
Fabrication and installation of two DN200 steel bypass lines to maintain gas supply.
Coating integrity test following pullback of the DN350 HDD pipeline to confirm the successful
installation.
Installation of bends to bring the newly installed pipeline on line with existing pipeline prior
to final hydrotest to 9,650kPa.
Commissioning of bypass and isolation of Brooklyn – Corio pipeline using TDW stopples and
bags (double block and bleed) to ensure gas free whilst cutting the main.
Oxy-cutting of the existing DN350 pipeline and final welding to tie-in new pipeline.
Commissioning of new section of Brooklyn – Corio pipeline following confirmation that the
two golden welds have passed the non-destructive testing.
Coating of final tie-in welds and hot-tap fittings remaining on the pipeline using HBE-95.
Entire pipeline coating tested using Holiday Detector to find and repair any coating defects.
Cutting and removal of existing gas free pipeline before abandoning section underneath the
freeway using flowable grout.
Backfill around the new pipeline with APA approved bedding material and supporting of new
pipeline with stabilised sandbag piers.
Bulk backfilling of the two major excavations using a 47 ton excavator and soil compactor to
achieve compaction of above 95% standard as required by VicRoads.
![Page 22: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/22.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 21
Figure 1: Pipeline installation of the 300mm steel main on Pelham St
3.3 APA Group – Melbourne Metro Rail (Parkville) Completion Date: 2017 Pipe Length: 1.0Km Pipe Diameter & Type: 300mm, 180mm, 150mm, 100mm Client: APA Group Client’s Representative: Colin Convey Construction of approx. 1,000M of DN300 Steel high pressure gas pipeline for APA group as part of the Melbourne Metro Rail enabling works. Pipeline installation included construction of DN300 pipeline on Flemington Road (night works) and a 180m horizontal directional drill underneath the Haymarket roundabout. Works also included 10 cut and caps to decommission existing gas mains in Grattan Street with pipe sizes ranging between DN450 and DN100. National Australian Pipelines also installed various short sections of steel and poly pipe work ranging between DN180 and DN63 to maintain gas supply to Melbourne University and the Parkville hospital precinct. Commissioning of the new gas lines and capping of existing lines included a number of hot-taps and live welding works to ensure supply was maintained throughout the construction operation. The construction of the gas pipelines in the metro area resulted in crossing over existing services and interfacing with a number of stakeholders and other contractors. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of Traffic Management
Plans.
Fulltime traffic management on
project through construction of the pipeline.
Site setup and survey of pipeline alignment.
Identification, potholing and recording of over 200 crossing existing assets and utilities using
along the pipeline construction alignment.
Excavation of trench to ensure pipeline installation at a minimum cover of 1200mm to the
top of pipe.
Cartage and disposal contaminated spoil given Cat C classification of the Parkville precinct.
![Page 23: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/23.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 22
Figure 2: Pullback of 180m DN300 HDD underneath the Haymarket Roundabout.
Figure 3: Flaring of newly constructed DN300 pipeline during commissioning.
Welding of the steel 300mm X52 steel pipe and non-destructive testing (NDT) on 10% of
mainline welds.
Stringing and laying of welded steel pipeline using a CAT 21 ton excavator and throughout
metro Melbourne streets including Flemington Rd, Grattan St, Pelham St and Bouverie St.
180m horizontal directional drilling underneath the Haymarket Roundabout on Flemington
Rd to install DN300 steel gas main. HDD construction conducted as night works to avoid
disturbance to traffic and nearby hospitals.
Night works construction for pipeline installed on Flemington Rd and Grattan St to avoid
disturbance to local traffic and community.
Backfilling of pipeline using APA approved materials and asphalt reinstatement of entire
pipeline alignment to VicRoads and council specification.
Pigging, gauging and hydrotesting the new main to a minimum pressure of 1500kpa in
accordance with the APA specification in the contract.
10 cut and caps to decommission existing gas mains in Grattan Street with pipe sizes ranging
between DN450 and DN100.
Commissioning of the new gas lines and capping of existing lines included a number of hot-
taps and live welding works to ensure supply was maintained throughout the construction
operation.
![Page 24: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/24.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 23
Figure 1: Vermeer T755 Trencher preparing trench for DN375 DICL pipe.
3.4 Cobar Water Board – Nyngan-Cobar Pipeline Replacement Completion Date: 2017 Pipe Length: 29.4Km Pipe Diameter & Type: 375mm Client: APA Group Client’s Representative: David Sechtig National Australian Pipelines supplied all materials, plant, labour and equipment required for the construction of the 29.4km long DN375 ductile iron cement lined (DICL) Nyngan to Cobar Pipeline Replacement for Cobar Water Board. The new pipeline was constructed to replace the existing raw water main between Nyngan and Hermidale with majority of the pipeline constructed within an operating rail corridor. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety Plan, Site Environmental Management Plan, Quality Plan.
Rail Industry Safety Induction (RISI) for all personnel working on the project as well as the
provision of a Rail Safety Officer (RSO) whilst working in the rail corridor.
Liaison and management of landowners disturbed by the construction of the new pipeline.
Procurement and supply of all pipe and fittings required for the works. Major pipe supplier
for the project: Iplex Pipelines.
Site setup and survey of pipeline alignment. Clear and grade over the 29km easement prior
to pipe stringing.
Management of pipe delivery and stringing
of DICL 375mm pipeline along the 29km
easement.
Trenching of the 29km pipeline through
varying ground conditions. Majority of
trenching for the new pipeline conducted
using a Vermeer T755 Track Mounted
Trencher.
![Page 25: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/25.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 24
Figure 2: Two CAT excavators installing & backfilling DN375 DICL pipe.
Figure 3: Pipeline construction within the rail corridor.
Figure 4: DICL pipe strung along the pipeline easement.
Supply, installation and backfill of over 29km’s of DN375 Ductile Iron Cement Lined (DICL)
pipe for the new pipeline.
Supply and installation of cross connections between the new DN375 pipeline and the
existing DN375 and DN300 pipelines throughout the alignment.
Supply and installation of all bends, air valves, scour valves and isolation valves including
construction of thrust and anchors blocks as required.
Supply and installation of all pipeline connections required at the Nyngan pump station
including all necessary valves, pipework, flow meters and pigging pits.
Transfer of all existing service connections from the existing 300mm pipeline to the newly
installed 375mm pipeline.
Improvements to valve, connections and pipework at surge tanks and water storage
facilities.
Hydrotesting of the entire 29km pipeline.
Rehabilitation of 29km pipeline easement
following construction of the new pipeline
and sign off from landowners where
applicable.
![Page 26: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/26.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 25
3.5 APA Group – Cranbourne East High Pressure Main Completion Date: 2017 Pipe Length: 1.3Km Pipe Diameter & Type: 200mm Client: APA Group Client’s Representative: Ian Bowman National Australian Pipelines constructed a 1330m steel HP main for APA Group in 2017. The 200mm pipeline was constructed to meet an operating pressure of 1050kpa in accordance with a HP Standard. The new main ties-in with the 200mm steel main at Majestic Blvd and the 150mm steel main at Linsell Blvd. Throughout the construction both open-cut and horizontal directional drilling (HDD) methods were used with the pipeline being pigged, gauged and hydrotested in accordance with the APA specification prior to commissioning. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of Traffic Management Plans.
Fulltime traffic management on project through construction of the pipeline.
Site setup and survey of pipeline alignment.
Identification and potholing of existing assets and utilities using Non-Destructive Digging
(NDD).
Excavation of trench to ensure pipeline installation at a minimum cover of 1200mm to the
top of pipe.
Welding of 200mm X52 steel pipe and non-destructive testing (NDT) on 10% of mainline
welds.
Stringing and laying of welded steel pipeline using a CAT 28 ton and 5 ton hydraulic
excavator, as well as a CAT 924H wheel loader.
Construction using horizontal directional drilling as required for all existing hard stand
surfaces and to avoid existing assets and utilities.
Coating of joints and unprotected steel to ensure the integrity of the pipeline. Coating tested
with a Holiday Detector.
Backfilling of pipeline using APA approved materials that met the specification provided in
the contract.
![Page 27: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/27.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 26
Figure 1: Bend installation and backfilling of the 200mm steel main.
Figure 2: Installation of tee fitting for testing and commissioning.
Figure 3: Construction of DN200 steel main around existing assets in
Cranbourne.
Installation of one cathodic protection (CP) point and several marker posts as required by
APA.
Pigging, gauging and hydrotesting the new main to a minimum pressure of 1470kpa in
accordance with the APA specification in the contract.
One in-line tie-in and one hot-tap tie-in to commission the newly constructed 200mm steel
main.
![Page 28: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/28.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 27
Figure 1 & 2: CAT 21 ton hydraulic excavator trenching and pipelaying as part of MGC Dedicated Main
3.6 Goulburn Valley Water – MGC Dedicated Main Completion Date: 2016 Pipe Length: 2.68Km Pipe Diameter & Type: DN375, DN300 and DN250 DICL Client: Goulburn Valley Water Client’s Representative: Lachlan McGregor National Australian Pipelines constructed a 2.68 kilometre water main as part of the MGC Dedicated Main project for Goulburn Valley Water. The ductile iron concrete lined (DICL) pipeline ranged from DN375 in Brepbir, Boorin, Cooray and Karook St to DN300 in Hamilton Lane and some sections of DN250 in Karook St. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety
Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set-out of pipeline alignment based on the contractual drawings
Excavation of trench and installation of pipeline bedding material to the contract
specification
Installation of all DN375, DN300 and DN250 DICL pipe and fittings to comply with the
contractual drawings
Backfilling and reinstatement of trenches including resurfacing of trafficable areas
Testing and commissioning of newly constructed water mains
Provide red-line mark-ups for as built drawings
![Page 29: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/29.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 28
3.7 APA Group – TGP-VTS Interconnect Completion Date: 2016 Pipe Length: 0.35Km Pipe Diameter & Type: DN300 and DN250 steel pipeline Client: APA Group Client’s Representative: Mukesh Bhatia National Australian Pipelines were engaged by APA to construct a new gas facility in order to inject stored natural gas from the Tasmanian Gas Pipeline (TGP) into APA’s Victorian Transmission System (VTS) at Longford in Victoria. The works included two hot-tap connections, a Transfer Station Facility (TSF) and an interconnecting pipeline between the Tasmanian Gas Pipeline (TGP) and the Victorian Transmission System (VTS). The construction included supply and mechanical installation of the TGP Main skids and associated electrical and instrumentation works. National Australian Pipelines also constructed 700 metres of DN300 steel pipeline and 50 metres of DN250 steel pipeline in accordance with the specifications and drawings provided by APA as well as AS2885. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety
Plan, Site Environmental Management Plan, Quality Plan.
Provision of Traffic Management Plans.
Fulltime traffic management on project through construction of the pipeline.
Site setup and survey of pipeline alignment.
Identification and potholing of existing assets and utilities using Non-Destructive Digging
(NDD).
Installation of above ground pipeline spools and skids to including installation of:
Inlet isolation skids
Dry gas filter skids
Liquid drain drum
Fuel gas skid
Gas heater skids
Regulation skids
Meter skids
GC Shed/DEA
![Page 30: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/30.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 29
Figure 1: Welding on 300mm X52 steel pipe in accordance with AS2885.
Figure 2: Pipelaying of DN300 pipe using a CAT 28 ton and Hitachi 35 ton
hydraulic excavator.
Boiler Skids
Construction of boiler skid shelter.
Electrical installation, commissioning and instrumentation of the pipework skids at the End of
Line Station.
Welding of 300mm X52 steel pipe & 250mm and 100% non-destructive testing (NDT) of
mainline welds.
Stringing and laying of welded steel pipeline using a CAT 28 ton and 5 ton hydraulic
excavator, as well as a CAT 924H wheel loader
Construction using horizontal directional drilling to construct the main under Jemena’s
driveway and under existing transmission gas assets.
Coating of joints and unprotected steel to ensure the integrity of the pipeline. Coating tested
with a Holiday Detector.
Backfilling of pipeline using APA approved materials that met the specification provided in
the contract.
Construction of the DN300 steel pipeline within a brown field site – existing APA Longford
compressor station site.
Installation of cathodic protection (CP) point and several marker posts as required by APA.
Pigging, gauging and hydro testing the new mains to a minimum pressure of 25,000kpa in
accordance with AS2885.5-2016
Completion of two hot-taps to commission the newly constructed 300mm and 250mm steel
main.
![Page 31: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/31.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 30
Figure 3: Horizontal Directional Drilling (HDD) on TGP-VTS project.
Figure 4: 20 ton Franna installing skids within the Transfer Station
Facility (TSF) compound.
Figure 5: Electrical and instrumentation works within the
Transfer Station Facility (TSF).
![Page 32: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/32.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 31
3.8 APA Group – Wadeye Lateral Pipeline Project & End of Line Station Completion Date: 2015 Pipe Length: 0.35Km Pipe Diameter & Type: 100mm Client: APA Group Client’s Representative: Mukesh Bhatia Construction of approximately 350 metres of 100NB pipeline as well as the delivery, installation, testing and coating of pre-fabricated assemblies for the Wadeye Lateral Pipeline End of Line Station. The works also include the installation of electrical and civil structures to be carried out for the End of Line Station. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; Health and Safety
Plan, Site Environmental Management Plan, Quality Plan.
Establishment of amenities and accommodation for construction and management crew
given the remote location of the project.
Fly in – fly out program for construction crew, working 21 days on and 7 days off for the
duration of the pipeline given the remote location.
350 metres of trench excavation for the Wadeye Lateral Pipeline.
Installation of 350 metres of 100NB pipeline tying into the existing Bonaparte Gas Pipeline.
Non-destructive testing (NDT) using X-ray on all welded joints in order to comply with AS2885
Cut and fill works for facilitating the construction of the end of line station.
Supply and construction of concrete pads and structures
Installation of above ground pipe spools
Installation of pre-fabricated skids for the End of Line Station.
Electrical installation, commissioning and instrumentation of the pipework skids at the End of
Line Station.
Installation of cathodic protection (CP) point and several marker posts as required by APA.
Pigging, gauging and hydro testing the new mains to a minimum pressure of 25,000kpa in
accordance with AS2885.5-2016
![Page 33: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/33.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 32
Figure 1: Welding 100mm Wadeye Lateral Pipeline in accordance with
AS2885.
Figure 2: Tying-in the newly constructed Wadeye Lateral Pipeline
to the existing Bonaparte Gas Pipeline.
Figure 3: Hydrotesting the Wadeye Lateral Pipeline in accordance with
AS2885.5.
Figure 4: Installation of pre-fabricated skids at the Wadeye
Lateral End of Line Station.
![Page 34: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/34.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 33
Figure 1: Pipeline Excavation and Laying with two CAT excavators.
3.9 BP Australia – BP Largs North Wharf Line Project Construction Works Completion Date: 2015 Pipe Length: 1.6Km Pipe Diameter & Type: 300mm Client: BP Australia Client’s Representative: Varun Agheda National Australian Pipelines have been contracted by BP Australia to carry out construction on the BP Largs North Wharf Line Project. The project involves replacing the existing Largs North Terminal Pipeline with two new wharflines to transport various liquid hydrocarbons (diesel, petrol and aviation fuel). The major tasks involved in this project were:
Provision of construction management plans for the pipeline including; BP control of work
requirements, HSE requirements, Environmental requirements, external stakeholder
approvals and specific construction requirements.
Tie in to Flinders Port headers.
Survey of the rail track prior to the commencement of works in order to define location for
the track at the crossing locations.
Construction of new pipelines and associated infrastructure from M-berth to BP terminal
through Flinders Port, PAE Council, ARTC and BP owned property.
![Page 35: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/35.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 34
Construction of new pipelines, pumping and pigging infrastructure within the BP terminal.
Construction of a bunker branch line to N-berth.
Construction of a Diesel Manifold Structure.
Construction of a pig launcher and receiver.
Construction of access platforms.
Construction of several existing pipe and bund loops.
The works conducted also had to correspond with the specific requirements of distinct
stakeholders specific requirements; BP Largs North Terminal Area, Flinders Port, Caltex,
ARTC, Port Adelaide and Enfield (PAE) Council, BP lot-13, Atkins Yard and Australian
Renewable Fuels.
NATA endorsed hydrostatic testing and intelligent pigging of the pipeline.
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads.
Installation of pipeline marker posts.
Figure 2: Pipe Laying around pre-existing, hand located services.
Figure 3: Above ground pipe work in the BP Terminal.
![Page 36: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/36.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 35
Figure 4: Pipe loop over bund wall.
Figure 5: Pipe loop over bund wall.
Figure 6: Scraper Pad, Pig Launcher and Pig Receiver
Figure 7: Diesel Manifold Structure and Piping
![Page 37: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/37.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 36
Figure 9: Concrete Pad, Pipe Supports, and Platforms @ Flinders
Port
Figure 8: Diesel Manifold Structure
![Page 38: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/38.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 37
3.10 APA/ DCE/ Evovle/ YVW – Donnybrook Rd Gas & Water Main (dual trench) Completion Date: 2014 Pipe Length: 3.6km (Gas main), 3.6km (Water main), 4.0km (Recycled water main) Pipe Diameter & Type: 300mm MSCL (Gas), 300mm MSCL (Water main), 375mm (Recycled) Client: APA Group, DCE, Mickleham Delivery Pty Ltd & Evolve, YVW Client’s Representative: Mark Trotto (APA) & Colin Dean (DCE) In 2014 National Australian Pipelines constructed a dual trench pipeline containing gas and water mains in order to supply the Donnybrook Road Merrifield Estate. The gas main was a 3.6km, 300mm diameter MSCL pipeline. The pipeline was constructed for APA Group to meet transmission gas main standards in order to ensure the integrity of the service. A 3.6km water main was also constructed in the same trench as the gas main in order to reduce costs for the respective clients. The water main was a 300mm MSCL pipeline constructed for the Mickleham Delivery Pty Ltd & Evolve, DCE and to be operated by Yarra Valley Water. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set out works
Figure 1: Pipe stringing for the water main along Donnybrook Rd.
![Page 39: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/39.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 38
Proving all existing assets
Excavation using trenchers and excavators in extremely wet/sloppy ground conditions
Welding and Coating of pipe above ground
Installation of the dual pipes in the single trench including, placement, jointing and external
joint coating.
Open cut excavation through concrete culverts and reinstatement of the culverts after
construction.
Installation of 8 doglegs on the gas main underneath the OD419 water main.
Open cut cross connections over Donnybrook Rd throughout the length of the pipelines.
Supply of materials, installation and compaction of pipe embedment and trench backfill
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Installation of pipeline marker posts.
Figure 2: Reinstatement of Donnybrook Rd after pipeline works have been
completed.
Figure 3: Dual Pipe Laying of the water main (left) and gas main (right)
along Donnybrook Rd.
![Page 40: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/40.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 39
3.11 APA Group – Robinsons Road Envestra Augmentation Project (Langwarrin) Completion Date: 2012 Pipe Length: 7.1Km Pipe Diameter & Type: 450mm Client: APA Group Client’s Representative: Mukesh Bhatia National Australian Pipelines have been contracted to construct the Robinson Road Envestra
Augmentation Project in Langwarrin. The project involves the construction of 7.1 Km of DN450 x 42
Steel Pipeline, from Ballarto Road, Skye, to Robinson Road, Langwarrin. The major tasks involved in
this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Land liaison works for liaising with approx 60 landowners
Survey and set out works
Proving all existing assets
Excavation using trenchers and excavators in extremely wet/sloppy ground conditions
Spear point dewatering of trenches
Welding , NDT and Coating of pipe above ground
Installation of pipe in trenches including, placement, jointing and external joint coating.
2 x Major HDD's (234m and 390m) to install DN450 Rock Jacket Coated pipe.
10 x Mini HDD' (20m to 120m) to install DN450 DLBE Pipe.
![Page 41: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/41.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 40
Supply of materials, installation and compaction of pipe embedment and trench backfill
NATA endorsed hydrostatic testing and intelligent pigging of the pipeline
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Installation of pipeline marker posts
Figure 1: Pipe Stringing with a 35 Ton Zero Swing CAT
Figure 2: DN450 Steel Pipe Welding
Figure 3: Pipe Installation on the Robinsons Road Envestra Augmentation Project
![Page 42: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/42.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 41
3.12 APA Group – Sunbury Looping Project Pipeline Construction (Rockbank) Completion Date: 2012 Pipe Length: 8.6Km Pipe Diameter & Type: 500mm Client: APA Group Client’s Representative: Richard Cherney
The Sunbury Looping Project is an 8.6Km pipeline being constructed under APA group. The DN500 X
70 Steel Pipeline runs from the corner of Hopkins Road and Middle Road in Rockbank, to Taylors
Road in Truganina. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Land liaison works for liaising with approx 20 landowners
Survey and set out works
Proving all existing assets
Excavation and rock breaking in extremely hard ground conditions
Figure 1: Pipe Unloading and Stringing Along Hopkins Road ROW
![Page 43: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/43.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 42
Welding , NDT and Coating of pipe above ground
Installation of pipe in trenches including, placement, jointing and external joint coating.
3 x Major Tunnel Bores - Road, Freeway and Railway.
Fabrication and installation of station pipework
Supply of materials, installation and compaction of pipe embedment and trench backfill
NATA endorsed hydrostatic testing and intelligent pigging of the pipeline
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Installation of pipeline marker posts
Figure 2: Trench works in wet conditions on the Hopkins Rd ROW
Figure 3: Installed DN500 pipe on the Sunbury Looping Project
![Page 44: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/44.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 43
3.13 APA Group – Pine Gap Pipeline Project (Alice Springs) Completion Date: 2011 Pipe Length: 4.2Km Pipe Diameter & Type: 150mm Client: APA Group Client’s Representative: GPA Engineering
The Pine Gap Pipeline Project in Alice Springs (NT) was constructed under contract for APA Group.
The scope of works involved the construction of 4.2Km of 150mm diameter pipe. The project was to
construct a lateral pipeline from the Palm Valley to Alice Springs Pipeline (PVP) to a new delivery
point at the Pine Gap Power Station within the Joint Defence Facility Pine Gap (JDFPG). The major
tasks involved in this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set out works
Figure 1: Welding of the DN150 Steel Gas Pipe
Figure 2: Unloading and Stringing of DN150 Pipe in Pine Gap, Alice Springs
![Page 45: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/45.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 44
Proving all existing assets
Working in the proximity of overhead powerlines
Working within the defence base, strict permit conditions
Excavation and rock breaking in extremely hard ground conditions
Welding , NDT and Coating of pipe above ground
Installation of pipe in trenches including, placement, jointing and external joint coating.
Supply of materials, installation and compaction of pipe embedment and trench backfill
NATA endorsed hydrostatic testing of the pipeline
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Installation of pipeline marker posts
Figure 3: Trench work in Pine Gap with a 35 Ton Hitachi Excavator
Figure 4: Trench work in Pine Gap with a 35 Ton Zero Swing CAT
![Page 46: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/46.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 45
3.14 Barwon Water Alliance – Lake Road Branch Sewer Completion Date: 2011 Pipe Length: 921m Pipe Diameter & Type: 375mm/ 300mm Client: Barwon Water Alliance Client’s Representative: Jill Boag The scope of the works for the Lake Road Branch Sewer involved the construction of a branch sewer
(DN375/ DN300) along Barwon Heads Road, between Charlemont Road and Lake Road, Conneware.
The major tasks involved in this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set out works
Proving all existing assets
Excavation and rock breaking in extremely hard ground conditions
Spear point dewatering of trenches
Dealing with extremely high volume of ground water infiltration
Construction of sewer access manholes.
Installation of pipe in trenches including, placement and jointing
Supply of materials, installation and compaction of pipe embedment and trench backfill
Vacuum testing of manholes and pipelines
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Figure 1: 47 Ton Hitachi Excavator working at Lake Road
![Page 47: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/47.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 46
3.15 Barwon Water Alliance – Boundary Road Feeder Main Completion Date: 2011 Pipe Length: 4.5km Pipe Diameter & Type: 960mm, 813mm & 648mm Client: Barwon Water Alliance Client’s Representative: Jill Boag The Boundary Road Feeder Main project conducted for Barwon Water Alliance involved the
construction of the water main at Boundary Road Grovedale, between Ghazepore Road in Waurn
Ponds and Charlemont Road in Connewarre. The pipeline in total was 4.5Km long, comprising of
477m of 960mm, 2,483m of 813mm and 1,605m of 648mm MSCL pipe. The major tasks involved in
this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set out works
Proving all existing assets
Working in the proximity of overhead powerlines
3 x Major Tunnel Bores - Barwon Heads Rd, Torquay Rd and Outfall Sewer
Construction of air valves, hydrants, scour valves and pressure reducing stations
Excavation and shoring of trenches to lay pipe
Installation of pipe in trenches including, placement and jointing
Supply of materials, installation and compaction of pipe embedment and trench backfill
Hydro testing of the pipeline at completion
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Figure 1: Right of way for the Boundary Road Feeder Main
![Page 48: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/48.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 47
3.16 Gippsland Water – Yinnar to Boolarra Distribution
Main
Completion Date: 2011 Pipe Length: 8.9km Pipe Diameter & Type: 140mm Client: Gippsland Water Client’s Representative: Peter Jenkins, Alex Irvine
The Yinnar to Boolarra distribution main project involved the construction of a feeder main between
Yinnar and Boolarra. The construction of 8.9km of 140mm diameter PE pipeline was undertaken on
behalf of Gippsland Water. The major tasks involved in this project were:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set out works
Proving all existing assets
Working in the proximity of overhead powerlines
10 x Mini HDDs (30m to 120m)
Construction of air valves, hydrants, scour valves and pressure reducing stations
Excavation and benching of trenches to lay pipe
Installation of pipe in trenches including, placement and jointing (Butt fusion of PE)
Supply of materials, installation and compaction of pipe embedment and trench backfill
Hydro testing of the pipeline at completion
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Figure 1: Yinnar to Boolarra Distribution Main prior to works beginning
![Page 49: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/49.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 48
3.17 Barwon Water Alliance – Charlemont Road Feeder Main Completion Date: 2011 Pipe Length: 2,568m Pipe Diameter & Type: DN300 & DN225 PVC Client: Barwon Water Alliance Client’s Representative: Jill Boag The scope of works involved the construction of 2,568m of Water/Recycled Water Pipeline as part of the Armstrong Creek Development for Barwon Water Alliance. The pipeline was constructed along Charlemont Rd between Boundary Rd and Lake Rd, Connewarre. The major tasks undertaken in the project include:
Provision of construction management plans for the pipeline including, Safety Health and
Safety Plan, Site Environmental Management Plan, Quality Plan.
Provision of traffic management plans
Traffic management during construction activities
Survey and set out works
Proving all existing assets
Working in the proximity of overhead powerlines
Working in conjunction with other contractors/developers
Construction of air valves, hydrants and scour valves
Excavation and shoring of trenches to lay pipe
Installation of pipe in trenches including, placement and jointing
Supply of materials, installation and compaction of pipe embedment and trench backfill
Hydro testing of the pipeline at completion
Reinstatement of all disturbed areas including easement, pipe track, construction access
roads and all public roads and reserves.
Figure 1: Charlemont Road Feeder Main prior to works beginning
![Page 50: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/50.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 49
3.18 APA Group – Ballarto Road Envestra Augmentation Pipeline Project Completion Date: 2011 Pipe Length: 8.9 km Pipe Diameter & Type: 457mm Client: APA Group Client’s Representative: Micheal Bergnach, Richard Cherney National Australian Pipelines was engaged by Envestra and APA Group to construct Stage 2 of the
augmentation of the existing 300NB Dandenong to Crib Point Pipeline. The project required a 450NB
Class 600 natural gas pipeline to be constructed to increase the capacity of the existing pipeline
system.
Construction activities associated with completing the Ballarto Road Envestra Augmentation Project
included:
Undertake a Safety HAZID and Environmental Risk Assessment Workshop
All NAP personnel and sub contractors will be required to undergo a safety induction by APA
Traffic management during construction activities
Proving of all existing services and liaising with all asset owners.
Clearing of works area
Excavation in any material for pipe trenches and disposal of surplus soil for construction of
the DN 450 Pipeline
Installation of the DN 450 API 5L – X42 pipe into trench
Supply of materials, installation and compaction of pipe embedment and trench backfill
Supply of materials, boring and installation of pipe into bored sections
Installation of electrolysis test points and connections to existing pipeline electrolysis system
Welding of all joints, pipe cutting, coating of field joints, repair of damage
![Page 51: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/51.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 50
Figure 3: Construction at Thompsons Road Figure 4: Laying pipe near Ballarto Road
Installation of pipeline marker posts.
Reinstatement of all areas disturbed during construction including easement, construction
access roads and all public roads and reserves.
Non destructive testing of all welded joints including x-ray and also magnetic particle testing
were required.
Fabrication of Cross Connecting Pipework
Hydrostatic pressure testing including pigging, drying and running of a geometric pig
Figure 5: Cross Connection Fabrication
![Page 52: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/52.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 51
3.19 Origin Energy – Mortlake Pipeline Extension Project Completion Date: 2010 Pipe Length: 362m Pipe Diameter & Type: DN500 X70 Client: Origin Energy Client’s Representative: Robbie Watt
The scope of works involves the construction of 362m of Pipeline as part of the Mortlake Pipeline
Extension Project for Origin Energy with the Woodside operated Otway Plant boundary.
The major tasks undertaken in the project include:
Provision of construction management plans for the pipeline including, program of work,
Quality Plan, Site Health and Safety Plan and Site Environmental Management Plan.
Provision of traffic management plans for the pipeline
Traffic management during construction activities
Figure 1: Trench Section outside Woodside Plant
Survey and set out of works.
Proving of all existing services
Excavation in any material for pipe trenches and disposal of surplus soil for construction of
the DN 500 Pipeline
![Page 53: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/53.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 52
Installation of the DN 500 API 5L – X70 11.2mm WT pipe including placement, jointing and
any external coating repairs
Figure 2: Construction Progress outside Woodside Plant
Supply of materials, installation and compaction of pipe embedment and trench backfill
Supply of materials, boring and installation of pipe into bored section
Tie into existing Mortlake Gas Pipeline at KP 394.36
Supply and installation of electrolysis test points and connections to existing pipeline
electrolysis system
Supply and installation of pipeline marker posts.
Reinstatement of all areas disturbed during construction including easement, pipe track,
construction access roads and all public roads and reserves.
Non destructive testing of all welded joints including ultrasonic and x-ray testing.
Hydrostatic pressure testing including pigging and drying of the additional 500m of pipeline
to the launching station.
![Page 54: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/54.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 53
3.20 Coliban Water – Eppalock to Sandhurst Pipeline Project (Stage 1, 2a and 2b) Completion Date: 2010 Pipe Length: 14 km Pipe Diameter & Type: 1250mm, 1000mm, 900mm MSCL Client: Coliban Water Client’s Representative: Nick Derrick
The scope of works involved the construction of approximately 14km of Pipeline as part of the Eppalock to Sandhurst Pipeline Augmentation Project for Coliban Water.
Construction activities associated included:
Traffic management during construction activities
Figure 6: Stage 1 Valve Construction
Proving of all existing services
Excavation in any material for pipe trenches and disposal of surplus soil for new sections of DN900, DN1000, and DN 1250 BSJ MSCL pipe
Installation of DN900, DN1000, and DN1250 MSCL BSJ pipes and fittings including placement, jointing and any external coating repairs
![Page 55: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/55.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 54
Figure 7: Stage 2 Valve Construction Figure 8: Sandhurst Reservoir Pipe Construction
Supply and installation of all MSCL bends and fittings
Supply and installation of DN800 HDPE submerged, precast pipe restraint encasement thrust blocks, all fittings and restoration works including erosion protection
Supply of materials, installation and compaction of pipe embedment and trench backfill
Supply and installation of all scour and air valve assemblies.
Supply and installation of non-return valve, electromagnetic flow meter and reinforced concrete pit and cover, MSCL pipework at Sandhurst Reservoir, including connection to power and communications
Supply and installation of electrolysis test points and connections to existing pipeline electrolysis system
Supply and installation of pipeline marker posts.
Reinstatement of all areas disturbed during construction including easement, pipe track, construction access roads and all public roads and reserves.
Hydrostatic pressure testing.
Commissioning following successful pressure testing including filling and charging the new water main in coordination with the Principal.
![Page 56: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/56.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 55
3.21 Melbourne Water - St Albans to Werribee Main (Stage 1) Completion Date: 2008 Pipe Length: 2.4 km Pipe Diameter & Type: 1350mm Client: Melbourne Water Client’s Representative: Alex Chapman
This project involved the construction of 2.4km of 1350mm MSCL Distribution Main in St Albans,
along Station Road, Kings Road and Taylor’s Road. The major tasks involved in this project were:
Excavating & pipe laying along major VicRoads managed roads
Excavation and disposal of extremely hard rock (220Mpa)
Working safely in greasy back ground conditions (slip ground)
Figure 9: Crossing of Gillespie Road Figure 10: Installation of DN900 (Slip Ground) Off takes & Manholes (Slip Ground)
![Page 57: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/57.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 56
Open Cut exaction of Major road crossings
Installation of 1.4m diameter pipe under numerous services
Working under power lines
Dealing with >20,000 vehicles per day
Figure 11: Sheet piling across Gillespie Road
Maintaining access to properties
Installation of DN1350 and DN900 butterfly valves
Tie in to existing mains
Major road reinstatement to VicRoads standards.
Figure 12: Use of road barriers along major roads.
![Page 58: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/58.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 57
3.22 George Street Feeder Main Completion Date: 2008 Pipe Length: 660 meters MSCL Pipe Diameter & Type: 1.4 km Client: Barwon Water Client’s Representative: David Kennedy
This contract involved the construction and replacement of approximately 1.4 km of 660mm
diameter MSCL pipe. The pipe was laid along Elizabeth Street, Autumn Street, George Street, and
Aphrasia Street. The major tasks involved in this project were:
Installation of pipelines along residential roads in Geelong
Managing School traffic, vehicle traffic and pedestrian traffic
Maintaining access at all times to properties
Figure 13: Rock Breaking across Figure 14: Cross connection into Shannon Road existing mains.
![Page 59: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/59.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 58
Major road reinstatement to council / VicRoads standards
Figure 15: Local Roads where pipes were installed
Construction of DN600 stop valve and bypass
Tie-ins to existing mains.
Figure 16: Excavation between existing services.
![Page 60: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/60.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 59
3.23 M205 Distribution Main Replacement Completion Date: 2007 Pipe Length: 2.4 kms Pipe Diameter & Type: 600mm MSCL Client: Yarra Valley Water Client’s Representative: Stephen Sonnenberg The M205 Watermain Replacement required construction of a replacement main for the existing
M205 Distribution Main and decommissioning of the redundant main. The new distribution main
included a new 600mm diameter mild steel cement lined (MSCL) main between Preston Reservoir
and Bell Street and a new 375mm diameter MSCL main across Bell Street. The major tasks involved
in this project were:
Installation of new 600mm diameter MSCL main from Preston Reservoir to the north
boundary of Bell Street
Installation of new 375mm diameter MSCL main across the intersection of Bell Street
Figure 17: Boring under Epping Railway Line Figure 18: Working along Regent Street
![Page 61: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/61.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 60
Connection to 150mm CICL reticulation main at Regent Street
Boring under the Epping railway line near Russell Street
Connection to 150mm AC reticulation main at Murray Road
Figure 19: Installation of Line Valves Road
Connection to the existing 375mm MSCL distribution main on the north side of Bell Street
Connection to the existing 300mm DICL distribution main on the south side of Bell Street
Decommissioning of redundant 600 CICL main
Figure 20: Pipelaying along Robinson
![Page 62: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/62.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 61
3.24 Tyabb – Transmission Gas Duplication Main, Mornington-Tyabb Road. Completion Date: 2007 Pipe Length: 5.4 kms Pipe Diameter & Type: 200mm Steel Pipe Client: Origin Energy Asset Management Client’s Representative: Jeff Wrigglesworth The Tyabb Transmission Gas Duplication Main involved construction of 5.4 km’s of 200mm Steel High
Pressure Transmission Pipeline along the Mornington – Tyabb Road. The major tasks involved in this
project were:
Pipelaying along Mornington Tyabb Road
Non destructive testing of welded joints
Figure 21: Hot tapping into existing main
![Page 63: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/63.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 62
Pipelaying under power lines with spotters
Traffic management to VicRoads standards
Contra flow set-up along VicRoads managed roads using temporary traffic lights.
Figure 22: Excavations along Mornington Tyabb Road
Figure 23: Working under power lines Figure 24: Contra flow along Mornington –
Tyabb Road
![Page 64: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/64.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 63
3.25 Rockbank Middle Road Watermain, Caroline Springs Completion Date: 2008 Pipe Length: 640 meters Pipe Diameter & Type: 450mm PVC Client: Delfin Lend Lease for City West Water Client’s Representative: Greg Miller This project involved the construction of 640m of DN450 water main in conjunction with Delfin Lend
Lease for City West Water along the Rockbank Middle road between the Caroline Springs Boulevard
and The Parkway at Caroline Springs. The major tasks involved in this project were:
Construction of mild steel doglegs to install pipe under existing storm water drains.
Open cut installation across Rock bank Middle Road, Caroline Springs.
Connection into existing 535mm diameter City West Water Main at Caroline Springs Boulevard.
Connection into existing 375mm diameter City West Water Main at The Parkway
Connection into existing 225mm diameter City West Water Main at St Georges Avenue.
![Page 65: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/65.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 64
3.26 Hurstbridge – Gas Supply Main and Reticulation System Completion Date: 2007 Pipe Length: 18 kms Pipe Diameter & Type: 180mm, 125mm and 63mm PE Client: Origin Energy Client’s Representative: Kevin Galea Construction of fusion welded polyethylene high-pressure gas supply main and reticulation system in
Hurstbridge including bored crossings. The major tasks involved in this project were:
Excavation in hard ground conditions
Pipe laying along Major Roads
Dealing with pedestrians
Tie-ins to existing live mains
Boring under Diamond Creek
Figure 25: Rock Breaking along Figure 26: Pipelaying along Main road, Hurstbridge-Kinglake Road Hurstbridge
![Page 66: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/66.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 65
3.27 Mitchell Water – Wimmera Mallee River Crossing
Completion Date: 2008 Pipe Length: 375 meters Pipe Diameter & Type: 1000mm / 711mm Client: Mitchell Water Client’s Representative: Lee Briggs Wimmera Mallee River Crossing involved construction of 350m of 1000mm and 24m of 711mm MSCL pipeline as part of the Wimmera Mallee Pipeline Project. The major tasks involved in this project were:
Open cut excavation of Mt William Creek
Figure 27: Open cut across Mt William Creek
![Page 67: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/67.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 66
Open cut excavation of the Wimmera River
Figure 28: Open cut across Wimmera River
Working in environmentally sensitive and culturally significant areas
Working with local aboriginal tribe members
Tie-ins to existing mains
Figure 29: Installation of pipe across Figure 30: Concrete Encasement of pipe
Wimmera River. across the river.
![Page 68: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/68.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 67
3.28 Bellarine TM Duplication Completion Date: 2001 Pipe Length: 12km Pipe Diameter & Type: 960mm MSCL Client: Barwon Water Client’s Representative: Nigel Target - Ph (03) 5226 2571 The Bellarine TM Duplication involved the construction of a 12km long, 960mm diameter MSCL
pipeline for Barwon Water. The other major tasks involved in this project were:
Open cut crossing the Barwon River and all environmental issues associated with it. This part
of the project involved pre-fabricating 60 Tons of pipe structure and then launching this into
the river.
Figure 31: Barwon River Crossing
Due to unforseen flooding, we conducted emergency procedures to secure the pre-
fabricated steel structures and prevent them from being washed in to the sea. We also
conducted this task as soon as we received a flood alert from Barwon Water.
![Page 69: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/69.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 68
Figure 32: Floods due to unseasonable rains Figure 33: Dewatering using multiple pumps
We also conducted massive amounts of dewatering using multiple pumps on the principal’s
request.
This project involved the construction of two underground concrete pits (50 Tons each),
which were precast offsite, transported and delivered to the tie-in locations.
Figure 34: Pipefittings in buried concrete pits
This project also involved extensive amounts of pipefitting and fabrication to tie-in to the
existing structure.
Another critical task in this project was working parallel to high voltage power lines
![Page 70: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/70.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 69
3.29 Werribee Recycled Water Scheme Completion Date: 2002 Pipe Length: 5km Pipe Diameter & Type: 600mm to 150mm DICL & MSCL Client: Melbourne Water Client’s Representative: David Wright - Ph (03) 9235 7163 The Werribee Recycled Water involved the construction of 5km of 600mm to 150mm diameter
ductile iron and mild steel pipeline for Melbourne Water. The other major tasks involved in this
project were:
Crossing the Werribee River
Figure 35: Crossing the Werribee River
Crossing the main Melbourne Outfall Sewer
Construction of two dams
![Page 71: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/71.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 70
Construction of two Pump Stations (one below ground)
Figure 36: Constructed pump station
Figure 37: 325BL CAT Excavator on site
![Page 72: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/72.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 71
3.30 St. Georges Road Water Main - Preston Completion Date: 2002 Pipe Length: 1.1km Pipe Diameter & Type: 1800mm MSCL Client: Melbourne Water Client’s Representative: Peter Clark - Ph (03) 9235 7100
The St. Georges Road Water main involved the construction of 1.5kn of 1800mm diameter mild steel
pipeline for Barwon Water. The other major tasks involved in this project were:
Boring under Bell Street by microtunnelling
Boring underneath the Epping railway line
Major traffic management control/plan according with the local authorities and VicRoads
requirements.
Figure 38: Lifting of the 1800mm MSCL pipe using appropriate slings
![Page 73: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/73.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 72
Figure 39: Branch connections and tie-ins
Co-ordination with Melbourne Water and Yarra Valley Water to ensure that the shutdown
time for tie-in was acceptable and achievable by all parties. Melbourne Water gave us 6
hours to do the tie-in, but we completed it in 4 hours.
This project also involved working in close proximity to high power poles.
Figure 40: Powerlines located along St Georges Rd
![Page 74: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/74.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 73
3.31 Whoorel Syphon – Geelong/Barwon Completion Date: 2004 Pipe Length: 1.5km Pipe Diameter & Type: 1800mm MSCL Client: Barwon Water Client’s Representative: Nigel Target - Ph (03) 5226 2571 The Whoorel Syphon involved the construction of 1.5km of 1800mm diameter mild steel pipeline for
Barwon Water. The other major tasks involved in this project were:
Timing was a key factor in this project. Hence, we completed it quickly and avoided any
disruption to 27% of Geelong’s Water supply.
Crossing of the Penny Royal Creek and dealing with all associated environmental issues
Figure 41: Crossing of the Penny Royal Creek
![Page 75: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/75.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 74
Removal and Reconstruction of the bridge at Penny Royal Creek
Construction of Headwalls and Penstocks
Removal of the existing 1400mm diameter water main
Figure 42: Constructed Headwall and Penstock
Figure 43: Grate and drain at Whoorel
![Page 76: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/76.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 75
3.32 Essendon Airport – MSCL Construction Completion Date: 2005 Pipe Length: 200m Pipe Diameter & Type: 1200mm MSCL Client: Baulderstone Hornibrook Client’s Representative: Patrick Whelan - Ph 0400 531 300 This project involved the construction of 200m of 1200mm Mild steel pipeline at the Essendon
Airport. The other major tasks that were involved are:
Fabrication and construction of mild steel (15 Tons) tie-in assemblies Bulk excavation and concreting works for Freeway construction
Figure 44: Laying of the fabricated toe-in assembly
Timely completion was essential to enable Freeway construction.
Co-ordination with Melbourne Water and Baulderstone Hornibrook to ensure that the
shutdown time for tie-in was acceptable and achievable by all parties. Melbourne Water gave
us 36 hours to do the tie-in, but we completed it in 24 hours.
![Page 77: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/77.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 76
3.33 Wimmera Mallee Pipeline – Initial Stage Completion Date: 2005 Pipe Length: 228m Pipe Diameter & Type: 965mm MSCL Client: GWM Water Client’s Representative: Andrew Sinn - Ph (03) 5362 0219
This project was the initial stage of the Wimmera Mallee pipeline project. This involved the
construction of 228m of 965mm mild steel pipeline through the existing car park in Halls gap.
The other major tasks involved in the project were:
Extremely wet ground conditions
Working with the members of the Brambuk cultural centre and dealing with Cultural Heritage
issues in the area where we laid the pipe.
Figure 45: Extremely wet ground conditions
![Page 78: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/78.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 77
3.34 Dromana Reservoir Bypass Main Completion Date: 2004 Pipe Length: 800m Pipe Diameter & Type: 960mm MSCL Client: Melbourne Water Client’s Representative: Peter Clark - Ph (03) 9235 7100 This project involved the construction of 800m of 960mm mild steel pipeline for the Dromana
Reservoir Bypass main (for Melbourne Water). The other major tasks involved in the project were:
This project also involved extensive amounts of pipefitting and fabrication to tie-in to the
existing structure.
Figure 46: Constructed pre-fabricated tie-in assembly
Co-ordination with Melbourne Water and Yarra Valley Water to ensure that the shutdown
time for tie-in was acceptable and achievable by all parties. Melbourne Water gave us 6
hours to do the tie-in, but we completed it in 4 hours.
![Page 79: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/79.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 78
3.35 Hazelwood Power Station pipeline Completion Date: 2004 Pipe Length: 2.7km Pipe Diameter & Type: 813mm MSCL Client: Gippsland Water Client’s Representative: Evgenia Brand - Ph (03) 5177 4608 This project involved the construction of 2.7km of 813mm mild steel pipeline within the Hazelwood
Power Station. The other major tasks of the project included:
Working around operational conveyors
Major excavation work involving cutting in of plant and equipment to achieve a depth of 8
metres
Figure 47: Digging trenches 8m deep and also working close to high voltage power lines
Working in the midst of mine operations
Boring underneath Halls road
![Page 80: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/80.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 79
3.36 Tocumwal to Finley Gas Supply Main Completion Date: 1998 Pipe Length: 26km Pipe Diameter & Type: 200mm Steel pipe Client: Stratus Network Client’s Representative: Peter Wheelwright - Ph (03) 9797 5156 This project involved the construction of a high-pressure gas steel pipeline from Tocumwal to Finley.
The other major tasks involved in this project were:
Crossing the Murray River by directional drilling Working in conjunction with the Yorta-Yorta people and environmentalists
Construction & installation of five buried concrete pits (5 tons each) for valves
Figure 48: Murray River crossing Figure 49: Working with the Yorta-Yorta People
![Page 81: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/81.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 80
3.37 Bundoora Water Main Replacement Completion Date: 2006 Pipe Length: 2.8km Pipe Diameter & Type: 813mm MSCL Client: Melbourne Water Client’s Representative: Kerri Skelton - Ph (03) 9235 2278
This project involved the construction of 2.8km of 813mm diameter mild steel water main for
Melbourne Water. The other major tasks involved in the project were:
Boring underneath Plenty road by Microtunnelling
Removal of existing 800mm water main
Breaking and excavation of an extensive amount of Bluestone Rock
Removal and Replanting of 200 Trees
Figure 50: Rock encountered while excavating
![Page 82: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/82.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 81
Co-ordination with Melbourne Water to ensure that the shutdown time for tie-in was
acceptable and achievable by all parties.
Figure 51: Trench excavation
Figure 52: Excavation and removal of spoil, Plenty Rd
![Page 83: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/83.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 82
3.37 National Australian Pipelines – Projects Summary
Project Client Date Length Diameter Period
Construction of a 7.8km 1600mm GRP irrigation pipeline along a greenfield
alignment through 15 different private properties and road reserves.
Scope of Work also included the installation of 16 above ground customer outlets, a transition
structure and the installation of associated valves and control
equipment.
Southern Rural Water
Project Manger Andrew Fullard
2018 7.8km
1600mm, 1500mm, 600mm, 450mm, 375mm
Construction date achieved
Relocation of 260m of the steel transmission Brooklyn – Corio pipeline located underneath the M80 Ring Road. Design and construction of a 248m horizontal directional drill through basalt rock and significant excavation for the HDD pits. Commissioning of the pipeline included double isolation of the Brooklyn – Corio pipeline with two DN200 bypasses operating to maintain gas supply.
APA Group
Project Manger Mukesh Bhatia
2018 0.26km 350mm Construction date achieved
Construction of approx. 1,000m of DN300 Steel high pressure gas
pipeline including construction of a 180m HDD underneath the
Haymarket roundabout. Works also included 10 cut and caps on gas mains ranging between DN450 and DN100.
APA Group
Project Manger Colin Convey
2017 1.0km
300mm, 180mm, 150mm,
Construction date achieved
Supply of all materials, plant, labour and equipment required for the construction of the 29.4km long DN375 ductile iron cement lined (DICL) Nyngan to Cobar Pipeline Replacement for Cobar Water Board. New pipeline constructed to replace the existing raw water main between Nyngan and Hermidale with majority of the pipeline constructed within an operating rail corridor.
Cobar Water Board
Project Manger David Sechtig
2017 29.4km 375mm Construction
date achieved
National Australian Pipelines constructed a 1330m steel HP main for APA Group in 2017 as part of the Cranbourne East High-Pressure Main. The 200mm pipeline was constructed to meet an operating pressure of 1050kpa in accordance with a HP Standard.
APA Group
Project Manger Ian Bowman
2017 1.3km 200mm Construction
date achieved
![Page 84: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/84.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 83
Project Client Date Length Diameter Period
National Australian Pipelines constructed a 2.68 kilometre water main as part of the MGC Dedicated Main project for Goulburn Valley Water. The ductile iron concrete lined (DICL) pipeline ranged from DN375, DN300, DN250.
Goulburn Valley Water
Project Manger Lachlan McGregor
2016 2.68km 375mm, 300mm, 250mm
Construction date achieved
National Australian Pipelines were engaged by APA to construct a new gas facility in order to inject stored natural gas from the Tasmanian Gas Pipeline (TGP) into APA’s Victorian Transmission System (VTS) at Longford in Victoria. The works included two hot-tap connections, a Transfer Station Facility (TSF) and an interconnecting pipeline between the Tasmanian Gas Pipeline (TGP) and the Victorian Transmission System (VTS).
APA Group
Project Manger Mukesh Bhatia
2016 0.35km 300mm, 250mm
Construction date achieved
Construction of approximately 350 metres of 100NB pipeline as well as the delivery, installation, testing and coating of pre-fabricated assemblies for the Wadeye Lateral Pipeline End of Line Station. The works also include the installation of electrical and civil structures to be carried out for the End of Line Station.
APA Group
Project Manger Mukesh Bhatia
2015 0.35km 100mm Construction
date achieved
BP Largs North Wharf Lines Project involved the construction of DN300 Multi Fuel Line (above ground and below ground) to AS2885 Standards incl construction of Pig Loop, Scraper Station, Diesel Manifold and associated civil and structural works
BP Australia
Project Manger Varun Agheda
2015 1.6km 300mm Construction
date achieved
Construction of a 3600m steel gas main along Donnybrook Road, Kalkallo. The gas main is 300mm in diameter and supplies the Merrifield Donnybrook estate.
APA Group
Project Manager Mark Trotto
2014 3.6Km 300mm Construction
date achieved
Construction of 3,645m of MSCL Water Main and 4,023m of MSCL Recycled Water Main along Donnybrook Road, Mickleham. The diameter of the pipe varied from 300mm to 375mm throughout the project.
Mickleham Delivery Pty Ltd & Evolve, DCE &
YVW
Project Manager Colin Dean
2014 3.6Km
& 4.0Km
300mm, 375mm
Construction date achieved
![Page 85: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/85.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 84
Project Client Date Length Diameter Period
A 502 metre PE & PVC Water Main as well as a 477 metre PE & PVC Recycled Water Main along Newbury Boulevard in Highlands Estate.
Stocklands Development Pty Ltd
Project Manager
Brendan Hall
2014 0.5Km
& 0.4Km
560mm, 450mm, 375mm, 150mm
Construction date achieved
Construction of a 4.2Km (Stage 1) & a 4.1Km (Stage 2) Recycled Water Main in Mt Duneed. The PVC and MSCL pipe ranged from 300mm – 500mm in diameter.
Barwon Water Alliance
Project Manager Michelle White
2014 4.2Km
& 4.1Km
300mm, 375mm, 400mm, 500mm
Construction date achieved
Construction of 2,350m of 200-280mm MSCL pipe and 400mm PE pipe along Craigieburn Road
Yarra Valley Water
Project Manager Mon Gan
2013 2.35Km 200mm, 280mm, 400mm
Construction date achieved
7.1km of 450 NB Class 600 Gas Transmission Pipeline from Dandenong Crib Point to Robinsons Road
APA Group
Project Manager Mukesh Bhatia
2012 7.1Km 450mm Construction
date achieved
Construction of 8.4km of 500mm Class 600 Gas Transmission Pipeline from Truganina to Plumpton
APA Group
Project Manager Richard Cherney
2012 8.4Km 500mm Construction
date achieved
Construction of lateral pipeline from Palm Valley to Alice Springs Pipeline (PVP) to a new delivery point at the Pine Gap Power Station with the Joint Defence Facility Pine Gap (JDFPG)
APA Group
Project Manager Marijan Mikulic
2011 4.2Km 150mm Construction
date achieved
Construction of Feeder Main at Charlemont Road Armstrong Creek. Comprising of 1,568 metres of 300mm, 75 metres of 300mm, 90 metres of 225mm and 38 metres of 225mm PVC pipeline.
Barwon Water Alliance
Project Manager Jill Boag
2011 1.7Km 300mm, 225mm
Construction date achieved
Construction of Branch Sewer at Lake Road Connewarre. Three Separable Portions of works in Armstrong Creek development area.
Barwon Water Alliance
Project Manager Jill Boag
2011 0.9Km 375mm Construction date achieved
Construction of Rising Main at Lake Road Connewarre. Comprising of 803 metres of 250mm PVC pipeline.
Barwon Water Alliance
Project Manager Jill Boag
2011 0.8Km 250mm Construction
date achieved
Construction of Feeder Main from Yinnar to Boolarra. Comprising of 8,890 metres of 140mm PE pipeline.
Gippsland Water
Project Manager Alex Irvine
2011 8.9Km 140mm Construction
date achieved
![Page 86: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/86.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 85
Project Client Date Length Diameter Period
Construction of Water Main at Boundary Road Grovedale between Ghazepore Road in Waurne Ponds and Charlemont Road in Connewarre. Comprising of 477 metres of 960mm, 2,483 metres of 813mm and 1,605 metres of 648mm MSCL pipeline.
Barwon Water Alliance
Project Manager Jill Boag
2011 4.5Km 960mm, 813mm, 648mm
Construction date achieved
Construction of 750m of 90mm poly gas pipeline laid along William Street, Wallan.
APA Group
Project Manager Dana Damjanac
2011 0.75Km 90mm Construction
date achieved
Construction of 5.8Km of 450NB Class 600 natural Gas Pipeline between Thompsons Road and Ballarto Road.
APA Group
Project Manager Richard Cherney
2011 5.8Km 450mm Construction
date achieved
Construction of 1.2Km of 90mm diameter gas pipeline laid parallel to the Northern Highway, Wallan.
APA Group
Project Manager Dana Damjanac
2011 1.2Km 90mm Construction
date achieved
Coating rectification at thirteen locations along the existing Mortlake gas pipeline. Installation of two additional Cathodic Protection points and installation of two temperature probes.
Origin Energy
Project Manager Robbie Watt
2011 13 Dig
ups n/a
Construction date achieved
Construction of 750m of 125mm P7 HP Pipe along Findon Road, Epping.
APA Group
Project Manager Dana Damjanac
2010 0.75Km 125mm Construction
date achieved
Construction of 400m of 500mm diameter steel gas pipe as an extension at Woodside to the Mortlake pipeline.
Origin Energy
Project Manager Paul Henshall
2010 0.4Km 500mm Construction
date achieved
Construction of 14km of 1250mm, 1000mm, 900mm MSCL Eppalock to Sandhurst Pipeline Project
Coliban Water
Project Manager Nick Derrick
2010 14Km 1250mm, 1000mm, 900mm
Construction date achieved
Construction of 2.2km of the 337mm and 419mm MSCL pipeline as part of the Cowies Hill High Level Outlet Main
City West Water
Project Manager Mahmoud Al-Madhoun
2009 2.2Km 337mm, 419mm
Construction date achieved
![Page 87: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/87.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 86
Project Client Date Length Diameter Period
Construction of 350m of 1000mm and 24m of 711mm MSCL pipeline as part of the Wimmera Mallee Pipeline Project
Mitchell Water
Project Manager Lee Briggs
2008 375m 1000mm, 711mm
Construction date achieved
Construction of 2.4km of 1350mm MSCL Distribution Main in St Albans.
Melbourne Water
Project Manager Alex Chapman
2008 2.4km 1350mm Construction
date achieved
Construction of 1.4km of 660mm MSCL Distribution Main in North Geelong.
Barwon Water
Project Manager David Kennedy
2008 1.4km 660mm Construction
date achieved
Construction of 600metres of 450mm PVC water main, (also 125mm & 150mm PVC, and 450mm MSCL), in Caroline Springs.
Delfin Lend Lease
Project Manager Greg Miller
2008 600m 450mm Construction
date achieved
Construction of 80mm/200mm/500mm Steel High Pressure Gas Pipeline – Derrimut
GasNet
Project Manager Peter Wheelwright
2007 2.9 kms 80mm /
200mm / 500 mm
Construction date achieved
![Page 88: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/88.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 87
Project Client Date Length Diameter Period
Construction of 200mm Steel High Pressure Transmission Gas Duplication Main, Mornington – Tyabb.
Origin Energy Asset Management
Project Manger
Jeff Wrigglesworth
2006 5.4kms 200mm
Steel pipe Construction
date achieved
Construction of fusion welded polyethylene high-pressure gas supply main and reticulation system in Hurstbridge. (incl bored crossings)
Origin Energy
Project Manager Kevin Galea
2006 18kms 180mm,
125mm and 63mm PE
Construction date achieved
Construction of 600mm MSCL (incl pipe supply and bored crossings) along St. Georges Road, Preston
Yarra Valley Water
Project Manger Stephen
Sonnenberg
2006 2.4kms 600mm MSCL
Construction date achieved
Construction of fully welded mild steel pipeline along Plenty Road, Bundoora. (incl bored crossings)
Melbourne Water
Project Manager Kerri Skelton
2006 2.8kms 813mm MSCL
Construction date achieved
Construction of fusion welded polyethylene high-pressure gas supply main from Bairnsdale to Paynesville. (incl bored crossings)
Origin Energy
Project Manager Paul Koedijk
2006 18.5km 180mm PE Construction
date achieved
Construction of rubber ring jointed glass-reinforced pipe including road bores and works through environmentally sensitive wetland and vegetated areas between Leongatha and Koonwarra.
South Gippsland Water
Project Manager Hoang Nguyen
2006 11km 500mm
GFRP Construction
date achieved
Construction of fully welded mild steel pipeline at Essendon Airport.
Baulderstone Hornibrook
Project Manager Patrick Whelan
2005 200m 1200mm
MSCL Construction
date achieved
Construction of rubber ring jointed mild steel pipe through existing car park in Halls Gap as initial stage of Wimmera Mallee Pipeline.
GWM Water
Project Manager: Andrew Sinn
2005 228m 965mm MSCL
Construction date achieved
Supply and construction of fully welded mild steel pipeline bypassing Melbourne Water’s Sydenham reservoir.
City West Water
Project Manager Scott Jordan-Legg
2005 360m 900mm and
600mm MSCL
Construction date achieved
Construction of fully welded steel pipeline for reticulation of natural gas throughout Bairnsdale (incl bored railway crossings)
Origin Energy
Project Manager Paul Koedijk
2005 4.8km 200mm
Steel Construction
date achieved
Construction of rubber ring jointed PVC pipeline, including construction through and management of environmentally sensitive areas.
Western Water
Project Manager David Dickins
2005 2.7km 225mm PVC Construction
date achieved
![Page 89: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/89.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 88
Project Client Date Length Diameter Period
Construction of a steel high-pressure gas supply main through princess highway, Bairnsdale
Origin Energy
Project Manager Paul Koedijk
2005 3.4km 200mm
Steel Construction date
achieved
Construction of a steel high-pressure gas supply main - Railway crossings at Dargo and Bosworth roads
Origin Energy
Project Manager Paul Koedijk
2005 1.4km 200mm
Steel Construction date
achieved
Construction of mild steel pipeline within the Hazelwood power station. Included work around operational conveyors and power generation systems as well as the presence of ongoing mining operations.
Gippsland Water
Project Manager Evgenia Brand
2004 2.7km 813mm MSCL
Construction date achieved
Construction of welded mild steel pipeline for Roxburgh Park water main relocation to allow for future development of Craigieburn railway station.
Department of Infrastructure
Project Manager
Philip Barlow
2004 500m 660mm MSCL
Construction date achieved
Construction of PVC pipeline for the Cobram reuse scheme. (incl directional drilling)
Murray Goulburn Co-op Co. Ltd
Project Manager Neil Van Buuren
2004 40km
375mm and
250mm PVC
Construction date achieved
Construction of mild steel welded pipeline, including removal of existing 1400mm main and modification of head walls and bridge structure.
Barwon Water
Project Manager Nigel Target
2004 1.5km 1800mm
MSCL Construction date
achieved
Construction of rubber ring jointed ductile iron and mild steel pipeline for the Campaspe water reclamation project. Includes directionally drilled channel crossings.
Earth Tech Engineering
Project Manager Collin Johnston
2004 20km 600mm
DICL and MSCL
Construction date achieved
Construction of PE pipeline and steel pipeline for Whittlesea gas pipeline. Includes open cut creek crossing at Barber’s Creek.
Origin Energy
Project Manager Jeff
Wrigglesworth
2004 6km
180mm PE &
200mm Steel pipe
Construction date achieved
Construction of welded mild steel pipeline for Dromana Reservoir Bypass main.
Melbourne Water
Project Manager
Peter Clark
2004 800m 960mm MSCL
Construction date achieved
Construction of mild steel rubber ring jointed pipeline at Colac.
Barwon Water
Project Manager Brett Smith
2003 2.4km 600mm MSCL
Construction date achieved
![Page 90: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/90.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 89
Project Client Date Length Diameter Period
Works related to bored crossing of the railway line in Bannockburn
Barwon Water
Project Manager Gwyn Williams
2003 100m 150mm
PVC Construction date
achieved
Drainage works at Tarago Reservoir
Melbourne Water
Project Manager Paul Maisano
2003 NA NA Construction date
achieved
Construction of recycled water pipeline and pump stations at Werribee. Includes crossing of Werribee River
Melbourne Water
Project Manager David Wright
2002 5km
600mm to 150mm
DICL and MSCL
Construction date achieved
Construction of welded mild steel water main along St. George’s road, Preston. Includes bored road crossings.
Melbourne Water
Project Manager Peter Clark
2002 1.1km 1800mm
MSCL Construction date
achieved
Avalon & Little River water supply improvements
Barwon Water
Project Manager: Des Rowe
2001 7.5kms
300mm & 225mm
DICL transfer
main
Construction date achieved
Bellarine TM Duplication
Barwon Water
Project Manager: Nigel Target
2001 12kms
960mm MSCL water main
Construction date achieved
Daylesford water supply main renewal.
Central Highlands Water
Project Manager:
Michael Martz
2000 6kms
100mm, 150mm 200mm
DICL & PVC
Construction date achieved
Insertion of water reticulation valves throughout Melb metro area
Yarra Valley Water
Project Manager Damian Ronan
1999 420
valves
100mm up to 300mm diameter
Construction date achieved
North Paaratte to Iona Gas Gathering Pipeline
Texas Utilities Transmission
Pipelines Australia
Project Manager
Bill Wallace
1999 8kms
High Pressure X70 Gas
Main TP pipeline
350mm
Construction date achieved
Yarrawonga to Mulwala Murray River Crossing
Stratus Networks
Project Manager Peter
Wheelwright
1998 1.5kms
High Pressure Gas main
TP pipeline
Construction date achieved
![Page 91: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/91.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 90
Project Client Date Length Diameter Period
Koonoomoo & Tocumwal Murray River Crossing
Stratus Networks
Project Manager Peter Wheelwright
1998 3.5kms High Pressure
Gas Main TP pipeline
Construction date achieved
Corowa-Wahgunyah Murray River Crossing
Stratus Networks
Project Manager Peter Wheelwright
1998 2kms
High Pressure Gas Main
Construction date achieved
Tocumwal to Finley Gas Supply Main
Stratus Networks
Project Manager Peter Wheelwright
1998 26kms 200mm
High Pressure Construction
date achieved
Mulwala Gas Reticulation system
Albury Gas Company
Project Manager William Hayward
1997 15km 50mm
High Pressure PE
Construction date achieved
Transmission .Pipeline Bonlac Milk Plant , Darnum
Gas & Fuel Highett
Project Engineer Alan Cook
1996 7km 200mm
Mild steel Construction
Date achieved
Slurry fly Ash return Water Line Bayswater Powerstation
John Holland Pacific Power
1995 30km 200mm
Mild steel DICL
Construction Date achieved
Echuca to Moama Contract No. 3124 High Pressure Gas Supply Main
Albury Gas Company
Project Manager William Haywood
1995 10.5km 150mm
Mild steel Construction
Date achieved
Healesville Contract No. 3101 High Pressure Steel Gas Supply Main to Healesville
Gas & Fuel Healesville
Project Manager Allen Lieu
1994 10km 150mm
Mild steel Construction
Date achieved
Supply of 150mm HP Main Wonga Park
Gas & Fuel - Regional Area -
Vermont
Project Manager Ken Thompson
1993 2.5km of HP
150mm by 4.8 wall thickness
Mild steel
Construction date achieved
Contract No. 2971 - Supply Main to Puckapunyal Army Base - Special Crossings Goulburn River Pipe Suspension on Bridge & Hume Highway Crossing 4 lanes & 4 lanes railway crossing Melbourne to Sydney
Gas & Fue - Northern Region
Project Manager Brian Rochford
1992/ 1993
18km of HP
200mm by 6.4mm wall thickness
Mild steel
Construction date achieved
Sunshine View Estate, Sunshine Water & Gas Reticulation - Common Trenching
Melbourne Water
Project Manager Pat Simons
1992 12km 225mm to 100mm
Mild steel DICL P.E.
Construction date achieved
Sydesdale to Haddon
Rural Water Commission
1992 15km 300mm DICL
Water Supply Main Construction
date achieved
![Page 92: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/92.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 91
Project Client Date Length Diameter Period
Contract No. 2900 - Transmission Pipeline Iona to Paaratte
Gas & Fuel Regional Area -
Project Manager
Graeme Witty
1992 7.5km
150mm by 7.1mm wall thickness - seamless pipe
Mild steel
Construction date achieved
Contract No. 2912 - Somerton Road, Greenvale HP Reinforcement - Special Crossing five express railway line from Melbourne to Sydney - insertion of sleeve bore in granite rock and Special Somerton Main Outfall Crossing
Gas & Fuel Regional Area - Thomastown
Project Manager John Hawthorn
1992 5.5km of HP
250mm by 6.4mm wall thickness internally lined
Mild steel
Construction date achieved
Chapel Street, South Yarra - 300mm HP - Special Crossings main bluestone MMBW outfall drain and Chapel Street in Toorak Road - two shifts day and night for three weeks - underground river to construct 300mm HP Gas Main under MMBW main bluestone outlet drain
Gas & Fuel - Regional Area – Tooronga
Project Manager
Richard Davis
1991 1km of HP
300mm by 7.2mm wall thickness internally lined
Mild steel & DICL
Construction date achieved
Contract No. 2860 Cockatoo to Emerald - Special Crossing overflow from the Emerald Lake diverted
Gas & Fuel Regional Area - Dandenong
Project Manager
Jeff Mock
1991 5km of HP
250mm by 6.4mm wall thickness internally lined
Mild steel
Construction date achieved
Reinforcement of 250mm HP - Acacia Road, Belgrave
Gas & Fuel Regional Area - Dandenong
Project Manager
Dario Stellar
1990 4.5km of HP
250mm by 6.4mm wall thickness
MSCL
Construction date achieved
Doncaster Reinforcement - Special Crossing Doncaster Road by sleeve boring
Gas & Fuel Regional Area - Vermont
Project Manager John Hawthorn
1989 6km of HP
200mm by 6.4mm wall thickness internally lined
Mild steel
Construction date achieved
Melton - Keilor Road, Sydenham - Special Crossing Melbourne to Bendigo Railway Line - 2 lanes solid rock crossing - Sydenham Ck
Gas & Fuel Regional Area – Ardeer
Project Manager William Holden
1988 10km of HP
250mm by 6.4mm wall thickness internally lined
Mild steel & DICL
Construction date achieved
Supply HP Main Diamond Creek
Gas & Fuel Regional Area -
Thomastown
Project Manager Ivo Vlakio
1987 5km of HP
250mm by 4.8mm wall thickness internally lined
Mild steel
Construction date achieved
Pt. Cook RAF Base - Special Crossing Princes Highway MMBW Outfall Open Sewer
Gas & Fuel Regional Area – Essendon
Project Manager
George Scott
1986 6km 4km of HP
150mm 100mm
Mild steel
Construction date achieved
![Page 93: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/93.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 92
Section 4 - National Australian Pipelines Personnel Director: Martin J Moran (CV Attached) Accountant: Brad Keele (CV Attached) Engineers: Ajay Kesavan (CV Attached) Leigh Smith (CV Attached) Kieran Moran (CV Attached) Construction Manager
Collin Field (CV Attached)
Crew Leaders/Supervisors
Scott Bennett (CV Attached)
Daniel Murphy (CV Attached)
Eamish Moran (CV Attached)
Mick King
Kevin Carter
Tony Hall
Scott Fewings
HSE
Martin Moran Jr (CV Attached) Traffic Management
Paul Bartels (CV Attached)
![Page 94: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/94.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 93
4.1 Organisation Structure
![Page 95: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/95.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 94
4.1.1 CV: Martin Moran Director/Operations Manager: Martin Moran Education and/or Trade Qualifications Construction Engineer / Project Manager – 30+ years experience Brief Employment History 1985 - To date National Australian Pipelines - Project Manager Relevant Experience
Extensive pipeline construction operation management experience on the following major projects, inner city Melbourne, cross country NSW, Vic & NT:
Whoorel Syphon Project – 2kms of 1850mm MSCL water pipeline, includes bridge construction Werribee Recycle Scheme - 5kms of 600mm pipeline including 3 pump stations and buildings –
recycled water pipeline Crossing of Werribee River – 600mm crossing – recycled water St Georges Rd Water Main Replacement inner city Melbourne – 1.1km of 1800mm MSCL – water
main Crossing of Barwon River - 11.5 kms of 960mm pipeline Bellarine TM Duplication (9 months) –
water supply 26kms of 200mm-gas transmission pipeline Tocumwal to Finley for Stratus Networks (Boral)
(1year) – gas pipeline Murray River Crossing – directional drilling – 3.5kms of high pressure gas Transmission Pipeline 30 kms of 200mm pipeline/pump stations for John Holland Pacific Power (1 year) Plus numerous other pipeline projects as indicated in our past projects
Relevant Training in Management, Supervision, OHS and Quality Assurance
Tyco Water Course’s Sintakote Program, Century Plus Program (7th/8th Feb 2001) Spotters Course (Sandcorp Pty Ltd) 15th June 2001 Level 1 First Aid (Chisholm Institute) 16th Feb 2001 Confined Spaces (Chisholm Institute) 16th Feb 2001 Licensed to use blasting explosives 18th June 1999 Certificate of Competency Crane Driver/Chaser (1982) Permit to Manage a Mine (Trenches) 22nd January 1995 DLI Welding certificate No.3 Certificate of Authorisation to butt weld PE pipes Stratus (Boral) 11th Feb 2001 Mechanical Engineering Construction Induction Card
![Page 96: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/96.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 95
4.1.2 CV: Brad Keele Accountant: Brad Keele Education and/or Trade Qualifications
Bachelor of Business - Accounting Certified Practicing Accountant (CPA) Diploma in Financial Planning – DFP 1 & DFP 8
Brief Employment History 2004 - To date National Australian Pipelines - Corporate Accountant 1995- 2004 Melican Thain Accountants - Public Accountant / Taxation Advisor 1983 -1995 Australian Taxation Office - Senior Taxation Officer Relevant Experience Extensive taxation, finance and business management experience in the following areas:
Business Taxation – Advising and assisting small businesses (with turnovers between $1 Million to $100 Million) to determine their taxation obligations, including Goods and Services Tax (GST).
Business Finance – Assisting business clients to secure financing arrangements for business and
property loans ranging from $200,000 to $15 Million.
Financial and Management Accounting – Preparing, analysing and advising business clients on financial and management reporting, business growth and increasing their profitability.
Staff and Work Flow management – Monitoring and managing staff performance and work flow
to meet deadlines and client requirements. Undertaking recruitment and human resource management activities.
Construction of 2.4km of fully welded 600mm Dia mild steel cement lined water main
replacement (for Yarra Valley Water) along St Georges Road (Preston), which also includes boring under roadways
Construction of 18km of fusion welded 180-63mm Dia polyethylene high-pressure gas supply
main and reticulation system in Hurstbridge for Origin Energy, which also includes boring under roadways.
![Page 97: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/97.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 96
4.1.3 CV: Ajay Kesavan Senior Engineer: Ajay Kesavan Education and/or Trade Qualifications
Bachelor of Engineering - Mechanical Doctor of Philosophy - Advanced Manufacturing
Brief Employment History 2006 - To date National Australian Pipelines - Senior Engineer 2005 - 2006 Goodyear Tyres - Engineer Relevant Experience Senior Engineer/Client Liaison on the following projects:
Southern Tinamba Stage 2 for Southern Rural Water
Parkville Gas Pipeline Project for APA Group
Nyngan-Cobar Water Pipeline Project for Cobar Water Board
TGP-VTS Pipeline Project for APA Group
Wadeye Lateral Pipeline Project for APA Group
Largs North Wharf Lines Project for BP Australia
Donnybrook Road Gas and Water Pipeline Project for APA Group and Yarra Valley Water
Newbury Boulevard Potable and Recycled Water Projects for Yarra Valley Water
Mt Duneed Recycled Water Pipeline project for Barwon Water Alliance
Craigieburn Road Water and Recycled Water Pipeline Project for Yarra Valley Water
Robinsons Road Gas Pipeline Project for APA Group
Sunbury Pipeline Looping Project for APA Group
Palm Valley to Alice Springs Pipeline project within the Joint Defence Facility Pine Gap for APA
Group
Charlemont Road Feeder Main Project for Barwon Water Alliance
Lake Road Branch Sewer Project for Barwon Water Alliance
Boundary Road Feeder Main Project for Barwon Water Alliance
Ballarto Road Pipeline Project for APA Group
Eppalock to Sandhurst Pipeline Project for Coliban Water
Cowies Hill Pipeline Project for City West Water
St Albans to Werribee Pipeline Project for Melbourne Water
George St Feeder Main for Barwon Water
Caroline Springs Water Pipeline Project for City West Water
Derrimut Gas Pipeline Project for Gasnet
Mornington-Tyabb Pipeline Project for APA Group
![Page 98: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/98.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 97
4.1.4 CV: Leigh Smith Engineer: Leigh Smith Education and/or Trade Qualifications
Bachelor of Engineering – Mechanical Bachelor of Business- Management Certificate II in Engineering- Production
Brief Employment History 2012 - To date National Australian Pipelines – Project Engineer 2011 - 2012 Epic Energy: QSN3 Project- Site Engineer Relevant Experience Involved in the following projects:
Project Engineer on the following projects.
o Southern Rural Water – Southern Tinamba Stage 2 o APA Group – Cranbourne East High Pressure Main o Goulburn Valley Water – MGC Dedicated Main o Stocklands/Yarra Valley water – Cloverton, Donnybrook Road Watermain Extension
Site engineer on the following projects.
o APA Group – Sunbury Pipeline Looping Project o APA Group – Wadeye Lateral Pipeline Project & End of Line Station o APA Group – Merrifield Donnybrook Road West Project o Stocklands/YVW – Newbury Boulevard Watermains o Evolve/DCE YVW – Potable & Recycled Donnybrook Transfer Mains
Site engineer for Epic Energy on the QSN3 project which consisted of 937km of gas transmission
pipeline from Wallumbilla Queensland, to Moomba in South Australia.
![Page 99: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/99.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 98
4.1.5 CV: Kieran Moran Engineer: Kieran Moran Education and/or Trade Qualifications
Bachelor of Engineering – Civil Bachelor of Business - Management
Brief Employment History 2014 - To date National Australian Pipelines – Project Engineer Relevant Experience Involved in the following projects:
Project engineer for the M80 Widening project for APA Group. Site engineer for the Melbourne Metro Rail – Parkville project for APA Group. Was also involved on the following projects:
o APA – Wadeye Lateral Pipeline Project o Stocklands – Lockerbie Estate o APA Group & YVW – Donnybrook Road
5+ years’ experience estimating and tendering projects for National Australian Pipelines
Graduated Swinburne University of Technology in 2017 with a Bachelor’s degree in Civil Engineering and a Bachelor’s degree in Commerce Management.
Graduated high school at Assumption College Kilmore in 2011.
Relevant Training in Management, Supervision, OHS and Quality Assurance
Level 2 First Aid Install trench support Dogger
“No Go Zone” Spotters Course
Construction Induction Card
Multiple Plant Operator Licenses
![Page 100: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/100.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 99
4.1.6 CV: Colin Field Construction Manager: Colin Field Brief Employment History 2001-To date National Australian Pipelines - Foreman 2001-2002 Minson Nacap P/L - Foreman 1999-2000 Broadvalley P/L - Foreman 1996-1998 Minson Construction - Foreman 2 years Burke Drainage Contractor 2 years Wypar Drainage Contractor 10 years Walsh Bros, Harris Drainage Contractor Relevant Experience Extensive pipeline construction/field supervision experience on the following major projects:
Senior Crew Leader for all major NAP projects. Previously managed projects include: Coliban Water – Eppalock to Sandhurst Pipeline. Melbourne Water – St. Albans to Werribee Main. APA – Pine Gap Pipeline Project, Robinsons Road Envestra Augmentation Pipeline Project, Ballarto Road Envestra Augmentation Project. Barwon Water – Boundary Road Feeder main Project, Charlemont Road Feeder main.
2.4kms of 600mm MSCL pipeline along St Georges Road, Preston 18.5kms of 200mm steel pipeline from Bairnsdale to Paynesville 4.8kms of 200mm steel pipeline throughout Bairnsdale Tarago Reservoir – Remedial Works to Embankment Drainage System – Melbourne Water 648mm steel pipeline - Colac Main Supply Pipeline – 5 Ways Valves & Wynns Valves – Barwon
Water Werribee Park recycled water pipeline – Melbourne Water 1750mm Water Main Replacement – St Georges Rd, Preston – Melbourne Water Esso Gas Pipeline – Golden Beach Bellarine TM Duplication Pipeline – Leopold to Geelong – Barwon Water Plus a numerous other pipeline and civil construction projects both within Australia and
internationally.
Relevant Training in Management, Supervision, OHS and Quality Assurance Level 2 First Aid Traffic Management Ticket Victorian Work Cover Trench/Excavation Safety Course 4WD Safety and Defensive Driving “No Go Zone” Spotters Course Mine managers permit Confined Space
Train Track Awareness
Multiple Plant Operator Licenses
Construction Induction Card
![Page 101: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/101.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 100
4.1.7 CV: Scott Bennett Site Supervisor/Foreman: Scott Bennett Brief Employment History 2006 - To date National Australian Pipelines - Foreman Relevant Experience Extensive pipeline construction/field supervision experience on the following major projects:
Senior Foreman on recently completed projects of Southern Tinamba Stage 2 (SRW) and Cranbourne East High Pressure Main (APA Group)
Senior Foreman on the recently completed projects of Donnybrook Rd (APA & YVW) and Torquay North (BWA).
Senior Crew member on the following projects: o Coliban Water – Eppalock to Sandhurst Pipeline. o Melbourne Water – St. Albans to Werribee Main. o APA – Pine Gap Pipeline Project o APA – Robinsons Road Envestra Augmentation Pipeline Project o APA – Ballarto Road Envestra Augmentation Project o BWA - Boundary Road Feeder main Project o BWA - Charlemont Road Feeder main
Relevant Training in Management, Supervision, OHS and Quality Assurance
Level 2 First Aid Confined Spaces License to perform high risk work Heavy vehicle driver license Workplace spotting for service assets Install trench support Trench laser safety Certificate III in Civil Construction Victorian train safety accreditation Certificate II – NWP07 Water Industry Operations 4WD Operations (initial) Polytec Electrofusion Accreditation Multiple Plant Operator Licenses
Construction Induction Card
![Page 102: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/102.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 101
4.1.8 CV: Daniel Murphy Site Supervisor: Daniel Murphy Brief Employment History 2014-To date National Australian Pipelines – Foreman/Leading Hand 10 Years Contracting to SpAusnet and APA Group Relevant Experience Extensive pipeline construction/field supervision experience on the following major projects:
Southern Tinamba Stage 2 for Southern Rural Water M80 Widening for APA Group Nyngan-Cobar Water Pipeline Project for Cobar Water Board. TGP-VTS Gas Pipeline Project for APA Group in Longford Wadeye Lateral Pipeline Project for APA Group Largs North Wharf Lines Project for BP Australia Donnybrook Road Potable and Recycled Water Pipeline for Yarra Valley Water Recycled Water Pipeline in Mt Duneed for Barwon Water Alliance Plus a numerous other pipeline and civil construction projects within Australia
Relevant Training in Management, Supervision, OHS and Quality Assurance
Level 2 First Aid Victorian Work Cover Trench/Excavation Safety Course Spotter
Train Track Awareness
Multiple Plant Operator Licenses
Construction Induction Card
Ductile Iron Pipelaying
Dogger
![Page 103: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/103.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 102
4.1.9 CV: Eamish Moran Site Supervisor: Eamish Moran Brief Employment History 2012-To date National Australian Pipelines – Leading Hand/Supervisor Relevant Experience Extensive pipeline construction/field supervision experience on the following major projects:
Southern Tinamba Stage 2 for Southern Rural Water M80 Widening for APA Group Melbourne Metro Rail (Parkville) for APA Group Nyngan-Cobar Water Pipeline Project for Cobar Water Board. Parkville Gas Pipeline Project for APA Group TGP-VTS Pipeline Project for APA Group Wadeye Lateral Pipeline Project for APA Group Donnybrook Road Potable and Recycled Water Pipeline Projects for Yarra Valley Water Newbury Boulevard Potable and Recycled Water Pipeline Projects for Yarra Valley Water
Relevant Training in Management, Supervision, OHS and Quality Assurance
Level 2 First Aid
Confined Space
Multi Plant Operator License
Truck License
Spotter
Traffic Controller
Implement Traffic Management Plans
Train Track Awareness
Trench Safety Awareness
Ductile Iron Pipelaying
Dogger
![Page 104: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/104.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 103
4.1.10 CV: Martin Moran Jr Health, Safety and Environmental Officer: Martin Moran Jnr Education and/or Trade Qualifications
Bachelor of Public Relations First Aid (Level 1 & 2) Confined Space Qualified Qualified Spotter Train Track Awareness Red Card Qualified Health & Safety Representatives Supervisors & Managers – Worksafe certificate.
Brief Employment History 2010 – Current National Australian Pipelines- Health and Safety Officer Relevant Experience HSE Officer on the following projects
Southern Tinamba Stage 2 for Southern Rural Water M80 Widening for APA Group Parkville Gas Pipeline Project for APA Group
Nyngan-Cobar Water Pipeline Project for Cobar Water Board
TGP-VTS Pipeline Project for APA Group
Wadeye Lateral Pipeline Project for APA Group
Largs North Wharf Lines Project for BP Australia
MGC Dedicated water pipeline for Goulburn Valley Water.
Donnybrook Road Gas and Water Pipeline Project for APA Group and Yarra Valley Water
Newbury Boulevard Potable and Recycled Water Projects for Yarra Valley Water
Mt Duneed Recycled Water Pipeline project for Barwon Water Alliance
Craigieburn Road Water and Recycled Water Pipeline Project for Yarra Valley Water
Sunbury Pipeline Looping Project for APA Group
Palm Valley to Alice Springs Pipeline project within the Joint Defence Facility Pine Gap for APA
Group
Charlemont Road Feeder Main Project for Barwon Water Alliance
Lake Road Branch Sewer Project for Barwon Water Alliance
Boundary Road Feeder Main Project for Barwon Water Alliance
Ballarto Road Pipeline Project for APA Group
![Page 105: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/105.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 104
4.1.11 CV: Paul Bartels Traffic Management Officer: Paul Bartels Brief Employment History 2005 – Current National Australian Traffic Management – Traffic Mgt Officer 2003 – 2005 RTM Traffic Control Relevant Experience Traffic Management responsibility for the following National Australian Pipelines projects
Southern Tinamba Stage 2 for Southern Rural Water Parkville Gas Pipeline Project for APA Group
TGP-VTS Pipeline Project for APA Group
MGC Dedicated water pipeline for Goulburn Valley Water.
Donnybrook Road Gas and Water Pipeline Project for APA Group and Yarra Valley Water
Newbury Boulevard Potable and Recycled Water Projects for Yarra Valley Water
Mt Duneed Recycled Water Pipeline project for Barwon Water Alliance
Craigieburn Road Water and Recycled Water Pipeline Project for Yarra Valley Water
Sunbury Pipeline Looping Project for APA Group
Charlemont Road Feeder Main Project for Barwon Water Alliance
Boundary Road Feeder Main Project for Barwon Water Alliance
Hurstbridge – Stage 1 & Part Stage 2 (8.5 km)
St Georges Road – Special Crossings
Tyabb – Stage 1 & 2 (5 km)
Relevant Training in Management, Supervision, OHS and Quality Assurance
Traffic Controller – CCF (Control Construction Traffic / Control Traffic) Red Card – CCF
![Page 106: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/106.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 105
Section 5 - National Australian Pipelines Equipment 5.1 NAP Plant & Equipment
National Australian Pipelines Plant and Equipment
Excavators Ser. No Reg. No Capacity Make Year
328D LCR Hydraulic Excavator RMX00252 N/A 35 Tons CAT 2011
325FL Hydraulic Excavator NDJ20267 N/A 25 Tons CAT 2018
325FL Hydraulic Excavator NDJ20190 N/A 25 Tons CAT 2018
335F LCR Hydraulic Excavator SGJ20165 N/A 35 Tons CAT 2018
305C Hydraulic Excavator 0HWJ00968 N/A 5 Tons CAT 2006
321D LCR Hydraulic Excavator 0KBZ00191 N/A 21 Tons CAT 2014 470H-3 Hydraulic Excavator HCM1J200C00022262 N/A 47 Tons Hitachi 2008
335F LCR Hydraulic Excavator SGJ20155 N/A 35 Tons CAT 2018
470H-3 Hydraulic Excavator HCM1J200E0021698 N/A 47 Tons Hitachi 2008 308DCR Hydraulic Excavator CAT0308DPFYC02279 N/A 8 Tons CAT 2011 AX-27U-43 Hydraulic Excavator 1MJB011008 N/A 3.5 Tons Airman 2010
Plus:
Full range of buckets for excavation in rock
Full range of rock separation buckets.
Indeco Rock Breakers, HP9000, HP5000 & HP3500
12 Ton Elite Vacuum Pipe Lifter
Loaders/Backhoes/Compactor Ser. No Reg. No Capacity Make Year
924H Wheel Loader OHXC03138 ZBG-005 11 Tons CAT 2012
299C Compact Track Loader JSP01343 N/A 4 Tons CAT 2008
924H Wheel Loader HXC02483 YXN-793 11 Tons CAT 2011
432E Backhoe Loader JBA00886 YXN-795 8 Tons CAT 2011
924H Wheel Loader OJTM00930 YXN-794 11 Tons CAT 2010
CP 323C Compactor 0EAS00552 N/A 4 Tons CAT 2008
432E Backhoe Loader 0BXE01097 UIJ-519 7.7 Tons CAT 2007
277B Skidsteer Multiterrain Loader 0MDH02959 N/A 1.3 Tons CAT 2006
246B Skidsteer Loader 5SZ03312 N/A 1 Ton CAT 2001
Trencher Ser. No Reg. No Capa5city Make Year
T755 Track Mounted Trencher N/A N/A 75 Tons Vermeer 1977
T655 – 111TR Self Propelled Trencher N/A N/A 65 Tons Vermeer 2007
![Page 107: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/107.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 106
Fork Lifts Ser. No Reg. No Capacity Make Year
Fork Lift N/A N/A 4 Tons Mitsubishi 2001
Prime Mover Ser. No Reg. No Capacity Make Year
NH12 Prime Mover N/A QPJ 324 420 hp Volvo 2001
Mack Titan Prime Mover 6FMR14H15DD804042 1HW8TD 860 hp Mack 2013
Pipe Transport Trailer
Quad Axle Low Loader Trailer 6VN9T26ABKE0074002 04212S Drake 2014
Wideing Dolly Trailer 6V9T23ABKD0074055 X42035 Drake 2013
4000 Pipe Skids 4 x 4
Water Tanker N/A 11,300L Tie Man 2004
Mitsubishi Canter N/A TAV 515 4 Cyl Mitsubishi 2013
Mitsubishi Canter N/A NVD 279 4 Cyl Mitsubishi 2012
Plus:
Pipe Transport Trailer
Pipe Skids (4 foot long) 4” x 4” x 4000 Nos
Plus:
Fuel and Maintenance truck and consumables
On Road Vehicles Reg. No Year
Toyota Hiace Van WVJ 568 2012
Toyota Hiace Van UGM 289 2012
F350 Crew Cab YDU 989 2011
Holden Omega Ute YJQ 396 2011
Nissan Patrol Trayback WMO 260 2008
Nissan Patrol Trayback WMO 261 2008
Nissan Patrol Trayback WMO 262 2008
Nissan Patrol Trayback UKX 497 2006
Nissan Patrol Trayback UKX 498 2006
Nissan Patrol Trayback UKX 499 2006
SS VY Crewman Ute TYB 695 2006
Holden Adventra AWD TVE 608 2006
Holden Rodeo Cab Chassis RYV 330 2005
Holden Commodore Ute STE 217 2003
![Page 108: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/108.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 107
Miscellaneous Equipment
Welding Equipment
Welding Vehicles – which includes 400AMP Lincoln Welders
Oxyacetylene Cutting Equipment, Pipe and Bevel Cutters, Line Up, two x
Clamps, including mobile telephones
Welding unit - CIG 500 AMP Perkins Engine driven
Grit Blasting, Spark Testing and Boring Equipment
Grit-blasting vehicles with wrapping equipment, consumables and
compressor, Burwell 100kg blasting equipment
Spy holiday spark testers range from 5,000 to 15,000V x 3
Mole 2000 hydraulic under road borer 0-40 diameter
Compressors & generators
Compare 175 compressors
Honda EX 1000 generator
Compare 175 CFM
Mobile Site Sheds
14 x 8 foot site office x 1
14 x 8 foot site canteen x 1
Mobile chemical toilets x 3
Dewatering equipment
Sykes pump 50mm air operated x 2
Sykes vacuum pump 100mm Dia capacity 190 litres/sec.
Wacker pump 100mm Dia Capacity 150 litres/sec.
Honda 75mm sludge x 2
![Page 109: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/109.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 108
Road Safety Equipment and Trench Support Systems
Lifesaver flashing arrows
Signs
Cones
Poles
Fencing
Fire Fighting Equipment
International 4 x 4 tanker
Fuel pumps
High-pressure pumps
Hoses
![Page 110: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/110.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 109
Section 6 – Our Key Suppliers 6.1 Pipe Supply 6.1.1 Viadux Water Network Solutions and Steel Mains They are our main suppliers for the following:
Ductile Iron Pipelines/Fittings/Valves
Mild Steel Pipelines/Fittings/Valves
Polyethylene Pipelines/Fittings
6.1.2 Crevet or Iplex Pipelines They are our main suppliers for the following:
PVC Pipelines/Fittings
Cast Iron Pipelines/Fittings
GFRP Pipelines/Fittings
6.1.3 Plastic Plumbing & Irrigation Supplies They are also one of our major suppliers of PVC Pipelines/Fittings 6.1.4 Humes Pty. Ltd. They are our main suppliers for the following:
Steel Reinforced Concrete Pipes
Jacking Pipes
![Page 111: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/111.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 110
6.2 Quarry & Concrete Supplies We have an excellent relationship with the following suppliers of Bedding Sand, Crushed Rock and Gravel:
Holcim (Readymix)
Hanson
Mawsons
Epsom Sand and Soil
The following is a list of our main suppliers of concrete products (Grout, Concrete, and Cement Stabilized
Sand):
Holcim (Readymix)
Hanson
Mawsons
6.3 Plant and Equipment 6.3.1 William Adams - Caterpillar We procure most of our equipment from them:
Excavators
Wheel Loaders
Skid Steer Loaders
Backhoe Loaders
They also provide us an extended maintenance and repair guarantee (Standard 3748 Guarantee)
![Page 112: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/112.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 111
6.4 Miscellaneous 6.4.1 Onsite Rentals We hire the following from them on a regular basis:
Portable Offices
Staff Lunchrooms
Chemical Toilets
Site Offices
6.4.2 Coates Hire We hire the following from them on a regular basis:
Trench Shields
Temporary Fencing
Compaction Equipment
6.4.3 Statewide Traffic Control We procure the following from them:
Traffic Management Signs and Bollards
Personal Protection Gear
6.4.4 Petro Coating Systems Pty. Ltd. We procure the following corrosion prevention and sealing systems to protect buried valves and flanges:
Petrolatum ST
Petrocote 1500
Powercrete PW
Raychem WPCT
Raychem Water Wrap
![Page 113: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/113.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 112
Section 7 - Our Key Subcontractors 7.1 Road, Railway and River Crossings 7.1.1 Pezzimenti Lazerbore They are experts in the field of Micro Tunnelling, Sleeve Boring, Pipe Jacking and Mini Tunnelling. They
have the capability to bore a range of diameters from 300mm to 2000mm. Their machines have the
capability of boring in a wide range of conditions (clay, soft clay, clayey silty sands, rock etc.). They also
have vacuum trucks to directly remove fluids and spoil from the drilling face, which is faster and cleaner
than any other system.
7.1.2 Theiss (Oz Bore) We have a long-standing relationship with Oz Bore. They are experts in the field of Horizontal Directional
Drilling (HDD) and Directional Boring. Where ever it is feasible we propose to use Horizontal Directional
Drilling, as it is generally more cost effective than Micro/Mini Tunnelling.
7.2 Special Pipes/Fittings 7.2.1 Australian Pipe Technology If there is a requirement for pre-fabricated special pipelines or fittings, we propose to use Australian Pipe
Services. They mainly fabricate mild steel special pipelines/fittings and connections. They are renowned in
the industry for the quality of work they produce.
7.2.2 Viadux Water Network Solutions and Steel Mains Viadux is the industry leader in providing "Complete Pipeline Solutions" for Steel, Ductile or Plastic
pipelines. Viadux also has the capability to fabricate special pipeline systems. We also procure special
fittings and pipelines from Viadux on a regular basis.
![Page 114: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/114.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 113
7.3 Truck & Trailer Hire and Soil Disposal 7.3.1 Lantrak They are experts at managing the logistical movement of earth, which includes finding the closest disposal
options through access to over 500 sites around Australia. They move around 5,000,000 m3 of spoil each
year (www.lantrak.com.au). Because of the vast contracts they have, they are also able to dispose spoil
safely at a nominal rate. We use Lantrak for those projects that require bulk cartage and disposal.
7.4 Concrete Works/Reinstatement 7.4.1 Statewide Asphalt Services We use Statewide for most of our structural concrete work, concrete paving, and concrete reinstatement
work. They have many years of experience in the concreting industry, and hence we propose to use them
for any concrete reinstatement work.
7.4.2 Asphalt Paving Services Pty Ltd We use Asphalt Paving Services for most of our Asphalt Reinstatement work. They have many years of
experience in this industry, and hence we propose to use them in conjunction with local councils for any
asphalt reinstatement work.
7.5 Corrosion Protection 7.5.1 Pipecorr Pty Ltd If the project requires the installation of cathodic protection units, we propose to use Pipecorr. Over the
past few years, we have used them for all our corrosion protection needs. Pipecorr have approximately 16
years of experience in designing, installing and maintaining cathodic protection systems as well as
pipeline testing and investigation services. Pipecorr is also a recognised Cathodic Protection supplier for
Melbourne Water.
![Page 115: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/115.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 114
7.6 Non-Destructive Testing 7.6.1 ALS Industrial If there is a requirement for Non-Destructive Testing of welds (magnetic testing or radiographic testing),
we propose to use ALS Industrial. This company has NATA accreditation in all aspects of NDT. Over the
past few years, we have used them to test welded joints (X-Ray Radiographic testing) of high-pressure gas
transmission steel pipelines.
7.7 Compaction Testing 7.7.1 Civil Test Pty Ltd If the proposed pipe route is along a roadway, then according to VicRoads Specification 706 and 173 we
propose to perform compaction tests. We propose to use Civil Test for performing soil compaction testing
according to VicRoads Standard Specifications.
7.8 Survey and Set-out 7.8.1 Sadlier Survey We propose to use Sadlier Survey for survey and set out works as they have 30 plus years experience in
this field and we have a long-standing relationship with them.
![Page 116: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/116.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 115
Section 8 – Summary 8.1 Cost Bringing projects in under budget from both National Australian Pipelines and the principals is one of our
key priorities. We focus specifically on the area of cost control.
8.2 Time Frames Completing projects in or ahead of schedule is one area we pay close attention to in the conduct of all our
projects. We have a companywide approach to review our work progress on a weekly and monthly basis
to ensure that projects proceed in accordance with scheduled time frames. The emphasis on meeting
time frames is instilled in all staff in National Australian Pipelines from Senior Management right through
to all members of each crew. Our ability to complete a time sensitive projects is outstanding and we have
proven time and again our ability to build pipelines in time sensitive or cost sensitive manner.
8.3 Project Delivery In delivering a water or gas pipeline projects we have an operational approach, which we have found to
be extremely effective. As a starting point, we always ensure that the following key issues are addressed:
We allocate appropriate staff and equipment to complete our projects.
The project management team has the necessary skills and knowledge to complete all elements
of the project (including special items such as river crossings, trenchless techniques, working near
powerlines, and building Pump Stations).
We maintain constant contact with the principal and other relevant stakeholders and work on
projects on a collaborative approach.
We maintain full documentary records of work completed on the project and maintain a robust
document trail from the work in the field through to all communication with principals and other
relevant stakeholders.
We actively work towards meeting and exceeding all milestones and targets whilst at the same
time ensuring the highest quality final product.
![Page 117: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/117.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 116
8.4 Stakeholder and Public Relations In the initial stages of the project, we identify all the stakeholders, contact them and draw input from
them on the project. Our preferred method is to bring all affected stakeholders together in a meeting at
project commencement. Before starting the construction work, we conduct a property inspection with
affected landowners, identify his needs and do a digital survey. At the end of the construction period, we
reinstate the affected landowner’s property exactly as they were prior to construction.
If we receive a verbal or written complaint from the general public, we key it into a data logger which is
held at project site offices and resolve the issue within 24 hours. We also inform the principal regarding
the complaint and the methods undertaken to resolve it.
8.5 Management philosophy Our management philosophy allows us to operate in a very efficient manner. Due to our flat
organisational structure decision making and communication is very quick. Issues within the field are
dealt with by the appropriate members of the project management team in a very direct manner.
Likewise, information flows from the Project management team to field staff, principals, and other
stakeholders in a considered and speedy manner.
The following highlights the strengths of our management philosophy:
Directors and Senior management are actively involved on a day to day basis with project
activities.
Decisions are made in a decisive manner and with the appropriate information and level of
expertise brought to the issue
Communication within the organisation and to third parties (including the principal, sub
contractors, stakeholders, members of the public) is very straight forward and fast
Our past experience with high profile and critical works have always benefited from our effective
management style (e.g. Longford gas duplication project during Victorian gas crisis in 1998/1999)
![Page 118: NATIONAL AUSTRALIAN PIPELINES...National Australian Pipelines is a family owned and operated company, where the owners are involved in the hands on day-to-day management of the business](https://reader034.fdocuments.us/reader034/viewer/2022052300/5f0a8fa27e708231d42c3ca8/html5/thumbnails/118.jpg)
21 SCHOLAR DRIVE BUNDOORA, VIC - 3083 PH: 03 9716 3277 FAX: 03 9716 3244
Water . Gas . Reticulation . Pipeline Construction . Civil Engineering 117
8.6 Occupational Health & Safety We have an outstanding record of Occupational Health and Safety (available upon request) and attribute
this to work done both in the field and by our project management teams to instil a safety ethic in all our
workers.
8.7 National Australian Pipelines, Policies
Our company wide philosophy towards quality assurance starts from the attitude and approach and the
pride in workmanship shown by our in field staff. We not only endeavour and achieve projects on time
and within budget we also ensure that the pipeline is operational at the highest level. We have
appropriate Project Management Plans (available upon request), Environmental Management Plans
(available upon request), and Industrial Relations Policy (available upon request), in place.