National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries,...
Transcript of National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries,...
![Page 1: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/1.jpg)
REPORT
The planned site for the extension of the Reina Sofía Museum, located at the rear of this Madrid Art Gallery, inspired a solution in which its marginal position in relation to the Atocha roundabout is compensated by a type of architecture that leaves no doubt as to the activity of the institution. The imposing mass of the existing building warned against a continuation of its compositional mechanisms and the extension is therefore a deliberate contrast, with a free style of geometry defined by the flow of movement through the building. A ramp rises up to the new entrance and opens onto a landscaped courtyard that serves as the centre of gravity. The formal fluidity of the extension is based on a brick-clad façade with metal sheets for the roof, a sloping plane that is echelonned to illuminate the halls and reflect the varying heights of the interior spaces.
Publication´s title: National Art Museum Queen Sofía, Madrid
Typology: Museums and Galeries, RehabilitationClient: MNCARSSurface: 16.309 m2
Year: 1999Status: Competition. FinalistsBudget: 23.699.093 €
SummarySummary
Madrid, Spain
National Art Museum Queen Sofía. Rehabilitation and Extension
![Page 2: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/2.jpg)
General Exterior Views General Exterior Views
![Page 3: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/3.jpg)
General Interior Views General Interior Views
![Page 4: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/4.jpg)
Model Model
![Page 5: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/5.jpg)
Sections Floor plans
Third floor
Second floor Third floor
Ground floor
First floor
![Page 6: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/6.jpg)
Sections Sections
General plan
Ground floor Third floor
![Page 7: National Art Museum Queen Sofía. Rehabilitation and Extension · Museums and Galleries, Rehabilitation Competition. Finalists 23.699.093 € X,X % (motivo, mejora de calidad del](https://reader034.fdocuments.us/reader034/viewer/2022050120/5f50acd213072b2bcd6b659a/html5/thumbnails/7.jpg)
Structural Section Technical Data
MAIN DATAClient:Address:Type:Status: Building costs:Difference with budget:
DATASCompetition: Design of project: Construction:Implementation:
SURFACESSite:Main building:Other buildings:TOTAL:
PROJECT TEAMMain Architect:Collaborators:
Local Architect: Interior design:Lighting design:Landscape architect:Restoration architect:Digital imaging:Model:Photography: Structural engineering: Climate engineer:Building physics advisor:Fire safety specialist:Health and Safety: Urban planning: Survey:
National Art Museum Queen Sofía. Rehabilitation and ExtensionMadrid, Spain
TECHNICAL DATA OF THE PROJECT
MNCARSC/ Santa Isabel, 52. 28012 Madrid, SpainMuseums and Galleries, RehabilitationCompetition. Finalists23.699.093 €X,X % (motivo, mejora de calidad del cliente)
1999 1999--
-16.309 m2
-
16.309 m2
Cruz y Ortiz ArquitectosBlanca Sanchez Lara, Belén Rivera Romero, Miguel Blázquez Gomez-Landero, Joaquín Pérez-Goicoechea, Elena de las Moras Hervella, Elba Herrero Acosta, Angel Garrido Burón, Alexander Fernandez-Llamazares, Juan Carlos Mulero Cortes, Miguel Velasco Gonzalez, Brigitte Joye, Sina Buxtorf, Sancho Igual------Luis MontielFotowork (Model)-------
AWARDS---------
Sevilla. 41001Santas Patronas nº36T e l . + 3 4 9 5 4 5 0 2 8 2 5secretar [email protected] w w w . c r u z y o r t i z . c o m
Amsterdam. 1015CW Keizersgracht nº126T e l . + 3 1 2 0 3 0 3 7 8 0 [email protected] w w w . c r u z y o r t i z . c o m