National Aeronautics and Space Administration The Future of Space Exploration Orion, Ares and...
-
date post
23-Jan-2016 -
Category
Documents
-
view
217 -
download
0
Transcript of National Aeronautics and Space Administration The Future of Space Exploration Orion, Ares and...
National Aeronautics and Space Administration
The Future of Space Exploration Orion, Ares and Beyond....AIAA / NSC / JPL Town Hall Meeting26 April • 2007
Neil WoodwardActing Director, Directorate Integration OfficeNASA Exploration Systems Mission Directorate
Exploration Systems Mission Directorate Update
Vision For Space Exploration
• Complete the International Space Station
• Safely fly the Space Shuttle until 2010
• Develop and fly the Crew Exploration Vehicle no later than 2014 (goal of 2012)
• Return to the Moon no later than 2020
• Extend human presence across the solarsystem and beyond
• Implement a sustained and affordable human and robotic program
• Develop supporting innovative technologies,knowledge, and infrastructures
• Promote international and commercialparticipation in exploration
Lunar Robotic Missions
Lunar Outpost Buildup
Mars Expedition
COTS Crew & Cargo
Shuttle OPS
Orion Development
Ares 1 Development
LSAM Development
Surface Systems
Ares 5 & Earth Departure Stage
Science Robotics Missions
Initial Orion (CEV) Capability
0605 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Exploration Roadmap
Saturn 5 (Apollo 17)141 Metric Tons
Space Shuttle20 Metric Tons
Ares I22 Metric Tons
Ares V131 Metric Tons
Defining the Transportation Architecture
Ares I
Ares V
Orion
Programs and Project Offices
Ames Research Center
Dryden Flight Research Center
Jet Propulsion Laboratory
White Sands Test Facility
Johnson Space Center
Michoud Assembly Facitity
Stennis Space Center
Kennedy Space Center
Marshall Space Flight Center
Langley Research Center
Goddard Space Flight Center
Glenn Research Center
O & C Facility SSME A-1 Test Stand Landing Impact Attenuation
KSC Launch Control Room 1 Wind Tunnel Tests
Making Progress....
LAS Reverse Flow Test
From SRR to SDR....
System Requirements Review
SEP OCT NOV DEC JAN FEB MAR APR MAY
Cx Program SRR
Ares (CLV) SRR Upper Stage SRR
Orion CEV SRR
Mission Systems (MS) SRR
Ground Systems (GS) SRR
2006 2007
Extravehicular ActivitySystems (EVA) SRR
Pro
gram
Baselin
e Req
uirem
ents S
ynch
ron
ization
Human Civilization Scientific Knowledge Exploration Preparation
Global Partnerships Economic Expansion Public Engagement
Defining the Global Exploration Strategy
Defining the Long-term Lunar Presence
Defining the Future Exploration Strategy