NASA Perspec+ves on Space Industrial Base and Supply Chain to Supply Chain 2010 Conference Gregory Robinson Deputy Chief Engineer October 20, 2010

Transcript of NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management...

Page 1: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

NASAPerspec+veson

SpaceIndustrialBaseandSupplyChainto

SupplyChain2010Conference

GregoryRobinson

DeputyChiefEngineer

October20,2010

Page 2: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

•  ThehealthofthespaceindustryisvitaltoallofNASA’smissionsaswellastothena+on(spaceleadership,newscience,innova+on,compe++veness,industrialgrowthandeconomicwell‐being)

•  Thehistoric,currentandemergingrela+onship(teamwork/partnership)betweenNASAandindustrycon+nuestoproduceourna+on’sspacesystemsforhumanandscienceexplora+on

•  However,thechanginglandscape/environmentforthespaceindustryandtheirsuppliers(thinningoftheU.S.Industrialbase,globaliza+onoftheindustry,etc.)hasraisedconcern

–  NASAandothergovernmentdepartmentsandagenciesarebecomingmorefocusedonhowitaffectstheformula+onandmanagementofspacesystemsdevelopment(diminishingdomes+csources/capabili+esandothersupplychainrisks,useofforeignsuppliersandexportcontrolconcerns,riseofcounterfeitparts,etc.)

–  Ques+onsweface:WhatistherolesoftheNASAprojects,primecontractorsanddomes+csuppliersinmaintainingandgrowingavibrant,world‐leadingna+onalcapabilityforspaceexplora+on;WhatshouldorcanbedonebyNASAprograms/projectstoaddresssupplierrisksandchallenges?

Page 3: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

•  NATIONALSPACEPOLICYoftheUNITEDSTATESofAMERICA,JUNE28,2010•  Na+onalAeronau+csandSpaceAdministra+onAuthoriza+onActof2010,Oct.11,2010

•  Redirec+onofSpaceFlightstrategycreatesnewchallengesforNASA’sindustrialbase.–  Itisimportantthatwemaintainindustrialcapabili+esthatarecri+calforproduc+onoffutureNASA

spacecra`andlaunchvehicles.

–  Wemustmakedecisionsaboutmaintainingdifficult‐to‐replaceNASAfacili+esandcapabili+es(suchasproduc+onoffluidsandpropellants).

–  Wemustdefinerela+onshipsbetweenNASAandcommercialcrewandcargodeliveryserviceproviderstoprovideconfidencethatNASAneedswillbemet.

•  Forfutureprogramswemustensurethatnecessarycontractualrequirementsareestablishedandcommunica+onmechanismsemplacedtoprovide+melyinforma+onaboutpoten+alsupplychaindisrup+ons.

Page 4: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

Transatlan(cAbortandEmergencyLandingArrangementson

6Con(nents

1,200Ac(veSuppliersin46States

1.2M+propertylineitemsandequipmentatgovernmentandcontractorsitesna(onwidevaluedover$12billion

MajorProduc(on,Opera(ons,andTes(ng

Facili(esAcrosstheCountry

SkilledTeamof1,200CivilServantsand9,200+PrimeContractors

ImportantCustomerforUniqueNa(onal

Capabili(es

SpaceShuRleProgram/Re(rementImpacts

Page 5: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

Combined Impact of Shuttle & Constellation Transitions is HUGE

Constella(onProgramStatus/Transi(onImpact

•  2005 Start, ~$10B Invested ($3.9B planned in FY10): Development of elements for access to LEO for ISS (Initial Capability) and a Human Lunar Return Capability

•  8 projects to design, develop, and execute US Space Exploration Policy: –  Orion, Ares (I & V), Ground Operations (GO), Mission Operations (MO), Lunar Lander, Lunar Surface Systems (LSS), Extravehicular

Activity (EVA). Hardware dev ongoing in all

•  6 Prime Contracts: ATK, Lockheed, Boeing, PWR, and Oceaneering –  160+ program-related contracts (not including sub-contracts) across US

•  Locations: Content across all 10 NASA Centers, 23+ States in FY10 •  Workforce: 2,867 FTEs and over 8,651 Support Contracts Personnel in FY10 •  Facilities: 2,000+ with 57 facility projects complete or under construction

AresILaunchVehicle AresV

LaunchVehicle

LaunchSuitEVA

OrionCrewVehicle

Ground&MissionOpera+ons

SurfaceSystems

Ini(alCapability LunarCapability

AltairLunarLander

Na(onalCapability

Page 6: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

IndustrialBaseAc(vi(es:NASAStudyTeam

AssessingimpactofConstella+onTransi+ononpartnersandspaceindustrialbase

CurrentEfforts–  Inter‐AgencySolidRocketMotortaskforce,OUSD(I)lead,NASAsupports

–  ReleasedDepartmentofCommerceindustrialbasesurveyof1500suppliers

–  Ini+allymappedsupplybasecommonality:NASA,MDA&USAF(On‐going)

–  InteragencyDiscussion/Coordina+on(DoD,MDA,NRO)atalllevels

–  TopAreasinclude:SRMIB,Propulsion&Launch,Ranges,DoDSupportNextSteps

–  Analysisofcommonsupplierstodetermineimpact&cri+cality

–  LaunchandAssessNASADepartmentofCommercesurvey

–  CompleteSupplyChainInteroperabilitypilotprojects

Page 7: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

DepartmentofCommerce(DoC)SpaceIBSurvey

•  DoCBureauofIndustryandSecurity(BIS)surveying1500NASAhumanspaceflight(HSF)suppliersto:

–  AssessimpactofShujlere+rementandConstella+ontransi+on

–  Determinehealthandcompe++venessoftheU.S.HSFsupplybase

–  Iden+fypoten+alindustrialcapabilitygapsforNASA’snewfocusareas

•  Timeline:Resultstobereleasedbyendof2010

StudyElement AreaIncludes

CompanyInforma(on Loca+on,POCs,BusinessDescrip+on

Product&ServiceTypeList Standardizednomenclature

Rela(onships Mergers&Acqs,JointVentures,Compe+tors,Suppliers

Opera(ons Produc+onCapacityU+liza+on,SCM,Machinery/Tooling/Facili+es

FinancialHealth FinancialStatements,Top10Customers,ExportSales

Employment PersonnelNumbers,PersonnelSkills/Descrip+on

Research&Development R&DExpenditures,FundingSources,Partnerships

Investments CapitalExpendituresandFutureProjec+ons/Outlook

Page 8: NASA Perspecves on Space Industrial Base and Supply Chain · 2013. 6. 3. · Chain Management issues as well as coordinate inter‐agency cooperaon with other government departments

•  NASAhasbeguntoiden+fythetopindustrialbaserisksandchallengesfacingthespaceindustryinfulfillingNASAmissions

–  AssessedduringAcquisi+onStrategyMee+ngs

–  EstablishedanAgencySupplyChainManagementTeamtosharpenthefocusonSupplyChainManagementissuesaswellascoordinateinter‐agencycoopera+onwithothergovernmentdepartmentsandagencies.

•  Conferencessuchasthisandyourinputisvitalfor:–  CurrentNASAHQini+a+ves/thinking/approachforaddressingindustrialbase/supply

chainmanagementchallengesandrisks–  Aswellasopportuni+es/waystomakeadifferenceaswemoveforward

•  Helpusdefinethefutureforindustrialbase/supplychainmanagementatNASA