Narayanpur Right Bank Canal Extension

12
Narayanpur Right Bank Canal Extension SALIENT FEATURES OF COMPLETED PROJECT Salient Features Photo Location: Extension of Narayanpur Right Bank Canal from Km 95.00 to 168.50 Utilisation 18.952 TMC Discharge @ Starting Point 33.725 Cumecs (1,191 Cusecs) Main Canal Extension of NRBC from Km 95.00 to 168.50 Distributaries D-18A to D-52 Network Command Area 56,100 Ha. Potential created - Nil -. Dist. / Taluks benefited Raichur Dist. : Raicur Taluk Status of work • NRBC Extension from Km 95.00 to 135.00 Almost completed. • NRBC from Km 135.00 to 168.50 – In progress. • Distry.No.23 Km 0.00 to 11.17 (including Aqueduct) in progress. • Tail End Distry. Km 0.00 to 18.60 in progress. Financial Details Updated Estimated Cost of Project : Rs.963.50 Crore. Expenditure incurred Upto March 2018 : Rs.176.50 Crore. NRBC Km 1

Transcript of Narayanpur Right Bank Canal Extension

Page 1: Narayanpur Right Bank Canal Extension

Narayanpur Right Bank Canal Extension

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: Extension of Narayanpur Right Bank Canal from Km 95.00 to

168.50

Utilisation 18.952 TMC

Discharge @ Starting Point

33.725 Cumecs (1,191 Cusecs)

Main Canal Extension of NRBC from Km 95.00 to 168.50

Distributaries D-18A to D-52 Network

Command Area 56,100 Ha.

Potential created - Nil -.

Dist. / Taluks benefited Raichur Dist. : Raicur Taluk

Status of work

• NRBC Extension from Km 95.00 to 135.00 Almost completed. • NRBC from Km 135.00 to 168.50 – In progress. • Distry.No.23 Km 0.00 to 11.17 (including Aqueduct) in progress.

• Tail End Distry. Km 0.00 to 18.60 in progress.

Financial Details Updated Estimated Cost of Project : Rs.963.50 Crore. Expenditure incurred Upto March 2018 : Rs.176.50 Crore.

NRBC Km 1

Page 2: Narayanpur Right Bank Canal Extension

Mallabad Lift Irrigation Scheme

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location:

Lift No.1 – Off-take @ Km 20.00 of Jewargi Branch Canal.

Lift No.2 – Off-take @ Km 20.00 of Mudbal Branch Canal Lift No.3 – Off-take @ Km 5.40 of Shahapur Branch Canal

Utilisation 8.054 TMC

Components

3 No. Head Work Main Canal : Lift No.1 – From Km 0.00 to 9.00

Lift No.2 – From Km 0.00 to 16.40 Lift No.3 – From Km 0.00 to 17.40

Distr. Network under 3 Lifts for 33,752 Ha.

Command Area 33,730 Ha. (83,313 Acres)

Potential created Under Lift No.1 : 4,950 Ha.

Dist. / Taluks benefited Kalburgi Dist. : Jewargi Taluk Yadgir Dist. : Shorapur Taluk

Status of work

Head works :

Under Lift No.1 – Completed. Under Lift No.2 – Completed. Under Lift No.3 – Completed. Canal Network : Under Lift No.1 : Main Canal Km 0.00 to 9.00 completed. Distry.No.1 2, 4 & 5 completed. Distry.No.3 Km 0.00 to 6.00 (including Aqueduct) in progress.

Under Lift No.2 : Main Canal Km 0.00 to 16.40 Completed.

Under Lift No.3 : Main Canal Km 0.00 to 17.60 in progress.

Financial Details Updated Estimated Cost of Project : Rs. 578.27 Crore Expenditure incurred Upto March 2018 : Rs.165.30 Crore

Page 3: Narayanpur Right Bank Canal Extension

Bhima Flank

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: Extension of SBC from Km 75.30 to 98.30

Utilisation 5.151 TMC

Components Main Canal : Extension of SBC from Km 75.30 to 98.30

Distry. Network for _21,572 Ha.

Command area 21,572 Ha.

Potential created Nil

Dist. / Taluks benefited Yadgir Dist. : Yadgir Taluka

Present status of the work

Main Canal : Extension of SBC from Km 78.30 to 98.30 in progress. Distry. Network Survey Investigation & Preparation of Estimates for Distry. Network in progress.

Financial Details Updated Estimated Cost of Project : Rs. 271.57 Crore Expenditure incurred Upto March 2018 : Rs. 01.00 Crore

Page 4: Narayanpur Right Bank Canal Extension

Sonthi Lift Irrigation Scheme

SALIENT FEATURES OF FRESH PROJECT

Salient Features Photo

Location On the Upstream of Sothi Barrage across River Bhima near

Tarwarpet Village of Chittpur Taluk of Kalburgi Dist..

Utilisation 4.00 TMC

Components

Head Work - 1 No. Sonthi Main Canal : 40.00 Km Sonthi Branch Canal : 18.10 Km

Distry.No.1 : 13.50 Km Yargol Minor Canal : 9.90 Km Distry. Network on Sonthi Main Canal & Sonthi Branch Canal and Distry No 1

Command Area 16,100 Ha. (39,767 Acres).

Potential created 10266 Ha.

Dist. / Taluks to be benefited

Kalburgi Dist. ; Chitapur Taluk Yadgir Dist. : Yadgir Taluk

Commencement of Project

2007

Status of work

Head works: Completed Canal Network : Feeder Canal 1. Km including Railway crossing completed.

Sonthi Main Canal Km 0.00 to 18.00 Almost completed. Sonthi Main Canal Km 18.00 to 40.00 under three packages in

progress. Sonthi Branch Canal Km 0.00 to 18.10 - Almost completed. Distry.No.1 Km 0.00 to 13.50 - Almost completed. Yargol Minor Canal Km 0.00 to 9.90 in Progress. Distry. Network under Sonthi Main Canal & Branch Canal in various status of progress. Water let out in completed Canal Network of Sonthi Main Canal,

Sonthi Branch Canal & Distry.No.1. Submergence of Hurasgundagi Village : Rehabilitation & Resettlement of Hurasagundagi Village in backwater of Sonthi Barrage in progress.

Financial Details Updated Estimated Cost of Project : Rs.673.90 Crore. Expenditure incurred Upto March 2018 : Rs.318.80 Crore

Head Work

Feeder Canal

Aqueduct on Sonthi Main Canal

Page 5: Narayanpur Right Bank Canal Extension

NRBC Distry.No.9A

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: Off-take at Km 54.12 _ of NRBC – Right side.

Utilisation 3.75 TMC

Components

NRBC Distry. No.9A of 29.15 Km

Arkera Brabch Distry. of 22.87 Km & Network Wadvatti Branch Distry. of 28.77 Km & Network

Command area 15,250 Ha

Potential created 12,021 Ha. Ha.

Dist. / Taluks benefited

Raichur Dist : Deodurga & Manvi Taluks

Status of work

NRBC Distry. 9A Km 0.00 to 29.15 Completed & water let out for irrigation. Arkera Branch Distry. Km 0.00 to 22.87 & Network completed &

water let out for irrigation. Wadvatti Branch Distry. Km 0.00 to 10.00 completed & Km 10.00 to 28.17 in progress.

Financial Details Updated Estimated Cost of Project : Rs.225.00 Crore Expenditure incurred Upto March 2018 : Rs.221.15 Crore

Aqueduct on NRBC Distry. 9A

Page 6: Narayanpur Right Bank Canal Extension

MANJRA BARRAGES IN BIDAR DIST

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: 4 No. Series of Barrages across river Manjra in Bidar Dist . in Aurad

& Bhalki Taluks.

Utilisation 4,80 TMC

Components

Construction of 4 No. Series of Barrages : 1) Jirgihal Bridge cum Barrage 2) Manikeshwar Bridge cum Barrage

3) Halhalli Bridge cum Barrage 4) Chandapur Bridge cum Barrage Barrages provided with Automatic Tilting Godbole Gates.

Command area 12,670 Ha. (Own Lift by Farmers from the storage accomplished at Barrages)

Dist. / Taluks

benefited Bidar Dist : Aurad & Bhalki Taluks

Status of work All Civil & Gate works of 4 No. Series of Barrages completed. Providing Low Level Friction Dampers works for all four Barrages in progress.

Financial Details Updated Estimated Cost of Project : Rs.300.00 Crore Expenditure incurred Upto March 2018 : Rs.279.80 Crore

Chandapur Bridge Cum

Barrage

Jirgihal Bridge Cu

Page 7: Narayanpur Right Bank Canal Extension

JETTUR BRIDGE CUM BARRAGE

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: Across River Kagina near Jettur Village of Chincholi Taluk, Kalburgi Dist.

Length of Barrage 191.60 Mt

No. of Piers 36 No. Main Piers & 35 Dummy Piers.

Gates 420 No. Needle Gates of Size 2.25 Mt. x 0.50 Mt. (6 No. Needle Gates in Each vent)

Command area 500 Ha. (Own Lift by Farmers from the storage accomplished at Barrage)

Dist. / Taluks benefited

Kalburgi Dist. : Chincholi Taluk

Status of work

Excavation for foundation completed.

12 No. Main Piers & 12 No. Dummy Piers completed. 4 No. Main Piers & 4 No. Dummy Piers in progress. Fabrication of 32 No. Gates completed out of 70 Nos

Financial Details Updated Estimated Cost of Project : Rs.26.26 Crore Expenditure incurred Upto March 2018 : Rs. 7.50 Crore

Page 8: Narayanpur Right Bank Canal Extension

FILLING UP OF 35 MI / ZP TANKS IN YADGIR DIST.

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location Lifting water from backwater of Yadgir Barrage across River Bhima .

Components of the Scheme

Intake Canal 1st Head Work U/s of Yadgir Barrage 2nd Head Work near Dharmapur village 2nd Sub Raising Main, Gravity Main & Pipe Distribution Network for filling up of 35 MI / ZP Tanks

Delivery Chamber

Administrative Approval GO No.WRD/135/KBN/2017 Dtd:08.11.2017 for Rs.440.00 Crore

Intake Level RL : 344.00 Mt.

Delivery Level DC-1 : RL : 642.00 M DC-2 : RL : 406.00 Mt. DC-3 : RL : 417.00 Mt.

Commencement of work March 2018

Name of Tanks Filling

.

From Jackwell Cum Pump House-1 (Raising Main-1)

1) Ramasamudram

2) Paspol

3) Gopalapur

4) Chintalapalli

5) Anapur

From Jackwell Cum Pump House-1 (Raising Main-3)

6) Lingeri

7) Haligeri

8) Nagalapur

9) Kilakera Rayan

10) Kalabelagundi

11) Madhwar tank

From Jackwell Cum Pump House-2 (Raising Main-2)

12) Dharmapur

From Delivery Chamber-1 under Pump House-1

13) Jangamakeri

Page 9: Narayanpur Right Bank Canal Extension

14) Machalanacheruvu

15) Kakalwar Tank-1

16) Kakalwar Tank-2

17) Chandaraki

18) Guramitkal

19) Itakal Tank-1

20) Mothakapalli

21) Tulmamadi

22) Buragapalli

23) Madhwar Kotakunta

From Delivery Chamber-2 under Pump House-1

24) Nilahalli

25) Kanekal Rekalkunta

26) Gudalgunta

27) Sambra

28) Kadechur Eramma

29) Duppalli

From Delivery Chamber-3 under Pump House-1

30) Yelasatti

31) Nasalwayi

32) Goranur

33) Thoranatippa

34) Karanagi

35) Jegram

Dist. / Taluk benefited Yadgir Dist. : Yadgir Tq. Kalburgi Dist. : Chitapur Taluk

Project Estimated Cost : Rs.440.00 Crore

Page 10: Narayanpur Right Bank Canal Extension

PROVOIDING VERTICAL LIFT GATE FOR YADGIR BRIDGE CUM BARRAGE ACROSS RIVER BHIMA

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: Near Yadgir Town across River Bhima

Utilisation 1.01 TMC

Command Area 1,935 Ha. (Own Lift by Farmers)

Length of Bridge 425 Mts

Cill Level RL 351.00 Mt.

FRL of Barrage RL 359.50 Mt

No. of Vents 24

Gates 24 No. Vertical Lift Gates of Size 15 Mt x 8 Mt.

Administrative Approval

GO No.WRD / 152 / KBN / 2017 Dtd: 04.10.2017 for Rs.58.00 Crore

Commencement of Project Work

April 2018.

Scope of the Project Providing Vertical Lift Gates with Mechanically Operated Hoisting

System by Extending alternate piers of existing Yadgir Barrage,

Present stage of work Concreting of Foundation Work on D/s of existing Barrage in progress. Fabrication of Vertical Lift Gates in progress.

Providing Vertical Lift Gates will ensure optimum utilization of water storage at barrage

Project Estimated Cost : Rs.58.00 Crore Expenditure Incurred : Rs.10.80 Crore

Existing Yadgir Barrage

Foundation

Page 11: Narayanpur Right Bank Canal Extension

PROVOIDING VERTICAL LIFT GATE FOR JOLADADGI-GUDUR BARRAGE ACROSS RIVER BHIMA

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Location: 11 Km U/s of confluence of River Bhima & Krishna

Utilisation 1.29 TMC

Command Area 1,960 Ha. (Own Lift by Farmers)

Length of Bridge 550 Mts

Cill Level RL 340.20 Mt..

FRL of Barrage RL 347.20 Mt

No. of Vents 44

Gates 44 No. Vertical Lift Gates of Size 10.50 Mt x 7.00 Mt.

Administrative

Approval

GO No.WRD / 151 / KBN / 2017 Dtd: 04.10.2017 for Rs.57.00

Crore

Commencement of Project Work

April 2018.

Scope of the Project Providing Vertical Lift Gates with Mechanically Operated Hoisting System by Extending alternate piers of existing Joladadgi-Gudur Barrage,

Present stage of work

Excavation of Foundation Work on D/s of existing Barrage in

progress. Fabrication of Vertical Lift Gates in progress.

Providing Vertical Lift Gates will ensure optimum utilization of water storage at barrage

Project Estimated Cost : Rs.57.00 Crore

Expenditure Incurred : Rs.12.24 Crore

Existing Joladaggi-Gudur Barrage View

Page 12: Narayanpur Right Bank Canal Extension

Remodeling of SBC, MBC & JBC under AIBP- PMKSY

SALIENT FEATURES OF COMPLETED PROJECT

Salient Features Photo

Scope of the Project:

Remodeling of Canal Networks under NLBC-ERM Project : a) Shahapur Branch Canal (SBC) b) Jewargi Branch Canal (JBC)

c) Mudbal Branch Canal (MBC)

Funding Under AIBP – PMKSY of GOI

Command Area Restoration of Command Area (Suffering Atchcut) under SBC, JBC & MBC

Components of the Scheme

a) Remodeling of Canal Network of SBC, JBC & MBC

b) SCADA Automation (Installation of Automated Integrated Gates) & GIS System for SBC, JBC & MBC Canal Network,

Commencement of Project

March 2014.

Present stage of the works

a) Remodeling of SBC, JBC & MBC Canal Network completed. b) Tender Invited for SCADA Automation System for SBC,

JBC & MBC Canal System in progress.

ERM of Canal Network facilitate Equitable Distribution of water & Improvement in Water Use Efficiency

Expenditure Incurred : Rs.1653.60 Crore.

Remodeling Done of SBC Main Canal Remdeling

Remodeling Done of MBC Main Canal

Remodeling Done of Distributary Ne