2Williamsburg Area Transit Authority
Project Purpose
Intelligent Transportation System Planning May 18th, 2011
Procurement of Intelligent Transportation Systems for fixed route and paratransit operationsEmploy systems engineering process to
Ensure appropriate technologies procured and integrated into operationIdentify impacts on operation and ongoing needs
Systems should:Improve operational efficiency and level of serviceImprove customer service and perceptionsImprove safetyProvide a platform for future upgrades and expansion
3Williamsburg Area Transit Authority
Process
Intelligent Transportation System Planning May 18th, 2011
Gathering Needs Technology Review
Technology-Needs Mapping
Cost Estimation
Concept of Operations
System Procurement
High-Level Requirements
Project Phasing
Detailed Requirements
4Williamsburg Area Transit Authority
TECHNOLOGY VISION
Intelligent Transportation System Planning May 18th, 2011
5Williamsburg Area Transit Authority
Planning and Scheduling Software
Intelligent Transportation System Planning May 18th, 2011
Fixed Route Operations SoftwareCreate trips and patternsGenerate service schedulesCreate pieces of work and runsDaily operations management
Fixed Route SchedulingPlan routesSchedule stops and running timesSchedule trips and workCreate driver assignments
Fixed Route Pullout ManagementAssign operators and vehicles to runVehicle availabilityTracking driver availability and managing overtime
• Mobile Data Terminals– Operator device control interface– Electronic messaging– Emergency alarm notification
• Automated Vehicle Announcements– Signs– Audio
• Automated Passenger
Counters
6Williamsburg Area Transit Authority
Onboard System
Source: Doug Parker
Source: IRIS
Intelligent Transportation System Planning May 18th, 2011
Source: Doug Parker
7Williamsburg Area Transit Authority
Automatic Vehicle Location and Central Software
Intelligent Transportation System Planning May 18th, 2011
Automatic Vehicle LocationTrack position of buses in real timeFeed into multiple systems
Computer Aided DispatchMonitor and manage fleetElectronic messagingHandle incidentsHandle alarms
8Williamsburg Area Transit Authority
Customer Information
Intelligent Transportation System Planning May 18th, 2011
Online Trip PlanningProvide self-service trip planningEstablish multi-modal connections
Data FeedWeb and Phone Real-Time Info
Provide self-service route or stop info
Stop Real-Time SignsProvide next vehicle arrival information at stops
9Williamsburg Area Transit Authority
Paratransit
Intelligent Transportation System Planning May 18th, 2011
FunctionsAdvance trip booking and schedulingDispatch for same day trip bookings/changes and service incidentsEnable electronic manifest to
reduce operator effortimprove data accuracydecrease data entry effort
Enable real-time navigation
Source: ecvv.com
10Williamsburg Area Transit Authority
AVAILABLE FUNDING
Intelligent Transportation System Planning May 18th, 2011
11Williamsburg Area Transit Authority
Available Funding
Intelligent Transportation System Planning May 18th, 2011
GRANT FEDERAL STATE LOCALTOTAL FUNDS
ARRA $ 350,000 $ 0 $ 0 $ 350,000
Revised 2 - Bus Purchase
$ 23,102 $ 0 $ 5,776 $ 28,878
Revised 6 – Bus Purchase
$ 104,112 $ 26,028 $ 0 $ 130,140
Revised 3 - Trolley Purchase
$ 18,961 $ 0 $ 4,740 $ 23,701
ARRA - Software $ 150,000 $ 0 $ 0 $ 150,000
TOTAL $ 646,175 $ 26,028 $ 10,516 $ 682,719
12Williamsburg Area Transit Authority
PHASING
Intelligent Transportation System Planning May 18th, 2011
13Williamsburg Area Transit Authority
Phased Cost Estimate
Intelligent Transportation System Planning May 18th, 2011
Capital Cost Annual O&M Cost
Total $ 939,100 $ 84, 500
Phase 1 $ 680,000 $ 67,980
Phase 2 (subject to funding)
$ 259,100 $ 16,520
• RFP for complete system – finalize Phases 1 and 2 through negotiation
Cost Estimate for Technology Vision
14
WATA CAD/AVL System - Costs Estimate Capital Cost O&M Annual Cost
ItemInstalled Quantity
Installed Unit Cost
Total Installed
Cost Spare
Quantity Spare
Unit Cost Total
Spare Cost Software
Cost Total
Equipment Repair /
Replacement
Software License / Support Other Total
CapitalOnboard EquipmentOnboard Computer w/ GPS Receiver and Cell Data Card 28 4,000$ 112,000$ 3 2,700$ 8,100$ 120,100$ $4,480 $4,480Mobile Data Terminal 28 3,000$ 84,000$ 3 2,000$ 6,000$ 90,000$ $3,360 $3,360Automated Passenger Counter 25 2,500$ 63,000$ 3 1,700$ 5,100$ 68,100$ $2,520 $2,520Automatic Vehicle Announcement (AVA) Equipment 25 2,000$ 50,000$ 3 1,300$ 3,900$ 53,900$ $2,000 $2,000Central SystemServers and Workstations 10,000$ 10,000$ $400 $400Fixed Route CAD/AVL Software 45,000$ 45,000$ $4,500 $4,500Mobile Data Communications Gateway Software 18,000$ 18,000$ $1,800 $1,800Automated Passenger Counter Software 15,000$ 15,000$ $1,500 $1,500Automatic Vehicle Announcement Software 15,000$ 15,000$ $1,500 $1,500Fixed Route Scheduling Software w/ Pullout Management Functionality 35,000$ 35,000$ $3,500 $3,500Paratransit Scheduling and Dispatch Software 35,000$ 35,000$ $3,500 $3,500Real-Time Information Software (Arrival Prediction, IVR, DMS Management) 70,000$ 70,000$ $7,000 $7,000Real-Time Information Website 10,000$ 10,000$ $1,000 $1,000Real-Time Data Feed 5,000$ 5,000$ $500IVR Integration with Existing Telephone System Infrastructure 30,000$ 30,000$ $0Wayside EquipmentFlat Panel Variable Message Signs (VMS) 2 3,000$ 6,000$ 6,000$ $240 $240
Totals 355,000$ 23,100$ 248,000$ 626,100$ Annual O&MCellular Data Accounts 28 5 MB/mth plan with estimated annual cost @ 240$ $6,700 $6,700Agency Incremental Staffi ng 0.5 FTE @ 80,000$ $40,000 $40,000
$13,000 $24,800 $46,700 $84,5002-Year Warranty (5%) 31,300$
Project Management, Training/Documentation (20%) 125,200$ Subtotal 782,600$
20% Contingency 156,500$ Total Capital Cost 939,100$ Total Annual O&M Cost $84,500
Number of Fixed Route Vehicles 25Number of Paratransit Vehicles 3Total Vehicles 28Fraction of Fleet equipped with APCS 100%Total Stop Displays 2
Intelligent Transportation System Planning May 18th, 2011
Williamsburg Area Transit Authority
15Williamsburg Area Transit Authority
Phase 1
Intelligent Transportation System Planning May 18th, 2011
Onboard EquipmentOnboard computer with GPS receiver and Cell Data CardMobile Data Terminal
Central SystemServers and WorkstationMobile Data Communication Gateway SoftwareFixed Route Scheduling Software with Pullout ManagementParatransit Scheduling and Dispatch SoftwareReal-Time Information SoftwareReal-Time Information WebsiteReal-Time Data Feed
Operations and ManagementCellular Data AccountsAgency Incremental Staffing
16Williamsburg Area Transit Authority
Phase 2
Intelligent Transportation System Planning May 18th, 2011
Onboard EquipmentAutomated Passenger Counters (APC)Automatic Vehicle Announcement (AVA)
Central SystemAPC SoftwareAVA Software
Wayside EquipmentFlat Panel Variable Message Signs
Operations and ManagementAgency Incremental Staffing
17Williamsburg Area Transit Authority
Schedule for Phase 1
Intelligent Transportation System Planning May 18th, 2011
18Williamsburg Area Transit Authority
Job Description Changes
Intelligent Transportation System Planning May 18th, 2011
DriversUse of terminal – log-in, messaging
Dispatch/ Customer ServiceSoftware operation
Supervisor/PlannerSoftware planning and daily management toolsConsolidated data entry
Maintenance and SupportAdditional effort for IT support (e.g., servers, workstations, networks, applications and data)Additional bus equipment maintenanceOptions:
Outsource IT SupportDedicated IT and maintenance staff personCross-train 2 or more personnel for redundancy