Name & Address Issues raised by the Response/Commitment of...

22
Date of Advertisement 05.12.2015 Newspapers in which the advertisement appeared Prabhat Khabar Date of public hearing (DD/MM/YYYY) 05.01.2016 Summary/details of public hearing in tabular form SN Name & Address Issues raised by the Public Response/Commitment of Project Proponents 1 Sri Bannu Mahto, Village - Baidkaro Proposed karo washery falls under Palmu panchayat. Land verification work is pending. He requested for the quick verification work. Arrangement of drinking water, road, electricity etc was requested by him. Verification work is going on. Assurance for pure drinking water, road, electricity etc was given. 2 Sri Hari Mahto, Panchayat representative, village - Palmu The implementation of the provisions of the public hearing report should be properly done. Arrangement for drinking water, education, medical etc. for the villager should be done. Employment to local people should be given. Provision made in the technical presentation should be taken care of. Arrangement for medical facility is being done in the hospital of CCL under CSR schemes. Arrangement for drinking water will be strengthen. 3 Sri Ranjit Mahto, Village Karo Basti Repair work of the road of Karo should be done. Employment of the local people in the outsourced company should be increased. Repair of the damaged road will be done. Outsource company has employed the local youth according to the requirement and the qualification of the youth. For more employment interaction with the outsource company will be done. 4 Sri Jhari lal Hasda, Village - Karo The basic facility should be provided for the villagers of the Charakpaniya, Kuri, Palmu, Karo, Baidkaro etc. Development work in the surrounding villages is being done with CSR & CD fund. The company is committed for providing basic facilities. 5 Sri Ashok Kumar, Ward member, No- 6,Subhash nagar The Project affected villagers should be give benefit. Top soil should be preserved. Preserved soil should be spread over reclaimed land after extraction of coal and the same land should be return to the villagers. Participation of the public representatives should be insured in the CSR meeting. Identity card of the project affected villagers is being prepared for the villager who have not been given employment.

Transcript of Name & Address Issues raised by the Response/Commitment of...

Page 1: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

Date of Advertisement 05.12.2015 Newspapers in which the advertisement appeared

Prabhat Khabar

Date of public hearing (DD/MM/YYYY) 05.01.2016 Summary/details of public hearing in tabular form

SN Name & Address Issues raised by the Public

Response/Commitment of Project Proponents

1 Sri Bannu Mahto, Village - Baidkaro

Proposed karo washery falls under Palmu panchayat. Land verification work is pending. He requested for the quick verification work. Arrangement of drinking water, road, electricity etc was requested by him.

Verification work is going on. Assurance for pure drinking water, road, electricity etc was given.

2 Sri Hari Mahto, Panchayat representative, village - Palmu

The implementation of the provisions of the public hearing report should be properly done. Arrangement for drinking water, education, medical etc. for the villager should be done. Employment to local people should be given.

Provision made in the technical presentation should be taken care of. Arrangement for medical facility is being done in the hospital of CCL under CSR schemes. Arrangement for drinking water will be strengthen.

3 Sri Ranjit Mahto, Village – Karo Basti

Repair work of the road of Karo should be done. Employment of the local people in the outsourced company should be increased.

Repair of the damaged road will be done. Outsource company has employed the local youth according to the requirement and the qualification of the youth. For more employment interaction with the outsource company will be done.

4 Sri Jhari lal Hasda, Village - Karo

The basic facility should be provided for the villagers of the Charakpaniya, Kuri, Palmu, Karo, Baidkaro etc.

Development work in the surrounding villages is being done with CSR & CD fund. The company is committed for providing basic facilities.

5 Sri Ashok Kumar, Ward member, No- 6,Subhash nagar

The Project affected villagers should be give benefit. Top soil should be preserved. Preserved soil should be spread over reclaimed land after extraction of coal and the same land should be return to the villagers. Participation of the public representatives should be insured in the CSR meeting.

Identity card of the project affected villagers is being prepared for the villager who have not been given employment.

Page 2: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

6 Sri Basant Rai Mukhiya, Village – Palmu

Development work should be done in the tribal dominated villages Barkikuri & Chotkikuri adjacent to the Project. Coal loading should be done manually and the villagers should be given priority in it. Technical education and training arrangement should be done for the youth.

Facilities for the villagers, adjacent to the Project, are being provided. Technical education and training arrangement has been done for the youth at CCL level.

7 Sri Ram charan turi Village – Amlo Basti

In village, land owner and landless people lives. Landless people depends on selling of leaves and datum from the jungle. Land owner should get employment.

All type of landowner and local unemployed people are given opportunity for job as per qualification.

8 Sri Pratap Singh, village - Karo

Many villagers are deprived of employment and other facilities due to late verification of gairmajuwa land. Verification work should be done fast. Few land are such that more than one claimant of ownership of land. Identification of right claimant of land will be done. Separate road for coal transportation from Karo Project should be constructed.

About 90 % of verification work of land owner is completed. Verification of GMK land is going on. Due to more than one claimant on few land created difficulty in identification of right claimant. It is carefully examined so that right owner of the land is identified.

9 Sri Sanjay Bhokatha, ward member, No -4, Karo Basti

Basic facilities should be provided in ST dominated villages Bandukbera.

Development work nearby villages are being done by CCL through CSR and CD fund.

10 Srimati Chinta Devi, member of District Parisad, Kurpaniya

The land owner whose land was acquired do not move here and there. Total development of rural area should be done.

The land owner whose land is verified, they are being provided all facilities as per company provision. Overall development of rural area will be kept in mind.

11 Srimati Archana Singh, ward member, Kargali Bazar

All the works should be done as per given in public hearing document. Arrangement for cleaning, drinking water etc. should be done and representative of people shall be invited in the CSR meeting.

Commitment made during public hearing will be done in toto regarding pollution control.

Page 3: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

12 Sri Prem kumar Mahto, Upperghat, Palmu

Focus should be given on providing drinking water, transport facilities and to reduce noise and air pollution. New pond should be constructed for use of irrigation and livestock. Old existing pond should be revive and check dam should be constructed. Review of the work performed under CSR fund should be done.

Development works viz. construction of pond and their revival, construction of wells and check dam are done under CSR fund in rural areas.

13 Sri Ganesh Mahto, Charakpaniya Basti

In absence of land record, one faces difficulty in the issue of residential and caste certificate. Issue of certificates for displaced persons is required for availing benefits.

Arrangement is being made for the issue of certificates for those displaced persons who have not been provided employment.

14 Sri Rameswar Mahto, Ward member, BaidKaro

Rural road should be connected to main road by metalling the rural road. Rabies injection should be made available in the dispensary.

All rural roads is being connected to main road. State government and CCL---------

15 Sri Iswar Mahto, Baidkaro

Basic facilities should be provided to the villagers.

Basic facilities are being provided to the villagers.

16 Sri Isar Mahto, Karo Basti

Water of Karo Pond has becomes completely polluted. There is scarcity of drinking water for which arrangement should be done and verification of GM land should be done.

Arrangement for the drinking water has been made through pipe lines. Efforts are being made for expediting the work of verification of land.

17 Sri Ram kisun Mahto, Village – barki Kuri

The name of Karo washery should be Barkikuri washery because the proposed washery will be commissioned on the land of Barkikuri. Electricity is available in the half of the village which should be extended to whole village. The paper of the land is submitted to B & K area since 2007. Verification should be done.

The name of any Project or Washery are recommended by DGMS, Proposed washery are recommended in the name of Karo washery.

18 Sri Jugal Kishore Mahto, Bermo Basti

The employment or compensation are not provided on the land acquired earlier. At present, the extension of Krishna Sudarshan central school is being done on raity land whose compensation are not paid.

All the paper related to this land may be deposited in the office. Action has been taken at the earliest.

Page 4: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

19 Sri Amrit Mahto, Baidkaro East Panchayat

Washery should be made but 10 % ownership should be given to Rayat.

Service and compensations are provided to land loser as per land acquisition act and company rule.

20 Sri Abhay kumar sao, Ward no -16

Implementation of the suggestions made in public hearing will ensure no grievance from anyone. Plantation should be done over reclaimed land after the mining is over.

Provisions made for pollution control measures should be adhered to. Provision for plantation over reclaimed land exists.

21 Sri Prakash kumar Mahto, Baidkaro Panchayat

What is provision of one employment against two acre land and who made this provision?

There is provision in Coal India for providing employment and compensation against two acre land.

22 Sri Jibu visvakarma, Karo Basti

Compensations are made to the land owner as the rate of 1984. Compensations should be made at present rate and the whole village should be rehabilitated altogether.

There is provision to take compensation with protest. Land owners can approach court for further justice.

23 Sri Mahendra kumar visvakarma, Subhashnagar

Standard of pollution in the project should be maintained. It should be kept in mind that the land owner gets maximum benefit.

Provisions made for control pollution should be implemented.

24 Sri Kamlesh Tiwari, Representative of Member of parliament, Subashnagar

Local people should be given preference in the employment in the proposed Coal Washery and in Project expansion so that local people may benefited along with Nation, government and the Coal company.

Arrangement for maximum employment of local people in the Company which is engaged in Construction of Coal washery and other works according to their qualifications.

Page 5: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-1

Page 6: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-2

Page 7: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-3

Page 8: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-4

Page 9: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-5

Page 10: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-6

Page 11: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-7

Page 12: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-8

Page 13: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-9

Page 14: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-10

Page 15: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-11

Page 16: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-12

Page 17: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-13

Page 18: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-14

Page 19: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-15

Page 20: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-16

Page 21: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-17

Page 22: Name & Address Issues raised by the Response/Commitment of ...environmentclearance.nic.in/writereaddata/Public... · to main road by metalling the rural road. Rabies injection should

EIA/EMP of Karo OCP. Exp. (11MTY) & Karo Washery (7MTY)

PH-18