Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards...
-
Upload
juliet-blankenship -
Category
Documents
-
view
217 -
download
0
description
Transcript of Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards...
Nam Theun 1 Tender Clarification MeetingContract B, Electro Mechanical Works and Switchyards
February 24th and 26th , 2016Mitsubishi Corporation
Proprietary & Confidential 2
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 3
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Company’s General IntroductionMitsubishi Corporation
Proprietary & Confidential 5
To be prepared by Mitsubishi Corp
Company’s General IntroductionToshiba Corporation
Proprietary & Confidential 7
To be prepared by Toshiba/THPC
Company’s General IntroductionHydroChina
SINOHYDRO BUREAU 14 中国水利水电第十四工程局有限公司
水电站机电设备安装业绩时段 投产发电机组台数(台) 投产发电机组容量( MW)
1957年 -2006年 271 8386.4
2007年 1 700
2008年 7 1120
2009年 8 3200
2010年 13 3488
2011年 3 750
2012年 6 2800
2013年 23 5198.4
截止 2013年底累计 332 25642.8
根据合同工程范围、工作内容、工程量及工期要求,设置现场管理机构,设决策层、管理层和作业层。明确各层级单位、个人的工作任务分工和管理职能分工。根据进度计划充分考虑各阶段的施工强度及工作内容,合理配置资源,进行人力资源计划及设备进场计划。 项目班子成员由分公司任命,根据需要由分公司抽调人员组成项目管理团队,组织专业队伍完成项目施工任务。 由分公司人力资源部按项目需求调配人力资源分期进场。 由分公司设备物资管理部门按项目需求调配或采购施工设备分期进场。
项目施工组织
典型项目施工组织机构图
用 P3EC编制进度计划,编制过程中加载工作面移交、设备到货、节点目标等限制条件,并按设备安装调试流程、工位占用、工装配置等要求设置逻辑关系,保证总进度计划的合理和科学。 采取科学合理的施工强度指标和人性化管理模式排定施工日程,注意维护职工身心健康,实现均衡生产和文明施工,确保工程的施工质量和安全生产。 分公司技术管理部门为项目总进度计划监控责任部门。
项目总进度计划编制
逐年、月、周分解进度计划,按计划配置资源,完成技术准备,安排生产任务。 在任何一个限制条件发生变化时及时更新,重新计算进度,及时调整,保证计划的真实。 每月在根据进度完成情况进行计划进展对比,根据对比结果确认进度是否受控,必要时采取措施进行调整,以保证总目标工期。
项目进度控制
根据合同约定的技术标准规范要求、设计要求、制造厂要求编制施工方案并经过相关审批。 常用的标准系列有: GB、 DL、 GBJ、 SD、 SDJ、 JB、 AISI、 ANSI、
ASME、 ASTM、 IEEE、 IEC、 ISO、 OSHA、 NEMA、 NFPA、 DIN等。
项目技术管理
按照 GB/T 19001-2008、 GB/T 24001-2004、 GB/T 28001-2011和 GB/T 50430-2007标准及过程模式建立质量、环境与职业健康安全管理体系,形成质量、环境与职业健康安全管理手册及其程序文件,加以实施和保持,并通过日常监测、内部审核和管理评审,确保管理体系持续适用和持续改进。
按业主要求及企业要求确定项目质量目标。 明确各级、各岗位人员质量职责,实行全面质量管理。 实体工程施工过程实行“三检制”,保证产品质量。 提前策划,改进外观质量。 对定子下线、 GIS安装调试、机组回装等区域实行封闭管理。执行出许可审批制度进、进出登记制度、进入封闭区域作业人员特殊劳保配置制度,封闭区域监控管理制度。 机组起动前,在业主、监理、设计联合检查前,由分公司组织专家组进行专项检查。
项目质量管理
Proprietary & Confidential 17
To be prepared by HydroChina
Proprietary & Confidential 18
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Project Organization
Proprietary & Confidential 20
To be prepared by Toshiba/THPC
Site Organization
Proprietary & Confidential 22
To be prepared by HydroChina
Proprietary & Confidential 23
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Project Execution Plan
Proprietary & Confidential 25
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Turbine
Proprietary & Confidential 27
To be prepared by Toshiba/THPC
Proprietary & Confidential 28
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Generator
Proprietary & Confidential 30
To be prepared by Toshiba/THPC
Proprietary & Confidential 31
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Proprietary & Confidential 34
To be prepared by HydroChina
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Proprietary & Confidential 36
To be prepared by HydroChina
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Proprietary & Confidential 38
To be prepared by HydroChina
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Proprietary & Confidential 40
To be prepared by HydroChina
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Proprietary & Confidential 42
To be prepared by HydroChina
Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
Proprietary & Confidential 44
To be prepared by HydroChina
Proprietary & Confidential 45
Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC
2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant
a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation
8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 46
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organization 工地 (现场 )管理组织c) Construction / Installation Scheduled) Interface management 接口管理Plan with other contractorse) Site Equipment 工地施工机械 / Toolf) Erection Bay Schedule 安装附表 Manpower Schedule 人力资源调度
Proprietary & Confidential 48
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
水轮机安装流程
Nam Theun 1 Hydropower Project
Turbine Installation Procedure
发电机安装流程Generator Installation Procedure
Nam Theun 1 Hydropower Project
Nam Theun 1 Hydropower Project
现场组织机构Site Organiation
Nam Theun 1 Hydropower Project主要设备安装进度计划
Main Equipment Installation Programme NO. Project Name
Unit 3# Unit 1# Unit 2#Start Time End Time Start
Time End Time Start Time End Time
1 桥机安装 bridge crane installation 2018-7-16 2018-11-12 2 尾水管安装 draft tube installation 2018-2-10 2018-3-18 2018-3-24 2018-5-12 2018-5-13 2018-7-21
4 座环蜗壳安装 stay ring and spiral case installation 2018-5-1 2018-8-20 2018-8-1 2019-1-8 2018-10-2 2019-2-24
5 混凝土浇筑至发电机层 pouring the concrete to generator layer
2019-1-12 2019-7-7 2019-8-8
6 导水机构预装 water distributor pre-assembly 2019-2-27 2019-4-2 2019-8-11 2019-9-9 2019-9-18 2019-10-17
7 转轮大轴吊入机坑 lift the runner main shaft to generator pit
2019-5-3 2019-5-12 2019-10-10 2019-10-19 2019-11-17 2019-12-1
8 定子组装、下线 stator winding installation and stator assembly
2019-1-11 2019-7-19 2019-4-11 2019-10-27 2019-10-28 2020-5-4
9 转子组装、磁极挂装 rotor assembly,magnetic pole suspending
2019-2-10 2019-6-9 2019-5-11 2019-9-7 2019-11-27 2020-3-25
10 下机架安装 lower bearing bracket installation 2019-7-30 2019-8-5 2019-7-18 2019-8-1 2019-8-26 2019-9-10
11 转子吊入机坑 lift the rotor to generator pit 2019-9-13 2019-9-19 2020-1-13 2020-1-19 2020-7-8 2020-7-14
12 上机架安装 upper bracket installation 2019-9-27 2019-10-3 2020-1-27 2020-2-5 2020-7-22 2020-7-31
13 机组盘车 turning gear 2019-10-4 2019-10-24 2020-2-6 2020-3-6 2020-8-1 2020-8-21
14 水轮发电机设备安装完成 completion of water turbine generator installation
2019-12-6 2020-4-24 2020-10-9
15 蜗壳进口蝶阀安装 installation of spiral case inlet butterfly valve
2018-4-23 2018-9-26 2019-7-8 2019-10-5 2019-8-9 2019-12-26
16 机组静态调试 static debug 2020-6-20 2020-7-4 2020-7-25 2020-8-23 2020-10-3 2020-10-31
17 机组动态调试 dynamic debug 2020-7-5 2020-7-14 2020-8-24 2020-9-7 2020-11-1 2020-11-15
18 机组投产发电 unit put into operation 2020-7-24 2020-9-22 2020-12-1
Nam Theun 1 Hydropower Project安装主要设备及工具(二)
Main Equipment and Tools of Installation(2)
No. Equipment Name Type and specification quantity
四、焊接设备 welding equipment
1远红外线自控两用焊条烤箱far-infrared ray automatic control dual purpose welding rod oven
YZH2—151型 4 sets
2 温控仪 Temperature Controller LWK—360 4 sets3 逆变焊机 Inverter welding machine YD-400AT 60 sets4 逆变焊机 Inverter welding machine ZX7-630S 10 sets6 氩弧焊机 argon arc welding machine AX7-500 6 sets7 气刨机 Gouging Machine 800A 4 sets8 气体保护焊机 gas shielded welding machine KEMPPIMIG500 10 sets9 铝母线焊机 Aluminum bus bar welding machine 2 sets
五、弯管及加工设备 elbow and processing equipment1 牛头刨床 Shaper/ shaping machine B650 1 set2 普通车床 common lathe CW6110V 1 set3 管子套丝机 pipe diehead threading machine EIT80 0.75kW 1 set4 弯管机 pipe bending machine DWG 1 set5 手动弯管机 hand bender 2 sets6 弓锯床 hacksaw machine 1 set7 摇臂钻床 radial drilling machine Z3080HX25 1 set8 自动液压弯管机 Automatic Hydraulic pipe bender DWQJ-G108 3 sets9 空压机 air compressor V-1.2/12.5 3 sets
10 空压机 air compressor UP5-22-10 3 sets11 磁座钻 magnetic drill press 32mm 2 sets12 磁座钻 magnetic drill press 49mm 1 set13 电动试压泵 Motor-driven pressure test pump DSY-35 3 sets
Nam Theun 1 Hydropower Project安装主要设备及工具(一)
Main Equipment and Tools of Installation(1)No. Equipment Name Type and specification quantity
一、测量设备 measure equipment1 水准仪 level DSZ2 1 set2 电子水平仪 electronic level DEG-1 1 set3 全站仪 total station TCR1201 1 set4 内径千分尺 inside micrometer 150~3000mm 1 hand5 外径千分尺 outside micrometer 150-6000mm 2 hand6 框式水平仪 Frame leveler 0.02mm/m 8 PCS7 百分表 dial gage 0-10mm 30 PCS
二、探伤、特殊工器具 flaw detection, Special instruments
1便 携 式 声 定 位 超 声 波 C 扫 描 探 伤 系 统(TOFD)Portable Acoustic positioning ultrasonic C Scan detection system
ISionic STAR 1 set
2 便携式磁力探伤仪 Portable magnetic flaw detector BT-910PA 1 set三、起重运输设备 Hoisting and transport equipment
1 卷扬机 winch 20t 1 set2 卷扬机 winch 10t 2 sets3 卸扣 Shackle 55t 2 pc4 卸扣 Shackle 35t 6 pcs5 卸扣 Shackle 10t 10 pcs6 千斤顶 jack 50t、 32t、 16t 各 6 pcs7 汽车吊 truck crane 300t、 120t 各 1 pc8 汽车吊 truck crane 50t 1 vehicle9 汽车吊 truck crane 16t 1 vehicle10 平板拖车组 platform trailer 120t 1 vehicle11 平板拖车组 platform trailer 60t 1 vehicle12 平板拖车组 platform trailer 40t CWA54HTIZ 1 vehicle13 载重汽车 heavy truck 18t 2 vehicles14 液压叉车 Hydraulic Fork Lift 10t、 3t 2 vehicles15 手动叉车 hand fork lifter 2t、 3t、 5t 2 vehicles16 客车 car 45 SET 1 vehicle17 金龙小客车 Kinglong passenger car KLQ6601E 1 vehicle18 小型客车 minibus 17 SET 3 vehicles19 重庆五十铃 Chongqing Isuzu NHR55ELWXS 1 vehicle20 皮卡车 pickup 2 vehicles
Nam Theun 1 Hydropower Project
人力资源计划Human Resouce Planning
年Year
季度quarter
水轮机工turbine worker
发电机工generator
worker
辅机工auxiliary worker
电工Electrici
an铆工
riveter焊工
Welder起重工
craneman
无损检测NDT
试验test
驾驶员operator
机加工machining
半熟练工semiskilled
worker
合计total
20163 0 0 2 3 6 2 2 1 0 2 0 10 284 5 0 2 3 6 4 2 1 0 2 0 20 45
2017
1 8 0 4 4 6 4 3 1 0 3 0 30 63
2 10 0 4 4 10 6 3 1 0 5 0 30 73
3 10 4 6 4 10 6 3 2 2 6 0 30 83
4 10 8 4 5 10 16 3 2 2 6 0 30 96
2018
1 16 10 2 5 10 16 3 2 3 6 2 40 115
2 16 16 4 12 8 16 3 2 3 6 2 50 138
3 20 16 8 15 8 16 3 2 3 8 2 50 151
4 20 16 10 15 8 12 5 2 4 8 2 70 172
2019
1 20 20 10 20 3 6 9 2 6 8 2 70 176
2 20 24 10 20 3 6 9 2 6 8 2 70 180
3 20 24 10 25 3 6 9 2 6 8 2 70 185
4 20 24 10 30 3 6 9 2 6 8 2 70 190
2020
1 20 24 10 30 3 6 9 2 10 8 2 70 194
2 20 24 10 30 3 6 9 2 10 8 2 70 194
3 16 20 10 24 2 6 9 1 10 8 2 60 168
4 14 16 6 13 2 4 5 1 10 6 2 50 129
Total 265 246 122 262 104 144 98 30 81 114 24 890 2380
Proprietary & Confidential 57
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organization(现场 )管理组织c) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 59
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 61
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 63
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 65
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule
Proprietary & Confidential 67
To be prepared by HydroChina
Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule 人力资源调度
Proprietary & Confidential 69
To be prepared by HydroChina
Thank you